Lesson - 3.7 - Project 01 - Measure Phase - Forklift Process (Contd.)

The document outlines a case study for a Lean Six Sigma Green Belt certification course, focusing on the Measure phase of the DMAIC process. It details the collection and analysis of data related to forklift billing, identifying defects and their frequencies, with a primary focus on serial number mismatches. The project scope is refined based on findings, and a new Sigma Level is calculated to measure performance improvements.

Uploaded by

Abdullah Sasy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
23 views12 pages

Lesson - 3.7 - Project 01 - Measure Phase - Forklift Process (Contd.)

The document outlines a case study for a Lean Six Sigma Green Belt certification course, focusing on the Measure phase of the DMAIC process. It details the collection and analysis of data related to forklift billing, identifying defects and their frequencies, with a primary focus on serial number mismatches. The project scope is refined based on findings, and a new Sigma Level is calculated to measure performance improvements.

Uploaded by

Abdullah Sasy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 12

Lean Six Sigma Green Belt

Certification Course
Measure Phase: Project (Contd.)
Case Study

This case study is a project simulation. As we complete each Phase of the DMAIC (Define, Measure,
Analyze, Improve, and Control) process, different aspects of the case study will be presented to you.
You will be given background information, instructions, data sets, project updates, and all necessary
information to work through each step of the project and answer questions.

Note:
You will be using only some of the DMAIC tools and techniques in the case study to practice solving
a single problem.

The provided solutions are not the “perfect” answers; they are only one of many potential solutions.
DMAIC Phase 2: Measure

Project Update: Collecting Data


Your team has completed the Define phase. A SIPOC map was created to show high level process
flow. Critical Quality Characteristics (CTQs) were identified, and an operational definition of billing
defects was created."
To help them understand how the current forklift billing process works, your team obtained a copy
of every invoice from all the vendors for a month from E/P. They also got a copy of the fleet report
from MO for the same month. The team must now investigate the current process.
DMAIC Phase 2: Measure

Project Update: Baseline Performance


Your team has collected 5,026 invoices for the selected month. Each invoice represents one month’s
lease agreement and service contract for an individual forklift. They compared the invoices to the
fleet report to identify discrepancies and decided to look at all invoices for the month instead of a
sample.
After collecting the data and compiling the results, your team identified 2,412 defects.
DMAIC Phase 2: Measure

Project Update: Defect Frequency


Your team matched all forklift invoices to the fleet report to determine the defects and their
frequency. They assigned a letter code for each defect as a quick identifier. The letter codes are
presented in the table below along with the defect frequency.

Code Defect Type Frequency


A Invoice is for incorrect amount 68
B Invoice sent to wrong location 75
C Invoice serial number is incorrect 54
D Invoice is late 134
E Fleet report amount differs from invoice 202
F Fleet report has incorrect location 296
G Fleet report is missing description 280
H Fleet report serial number doesn’t match invoice serial number 1303
DMAIC Phase 2: Measure

Measure Phase Questions


1. What is the goal or objective of the Measure Phase?
2. Based on the definition of defect(s) identified in the Define Phase, what are the defect
opportunities for each forklift charge/invoice?
3. Calculate the current process Sigma Level for the forklift billing process based on the number of
identified defect opportunities.
4. After creating a Pareto Chart, identify the primary defect(s) and your next steps.
DMAIC Phase 2: Measure

Measure Phase Answers


1. The purpose of the Measure phase is to gather as much data about the process as possible to
better understand the current situation.
2. Defect opportunities include location, accurate charges, and serial number agreement.
3. Based on the opportunities listed, here is the calculation for the process Sigma Level:

Step Equation Result


Determine number of defect opportunities per unit O= 3
Determine number of units processed N= 5026
Determine total number of defects made D= 2412
Calculate defects per opportunity DPO = D / (N X O)= 0.1599682
Calculate yield Yield = (1-DPO)*100 84.00
Sigma Level from Sigma conversion table process sigma = 2.495
DMAIC Phase 2: Measure

Measure Phase Answers


4. The primary defect code is H which indicates the number of times the fleet report and invoice
serial numbers do not match (code H), as shown in the Pareto Chart. The team should use the
information to focus the scope of the project on minimizing this defect type.
DMAIC Phase 2: Measure

Project Update: Redefining Project Scope


You arrange to meet your Champion to present your team’s findings so far. From the Pareto charts,
you conclude the primary defect is the mismatch of the fleet report serial number with the invoice
serial number. Because of the high occurrence of this defect, your Champion narrows the scope of
the project to improve the match of the serial numbers in the fleet records to the vendor bills.
DMAIC Phase 2: Measure

Measure Phase Questions


5. Based on the new scope, how will you describe the defect and how many defect opportunities
exist per charge?
6. Recalculate process Sigma Level from the new defect definition. This value will be your process
baseline to measure the improvements in performance.
DMAIC Phase 2: Measure

Measure Phase Answers


7. The new defect definition is any invoice serial number that does not match the company and
vendor records. This is now one defect opportunity per unit.
8. Based on the change in scope, the new project Sigma Level is calculated as shown here:

Step Equation Result


Determine number of defect opportunities per unit O= 1
Determine number of units processed N= 5026
Determine total number of defects made D= 1303
Calculate defects per opportunity DPO = D / (N X O)= 0.25925189
Calculate yield Yield = (1-DPO)*100 74.07
Sigma Level from Sigma conversion table Process sigma = 2.146

In the Measure Tollgate, your Champion sets a goal for the project team of 3.0 Sigma Level based on
your updated baseline calculation.