This document is a Bill of Quantities for the construction of a B+G+8 mixed-use building for Bankii Sinqee, prepared by ETG Designers and Consultants. It details various construction activities, including earth moving, concrete work, and masonry, along with their respective quantities, rates, and total amounts. The total estimated cost for the listed activities amounts to 60,918,657.04 Ethiopian Birr.

Uploaded by

hamteshnig
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2 views

Sinqee Boq Final

This document is a Bill of Quantities for the construction of a B+G+8 mixed-use building for Bankii Sinqee, prepared by ETG Designers and Consultants. It details various construction activities, including earth moving, concrete work, and masonry, along with their respective quantities, rates, and total amounts. The total estimated cost for the listed activities amounts to 60,918,657.04 Ethiopian Birr.

Uploaded by

hamteshnig
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 242

BILL OF QUANTITIES

FOR

BAANKII
BAANKII SIINQEE
SIINQEE

FOR

B+G+8 MIXED USE BUILDING

PRICED

Designers & Consultants Sh.Co


Architects, Engineers, Planners & Assoc
Tel. 251-115- 54-88-60
Fax: 251-115-54-14-47
P. O. Box 12756 Addis Ababa, E
Email:[email protected]
Info@ etgdesigners.net
Web Site: www.etgdesigners.

MARCH, 2023
Addis Ababa
Ethiopia
B+G+8 Mixed Use Building

Item no Description Unit Quantity Rate Amount

1 DIVISION -31 EARTH MOVING


1.1 Shoring and Related Works
1.1.1

Mobilization of staff and equipment for piling foundation anchoring,


Shoot erecting, excavation and complete shoring system design as per
the site geotechnical investigation report.
Design,
supply & Install vertical support of Excavations.Design is to be
performed by qualified specialty engineer who has ample experience in
designing of support of excavation and whose design have been installed
with successful performance. The supply and installation shall include
but not limited to reinforced bored cast in situ piles including concrete
and reinforcement, permanent grouted anchors including all accessories,
proof testing of working anchors to a test load of 60tons and reinforced
shot-Crete membrane to be installed between shoring piles
The works shall include

Drilling of piles of required diameter in all soil formations including


boulders and rock socket application.

Supply and instalation of reinforcement for bored cast in situ piles.


Supply and instalation of required diameter piles including supply of
pumpable filling Concrete, installation and pouring of Concrete with
tremie method and crane.
Installation of inclined temporary grouted body with grouting mix and
anchor heads incl. Supply of material,anchor stands grouting pipe and
anchor head.
Proof test anchors according to DIN 4014

Perform Shotcrete membrane between installed reinforced concrete


piles, thickness of 20cm approx.
The total gross vertical area M2 201.60 3,000.00 604,800.00
1.20 Site Cleaning
1.2.1 Clear and remove top soil not exceeding 200mm. M2 1,314.53 50.00 65,726.50
1.30 EXCAVATION AND GATE OUT
Bulk excavation in ordinary soil to reduce level to the depth of
1.3.1 1500mm. M3 1635.00 242.00 395,670.00

Ditto to item No 1.3.1 but exceeding 1500mm but not exceeding


1.3.2 3000mm. M3 1417.00 290.00 410,930.00

Pit excavation in ordinary soil from reduce level to the depth of


1.3.3 1500mm. M3 1385.05 433.00 599,726.65

Ditto to item No 1.3.3 but exceeding 1500mm but not exceeding


1.3.4 3000mm. M3 969.54 469.00 454,714.26

Trench excavation in ordinary soil from reduce level to the depth of


1.3.5 1500mm. M3 15.00 433.00 6,495.00

Fill around foundation and around imported selected material from site
1.3.6 waste well rolled and compacted in layers not exceeding 200 mm thick. M3 0.00

Client :Bankii Sinqee Page 2 of 242 ETG Designers and consultants Sh.Co
B+G+8 Mixed Use Building

Item no Description Unit Quantity Rate Amount

Fill under hard core with imported selected material from quarry waste
1.3.7 well rolled and compacted in layers not exceeding 200 mm thick. M3 1749.11 1,331.00 2,328,068.07

Load and cart away surplus excavated material to an appropriate tip


1.3.8 within 15km. M3 5684.50 166.00 943,626.34

250mm thick Basaltic or equivalent stone hard core well rolled


1.3.9 consolidated and blinded with crushed stone. M2 751.21 500.00 375,606.50

TOTAL CARRIED TO SUMMARY ................................................... 6,185,363.32

2 DIVISION -3 CONCRETE
B-SUB STRUCTURE
2.1 CAST-IN-PLACE CONCRETE
50 mm thick lean concrete quality C-5, with minimum cement content
2.1.1 of 150 kg /m3, of concrete:

a) Under Footing pad M2 628.55 435.00 273,419.25

b) Under basement Slab M2 39.41 435.00 17,143.35

Reinforced concrete Class C-30,with minimum cement content of 420


kg of cement/m3 filled in to form work and vibrated around rod
2.1.2 reinforcement.(Formwork and reinforcement measured separately)
a) In Foundation column M3 28.43 12,005.11 341,305.14
b) In Basement Cloumn M3 53.79 12,005.11 645,754.61
c) In Shear Wall& Lift Shaft Shear wall M 3
27.91 12,005.11 335,062.49
d) In RC Retaining Wall M 3
151.06 12,005.11 1,813,491.20

Reinforced concrete Class C-25/30,with minimum cement content of


360kg of cement/m3 filled in to form work and vibrated around rod
2.1.3 reinforcement.(Formwork and reinforcement measured separately)

a) In Footing pad M3 510.61 11,302.81 5,771,330.12


b) In Basement beam M 3
48.04 11,302.81 542,987.21
c) In Ground floor beam M 3
55.79 11,302.81 630,630.93
d) In 100mm thick Basment floor slab. M2 751.21 1,130.28 849,082.12
e) In 180mm thick Ground floor slab. M 2
667.02 2,034.51 1,357,048.46
f) In Stair Case and Landing M 3
3.18 11,302.81 35,999.46
g) In Ramp beam M3 5.24 11,302.81 59,226.75
h) In 180 mm Ramp Slab M 2
11.29 2,034.51 22,969.58
i) In Enterance Stair M 3
1.76 11,302.81 19,892.95
j) In Enterance Ramp M3 2.18 11,302.81 24,640.14

2.2 CONCRETE FORMWORK


Provide, cut and fix in position sawn structural wood or steel formwork
2.2.1 which ever is appropriate;

a) To Footing pad M2 524.60 901.00 472,664.60


b) To Foundation column M 2
134.99 995.00 134,315.05
c) To Basement Column M2 292.15 995.00 290,689.25
d) To Lift Shaft Shear Wall M 2
188.98 1,027.29 194,137.27

Client :Bankii Sinqee Page 3 of 242 ETG Designers and consultants Sh.Co
B+G+8 Mixed Use Building

Item no Description Unit Quantity Rate Amount

e) To RC Retaining Wall M2 1007.06 1,027.29 1,034,542.70


f) To Basement floor beam M 2
320.24 1,048.00 335,611.52
g) To Ground floor beam M 2
386.83 1,048.00 405,397.84
h) To Ground floor slab. M2 690.50 1,098.00 758,164.61
J) To Stair Case And Landing M2 15.29 1,027.29 15,707.26
k) To Ramp beam M2 34.54 1,048.00 36,197.92
l) To Ramp Slab M 2
62.70 1,027.29 64,411.09
m)To Enterance Stair M2 12.53 1,027.29 12,871.94
n)To Enterance Ramp M 2
16.20 1,027.29 16,642.10

2.3 STEEL CONCRETE REINFORCEMENT


Mild steel reinforcement ,S- 500 according to structural drawing. Price
includes cutting, bending, placing in position , tying wire, concrete
2.3.1 spacers and reinforcement bar chairs.

a) Dia 6 mm plain bar Kg 2,974.72 165.00 490,828.78


b) Dia 8 mm deformed bar Kg 0.00 165.00 0.00
c) Dia 10mm deformed bar Kg 0.00 165.00 0.00
d) Dia 12 mm deformed bar Kg 0.00 165.00 0.00
e) Dia 14 mm deformed bar Kg 1,265.59 165.00 208,822.33
f) Dia 16 mm deformed bar Kg 241.17 165.00 39,792.57
g) Dia 20 mm deformed bar Kg 73.76 165.00 12,170.18
h) Dia 24 mm deformed bar Kg 0.00 165.00 0.00

B-SUPER STRUCTURE
2.1 CAST-IN-PLACE CONCRETE

Reinforced concrete Class C-30,with minimum cement content of 420


kg of cement/m3 filled in to form work and vibrated around rod
2.1.1 reinforcement.(Formwork and reinforcement measured separately)

a) In Elevation columns M3 339.49 12,584.00 4,272,142.16


b) In Lift shaft shear wall and Shear Wall M 3
193.29 12,584.00 2,432,361.36

Reinforced concrete Class C-25/30,with minimum cement content of


360 kg of cement/m3 filled in to form work and vibrated around rod
2.1.2 reinforcement.(Formwork and reinforcement measured separately)
a) In Floor Beam M3 392.91 11,360.00 4,463,457.60
b) In Top Tie Beam M 3
18.06 11,360.00 205,161.60
c) In 180mm thick Floor slab M2 6785.22 2,044.80 13,874,417.86
d) In 180mm Roof slab M2 123.06 2,044.80 251,633.09
e) In staircase and Landing M 3
57.86 11,360.00 657,289.60
f) In Gutter M3 4.46 11,360.00 50,608.80

2.2 CONCRETE FORMWORK

Provide, cut and fix in position sawn structural wood or steel formwork
2.2.1 which ever is appropriate;

a) To Elevation columns M2 2205.57 1,120.00 2,470,238.40


b) To Lift shaft shear wall M 2
1307.67 1,128.00 1,475,051.76
c) To Floor Beam M2 2526.32 1,123.00 2,837,057.36
d) To Top Tie Beam M 2
134.70 1,123.00 151,268.10
e) To Floor slab M 2
7010.51 1,098.00 7,697,539.98

Client :Bankii Sinqee Page 4 of 242 ETG Designers and consultants Sh.Co
B+G+8 Mixed Use Building

Item no Description Unit Quantity Rate Amount

f) To Roof slab M2 136.02 1,098.00 149,349.96


g) To Staircase and landing M 2
434.64 1,128.00 490,273.92
h) To Gutter M 2
65.05 1,123.00 73,046.66

2.3 STEEL CONCRETE REINFORCEMENT


Mild steel reinforcement ,S- 500 according to structural drawing. Price
includes cutting, bending, placing in position , tying wire, concrete
2.3.1 spacers and reinforcement bar chairs.

a) Dia 6 mm plain bar Kg 167.00 0.00


b) Dia 8 mm deformed bar Kg 5693.19 167.00 950,763.08
c) Dia 10mm deformed bar Kg 1832.68 167.00 153,028.64
d) Dia 12 mm deformed bar Kg 222.35 167.00 18,566.09
e) Dia 14 mm deformed bar Kg 11707.47 167.00 977,573.60
f) Dia 16 mm deformed bar Kg 0.00 167.00 0.00
g) Dia 20 mm deformed bar Kg 29.20 167.00 4,876.63
h) Dia 24 mm deformed bar Kg 0.00 167.00 0.00

2.40 Concrete Ancilary


2.4.1 10x100mm Styrofoam expansion joint filler between Ml 0.00

TOTAL CARRIED TO SUMMARY ................................................... 60,918,657.04


DIVISION -4 MASONARY
3
UNIT MASONARY

Class B, 200mm thick HCB wall with the designed compressive strength
3.1.1 , bedded in cement mortar (1:3).Price shall include mortar bed. M2 2590.14 1,061.00 2,748,135.28

3.1.2 Ditto as Item 3.1.1 but 150mm thick M2 2725.58 944.00 2,572,943.83

3.1.3 Ditto as Item 3.1.1 but 100mm thick M2 477.48 745.00 355,723.65

400mm thick hard trachytic or equivalent roughly dressed stone


masonry foundation wall below ground level bedded in cement mortar
3.1.4 mix ratio (1:3). M3 0.00

3.1.5 Ditto but for exposed part above natural ground level. M3 0.00

TOTAL CARRIED TO SUMMARY ................................................... 5,676,802.77

4 DIVISION -5 METALS

Supply and fix 90cm hand rail to the stair case made from 5mm thick
laminated clear glass and Ø40mm vertical aluminum rail placed c/c
1000mm. Price shall include metal plates and all other necessary works
and materialsneeded for anchorage. Price shall also include one coat of
antirust & syntheticenamel spray paint to metal parts & all other
4.10 necessary accessories needed to complete the work. Ml 289.03 11,000.00 3,179,364.54

Ditto as item no 4.01 but 900mm heigh gurd rail for balcony , open
4.20 down and disable ramp Ml 128.10 11,000.00 1,409,100.00

Supply and fix 20x70 cm aluminum sun shade for the Window as per
the given design with aluminum vertical mullions and horizontal
4.3 transoms , price shall include all the necessary works there to complete. Ml 217.60 3,700.00 805,120.00

Client :Bankii Sinqee Page 5 of 242 ETG Designers and consultants Sh.Co
B+G+8 Mixed Use Building

Item no Description Unit Quantity Rate Amount

4.4 STEEL TRUSS

Supply, fabricate and mount steel truss according to the structural


drawing .Price shall include one coat of antirust and two coats of
synthetic enamel painting and all other necessary accessories to
complete the work.

4.4.1 RHS Truss Upper , Lower chord


a) 60x60x3mm Kg 933.94 268.00 250,294.98

b)40x40x3mm Kg 827.14 268.00 221,672.53

4.4.2 RHS Lattice Purlins


a) 25X25X2mm. Kg 1682.42 268.00 450,888.35

4.4.3 Angle Iron truss to lattice purlin


Size 40X25x25x4mm length 40mm Pcs 60.00 20.00 1,200.00

4.4.4 Bolts with Nuts


a) Dia 20mm J bolt. Dev length=400mm Pcs 48.00 165.00 7,920.00

b) Dia 12mm purlin to truss connection bolt. Pcs 60.00 50.00 3,000.00

4.4.5 Metal plates


a) 2(300x300x5mm) Pcs 12.00 1,816.00 21,792.00

TOTAL CARRIED TO SUMMARY ................................................... 6,350,352.39

5 DIVISION -7 THERMAL AND MOISTURE PROTECTION

Average 100mm thick light weight concrete in mix (1:2:5) cement,


pumice and sand laid over RC roof slab with proper slope towards down
pipe and corners angled at 450 at roof slab connection as shown on the
5.01 detail drawing. M2 207.29 1,287.00 266,782.23

30mm thick smooth finished cement sand screed laid on top of light
weight concrete and gutter in mortar mix (1:3) with proper slope
5.02 towards down pipe. M2 207.29 604.00 125,203.16

Supply,Apply, test and commission Acrylic co-polymers based Elastic


coating, applied as liquid & cures to form a durable, protective Water
proofing membrain, Q-CRYL or equivalent of approved Standards &
quality, for Terrace system including the respective parapet wall, wet
rooms in upper floors and the Lift shaft pit including surrounding wall
systems to a height of 30cm above FFL, as where shown on the
drawings. Unit price shall include all incidential civil works and other
5.03 necessary accesseries there to.
a) Wet Rooms, Balconies & Terraces M2 858 850.00 728,883.50

Client :Bankii Sinqee Page 6 of 242 ETG Designers and consultants Sh.Co
B+G+8 Mixed Use Building

Item no Description Unit Quantity Rate Amount

Apply APP modified & thickness not less than 4mm slated finish Water
Proofing Membrane or compatible equivalent material for concrete
roof slab including surrounding Parapet wall system to a height of the
copping cover as per the manufacturer's instructions and
recommendations. The cost shall include cleaning of all dirt and dust
materials and all incidental works and details of manufacturer. The
work shall be done on sub contractual base with the supplier of the
material which will give material and construction guarantee to the
client .The work shall include all incidential civil works & tasting of
5.04 roof leakage after completion of the work.
a) Flat Roofs & Gutters M2 207.29 650.00 134,738.50

TOTAL CARRIED TO SUMMARY ................................................... 1,255,607.39

6 DIVISION -8 OPENINING
6.1 GLAZED ALUMINIUM CURTAIN WALLS

All doors and window are manufactured from 1.8mm thick anodized
aluminum profile frames. All works should be cut and assembled to
sizes and shaps of the window and door schedule up on submitting work
shop drawing by the contractor. Unit price includes supply and
installation 5mm thick Clear glass, anchor bolts, 3mm thick aluminum
cover plates, cylindrical locks, door stoppers and all other necessary
accessories as per ES 3139 quality requirment to completing the work.

6.1.1 Window
a) Type W1 size: 1500x600mm Pcs 9.00 13,500.00 121,500.00
b) Type W2 size: 2000x600mm Pcs 32.00 18,000.00 576,000.00
c) Type W3 size: 990x600mm Pcs 10.00 8,910.00 89,100.00
d) Type W4 size: 2890x1200mm Pcs 10.00 52,020.00 520,200.00
e) Type W5size: 5200x3600mm Pcs 2.00 280,800.00 561,600.00
f) Type W6 size: 5000x3600mm Pcs 1.00 270,000.00 270,000.00
g) Type W7 size: 5400x3600mm Pcs 2.00 291,600.00 583,200.00
h) Type W9 size: 4200x3600mm Pcs 1.00 226,800.00 226,800.00
i)Type W10 size 5000x10000mm Pcs 2.00 750,000.00 1,500,000.00
j) Type W11 size: 4420x3600mm Pcs 1.00 238,680.00 238,680.00
k) Type W13 size: 1500x1200mm Pcs 24.00 27,000.00 648,000.00
l) Type W14 size: 3990x2800mm Pcs 8.00 167,580.00 1,340,640.00
m) Type W16 size: 5400x2800mm Pcs 19.00 226,800.00 4,309,200.00
n) Type W19 size: 2720x2800mm Pcs 1.00 114,240.00 114,240.00
o) Type W21 size: 6000x2800mm Pcs 1.00 252,000.00 252,000.00
p) Type W 27size: 5880x2800mm Pcs 2.00 246,960.00 493,920.00
q) Type W30 size: 2490x2800mm Pcs 1.00 104,580.00 104,580.00
r) Type W 33 size: 2560x2800mm Pcs 1.00 107,520.00 107,520.00
s) Type W 37 size: 3220x2800mm Pcs 1.00 135,240.00 135,240.00
t) Type W 38 size: 2820x600mm Pcs 8.00 25,380.00 203,040.00
w) Type W 39 size: 2700x1200mm Pcs 1.00 48,600.00 48,600.00
x) Type W 40 size: 2500x1200mm Pcs 1.00 45,000.00 45,000.00
y) Type W 41 size: 1050x600mm Pcs 2.00 9,450.00 18,900.00
z) Type W 42size: 5650x600mm Pcs 1.00 50,850.00 50,850.00
a'') Type W 44 size: 5400x2800mm Pcs 2.00 226,800.00 453,600.00
b'') Type W 45 size: 3530x2800mm Pcs 9.00 148,260.00 1,334,340.00
c'') Type W46 size: 3160x2800mm Pcs 1.00 132,720.00 132,720.00
d'') Type W 49 size: 4200x2800mm Pcs 8.00 176,400.00 1,411,200.00
e'' Type W 50 size: 6050x2800mm Pcs 4.00 254,100.00 1,016,400.00
f'') Type W 55 size: 1500x2000mm Pcs 12.00 45,000.00 540,000.00
g'') Type W 56 size: 3000x650mm Pcs 5.00 29,250.00 146,250.00
h'') Type W 57 size: 1500x650mm Pcs 2.00 14,625.00 29,250.00

Client :Bankii Sinqee Page 7 of 242 ETG Designers and consultants Sh.Co
B+G+8 Mixed Use Building

Item no Description Unit Quantity Rate Amount


i'') Type W 58 size :3630x2000mm Pcs 1.00 108,900.00 108,900.00

6.1.2 Door
a) Type D1 = size:700x2100mm Pcs 74.00 22,050.00 1,631,700.00
b) Type D2 = size: 900x2100mm Pcs 57.00 28,350.00 1,615,950.00
c) Type D3 = size: 1000x2100mm Pcs 1.00 31,500.00 31,500.00
d) Type D4 = size: 1200x2100mm Pcs 2.00 37,800.00 75,600.00

6.1.3 Window Door


a) Type WD1 = size: 5000x10000mm Pcs 1.00 750,000.00 750,000.00
b) Type W5'size: 5200x2800mm Pcs 9.00 218,400.00 1,965,600.00
c) Type W6' size :5000x3600mm Pcs 1.00 270,000.00 270,000.00
d) Type W7' size :5400x3600mm Pcs 1.00 291,600.00 291,600.00
e) Type W8 size: 3530x3600mm Pcs 2.00 190,620.00 381,240.00
f) Type W12 size: 2700x3600mm Pcs 1.00 145,800.00 145,800.00
g) Type W15 size: 3400x2800mm Pcs 2.00 142,800.00 285,600.00
h) Type W17 size: 5850x2800mm Pcs 2.00 245,700.00 491,400.00
i) Type W18 size: 2200x2800mm Pcs 2.00 92,400.00 184,800.00
j) Type W20 size: 3850x2800mm Pcs 1.00 161,700.00 161,700.00
k) Type W22 size: 2500x2800mm Pcs 1.00 105,000.00 105,000.00
l) Type W23 size: 5200x2800mm Pcs 6.00 218,400.00 1,310,400.00
m) Type W 24 size: 5650x2800mm Pcs 2.00 237,300.00 474,600.00
n) Type W 25 size: 5830x2800mm Pcs 2.00 244,860.00 489,720.00
o) Type W 26 size: 2690x2800mm Pcs 2.00 112,980.00 225,960.00
p) Type W 28 size: 2400x2800mm Pcs 2.00 100,800.00 201,600.00
q) Type W 29 size: 2650x2800mm Pcs 2.00 111,300.00 222,600.00
r) Type W 31 size: 5600x2800mm Pcs 5.00 235,200.00 1,176,000.00
s) Type W 32 size: 5450x2800mm Pcs 5.00 228,900.00 1,144,500.00
t) Type W 34 size: 3350x2800mm Pcs 6.00 140,700.00 844,200.00
w) Type W 35 size: 3000x2800mm Pcs 1.00 126,000.00 126,000.00
x) Type W 36 size:4420x2800mm Pcs 2.00 185,640.00 371,280.00
y) Type W 43 size: 5000x2800mm Pcs 24.00 210,000.00 5,040,000.00
z) Type W 47 size:4250x2800mm Pcs 1.00 178,500.00 178,500.00
a'') Type W48 size: 5800x2800mm Pcs 1.00 243,600.00 243,600.00
b'') Type W 51 size: 4650x2800mm Pcs 4.00 195,300.00 781,200.00

Supply and fix Fire resistance Bristol door of rating of 120 minute as
per the architectural schedule,FLS and NFPA , made of frame 45mm
thick metal door – frame sheet 2.0 mm thick GI sheet visible seam-leaf
sheet material 1.5 mm thick G.I steel – door silencer 2 No’s rubber
bumpers supplied – frame jamb depth up to 150 mm, single rebated
frame-finish polyster powder coated at factory finish match leaf. price
shall include all the necessary fixing accessories and approved quality
fire resistant 6.5mm vision panel, inturnescent strip/cold smoke seal,
kick plate, door closer, lock, (product data, shop drawings, material type,
color, size, pattern and BS/UL10Cshall be reviewed/approved by
6.2 architect prior to any purchase.
a) Type D5 size: 2000x2100 mm PCs 12.00 720,000.00 8,640,000.00

Curtain walls

Client :Bankii Sinqee Page 8 of 242 ETG Designers and consultants Sh.Co
B+G+8 Mixed Use Building

Item no Description Unit Quantity Rate Amount

Supply and fix semi- structural of appropriate section to safely bear the
expected load and curtain wall made of double glazed continuous
horizontal panel or glass bearing units with profile dimensions 1.8mm.
The units are composed of a frame with horizontal perimetral profiles
able to mechanically restrain the glass panel by inserting an external
glass beading profile and vertical profiles that enable the glass to cover
the profiles. The materials to be used are high quality, anodized
aluminum profile frames with 5mm thick black tinted glass openable
window and sealant, as per the engineers approval. Price shall include
glass, anchorage, sealant and all the necessary accessories needed to
6.30 finish the workin comply to BS5516

a) Type CW 1 size: 14600x8000mm M2 120.67 25,000.00 3,016,750.00


b)Type CW 2 size: 27000x12400mm M2 152.67 25,000.00 3,816,750.00
c)Type CW 3 size :8470x12400 mm M 2
87.80 25,000.00 2,195,000.00

TOTAL CARRIED TO SUMMARY ................................................... 56,617,620.00

7 DIVISION -9 FINISHES
7.1 PLASTERING

Apply two coats of plastering in cement mortar (1.3) for internal wall
Surface to comply with the requirements of ES 1487. All wall concrete
7.1.1 structure joints shall be well treated to avoid hairline cracks.

a) To all internal wall surface M2 7754.75 454.00 3,520,657.03


b) To all External wall Surface M2 2402.04 513.00 1,232,245.83
c) To exposed columns,Beam & Shear wall M 2
4596.08 508.00 2,334,809.66
d) To RC ceiling & Stair case M 2
4582.30 508.00 2,327,807.89
e) To receive ceramic wall tile internal wall M2 1429.60 454.00 649,037.97

Apply approved gypsum plaster with a minimum thickness of 3mm


over the 2nd coat plastered surface to internal wall.Work and cost
includes:- preparing the surfaces , preparing every working materials
etc.Application shall be done after well cured the plasterd surface and as
7.1.2 per the instruction of engineers.
a) To all internal wall surface M2 10228.46 144.00 1,472,897.69
b) To RC ceiling M 2
4582.30 144.00 659,851.06

7.2 TILING & CEILING Work


7.2.1 50mm thick Screed M2 882.34 745.81 658,057.06

7.2.2 Patterned cement trowel Floor Finish M2 19.71 755.81 14,896.99

7.2.3 Ditto as item no 7.01 but 40mm thick


a) To receive ceramic floor tile. M2 600.39 674.90 405,207.25
b) To receive porcline floor tile. M2 7456.96 674.90 5,032,735.65

10mm thick first grade RAK Dubai or equivalent Mat ceramic tile
flooring stuck down with approved type adhesive on cement sand screed
floor finish and joints grouted in appropriate color setting coat mortar.
Type, color, size and pattern of tile shall comply with technical
7.2.4 specification requirement,Architects preference and approval. M2 600.39 5,000.00 3,001,960.00

Client :Bankii Sinqee Page 9 of 242 ETG Designers and consultants Sh.Co
B+G+8 Mixed Use Building

Item no Description Unit Quantity Rate Amount

100mm high Italian made or equivalent Ceramic skirting stuck to wall


7.2.5 with approved type of adhesive. Ml 143.28 550.00 78,802.90

10mm thick Italian made or equivalent high quality polished


Porcelain tile flooring stuck down with approved cement sand mortal
mix (1:3) on cement and sand screed floor finish and joints grouted in
setting coat mortar. Color, size and pattern of tile shall be approved by
7.2.6 the Engineer.. M2 7456.96 5,600.00 41,758,976.00

100mm high Italian made or equivalent Porcelain skirting stuck to wall


7.2.7 with approved type of adhesive. Ml 2315.46 620.00 1,435,588.30

Supply and fix 3mm thick Rolled PVC flooring glued with approved
type adhesive to cement screed. Price shall include adhesive. Color and
quality to be approved by the Engineer and material shall be in
7.2.8 compliance with BS 3260 quality standard.. M2 271.81 1,300.00 353,353.00

Supply and fix 100 mm high PVC Rolled tile skirting glued with
7.2.9 approved type adhesive backing Ml 58.66 150.00 8,799.00

Polished Granite tile to staircase and landing bedded on and including


cement sand (1:3) mortar. Price shall include chamfering joint grouted
7.2.10 and all other necessary works to make the work complete.

- Tread size 30x300mm Ml 529.74 3,600.00 1,907,064.00


- Riser size 20x160mm Ml 615.75 1,760.00 1,083,723.52
- Landing M2 51.40 11,000.00 565,400.00
- Skirting size 20x100mm Ml 228.36 1,100.00 251,198.64

Polished Granite tile to entrance steps bedded in cement sand mortar


mix (1:2) with chamfered edge and joints grouted in white water proof
7.2.11 joint filler
Tread size 30x320mm Ml 38.20 3,840.00 146,688.00
Riser size 20x160mm Ml 45.84 1,760.00 80,678.40

280x30mm Marble window sill cut to appropriate size, weathered and


mounted on and including 20mm thick cement mortar (1:3) bedding.
Price includes making water drip and edge chamfering as shown on the
7.2.12 Architectural detail drawing. Ml 235.00 2,500.00 587,501.25

20mm thick marble threshold bedded on & including 30mm thick


7.2.13 cement mortar.

a) Width 250mm Ml
b) Width 200mm Ml 757.04 1,500.00 1,135,560.00

300x200x6mm thick First grade RAK Dubai or equivalent white glazed


ceramic wall tile bedded to walls on & including cement mortar (1:3)
backing & joints grouted in appropriate color . Type, color, size and
pattern of tile shall comply with technical specification
7.2.14 requirement,Architects preference and approval. M2 1504.84 3,800.00 5,718,396.18

Client :Bankii Sinqee Page 10 of 242 ETG Designers and consultants Sh.Co
B+G+8 Mixed Use Building

Item no Description Unit Quantity Rate Amount

Supply and fix 15mm thick granite wall cladding to lift shaft shear wall
in accordance with the Architectural detail drawing stuck to wall with
approved type of adhesive on plastered wall surface and joints to be
grouted in appropriate color setting coat mortar. Color, Size and Pattern
of the tile shall be in accordance with the Architect's preference and
7.2.15 Technical Specification Requirement. M2 514.30 10,000.00 5,143,000.00

Supply & fix 15mm thick Gypsum Fiber ceiling With Suspender & all
7.2.16 accessories M2 4002.81 1,500.00 6,004,215.00

Floor anchored and overhead braced casino toilet partition wall, to be 1”


thick with homogeneous color throughout, constructed from high
density polyethylene (HDPE) resins, which are, waterproof non-
absorbent and have a self-lubricating surface that resists markings from
pens, pencils and other writing instruments. Price includes all necessary
accessories to finish the work. All works shall be done in accordance to
detail drawing, manufacturer's specification and the approval of the
engineer.
7.2.17 Ml 34.18 15,000.00 512,700.00

Marble coping bedded in cement sand mortar mix (1:2) and joints
7.2.18 grouted in white water proof joint filler
Size 300 x 30mm Ml 140.50 2,700.00 379,350.00

7.3 CONSTRUCTION PAINTING


Apply three coats of approved quality plastic paint.Price shall include
7.3.1 pre-cleaning and preparation of surfaces.

a) To all internal wall surface. M2 10228.46 119.03 1,217,490.19


b ) To RC ceiling M 2
4582.30 119.03 545,429.73

Supply and apply by roller 2 coats of approved type quartz paint as per
7.3.2 manufacturere instruction over finish plaster surface to:-
a ) To External Wall M2 3821.61 550.00 2,101,883.11

7.3.3 ROAD TRAFFIC MARKINGS AND ROAD STUDS

7.3.3.1 unbroken lines, 100 mm width Ml 0.00


7.3.3.2 broken lines, 100 mm width Ml 0.00
TOTAL CARRIED TO SUMMARY ................................................... 92,325,961.30
8.00 DIVISION -10 SPECIALITIES

Supply, fix, test and commission soap holder made of white vitreous
china near the shower and bath tub units complete with its all
8.1
acsessories, best quality and approved standards.
Size - 185 x 95mm No 41 1,128.00 46,248.00
Supply, fix, test and commission towel hanger, 600mm long, made of
8.2 chrome plated tubular metal rollers including fastening screws. No 2 653.00 1,306.00

Supply, fix, test and commission toilet paper holder made of white
vitreous china complete with chrome plated metal roller & fastening
8.3
screws; all of best quality and approved standards.
Size - 170 x 185mm No 70 650.00 45,500.00
Supply, fix, test and commission crystal glass mirror with copper back
protection, including chrome plated brass clips and fixing screws of best
8.4 quality & approved standards.
Size - a) 500x600mm No 73 1,105.00 80,665.00

Client :Bankii Sinqee Page 11 of 242 ETG Designers and consultants Sh.Co
B+G+8 Mixed Use Building

Item no Description Unit Quantity Rate Amount

Supply, fix, test and commission Automatic Soap Dispenser, Wall


mounted, complies with the CEI EN 60335-1/1995 + A1 + A12
8.5 Standards with adjustable sensor & dispence quantity. " 35 16,000.00 560,000.00

Ditto item No/1.17 above but Automatic Hand dryer, complies with the
8.6 EN 60335-2-23/1997 Standards. " 35 16,000.00 560,000.00

TOTAL CARRIED TO SUMMARY ................................................... 1,293,719.00

9.00 DIVISION -22 PlUMBING

All Fixtures, Equipments, pipes & fittings shall subject to approval


based on SAMPLES, CATALOGUES & BROCHURES and/or
Brochures presented by the contractor. Unit price shall include all
required civil works for the proper Installation & Opration of the
Sanitary wares, pipe works and any other related sanitary works. All
materials shall conform with relevant clauses of Local & International
Standards.

A) INTERNAL SANITARY INSTALLATIONS


9.1) SANITARY WARES/ EQUIPMENTS:
Supply, fix, test and commission hand wash basin with pedestal stand
made of white vitreous china, including chrome plated faucet, plug,
chain, bottle-trap, heavy duty flexible pipe and all required accessories
9.1.1 there to. All of Europian standards & best quality.
Size - a) 500x405mm set 72 10,765.00 775,080.00

Supply, fix, test and commission low flush water closet , made of
white glazed vitreous china, of Europian standards with close coupled
cistern complete with universal mechanism & float ball valve, plastic
seat & cover, heavy duty flexible pipe and all required accessories of
9.1.2 approved standards & best quality. " 70 20,529.00 1,437,030.00

Supply, fix, test and commission Wall hung Urinal, made of white
glazed vitreous china, of Europian standards, including Push button
chrome plated faucet, S-Trap and all required accessories of approved
9.1.3 standards & best quality. No 42 6,450.00 270,900.00

Constract shower unit made of Floor rescessed non slippery Ceramic


Tiles, or equivalent with slip resistant base. Unit price shall include
supply of chrome plated shower head, mixing valves, respective Smell-
9.1.4 trap and all reqired accessories. No 2 6,500.00 13,000.00

Supply and install kitchen sink in stainless steel, double bowl, with
chrome plated mixing faucet, chain, plug, Smell trap and complete with
9.1.5 all required accessories.
Size -1500x500mm, Single Bowl No 5 8,500.00 42,500.00

Supply, fix, test and commission water heater Complete with all water
proofing, mounting and fastening materials, heat insulation, safety and
non-return valve, & all accessories; all of approved standards & quality.
Unit price shall include all assisstance works there to.
9.1.6
Size - a) 50 lit.capacity No 2 18,008.00 36,016.00
Size - b) 100 lit.capacity No 1 26,384.00 26,384.00

9. 2) WATER SUPPLY SYSTEM:

Client :Bankii Sinqee Page 12 of 242 ETG Designers and consultants Sh.Co
B+G+8 Mixed Use Building

Item no Description Unit Quantity Rate Amount

Supply, install, disinfect, test and commission potable water supply PP-
R Pipes, PN 20, of aproved standards & qualities, for cold & Hot water
distribution to all sanitary fixtures or equipments as where shown on the
drawings. Complete with connecting fittings such as bends, unions,
tees, reducers, supporting clamps, anchors, painting as where required,...
etc. The scope of works includes all incidential civil works, such as
chiselling of walls, floors and closing them with cement mortar or
concrete to normal conditions. All as spacified in the techinical
spesification of the material and the manufacturer's instructions &
recomendation. The installation of the system shall be tested at the
expence of the copntractor with a pressure of 10kg/cm² or twice the
working pressure, which ever is greater. All pipe sizes mentioned here
9.2.1 are commercial external diametrers.
a) ¯25mm ML 325 245.00 79,625.00
b) ¯50mm " 24 380.00 9,120.00
c) ¯75mm " 28 510.00 14,280.00
Supply, fix, test and commission PP-R gate valves, of approved
Standards & quality, and the same brand of the pipe, for Cold and Hot
water distribution systems as where shown on the drawings. Complete
9.2.2 with all required fittings and accesseries there to.
a) CHROME PLATED ANGLE VALVE No 263 480.00 126,240.00
b) ¯25mm NORMAL " 26 630.00 16,380.00
9.3) WASTE, VENT & STORM WATER DRAIN PIPES:

All soil & waste, vent and storm water pipe lines shall be UPVC pipe
to BS 4514 and the slope towards the outlet shall be provided in the
drawings. All UPVC pipes and necessary fittings shall be standard
quality and be free from damage during srorage & constraction. Unit
price shall include all assisstance civil works and fixing or/& hanging to
walls, beams or slabs etc...

Supply, install, test and commission soil & waste water drainage
pipes in horizontal branches and vertical stacks made of UPVC
Pipes(PN6) of approved standards & quality including all necessary
fittings such as elbow. Y,Tee ...etc. with tight joints. All horizontall
branches shall be laid in a slope of 2% at normal conditions. Unit price
shall include provision of MARMOX OR equivalent angle board for
cladding the vertical stacks of the waste drain pipes, all necessary
assistance works such as chiseling of walls, beams, floors,... etc and
closing them with concrete or cement mortar to normal conditions.
9.3.1
a) ¯50mm ML 67 395.00 26,465.00
b) ¯75mm " 83 510.00 42,330.00
c) ¯110mm " 104 725.00 75,400.00
c) ¯160mm " 45 725.00 32,625.00
Supply and install vent caps made of rigid UPVC to be connected to
the roof terminal of vent pipes as shown on the riser diagram complete
9.3.2 with all necessary sealing gaskets and accessories there to.
a) ¯110 No 5 230.00 1,150.00
Supply, install, test and commission floor drains as where shown on
drawings, made of polished stainless steel or equivalent, with suficient
water seal not less than 2.5cm, or accompanied with P-Smell Trap, on
waste water drainage pipes, including accessories for the proper
installation and operation of the fixture. All as specified on the technical
specification.
9.3.3
a) ¯80mm " 33 1,037.00 34,221.00
Ditto item No/3.3 above but for Stainless Steel Floor Gulley, purpose
9.3.4 made.
a) 20 x 60cm " ….

Client :Bankii Sinqee Page 13 of 242 ETG Designers and consultants Sh.Co
B+G+8 Mixed Use Building

Item no Description Unit Quantity Rate Amount


Supply and fix approved quality screw type under slab Clean Out as
where shown on the drawing. Price shall include all the necessary
9.3.5 connecting pieces.
a) ¯50mm " 53 361.00 19,133.00
b) ¯75mm " 1 451.00 451.00
c) ¯110mm " 19 906.00 17,214.00

Ditto item NO/ 3.1 above but for storm water drain Down Pipes.
Exposed UPVC Down Pipes to sun light shall be painted with UV
resistant paint and withstand the external temprature and the quality
9.3.6 shall meet the purpose.
a) ¯50mm, for spouts ML 12 250.00 3,000.00
b) ¯110mm " 341 500.00 170,500.00
Supply, install and commission storm water flat roof drain Strainer
made of dura coated cast iron body or equivalent, incobination flashing
clamp/gravel guard and other required fittings and accessories such as
adaptors to UPVC down pipe riser. All as where shown on drawings and
as specified on the technical specification.
9.3.7 No 11 737.00 8,107.00

B) ROOF WATER SUPPLY INSTALLATIONS

Supply, install, disinfect, test and commission potable water supply


Pipes, of aproved standards & qualities, for Riser to roof water tank, and
water distribution to all sanitary Rooms as where shown on the
drawings. Complete with connecting fittings such as bends, unions,
tees, reducers, supporting clamps, anchors, painting as where required,...
etc. The scope of works includes all incidential civil works, such as
chiselling of walls, floors and closing them with cement mortar or
concrete to normal conditions. All as spacified in the techinical
spesification of the material and the manufacturer's instructions &
recomendation. The installation of the system shall be tested at the
expence of the copntractor with a pressure of 10kg/cm² or twice the
working pressure, which ever is greater. All pipe sizes mentioned here
9.1 are commercial external diametrers.
a) Ø25mm Coated PP-R, PN 20 ML 32 750.00 24,000.00
b) Ø50mm Coated PP-R, PN 20 ML 28 1,550.00 43,400.00

Supply, fix, test and commission Gate valves, PN 25, of approved


Standards & quality, and the same brand of the pipe, on the water supply
Riser Branch lines to rooms with sanitary provissions, as where shown
on the drawings. Complete with all required fittings and accesseries
9.2 there to.
a) Ø25mm, PPR-PN25 No 3 495.00 1,485.00
b) Ø50mm, PPR-PN 25 No 4 978.00 3,912.00

Supply, fix, test and commission Water Tanks, made of aluminium or


equivalent of approved Standards & quality, for Roof Water Tanks of
the water supply system, as where shown on the drawings. Complete
with in let, out let, drain & over flow access holes including respective
bronze/ Brass adopter nipples & Gate Valves, and other necessary
9.3 fittings and accesseries there to.
a) 5m³ Capacity Roof water tank No 2 305,000.00 610,000.00

C) FIRE FIGHTING SYSTEM:

Client :Bankii Sinqee Page 14 of 242 ETG Designers and consultants Sh.Co
B+G+8 Mixed Use Building

Item no Description Unit Quantity Rate Amount

Supply, install, test and commission medium class ( B-Class)


Galvanized Steel Pipes, PN-16, of aproved standards & qualities, for
Fire fighting water distribution system, as where shown on the drawings,
Complete with connecting fittings such as bends, unions, tees, reducers,
supporting clamps, anchors, painting as where required,... etc. The scope
of works includes all incidential civil works, such as chiselling of walls,
floors and closing them with cement mortar or concrete to normal
conditions. All as spacified in the techinical spesification of the material
and the manufacturer's instructions & recomendation. The installation of
the system shall be tested at the expence of the copntractor with a
pressure of 10kg/cm² or twice the working pressure, which ever is
greater. All pipe sizes mentioned here are commercial external
9.1 diametrers.
a) ¯40mm ML 12 750.00 9,000.00
b) ¯50mm " 12 990.00 11,880.00
c) ¯65mm " 41 2,500.00 102,500.00

Supply, fix, test and commission Bronze Gate valves, PN16, of


Europian Standards & quality, at Pump & G/Reservoir Connections, on
the Riser Branch lines to Hydrants, as where shown on the drawings.
9.2 Complete with all required fittings and accesseries there to.
a) ¯100mm No 5 5,000.00 25,000.00

Supply, fix, test and commission Wall mounted, Fire Hose Cabinate as
per BS EN671-1, complete with Ф40mm, 30m long non percoleting
canvas hose, Bronzze spray jet nozzle, hose reel and angle valve with
built-in pressure reducer, swinging guide arm and all other necessary
connecting and fixing fittings and accessories for the proper installation
and function of the system and quick connection to Fire Hydrant. The
Cabinet shall provide space for the chemical fire extingusher & be
factory made 1.2mm thick ... etc. Unit price shall include all accessories
9.3 & incidential works there to.
Size: - 80 X 90 X 20cm No 9 32,000.00 288,000.00
Supply and fix Chemical fire extinguisher, with described size & class
of fire, all of approved standards & quality and complete with required
9.4 fittings. It will placed in the fire hose cabinate.
a) 6kg, class of fire A, B, C, & E No 9 3,550.00 31,950.00

D) WATER PROOFING WORKS

Supply,Apply, test and commission Crystalizing Cementious Water


Proofing, accompanied with respective purpose made sealants for
any pipe crossings there to. This shall be done for treating lift shaft pit,
the basement floor, the basement peripherial shear wall internal system
and the basement columns to a height of 500mm; as per the
manufacturer's instructions and recommendations. The cost shall include
all substrate preparation works such as cleaning of all dirt, trace of
grease, oil and loose particles. The work shall be done on sub
contractual bases with the supplier of the material which will give
material & construction guarantee to the client.
9.1 M2 905 850.00 769,250.00

E) SUB-SURFACE DRAINAGE SYSTEM

Client :Bankii Sinqee Page 15 of 242 ETG Designers and consultants Sh.Co
B+G+8 Mixed Use Building

Item no Description Unit Quantity Rate Amount


Supply, lay, test and commission diameter 160mm PN10 UPVC pipe
(BS 4660), purpose made factory sloted, for subsurface water drainage.
Cost shall include 150mm thick class C-20 mass concrete bedding,
washed gravel fill above the pipe, Geotextile wrapping at both sides of
the gravel pack, impervious material (red clay) fill at the top of the
gravel pack, water proofing works with 4mm thick membrane including
the protection wall provission arround the shear wall. Complete with all
the necessary accessories and incidental works there to. all as per the
detail drawings provided.

9.1 ML 150 45,000.00 6,750,000.00

Construct rectangular Pump Sump, as per the detail drawing; out of


200mm R.C concrete C-20 internal dimension 2000mm x 2000mm x
3,000mm (average depth) on a base of R.C. slab, including benching
and bottom channeling with mass concrete. Provide 250mm Hard core
under the base slab, on a compacted earth. Manhole shall have cast
iron cover of size Ø300mm with cast iron frame all in accordance
with the given detail drawings. Unit price shall include excavation of
9.2 the pit and cart away of the excavated soil. No 1 75,000.00 75,000.00

Supply, fix, test and commission Submersible dewatering pump for


subsurface drainage system complet with float switch and control panel
including all accessories with the following properties:
Q = 3lit/sec.
H =18 meters

Suction Dia.
9.3 = 2" Discharge Dia. = 2" No 1 219,289.00 219,289.00

F) GROUND RESERVOIR & CONNECTIONS

9.1) WATER SUPPLY SYSTEM:

Supply, install, disinfect, test and commission potable water supply


Coated PPR Pipes, PN 20, of aproved standards & qualities, for
Connection of water meter to Ground Reservoir, and RISER to Roof
Water Tank; Complete with connecting fittings such as bends, unions,
tees, reducers, supporting clamps, anchors, painting as where required,...
etc. The scope of works includes all incidential civil works, such as
excavation of trenches, provision of 10cm thick sand beddings arround
the pipe, back fill and cart away the surpless. All as spacified in the
techinical spesification of the material and the manufacturer's
instructions & recomendation. The installation of the system shall be
tested at the expence of the copntractor with a pressure of 10kg/cm² or
9.1.1 twice the working pressure, which ever is greater.
b) Ø50mm Coated PP-R, PN 20 ML 42 1,550.00 65,100.00
c) Ø75mm Coated PP-R, PN 20 " 26 2,180.00 56,680.00
Supply, fix, test and commission Gate valves of of the same brand to
the respective pipe & Europian Standards & quality, at Pump &
G/Reservoir Connections as where shown on the drawings. Complete
9.1.2 with all required fittings and accesseries there to.
a) Ø25mm, PPR-PN 20 No 2 350.00 700.00
b) Ø50mm, PPR-PN 20 No 4 978.00 3,912.00
c) Ø75mm, PPR-PN 20 No 4 1,950.00 7,800.00
9.1.3 Ditto item NO/ 1.2 above but Check Valve for Pumps
a) Ø50mm No 1 1,500.00 1,500.00

Client :Bankii Sinqee Page 16 of 242 ETG Designers and consultants Sh.Co
B+G+8 Mixed Use Building

Item no Description Unit Quantity Rate Amount

Supply, fix, test and commission Gate valves of Compatible brand to


the respective pipe & Europian Standards & quality, at Pump &
G/Reservoir Connections as where shown on the drawings. Complete
9.1.4 with all required fittings and accesseries there to.
b) Ø 75mm " 2 3,800.00 7,600.00
c) Ø 100mm " 8 5,100.00 30,400.00
9.1.5 Ditto item NO/ 1.5 above but Check Valve
a) Ø 100mm No 2 5,500.00 11,000.00

Supply, fix, test and commission Europian manufactured water meter


as per Europian standards of approved quality complete with gate valve,
check valve, union, and connecting fittings.Unit price shall include all
assistance works there to .
9.1.6
a) Ø50mm No 1 5,000.00 5,000.00

9.2) GROUND RESERVOIR & PUMP STATION

Supply, mount, test and commission WATER TANKS of GRP or


equivalent, of approved standards & quality, for ground reservoir to
accommodate the demands for fire fighting & domestic water supply.
equipped with inlet, outlet, over-flow, and drain access holes including
respective adopter-nipples, Gate valves, Float Valve control at
inlet, ...etc. Unit price shall include constraction of all assistance civil
works there to. All as per the manufacturer's instructions &
9.2.1 recomendation.
Size : - 70m³ Capacity No 1 4,350,000.00 4,350,000.00
Supply, install,test and commission electrical driven centrifugal pump as
where shown on the drawings equiped with required fittings such as
automatic float switch including respective cable at both G/Reservoir
and respective roof water tanks, non return (check) valve, gate valves,
foot valve with Strainer at suction tip , etc… inaccordance with the lay
out plan submitted. The pump system shall made to switch off
automatically in accordance with the minimum level of the
DOMESTIC RESERVE, by the help of automatic float switches or
equivalent, inorder to protect the pump from dry run. Unit price shall
include provision of all necessary devices and fittings such as electrical
control panel, shock absorber; all of approved standards and Quality,
including other incidential works there to. (OPTIONAL) The work shall
be done on sub contractual bases with the supplier of the material which
will give material & installation guarantee to the client.

9.2.2
i) Pump set for water tanks
· Q = 3.5l/s
· H = 50m
· P = 3kw No 2 1,381,325.50 2,762,651.00
Supply,install,test and commission FACTORY ASSEMBLED
Centrifugal pumps, equiped with Diesel pump,Electrical pump,Jocky
pump for FIRE FIGHTING, as where shown on the drawings, complete
with required fittings such as automatic float switch including respective
cable at G/Reservoir, non return (check) valve, gate valves, foot valve
with Strainer at suction tip , etc…. Both pumps, the on duty and the
stand by one will have common suction as well as delivery lines. Unit
price shall include provision of all necessary devices and fittings such as
electrical control panel, construction of pump house and Pump Seat Rc-
Pad all of approved standards & Quality, and incidential works there to.
The work shall be done on sub contractual bases with the supplier of the
material which will give material & installation guarantee to the client.

9.2.3 set 1 5,565,000.00 5,565,000.00


Electrical driven centrifugal pump
· Q = 2.5l/s

Client :Bankii Sinqee Page 17 of 242 ETG Designers and consultants Sh.Co
B+G+8 Mixed Use Building

Item no Description Unit Quantity Rate Amount


· H = 71m
· P = 5.0kw
Diesel pump
· Q = 2.5l/s
· H =71m
· P = 5.0kw
Jocky pump
· Q = 2 l/s
· H = 80m

G) SANITARY SEWER OUTFALL CONNECTIONS

9.1) SEWER PIPE LINE


Supply, lay, test and commission UPVC- pipes of BS4660 or
equivalent standard for sewer lines conveying soil & waste water to
septic tank as where shown on the drawing, complete with all the
necessary fittings and accessories with tight joints. Unit price shall
include all necessary assistance works such as excavation of treanches,
selected material back fill, cart away surplus material, and other
assisstance works there to.
9.1.1
a) Ø160mm " 104 1,650.00 171,600.00

9.2) Manholes
Construct rectangular manholes out of mortar 15cm thick RC-Concrete
wall, internally plastered, on a base of 150mm thick RC-Concrete slab
cast over 15cm thick hard core, and covered withPurpose made Cast
Iron Cover of aproved quality; all as shown on the Detail drawings .
Price shall also include excavation of pit , backfilling and cartaway .

9.2.1
Size: - a) 1000 x 1000mm (avg. depth 1200mm) No 6 15,300.00 91,800.00
9.2.2 SPETIK TANK
construct effective volume of 100 m3 septic tank out of 200mm
thick RC wall &on the base of 200mm thick R.C
concrete bottom slab , top slab and reinforced manhole
cover .the work shal be carried out in accordance with the given sanitary
detail drawing & instruction .
price shall include excavation to the
required depth ,backfilling ,cart away and all the necessary assitance
work No 1 1,105,000.00 1,105,000.00

9.2.3 SOAKAWAY PIT


Construct circular Soakaway pit made of 500mmthick stone massonry
wall covered with 150mm thick R.C slab and filled inside with gravel
and
sand all as per the given detail drawing
internal diameter 3000mm effective depth 3000mm No 1 65,000.00 65,000.00

9. 3.3 STORM RUNOFF DRAINAGE SYSTEM

Construct Rectangular open Channels out of RC-UChannel, 15cm thick,


on a base of 200mm thick well compacted sellected material fill. Unit
price shall include provision of purpose made cast iron grill cover or
equivalent; at circulation areas, Treanches excavation to the required
depth, backfilling, cart away and all the necessary incidental works; All
as per the given detail drawings.
a) 30cm wide ml 106 650.00 68,900.00

TOTAL CARRIED TO SUMMARY ................................................... 26,611,460.00

Client :Bankii Sinqee Page 18 of 242 ETG Designers and consultants Sh.Co
B+G+8 Mixed Use Building

Item no Description Unit Quantity Rate Amount

10.00 DIVISION -26 ELECTRICAL


All electrical materials shall be 3rd party certified
From internationally recognized institutions
10.1 Distribution boards
All main boards shall be type tested

Floor Floor standing main distribution board MDB in metalic enclosure


with locable door, earthing lead connectors and all the necessary
10.1.1 accessoris consisting of:-
1 pc main MCCB of 630A/3P Icu=50KA
1 pc MCCB of 160A/3P Icu=20KA
1 pc MCCB of 80A/3P Icu=20KA
7 pcs MCB of 63A/3P Icu=10KA
1 pc MCB of 32A/3P Icu=10KA
1 pc MCB of 25A/3P Icu=10KA
1 pc MCB of 16A/1P Icu=10KA
2 pcs MCB of 6A/1P Contactor coilt for timmer switch
1 pc Programable timer Switch
1 Pc of surge arrestor of 50KA
3 pcs of Ameter 0-1000A
3 pcs of current meter 1000/5A
1 pc of voltmeter with selector switch (0-500V)
with 4P+E busbar 800A and 25% reserve space.
with DIN rail mounted terminal blocks for all out
going wires. No 1 350,000.00 350,000.00

Surface mounted sub distribution board SDB-R in metalic enclosure


with locable door, earthing lead connectors and all the necessary
10.1.2 accessoris consisting of:-
1 pc main MCCB of 160A/3P Icu=20KA
2 pcs MCB of 63A/3P Icu=10KA
10 pcs MCB of 10A/1Ph Icu=6KA
2 pcs MCB of 10A/1Ph Icu=6KA
1 Pc of surge arrestor of 40KA
3 pcs of Ameter 0-200A
3 pcs of current meter 200/5A
1 pc of voltmeter with selector switch (0-500V)
with 4P+E busbar 200A and 25% reserve space.
with DIN rail mounted terminal blocks for all out
going wires. No 1 350,000.00 350,000.00

Surface mounted metal enclosures sub distribution board SDB-PUMP


with lockable door, earthing lead, cable terminal, labeling, connectors
10.1.3 and all the necessary accessories consisting of:-
1Pc main MCCB of 63A, 3-ph Icu=10KA
1Pc MCB of 25A, 3ph Icu=10KA
2 Pcs MCB of 20A, 1ph Icu=6KA
2pcs of contactors of 16A/3ph ,contact of 220/240, coupled with
thermial overload relay setting for 12KW motor.
4Pcs mercury float switch for each pump for min & max level control
inside elevated tank ,for min level control, inside a reservoir . Manual
control with selector switch of 25A/3ph for two pumps junction boxes
with complete accessories for controlling water pump system all
complete.
4pcs pilot lump
3pcs of Ameter 0-80A
3pcs of current meter 80A

Client :Bankii Sinqee Page 19 of 242 ETG Designers and consultants Sh.Co
B+G+8 Mixed Use Building

Item no Description Unit Quantity Rate Amount


1pc of voltmeter with selector switch (0-500V)
complet with star delta starter
with busbar 125A and 25% reserve space. No 2 40,000.00 80,000.00

Flush mounted sub distribution board SDB-BS in metalic enclosure with


locable door, earthing lead connectors and all the necessary accessoris
10.1.4 consisting of:-
1 pc main MCB of 25A/3Ph Icu=10KA
7 pcs MCB of 10A/1Ph Icu=6KA
4 pcs MCB of 16A, 1ph Icu=6KA
1 pc MCB of 6A/1Ph for Contactor coil
1Pc programabe time lag switch to control stair case light
with 4P+E busbar 63A and 25% reserve space.
with DIN rail mounted terminal blocks for all out
going wires. No 1 15,000.00 15,000.00

Flush mounted sub distribution board SDB-BK-M in metalic enclosure


with locable door, earthing lead connectors and all the necessary
10.1.5 accessoris consisting of:-
1 pc main MCB of 32A/3Ph Icu=10KA
5 pcs MCB of 10A/1Ph Icu=6KA
9 pcs MCB of 16A, 1ph Icu=6KA
1 pc MCB of 6A/1Ph for Contactor coil
1Pc programabe time lag switch to control stair case light
with 4P+E busbar 63A and 25% reserve space.
with DIN rail mounted terminal blocks for all out
going wires. No 1 15,000.00 15,000.00

Flush mounted sub distribution board SDB-BK in metalic enclosure


with locable door, earthing lead connectors and all the necessary
10.1.6 accessoris consisting of:-
1 pc main MCB of 50A/3Ph Icu=10KA
1Pc MCB of 25A, 3ph Icu=10KA
3 pcs MCB of 10A/1Ph Icu=6KA
9 pcs MCB of 16A, 1ph Icu=6KA
1 pc MCB of 6A/1Ph for Contactor coil
1Pc programabe time lag switch to control stair case light
with 4P+E busbar 63A and 25% reserve space.
with DIN rail mounted terminal blocks for all out
going wires. No 1 15,000.00 15,000.00

Surface mounted sub distribution board SDB-SH-1=OF-1 in metalic


enclosure with locable door, earthing lead connectors and all the
10.1.7 necessary accessoris consisting of:-
1 pc main MCCB of 25A/1Ph Icu=10KA
1 pc MCB of 16A/1Ph Icu=6KA
1 pc MCB of 10A, 1ph Icu=6KA
with 2P+E busbar 63A and 25% reserve space.
with DIN rail mounted terminal blocks for all out
going wires. No 22 15,000.00 330,000.00

Flush mounted sub distribution board SDB-GF in metalic enclosure


with locable door, earthing lead connectors and all the necessary
10.1.8 accessoris consisting of:-
1 pc MCB of 63A/3Ph Icu=10KA
1 pc MCB of 50A/3Ph Icu=10KA
5 pcs MCB of 25A/1Ph Icu=10KA
2 pcs MCB of 16A/1Ph Icu=6KA

Client :Bankii Sinqee Page 20 of 242 ETG Designers and consultants Sh.Co
B+G+8 Mixed Use Building

Item no Description Unit Quantity Rate Amount


5 pcs MCB of 10A, 1ph Icu=6KA
with 4P+E busbar 80A and 25% reserve space.
with DIN rail mounted terminal blocks for all out
going wires. No 1 20,000.00 20,000.00

Flush mounted sub distribution board SDB-1F in metalic enclosure with


locable door, earthing lead connectors and all the necessary accessoris
10.1.9 consisting of:-
1 pc main MCB of 63A/3Ph Icu=10KA
12 pcs MCB of 25A/1Ph Icu=10KA
2 pcs MCB of 16A/1Ph Icu=6KA
5 pcs MCB of 10A, 1ph Icu=6KA
with 4P+E busbar 63A and 25% reserve space.
with DIN rail mounted terminal blocks for all out
going wires. No 1 20,000.00 20,000.00

Surface mounted sub distribution board SDB-2F in metalic enclosure


with locable door, earthing lead connectors and all the necessary
10.1.1 accessoris consisting of:-
1 pc main MCB of 80A/3Ph Icu=10KA
1 pc MCB of 32A/1Ph Icu=10KA
17 pcs MCB of 25A/1Ph Icu=10KA
2 pcs MCB of 16A/1Ph Icu=6KA
5 pcs MCB of 10A, 1ph Icu=6KA
1 Pc of surge arrestor of 40KA
3 pcs of Ameter 0-125A
3 pcs of current meter 125/5A
1 pc of voltmeter with selector switch (0-500V)
with 4P+E busbar 100A and 25% reserve space.
with DIN rail mounted terminal blocks for all out
going wires. No 1 35,000.00 35,000.00

Surface mounted sub distribution board SDB-SP in metalic enclosure


with locable door, earthing lead connectors and all the necessary
10.1.11 accessoris consisting of:-
1 pc main MCCB of 32A/1Ph Icu=10KA
2 pcs MCB of 16A/1Ph Icu=6KA
3 pcs MCB of 10A, 1ph Icu=6KA
with 2P+E busbar 63A and 25% reserve space.
with DIN rail mounted terminal blocks for all out
going wires. No 1 35,000.00 35,000.00

Flush mounted sub distribution board SDB-CF in metalic enclosure with


locable door, earthing lead connectors and all the necessary accessoris
10.1.12 consisting of:-
1 pc main MCB of 50A/3Ph Icu=10KA
6 pcs MCB of 25A/1Ph Icu=10KA
7 pcs MCB of 16A/1Ph Icu=6KA
7 pcs MCB of 10A, 1ph Icu=6KA
with 4P+E busbar 63A and 25% reserve space.
with DIN rail mounted terminal blocks for all out
going wires. No 1 30,000.00 30,000.00

Flush mounted sub distribution board SDB-3F in metalic enclosure with


locable door, earthing lead connectors and all the necessary accessoris
10.1.13 consisting of:-
1 pc main MCB of 50A/3Ph Icu=10KA
1 pc MCB of 25A/3Ph Icu=10KA

Client :Bankii Sinqee Page 21 of 242 ETG Designers and consultants Sh.Co
B+G+8 Mixed Use Building

Item no Description Unit Quantity Rate Amount


2 pcs MCB of 20A/1Ph Icu=10KA
6 pcs MCB of 16A/1Ph Icu=6KA
12 pcs MCB of 10A, 1ph Icu=6KA
with 4P+E busbar 63A and 25% reserve space.
with DIN rail mounted terminal blocks for all out
going wires. No 1 20,000.00 20,000.00

Flush mounted sub distribution board SDB-OF-2 in metalic enclosure


with locable door, earthing lead connectors and all the necessary
10.1.14 accessoris consisting of:-
1 pc main MCB of 25A/3Ph Icu=10KA
5 pcs MCB of 16A/1Ph Icu=6KA
3 pcs MCB of 10A, 1ph Icu=6KA
with 4P+E busbar 63A and 25% reserve space.
with DIN rail mounted terminal blocks for all out
going wires. No 9 20,000.00 180,000.00

Surface mounted sub distribution board SDB-OF-3 in metalic enclosure


with locable door, earthing lead connectors and all the necessary
10.1.15 accessoris consisting of:-
1 pc main MCB of 25A/3Ph Icu=10KA
6 pcs MCB of 16A/1Ph Icu=6KA
5 pcs MCB of 10A, 1ph Icu=6KA
with 4P+E busbar 63A and 25% reserve space.
with DIN rail mounted terminal blocks for all out
going wires. No 4 35,000.00 140,000.00

Surface mounted sub distribution board SDB-OF-4 in metalic enclosure


with locable door, earthing lead connectors and all the necessary
10.1.16 accessoris consisting of:-
1 pc main MCB of 25A/3Ph Icu=10KA
2 pcs MCB of 16A/1Ph Icu=6KA
2 pcs MCB of 10A, 1ph Icu=6KA
with 4P+E busbar 63A and 25% reserve space.
with DIN rail mounted terminal blocks for all out
going wires. No 1 35,000.00 35,000.00

Flush mounted sub distribution board SDB-4F, 5F, 6F, 7F in metalic


enclosure with locable door, earthing lead connectors and all the
10.1.17 necessary accessoris consisting of:-
1 pc main MCB of 63A/3Ph Icu=10KA
3 pcs MCB of 25A/3Ph Icu60KA
1 pc MCB of 25A/1Ph Icu=6KA
2 pcs MCB of 20A/1Ph Icu=6KA
11 pcs MCB of 10A, 1ph Icu=6KA
with 4P+E busbar 63A and 25% reserve space.
with DIN rail mounted terminal blocks for all out
going wires. No 4 45,000.00 180,000.00

10.2 Light Points


Flush mounted light points fed through PVC insulated conductors of
2x2.5 mm² inside PVC conduits of 16mm diameter,including junction
10.2.1 boxes with covers insulating screw cap connectors. No 1290 800.00 1,032,000.00

10.3 Switch with detachable frames &


corresponding box
(TYPE LEGRAND SUNO OR EQUIVALENT)
10.3.1 Single switch No 134 191.25 25,627.50

Client :Bankii Sinqee Page 22 of 242 ETG Designers and consultants Sh.Co
B+G+8 Mixed Use Building

Item no Description Unit Quantity Rate Amount


10.3.2 Double gung switch No 164 234.60 38,474.40
10.3.3 Triple Switch No 350.00 -
10.3.4 Two way switch No 30 280.00 8,400.00
10.3.5 Intemediate switch No 8 280.00 2,240.00
10.3.6 Push Button No 10 234.60 2,346.00
Programable time lag swich for stair case controlled with flushmounted
10.3.7 pushbutton No 1 5,000.00 5,000.00

10.4 Socket outlet points


16A/1P flush mounted socket outlets point fed through PVC insulated
conductors of 3x2.5mm² inside PVC conduits of 16mm diameter
including junction boxes with covers and insulating screw cap
10.4.1 connectors. No 400 1,275.00 510,000.00
25A/1P flush mounted socket outlets fed through PVC insulated pvc
Sheethed 0.6/1kv Power cable of 3x6mm² inside PVC conduits of 32mm
diameter including junction boxes with covers and insulating screw cap
10.4.2 connectors. No 11 4,000.00 44,000.00
25A/3P flush mounted socket outlets fed through PVC insulated pvc
Sheethed 0.6/1kv Power cable of 5x6mm² inside PVC conduits of 32mm
diameter including junction boxes with covers and insulating screw cap
10.4.3 connectors. No 8 6,000.00 48,000.00

10.5 Flush Mounted socket points with earth Contact


(TYPE LEGRAND SUNO OR EQUIVALENT)
10.5.1 Flush mounting socket outlet of 16A/1P, No 69 350.00 24,150.00
10.5.2 Flush mounting twin socket outlet of 16A/1P No 328 400.00 131,200.00

10.5.3 Flush mounting socket outlet of 16A/1P, with switch for water heater. No 3 400.00 1,200.00
10.5.4 Flush mounting socket outlet of 25A/1P No 11 600.00 6,600.00
10.5.5 Flush mounting socket outlet of25A/3P No 5 800.00 4,000.00
10.5.6 Flush mounting socket outlet of32A/3P No 3 800.00 2,400.00
Floor Box. -
-Floor box shall be fixed neatly in contact with the horizontal surface of
the Floor with the necessary fixers or connectors with IP 54 enclousures
and maximum depth of 5-7cm -
-Floor box ,data,socket and telephone out lets shall be the product of the
same manfacture. -
EAE , DB MX-1-S1 360X360 in screed floor service outlet box +DK
MX1 250x250 Modular socket Box, Grey or approved equivallent and
consisting of :- -
4pcs 8 contact RJ 45 data/tele outlet and 4pcs socket out let
10.5.7 .(4US,2D/T). No 76 12,000.00 912,000.00

10.6 Light fittings and lamps


(Specified type or equivalent)
10.6.1 Type1: RZB Santos Kreis 311880.0042 LED 19W lamp 50,000h No 404.00 1,500.00 606,000.00
Type2:RZB 451054.75X .Q RT 44 + 1 x T16 (T5) 14 W(socket G5)
10.6.2 Lamp 50,000h No 31.00 2,500.00 77,500.00
Type3: RZB 901454.002 Ledona ECO Round + LED 34W Lamp
10.6.3 50,000h No 61.00 3,500.00 213,500.00
Type4: Disano 150203-00 842 LED Panel + CLD CELL +LED-42W
10.6.4 50,000h No 613.00 8,000.00 4,904,000.00
Type5:Disano 164754-07 960 Hydro Led + CLD CELL-E+LED-39W
10.6.5 50,000h No 107.00 5,500.00 588,500.00
Type 6:LEDS.C4 00-6414- 93-14 Contrast E27 Hal - Fluo - Led 60W
10.6.6 lamp 50,000h No 23.00 7,000.00 161,000.00
10.6.7 Type10: LEDS.C4 HAMER 05-9871- Z5 Hal - Fluo - Led 35W No 6.00 5,000.00 30,000.00
Emergency Lighting System

Client :Bankii Sinqee Page 23 of 242 ETG Designers and consultants Sh.Co
B+G+8 Mixed Use Building

Item no Description Unit Quantity Rate Amount


Type E1=DISANO 612 Safety- emergency+1x18w lamp emergency
lighting system shall be installed with standard dimensions as indicated
on the drawings throughout building for the convenient of the public
and workers. The system shall provide safety evacuation of public
during emergency for with at least of 3hr emergency battery
10.6.8 No 24 5,000.00 120,000.00
- -
Illuminated Signage System - -
Flush ceiling type or wall surface - -
DISANO 615 safty only emergency with FLC 11SE or approved
equivallent illuminated signage system shall be installed to give
information with standard dimensions information displays and
illumination level with double or single faces. The display consisting of
symbols, text or figures supported with direction which will indicate
EXIT, toilets (lady and gentlemen), staircases and floor level will be
placed as indicated on the drawings throughout building for the
convenience of the public and workers .The symbols, text or figures
shall be choices of the client or engineer and shall be appropriate enough
to describe the room, areas, services and all safety directions it should
have emergency battery for at least 3 hours .

10.6.9 No 21 5,500.00 115,500.00

10.7 PVC pipe


10.7.1 PVC pipe of 110 mm diameter. M 715 105.00 75,075.00
10.7.2 PVC pipe of 50mm diameter. M 620 50.00 31,000.00
10.7.3 PVC pipe of 32 mm diameter. M 1000 50.00 50,000.00

10.8 Manholes
Manhole in brick or masonry, internally of 600x600x600mm including
No 3,800.00 15,200.00
10.8.1 reinforced concrete cover with lifting lug. 4

10.9 Power cables 0.6/1KV NYY


PVC Sheathed PVC Insulated power cable type SIEMENS NYY
0.6/1KV or equivalent to be drawn inside cement or PVC conduit
(measured elsewhere) and of.:
10.9.1 2(3X240/120+120)sq.mm M. 150 13000 1,950,000.00
10.9.2 3x120/70+1x70 sq.mm M. 150 4500 675,000.00
10.9.3 3x90/50+1x50 sq.mm M. 80 2400 192,000.00
10.9.4 3x70/35+1x35sq.mm M. 120 2100 252,000.00
10.9.5 3x50/25+1x25sq.mm M. 120 2100 252,000.00
10.9.6 5x16sq.mm M. 260 1250 325,000.00
10.9.7 5x10sq.mm M. 105 800 84,000.00
10.9.8 5x6sq.mm M. 600 1250 750,000.00
10.9.9 3x10sq.mm M. 20 800 16,000.00
10.9.10 3x6sq.mm M. 1000 800 800,000.00
10.9.11 3x4sq.mm M. 650 800 520,000.00

10.10 Grounding
50 x 50 x 50 cm single brick inspection pit with the cover top inscribed
10.10.1 "Earthing" as per the detail drawing No 1 2,800.00 2,800.00
10.10.2 4 x 150 sq.mm bare copper wire m 15 556.25 8,343.75
10.10.3 Diameter 16mm and 1500mm long copper rod
Note:If the earth resistence is more than 5 ohms 'add additional electrode
spaced at length of the electrode No 1 650.00 650.00
TOTAL CARRIED TO SUMMARY ................................................... 17,462,706.65

11.00 DIVISION -27 COMMUNICATION


11.1.Data /Tele system

Client :Bankii Sinqee Page 24 of 242 ETG Designers and consultants Sh.Co
B+G+8 Mixed Use Building

Item no Description Unit Quantity Rate Amount


Extra over Telephone socket out lets with detachable frames &

corresponding box (Type Legrand Suno or Approved equivalent)


RJ 45 for flush mounting Telephone socket out let points in
thermoplastic conduit of 20mm with appropriate type junction box fed
by standard CAT 6 UTP data cable and the necessary accessories to
make the system complete.
11.1.1 No 6 1,296.00 7,776.00
Flush mounting 2XRJ 45, 8 contact data/tele socket out let points in
thermoplastic conduit of 20mm with appropriate type junction box fed
by standard 2XCAT 6 UTP data/Tele cable for 10/100 base internet with
RJ 45 connector plug to be fixed on patch pannel data transfer rate of
min.100Mbs and the necessary accessories to make the system
11.1.2 complete. No 232 5,030.10 1,166,983.20
Ditto but for floor box in termoplastic condiut of 32mm fed by (4 x
11.1.3 CAT 6A UTP data /tele cable ). No 150 11,880.00 1,782,000.00
11.1.4 2XRJ 45 8contact cat 6 data/tele socket outlet No 232 1,425.00 330,600.00
Wifi access points
Manageable Wi-Fi access points 802.11a & b/g
11.1.5 Dual-band and dual-radio
Conform with standards 802.11a and 802.11b/g
Gross speed: 54 Mbps max. on each frequency
(802.11a and 802.11g) simultaneously

Tool-free network connection via RJ 45 connector


PoE power supply (Power over Ethernet - standard 802.3 af)
The management function allows the network administrator to manage
Wi-Fi access points remotely via a web interface
Security via WPA2 encryption (802.11i) and 802.1x authentication
Guest access: allows visitors free access to the Internet (access
independent of the main Wi-Fi network) No 6 8,500.00 51,000.00

Telephone Terminal Blocks(Punch downs)


with corresponding box and frames

Supply, install, leble, test and commission of 22U, 19" wall Mounted
steel enclosure for IDF-GF with transparent and lockable door ,knock-
out holes for cable entrance and conduit connection, ventilation
fan,screen lable holder and including reserve space for hubs and
switches,complete connection and all the necessary accessories
consisting:-
11.1.6
2 pcs cat 6, 48port patch panel, RJ 45 8 contacts for horizontal cabling
(Both Data and telephone) (96ports) (4U)
1pc voice patch panel, 24port contacts for 20 pair telephone cable
(1U)
6 pcs cable organizer, (6U)
1pc PDU with 8 shuko socket outlets (1U)
2 pcs 48Ports Cisco or equivalent Switch (4U)
fiber optic drawer and fiber optic unit to accommodate 6 multimode
fiber back bone cables. Standard (2m) patch cords , fiber optic LC-LC
patch cords And all necessary accessories to make the system complete. No 1 580,000.00 580,000.00

Supply, install, leble, test and commission of 16U, 19" wall Mounted
steel enclosure for IDF-1F with transparent and lockable door ,knock-
out holes for cable entrance and conduit connection, ventilation
fan,screen lable holder and including reserve space for hubs and
switches,complete connection and all the necessary accessories
consisting:-
11.1.7

Client :Bankii Sinqee Page 25 of 242 ETG Designers and consultants Sh.Co
B+G+8 Mixed Use Building

Item no Description Unit Quantity Rate Amount

1 pcs cat 6, 48port patch panel, RJ 45 8 contacts for horizontal cabling


(Both Data and telephone) (48ports) (2U)
1pc voice patch panel, 24port contacts for 20 pair telephone cable
(1U)
2 pcs cable organizer, (4U)
1pc PDU with 8 shuko socket outlets (1U)
1 pc 48 Ports Cisco or equivalent Switch (2U)
fiber optic drawer and fiber optic unit to accommodate 6 multimode
fiber back bone cables. Standard (2m) patch cords , fiber optic LC-LC
patch cords And all necessary accessories to make the system complete. No 1 580,000.00 580,000.00

Supply, install, leble, test and commission of 22U, 19" wall Mounted
steel enclosure for IDF-3F with transparent and lockable door ,knock-
out holes for cable entrance and conduit connection, ventilation
fan,screen lable holder and including reserve space for hubs and
switches,complete connection and all the necessary accessories
consisting:-
11.1.8
2 pcs cat 6, 48port patch panel, RJ 45 8 contacts for horizontal cabling
(Both Data and telephone) (96ports) (4U)
1pc voice patch panel, 24port contacts for 20 pair telephone cable
(1U)
6 pcs cable organizer, (6U)
1pc PDU with 8 shuko socket outlets (1U)
2 pcs 248Ports Cisco or equivalent Switch (4U)
fiber optic drawer and fiber optic unit to accommodate 6 multimode
fiber back bone cables. Standard (2m) patch cords , fiber optic LC-LC
patch cords And all necessary accessories to make the system complete. No 1 580,000.00 580,000.00

Supply, install, leble, test and commission of 32U, 19" wall Mounted
steel enclosure for IDF-TF(4-7F) with transparent and lockable
door ,knock-out holes for cable entrance and conduit connection,
ventilation fan,screen lable holder and including reserve space for hubs
and switches,complete connection and all the necessary accessories
consisting:-
11.1.9
3 pcs cat 6, 48port patch panel, RJ 45 8 contacts for horizontal cabling
(Both Data and telephone) (144ports) (6U)
2pc voice patch panel, 24port contacts for 40 pair telephone cable
(2U)
6 pcs cable organizer, (6U)
1pc PDU with 8 shuko socket outlets (1U)
3 pcs 48Ports Cisco or equivalent Switch (6U)
fiber optic drawer and fiber optic unit to accommodate 6 multimode
fiber back bone cables. Standard (2m) patch cords , fiber optic LC-LC
patch cords And all necessary accessories to make the system complete. No 4 580,000.00 2,320,000.00

Surface mounted main distribution frame 100 pairs telephone terminal


blocks or Punch down blocks with lockable doors wall support
11.1.10 structure complete accessories or equivalent pair as ETC standard Nº 1 5,000.00 5,000.00

Telephone Distrubution cables


30 pairs UTP telephone cable in PVC dia.36mm or equivalent pair as
11.1.11 ETC standard m 1000 220.00 220,000.00

11.2 MATV system (3rd party certified)

Client :Bankii Sinqee Page 26 of 242 ETG Designers and consultants Sh.Co
B+G+8 Mixed Use Building

Item no Description Unit Quantity Rate Amount

Dish antenna for for sattelite signal reception complete with C-band
11.2.1 LNB, cabling, mounting accessories on roof top concrete base. No 1.00 132,000.00 132,000.00

Terrestrial TV signal antenna suitable for local signal reception complete


11.2.2 with 2.5m steel mounting rod No 1.00 12,000.00 12,000.00

MATV head end equipment consisting of amplifiers, 2 chanel


modulator, power supply and other necessary installation and fixing
11.2.3 accessories No 1.00 88,000.00 88,000.00

TV points fed through RG6 Coaxial Cable and Power supply wires
through inside PVC conduits of 32mm diameter including MS box,
junction boxes with covers, insulating screw cap connectors, and flush
mounted terminal loop through TV sockets with all required materials
11.2.4 with necessary distributor terminal in between the TV Terminals. Nº 10 1,800.00 18,000.00
Loop through Double moudule FM+AM TV out let for flush mounting
11.2.5 Nº 10 1100 11,000.00
11.2.6 Flush mountedTV Box Nº 2 650 1,300.00

TOTAL CARRIED TO SUMMARY ................................................... 7,885,659.20

12 DIVISION -28 Electronic Safty and Security


12.1 CCTV SYSTEM
IP based Closed circuit television equipment, supplied,
installed,connected, tested and commissioned including CAT6A UTP
cables,complete all as specified (or equivalent).Factory test report,2
years guarantee factory faults

CCTV POINTS No 35 1676.7 58,684.50


IP CCTV points in thermoplastic conduit of minimum diameter 21mm No
fed by CAT6A UTP cable as shown on drawings, including junction
12.1.1 boxes with covers, 35 54850 1,919,750.00
IP CCTV 2MP 360 deg.Fisheye Mobile vendal resistance digital No.
PTZ/Bi directional Audio ,Digital wide dynamic range Motion detection
Audio detection M12 & RJ-45 connector. Type SAMSUNG SNF-
12.1.2 8010VM or approved equivallent. 3 55430 166,290.00
Approved type 32" LCD high resolution color monitor,desplay No.
12.1.3 16/9 .maximum resolution:1680x1050 1 62000 62,000.00
Purpose made control consol for Two 32"monitors, VCR, multiplexer, No
12.1.4 controller and keyboard 1 24000 24,000.00
12.1.5 Approved type alarming switcher 220Vac/ 50Hz No. 1 43000 43,000.00
Fully programmable keyboard controller with touch screen LCD as LS
12.1.6 specified or approved equivalent. 1 500000 500,000.00
CCTV Management Software licence for 136 cameras, documentation,

12.1.7 instruction of owner's staff, power supplies/transformers.


No 2 517500 1,035,000.00
CCTV IP Network video recorder NVR 4/16 cameras, Pentaplex:
simultaneous live, record, playback,extraction and remote access Video
compression format: H264 , Number of frames recorded: Up to 25
frames per second for 16 cameras in D1 resolution Memory: 2 x 2 TB
internal hard disks, i.e. a total of 4TB and built-in DVD writer: and 19"
rack mountable with all necessary acessories to make the system
12.1.8 complete.
ls 1 287500 287,500.00

Client :Bankii Sinqee Page 27 of 242 ETG Designers and consultants Sh.Co
B+G+8 Mixed Use Building

Item no Description Unit Quantity Rate Amount


CCTV system with above mentioned equipments including system
connectors,line and head end video amplifiers, digital control system ,
cabinet of heavy duty and free standing for all electronic equipments
with complete analysis made on cable losses (both signal and power) &
signal level in dB at out camera and monitor units ,with latest
technology of each equipments, shop drawing with complete analysis
and all the necessary accessories to be submitted prior to purchase and
12.1.9 installtion. see the drawing for the lay out

12.2 FIRE ALARM SYSTEM


Cabling
12.2.1 -As per IEC 331,IEC 332-1,IEC 332-3,IEC 1034,IEC 754-1
-With copper conductor
-Fire resistant and flame retardant
-Colour coded and suitable for addressable system
-Consisting of all the necessary accessories
No. 207 1,850.00 382,950.00
Smoke / heat detector ,Manual call points , short circuit isolators , alarm
and visual indicating points fed through fire resistant cable of 2-core
2.5sq.mm inside PVC conduit of 20mm diameter including all necessary
accessories.
12.2.2

12.2.3 Fire alarm control pannel


Intelligent fire alarm equipment, supplied, installed, connected, tested
and commissioned including fire rated cables, conduits and all necessary
accessories, complete as manufatured by Notifier or approved equivalent
and/or shown on drawings.'Factory test report, 4 years guarantee factory
faults

Intelligent digital addressable fire control and indicating panel, type


Notifier NFS-640 or approved eqivqlent including Notification
Appliance Circuit Modules,Control Relay Module , auxilary contact and
under mentioned specification
-Input power 220VAC, 50 Hz
-Capable of networked connection
-Programmable internal hard ware and output circuits
-Programmable soft ware zones
-Accessories for out put connection for telephone circuit
-Sealed battery capable of supply to all equipments for at least 72Hr
-Intelligent signaling line circuit
-PA system interface
-Visual and audiable trouble alarm by zone
-Manual acknowlage function
-Minimum of 10 zones digital
-LCD display (80 characters)
-Program keypad
-LED indicators
-13 relay outputs
.3 loops No.
-Compatible intelligent devices 1 1,200,000.00 1,200,000.00
with all necessary accessories as BSNE 54 ,NFPA 72 standards to make
the system complete. -
No. 147 8,000.00 1,176,000.00
Intelligent ionization type photoelectric smoke sensors with all
12.2.4 necessary mounting accessories, for both surface / flush mounting No. 21 7,500.00 157,500.00
Intelligent ionization type Heat sensors with all necessary mounting
12.2.5 accessories, for both surface / flush mounting No. 10 4,500.00 45,000.00
Annunciator fire alarm visula indicator with all necessary mounting
12.2.6 accessories, for surface/ flush or wall mounting No. 10 4,500.00 45,000.00

Client :Bankii Sinqee Page 28 of 242 ETG Designers and consultants Sh.Co
B+G+8 Mixed Use Building

Item no Description Unit Quantity Rate Amount


Fire alarm sounder (siren) with sound presure of 110 dB at 1 meter
12.2.7 (Red) with all necessary mounting accessories, No. 8 5,000.00 40,000.00
Addressable manual pull switch station with all necessary mounting
12.2.8 accessories, flush mounting,for surface/ flush or wall mounting . No 10 4,500.00 45,000.00
12.2.9 Short circuit isolators to be placed after every 18 detectos.

TOTAL CARRIED TO SUMMARY ................................................... 7,187,674.50

13.00 DIVISION -28 Mechanical installation


13.1 Passenger Lift (Type Schindler)
Technical Specifications
Standards
ISO 7465:2001,EN-81,BS ,ANSI,JIS,ISO 9001,ES 3158:2006,ES
3159:2006 , latest editions of BS/EN or ES and others quality certificate
for design, Manufacturing installation and commissioning lifts and lift
parts.
-Electromagnetic compatibility
- Electromagnetic immunity
-Electrical Safety
- Electronic equipment for use in power facilities:

13.2 Mechanical property and Finishing Material


Function :- Passenger Lift
Rated load : -1300kg,15person
Rated speed :- 1.6m/sec
Number of stops:-11 in one line
Floor - B+G+9F
Cabin door type:- Automatic center opening
Landing door type:- Automatic single door center opening
No entrance :- one(1) @ 0 degree
Floor - Vinyl composition tile/wear resistant rubber
Wall - Stainless steel
Interior face of doors - Stainless steel
Ceilings - Stainless steel panels/diffuser gird
Handrail -stainless steel, two sides
Mirror -Silver color, rear panel
Frame- Stainless steel
Exterior face of door - Stainless steel
Drive system and Elevator operation
-Gearless machine
- Triplex full Collective Selective control
-Electric traction type
-VVVF with encoder
Special operation and facilities
- Smoke Detectors
- Alarm buzzer
- Chime gong to sound present audioable indication control
- Toggle switch
- call registered light
- Inter phone to communicate with machine room
- Over load indicator both audible and visual indicators
Car and Landing operation panel
- Car display for position and direction
- Digital car position and direction control
-Digital landing position & direction indicator on
all floors
-Vandal proof Wait/stop push button
-Car display for position and direction

Client :Bankii Sinqee Page 29 of 242 ETG Designers and consultants Sh.Co
B+G+8 Mixed Use Building

Item no Description Unit Quantity Rate Amount


Control and safety features
-Dynamic braking for traction machine in event of power
failure
Power supply- 380volts AC 50Hz 3phase
Disable - Add Braille tactile to all emergency buttons
Lighting Supply
- 220v, 50Hz, 1ph
- Indirect light in diffuser grid
Ventilation
-Car ventilation with fan built in the ceiling
-Temperature control Thermostat
Rescue device
-Automatic rescue device/ back up(Emergency battry drive)
when power fails
- All power outputs are electronically protected
against short circuit

- Earth leak detection for traction machine during emergency


operation(short circuit, overload, loss of connection of a phase to the
motor, phase imbalance,thermal protection, overspending, turning
blockage) Performs analysis of optimum motor turning direction
(minimum battery consumption during emergency operation)
Conforms to EN81 regulation
-
Shaft Information No 4 4,000,000.00 16,000,000.00
-Shall take and consider approprate standards for the shaft, Cabin, doors
,machine room size; Refer architectural and structural drawing.

13.3 Deto but Mechanical property and Finishing Material


Function :- Passenger Lift
Rated load : -1300kg,15person
Rated speed :- 1.6m/sec
Number of stops:-5 in one line
Floor - B+G+3F
Shaft Information No 1 3,500,000.00 3,500,000.00
-Shall take and consider approprate standards for the shaft, Cabin, doors
,machine room size; Refer architectural and structural drawing.

13.4 Lightning Arrester System


(Eritech or Equivalent)
Shall include all metalic structures in the network with appropriate
welding and related works
No 2 39,000.00 78,000.00
Early Streamer Emmision(ESE) Protector SI 60 with mounting mast of
13.4.1 H=6m and all necessary connecting acessories. m 80 445.00 35,600.00
13.4.2 25x3mm copper tape with all necessary roof connecting accessories -
-
Down conductor ml 80 445.00 35,600.00
25 x 3mm insulated copper tape with vertical supportings every 1m to
the wall & all the necessary accessories coordinate the routing of down
conductors with the building external skin and architectural features.
13.4.3 No 2 2,800.00 5,600.00
50 x 50 x 50 cm test pit with top cover inscribed "Test pit" as per the
13.4.4 detail drawing ml 80 274.05 21,924.00
13.4.5 1 x 70 sq.mm bare copper wire No 2 573.75 1,147.50
13.4.6 Diameter 16mm & 1500mm long copper rod

MV/LV Transformer
13.5 (Supplied by EEPCo or Nominated Sub Contractor)

Client :Bankii Sinqee Page 30 of 242 ETG Designers and consultants Sh.Co
B+G+8 Mixed Use Building

Item no Description Unit Quantity Rate Amount

Utility connection with transformer of 400KVA ,gas insulated RMU


2+1,with internal breaker ,CT and VT for KWH,KVAR low voltage side
switch gears and all medium, low and high tension cable connection
accessories and all the necessary accessories as per EEPCO regulation
13.5.1 and the low voltage side consisting of
1Pc Main MCCB of 630A, 3ph Icu=20kA
1Pc of surge arrestor of 50KA -
with bus bar of 800A ,approved type bus supprorting No 1 4,000,000.00 4,000,000.00
accessories and ample reserve space

Standby Diesel Generator Set (supplied by


13.6 client )
13.6.1 a. Supply and install out door generator with foundation
as per the manufacturer recommdation shock absorving
mounting rails and the following specifications:-
Type water cooled turbo engine
Altitude Avg =Suitable For Bahr Dar
Frequency 50Hz
Stand by power 300KVA
Control panel comprises the following:-
- 3 Ammeter
-Voltmeter/selector switch
-Hour run counter
-Alarm modul
-Water temperature gauge
- Molded case circuit breaker with access and bus way connection
-Frequency meter
-Battery condition indicator
-Emergency stop button
-Lubrication oil pressure gauge
- Protection fuse
-12-24V electric starting system including heavy duty
dry charged battery pack
-Sheet steel constructed frame
-Antivibration pad between engine /alternator and base
frame and ground
-Painting to high industrial standards
-Operation and maintenance manuals ,spare parts
for one year catalogs circuit diagram and test report
-Sound Canopy with all the necessary Exhaust and inlet
ventilation system extended upto the area which doesn't
affect the surrounding area with noise level of 80db@1meter
(silencer/air inlet and out let sound attenuators and sound
absorving wall lining) in consaltion with the engineer
-Base mounted daily fuel tank complete with essential
accessories comprising filiter,breather feed and return
lines dial type content gauge and complete accessories
Diesel engine:- type Cummins, Deutz,Perkins, Volvo, Caterppillar
or equivalent, and subject to the engineers/consultants approval.

Speed- 1500rpm at 50HZ, with automatic speed governor


Lubrication- with forced oil circulation with detachable oil filter and
cartridge
Cooling SYSTEM- water cooling with radiator
Electric start including batteries with cables, termination, and battery
isolator switch, and battries charged by generator.
Fuel tank with filter

Client :Bankii Sinqee Page 31 of 242 ETG Designers and consultants Sh.Co
B+G+8 Mixed Use Building

Item no Description Unit Quantity Rate Amount


Alternator:- type Stamford, Leroy Somer, ABB, MR, MARATHON
or equivalent, and subject to the engineers/consultants approval.

Three phase 300KVA , Y-connection and accessible neutral


Standard voltage: 380/220V, at 50HZ
Brushless. Windings with H class insulation
Indix of protection -IP54
Electronic voltage regulator to satisfiy the voltage with in +/- 1.5% with
nominal load, and power factor 0.8 lagging to unity

b.Custom designed fuel tank capacity of 3000 liters


with pumps and accessories comprising filiter,breather
feed and return lines dial type content gauge and
complete accessories and connections with detail
drawings submitted before installation in consulation
with the engineer.

C. Floor standing Automatic Transfer switch in metal enclosure and


lockable door , IP 54, Cable connection accessories (with busway
joint)Automatic mains and genertor sensing units,Digital master
controler
1 pcs ATS 630A /4P Motorised circuit breaker and all the necessary
accessories to make the system complete No 1 4,300,000.00 4,300,000.00
Factory test report, 1 year guarantee for factory faults -
-
13.7 Grounding No 2 1011.26 2,022.52
1500x16MM Copper Clad Earthing Rod inside 1000x1000x700MM pit
with the cover top inscribed "Earthing" as per the detail measured else
13.7.1 where. m 10 1079.5 10,795.00
13.7.2 2(1X120) sq.mm bare copper wire measured else where. No 10 301.75 3,017.50
13.7.3 PVC Pipe 110MM Diameter measured else where.

13.8 CABLE LADDER

Hot dip galvanized after fabrication, cable ladder, Niedax, Wibe


orapproved equivalent including joint, elbows and T-joints for
horizontal change in direction, hinge connector for vertical change in
direction,wall & pendant brackets for support from the wall and ceilling
respectively, complete with connectors and other fixing accessories, and
of: m 80 1,200.00 96,000.00
13.8.1 A-60mm x400mm for Power cables through risers.

TOTAL CARRIED TO SUMMARY ................................................... 28,089,706.52

Client :Bankii Sinqee Page 32 of 242 ETG Designers and consultants Sh.Co
Project Residence
Location ADDIS ABABA
SUB - STRUCTURE

Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32

Left wings
F1 16 7.00 32.00 #REF! #REF!
16 6.30 38.00 #REF! #REF!
F2 16 5.90 39.00 #REF! #REF!
16 6.60 33.00 #REF! #REF!
F3 16 5.60 62.00 #REF! #REF!
F4 16 5.40 52.00 #REF! #REF!
F5 16 4.70 46.00 #REF! #REF!
F6 14 4.10 46.00 #REF! #REF!
F7 14 3.50 44.00 #REF! #REF!
F8 12 2.80 32.00 #REF! #REF!
F9 10 6.60 18.00 #REF! #REF!
Compundfooting
CF1 16 4.70 84.00 #REF! #REF!
CF2 16 5.40 84.00 #REF! #REF!
RWF1 20 4.30 81.00 2 696.60
20 4.30 81.00 2 696.60
16 6.05 13.00 2 157.30
16 6.05 13.00 2 157.30
Stripped footing
3.013 20 9.30 16.00 1 148.80
20 7.20 16.00 1 115.20
20 6.20 16.00 1 99.20
20 6.60 27.00 6 1,069.20
20 7.80 16.00 1 124.80

20 3.37 324.00 1 1,090.58


Mat beam
20 11.20 94.00 1 1,052.80
20 4.90 94.00 1 460.60
20 11.05 130.00 1 1,436.50

24 6.87 49.00 1 336.63


24 3.10 57.00 1 176.70
24 5.17 57.00 1 294.69
24 4.27 162.00 2 1,383.48

MX5 & Mx6 20 7.05 12.00 2 169.20


20 7.05 12.00 2 169.20
20 5.05 12.00 2 121.20
20 11.05 14.00 2 309.40
16 12.00 4.00 2 96.00
St 12 3.70 47.00 2 347.80
12 1.90 47.00 2 178.60

Sy4&SY6 24 8.60 12.00 2 206.40


24 10.60 12.00 2 254.40
St 12 3.70 48.00 2 355.20
12 1.90 48.00 2 182.40

Along B/n Ax-SY4 &Sy5 24 8.60 12.00 1 103.20


24 10.60 12.00 1 127.20
St 12 3.70 48.00 1 177.60
12 1.90 48.00 1 91.20

Right wings
F3 16 5.60 62.00 #REF! #REF!
F10 16 5.40 50.00 #REF! #REF!
F11 16 4.60 50.00 #REF! #REF!
F12 14 3.70 50.00 #REF! #REF!
F13 14 3.20 28.00 #REF! #REF!

SWF1 16 7.95 40.00 1 318.00


20 3.30 94.00 1 310.20

SWF2 16 8.40 40.00 1 336.00


20 3.30 112.00 1 369.60
Stripped footing
3.013 20 7.80 16.00 1 124.80
20 6.60 16.00 7 739.20
20 8.45 16.00 1 135.20
20 4.44 16.00 1 70.96
20 3.38 16.00 1 54.08
20 4.00 16.00 6 384.00
20 4.35 16.00 1 69.52
20 4.19 16.00 1 67.04

20 3.37 287.00 1 966.04


Mat beam
10.245 20 8.00 98.00 1 784.00
20 8.40 98.00 1 823.20
20 11.05 132.00 1 1,458.60

24 3.22 58.00 1 186.76


24 5.27 58.00 1 305.66
24 3.35 58.00 1 194.30
24 4.52 160.00 2 1,446.40
Project Residence
Location ADDIS ABABA
SUB - STRUCTURE

Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
MX5 & Mx6 20 7.05 8.00 2 112.80
20 7.05 8.00 2 112.80
20 5.05 12.00 2 121.20
20 11.05 14.00 2 309.40
16 12.00 4.00 2 96.00

St 12 3.70 94.00 2 695.60


12 1.90 94.00 2 357.20

Sy16&SY17 24 8.60 11.00 2 189.20


24 10.60 12.00 2 254.40
2.15
St 12 3.70 62.00 2 458.80
12 1.90 62.00 2 235.60

Along B/n Ax-SY4 &Sy5 24 8.60 11.00 1 94.60


24 10.60 12.00 1 127.20
St 12 3.70 62.00 1 229.40
12 1.90 62.00 1 117.80
Foundationcolumn
left wings
C-1 20 4.05 16.00 #REF! #REF!
St1 10 2.26 18.00 #REF! #REF!
St2 10 1.76 18.00 #REF! #REF!
St5 10 0.61 18.00 #REF! #REF!

C2 24 4.37 16.00 #REF! #REF!


St1 10 2.86 18.00 #REF! #REF!
St2 10 2.32 18.00 #REF! #REF!
St3 10 1.72 18.00 #REF! #REF!
St4 10 2.05 18.00 #REF! #REF!

C3 24 4.37 18.00 0 0.00


St1 10 3.06 18.00 0 0.00
St2 10 2.52 18.00 0 0.00
St3 10 2.36 18.00 0 0.00
St4 10 1.92 18.00 0 0.00
St4 10 0.80 18.00 0 0.00

C3' 24 4.37 18.00 #REF! #REF!


St1 10 3.06 18.00 #REF! #REF!
St2 10 2.52 18.00 #REF! #REF!
St3 10 2.36 18.00 #REF! #REF!
St4 10 1.92 18.00 #REF! #REF!
St4 10 0.80 18.00 #REF! #REF!

C4 24 4.37 16.00 #REF! #REF!


St1 10 2.66 18.00 #REF! #REF!
St2 10 2.12 18.00 #REF! #REF!
St3 10 1.98 18.00 #REF! #REF!
St4 10 1.52 18.00 #REF! #REF!

C5 24 4.37 16.00 #REF! #REF!


St1 10 2.66 18.00 #REF! #REF!
St2 10 2.12 18.00 #REF! #REF!
St3 10 1.98 18.00 #REF! #REF!
St4 10 1.52 18.00 #REF! #REF!

C6 24 4.37 16.00 #REF! #REF!


St1 10 2.66 18.00 #REF! #REF!
St2 10 2.12 18.00 #REF! #REF!
St3 10 1.98 18.00 #REF! #REF!
St4 10 1.52 18.00 #REF! #REF!

C7 24 4.37 16.00 #REF! #REF!


St1 10 2.66 18.00 #REF! #REF!
St2 10 2.12 18.00 #REF! #REF!
St3 10 1.98 18.00 #REF! #REF!
St4 10 1.52 18.00 #REF! #REF!

C8 24 4.37 16.00 #REF! #REF!


St1 10 2.66 18.00 #REF! #REF!
St2 10 2.12 18.00 #REF! #REF!
St3 10 1.98 18.00 #REF! #REF!
St4 10 1.52 18.00 #REF! #REF!

C9 24 4.37 16.00 #REF! #REF!


St1 10 2.66 18.00 #REF! #REF!
St2 10 2.12 18.00 #REF! #REF!
St3 10 1.98 18.00 #REF! #REF!
St4 10 1.52 18.00 #REF! #REF!

C10 24 4.37 16.00 #REF! #REF!


St1 10 2.66 18.00 #REF! #REF!
St2 10 2.12 18.00 #REF! #REF!
St3 10 1.98 18.00 #REF! #REF!
St4 10 1.52 18.00 #REF! #REF!
Project Residence
Location ADDIS ABABA
SUB - STRUCTURE

Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
C11 24 4.37 14.00 #REF! #REF!
St1 10 2.26 18.00 #REF! #REF!
St2 10 1.76 18.00 #REF! #REF!
St3 10 1.58 18.00 #REF! #REF!
St4 10 0.61 18.00 #REF! #REF!

C12 20 4.05 16.00 #REF! #REF!


St1 10 2.26 18.00 #REF! #REF!
St2 10 1.76 18.00 #REF! #REF!
St5 10 0.61 18.00 #REF! #REF!

C13 20 4.05 14.00 #REF! #REF!


St1 10 1.86 18.00 #REF! #REF!
St2 10 1.32 18.00 #REF! #REF!
St2 10 1.46 18.00 #REF! #REF!
St5 10 0.51 18.00 #REF! #REF!

C13' 20 4.05 14.00 #REF! #REF!


St1 10 1.86 18.00 #REF! #REF!
St2 10 1.32 18.00 #REF! #REF!
St2 10 1.46 18.00 #REF! #REF!
St5 10 0.51 18.00 #REF! #REF!
C1 20 4.05 16.00 #REF! #REF!
right wing
C-1 20 4.05 18.00 #REF! #REF!
St1 10 3.06 18.00 5 275.40
St2 10 2.26 18.00 5 203.40
St3 10 2.16 18.00 5 194.76
St4 10 1.52 18.00 5 136.80
St5 10 0.80 18.00 5 72.45

C1' 20 4.05 20.00 #REF! #REF!


St1 10 2.86 18.00 #REF! #REF!
St2 10 2.39 18.00 #REF! #REF!
St3 10 1.88 18.00 #REF! #REF!
St4 10 2.32 18.00 #REF! #REF!
St5 10 1.72 18.00 #REF! #REF!

C3 24 4.37 18.00 #REF! #REF!


St1 10 3.46 18.00 #REF! #REF!
St2 10 2.91 18.00 #REF! #REF!
St3 10 2.32 18.00 #REF! #REF!
St4 10 3.09 18.00 #REF! #REF!
St5 10 2.67 18.00 #REF! #REF!
St6 10 2.25 18.00 #REF! #REF!
St7 10 1.83 18.00 #REF! #REF!

C4 20 4.05 20.00 0 0.00


St1 10 2.86 18.00 0 0.00
St2 10 2.39 18.00 0 0.00
St3 10 1.88 18.00 0 0.00
St4 10 2.32 18.00 0 0.00
St5 10 1.72 18.00 0 0.00

C5 20 4.05 20.00 #REF! #REF!


St1 10 2.86 18.00 #REF! #REF!
St2 10 2.39 18.00 #REF! #REF!
St3 10 1.88 18.00 #REF! #REF!
St4 10 2.32 18.00 #REF! #REF!
St5 10 1.72 18.00 #REF! #REF!

C6 20 4.05 20.00 #REF! #REF!


St1 10 2.46 18.00 #REF! #REF!
St2 10 1.48 18.00 #REF! #REF!
St3 10 1.99 18.00 #REF! #REF!
St4 10 1.96 18.00 #REF! #REF!
St5 10 0.71 18.00 #REF! #REF!

C7 20 4.05 18.00 #REF! #REF!


St1 10 2.66 18.00 #REF! #REF!
St2 10 2.12 18.00 #REF! #REF!
St3 10 2.16 18.00 #REF! #REF!
St4 10 1.52 18.00 #REF! #REF!
St4 10 0.80 18.00 #REF! #REF!

C8 20 4.05 18.00 #REF! #REF!


St1 10 2.66 18.00 #REF! #REF!
St2 10 2.12 18.00 #REF! #REF!
St3 10 2.16 18.00 #REF! #REF!
St4 10 1.52 18.00 #REF! #REF!
St4 10 0.80 18.00 #REF! #REF!

C9 20 4.05 20.00 #REF! #REF!


St1 10 2.86 18.00 #REF! #REF!
St2 10 2.39 18.00 #REF! #REF!
St3 10 1.88 18.00 #REF! #REF!
St4 10 2.32 18.00 #REF! #REF!
St5 10 1.72 18.00 #REF! #REF!
Project Residence
Location ADDIS ABABA
SUB - STRUCTURE

Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32

C9' 20 4.05 20.00 #REF! #REF!


St1 10 2.86 18.00 #REF! #REF!
St2 10 2.39 18.00 #REF! #REF!
St3 10 1.88 18.00 #REF! #REF!
St4 10 2.32 18.00 #REF! #REF!
St5 10 1.72 18.00 #REF! #REF!

C10 20 4.05 18.00 #REF! #REF!


St1 10 2.66 18.00 #REF! #REF!
St2 10 2.12 18.00 #REF! #REF!
St3 10 2.16 18.00 #REF! #REF!
St4 10 1.52 18.00 #REF! #REF!
St4 10 0.80 18.00 #REF! #REF!

C11 20 4.05 18.00 #REF! #REF!


St1 10 2.66 18.00 #REF! #REF!
St2 10 2.12 18.00 #REF! #REF!
St3 10 2.16 18.00 #REF! #REF!
St4 10 1.52 18.00 #REF! #REF!
St4 10 0.80 18.00 #REF! #REF!

C12 20 4.05 18.00 #REF! #REF!


St1 10 2.26 18.00 #REF! #REF!
St2 10 1.76 18.00 #REF! #REF!
St3 10 0.61 18.00 #REF! #REF!

C13 20 4.05 18.00 #REF! #REF!


St1 10 2.66 18.00 #REF! #REF!
St2 10 2.12 18.00 #REF! #REF!
St3 10 2.16 18.00 #REF! #REF!
St4 10 1.52 18.00 #REF! #REF!
St4 10 0.80 18.00 #REF! #REF!

C13' 20 4.05 18.00 #REF! #REF!


St1 10 2.66 18.00 #REF! #REF!
St2 10 2.12 18.00 #REF! #REF!
St3 10 2.16 18.00 #REF! #REF!
St4 10 1.52 18.00 #REF! #REF!
St4 10 0.80 18.00 #REF! #REF!

C14 20 4.05 20.00 #REF! #REF!


St1 10 2.86 18.00 #REF! #REF!
St2 10 2.39 18.00 #REF! #REF!
St3 10 1.88 18.00 #REF! #REF!
St4 10 2.32 18.00 #REF! #REF!
St5 10 1.72 18.00 #REF! #REF!

C14' 20 4.05 20.00 #REF! #REF!


St1 10 2.86 18.00 #REF! #REF!
St2 10 2.39 18.00 #REF! #REF!
St3 10 1.88 18.00 #REF! #REF!
St4 10 2.32 18.00 #REF! #REF!
St5 10 1.72 18.00 #REF! #REF!

C15 20 4.05 20.00 #REF! #REF!


St1 10 2.86 18.00 #REF! #REF!
St2 10 2.39 18.00 #REF! #REF!
St3 10 1.88 18.00 #REF! #REF!
St4 10 2.32 18.00 #REF! #REF!
St5 10 1.72 18.00 #REF! #REF!

C15' 20 4.05 20.00 0 0.00


St1 10 2.86 18.00 0 0.00
St2 10 2.39 18.00 0 0.00
St3 10 1.88 18.00 0 0.00
St4 10 2.32 18.00 0 0.00
St5 10 1.72 18.00 0 0.00

At Basment floor
left wings
C-1 20 4.80 16.00 #REF! #REF!
St1 10 2.26 18.00 #REF! #REF!
St2 10 1.76 18.00 #REF! #REF!
St5 10 0.61 18.00 #REF! #REF!

C2 24 5.20 16.00 #REF! #REF!


St1 10 2.86 18.00 #REF! #REF!
St2 10 2.32 18.00 #REF! #REF!
St3 10 1.72 18.00 #REF! #REF!
St4 10 2.05 18.00 #REF! #REF!

C3 Sec-6 24 5.20 18.00 0 0.00


St1 10 3.06 18.00 0 0.00
St2 10 2.52 18.00 0 0.00
St3 10 2.36 18.00 0 0.00
St4 10 1.92 18.00 0 0.00
St4 10 0.80 18.00 0 0.00
Project Residence
Location ADDIS ABABA
SUB - STRUCTURE

Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
C3' Sec-6 24 5.20 18.00 #REF! #REF!
St1 10 3.06 18.00 #REF! #REF!
St2 10 2.52 18.00 #REF! #REF!
St3 10 2.36 18.00 #REF! #REF!
St4 10 1.92 18.00 #REF! #REF!
St4 10 0.80 18.00 #REF! #REF!

C4 Sec-8' 24 5.20 16.00 #REF! #REF!


St1 10 2.66 18.00 #REF! #REF!
St2 10 2.12 18.00 #REF! #REF!
St3 10 1.98 18.00 #REF! #REF!
St4 10 1.52 18.00 #REF! #REF!

C5
Sec-8' 24 5.20 16.00 #REF! #REF!
St1 10 2.66 18.00 #REF! #REF!
St2 10 2.12 18.00 #REF! #REF!
St3 10 1.98 18.00 #REF! #REF!
St4 10 1.52 18.00 #REF! #REF!

C6 Sec-8' 24 5.10 16.00 #REF! #REF!


St1 10 2.66 18.00 #REF! #REF!
St2 10 2.12 18.00 #REF! #REF!
St3 10 1.98 18.00 #REF! #REF!
St4 10 1.52 18.00 #REF! #REF!

C7 Sec-8' 24 5.10 16.00 #REF! #REF!


St1 10 2.66 18.00 #REF! #REF!
St2 10 2.12 18.00 #REF! #REF!
St3 10 1.98 18.00 #REF! #REF!
St4 10 1.52 18.00 #REF! #REF!

C8 Sec-8' 24 5.10 16.00 #REF! #REF!


St1 10 2.66 18.00 #REF! #REF!
St2 10 2.12 18.00 #REF! #REF!
St3 10 1.98 18.00 #REF! #REF!
St4 10 1.52 18.00 #REF! #REF!

C9 Sec-8' 24 5.10 16.00 #REF! #REF!


St1 10 2.66 18.00 #REF! #REF!
St2 10 2.12 18.00 #REF! #REF!
St3 10 1.98 18.00 #REF! #REF!
St4 10 1.52 18.00 #REF! #REF!

C10 Sec-8' 24 5.10 16.00 #REF! #REF!


St1 10 2.66 18.00 #REF! #REF!
St2 10 2.12 18.00 #REF! #REF!
St3 10 1.98 18.00 #REF! #REF!
St4 10 1.52 18.00 #REF! #REF!

C11 Sec-10 24 5.00 14.00 #REF! #REF!


St1 10 2.26 18.00 #REF! #REF!
St2 10 1.76 18.00 #REF! #REF!
St3 10 1.58 18.00 #REF! #REF!
St4 10 0.61 18.00 #REF! #REF!

C12 Sec-1 20 4.80 16.00 #REF! #REF!


St1 10 2.26 18.00 #REF! #REF!
St2 10 1.76 18.00 #REF! #REF!
St5 10 0.61 18.00 #REF! #REF!

C13 Sec-9 20 3.61 14.00 #REF! #REF!


St1 10 1.86 18.00 #REF! #REF!
St2 10 1.32 18.00 #REF! #REF!
St2 10 1.46 18.00 #REF! #REF!
St5 10 0.51 18.00 #REF! #REF!

C13' Sec-9 20 3.61 14.00 #REF! #REF!


St1 10 1.86 18.00 #REF! #REF!
St2 10 1.32 18.00 #REF! #REF!
St2 10 1.46 18.00 #REF! #REF!
St5 10 0.51 18.00 #REF! #REF!

right wing
C-1 Section 1 20 4.90 18.00 #REF! #REF!
St1 10 3.06 18.00 #REF! #REF!
St2 10 2.26 18.00 #REF! #REF!
St3 10 2.16 18.00 #REF! #REF!
St4 10 1.52 18.00 #REF! #REF!
Project Residence
Location ADDIS ABABA
SUB - STRUCTURE

Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
St5 10 0.80 18.00 #REF! #REF!

C1' Section 5-5 20 5.20 20.00 #REF! #REF!


St1 10 2.86 18.00 #REF! #REF!
St2 10 2.39 18.00 #REF! #REF!
St3 10 1.88 18.00 #REF! #REF!
St4 10 2.32 18.00 #REF! #REF!
St5 10 1.72 18.00 #REF! #REF!

C3 Sec-7 24 5.20 18.00 #REF! #REF!


St1 10 3.46 18.00 #REF! #REF!
St2 10 2.91 18.00 #REF! #REF!
St3 10 2.32 18.00 #REF! #REF!
St4 10 3.09 18.00 #REF! #REF!
St5 10 2.67 18.00 #REF! #REF!
St6 10 2.25 18.00 #REF! #REF!
St7 10 1.83 18.00 #REF! #REF!

C4 Sec-5 20 5.00 20.00 0 0.00


St1 10 2.86 18.00 0 0.00
St2 10 2.39 18.00 0 0.00
St3 10 1.88 18.00 0 0.00
St4 10 2.32 18.00 0 0.00
St5 10 1.72 18.00 0 0.00

C5 Sec-5 20 5.00 20.00 #REF! #REF!


St1 10 2.86 18.00 #REF! #REF!
St2 10 2.39 18.00 #REF! #REF!
St3 10 1.88 18.00 #REF! #REF!
St4 10 2.32 18.00 #REF! #REF!
St5 10 1.72 18.00 #REF! #REF!

C6 Sec-12 20 4.90 20.00 #REF! #REF!


St1 10 2.46 18.00 #REF! #REF!
St2 10 1.48 18.00 #REF! #REF!
St3 10 1.99 18.00 #REF! #REF!
St4 10 1.96 18.00 #REF! #REF!
St5 10 0.71 18.00 #REF! #REF!

C7 Sec-1 20 4.90 18.00 #REF! #REF!


St1 10 2.66 18.00 #REF! #REF!
St2 10 2.12 18.00 #REF! #REF!
St3 10 2.16 18.00 #REF! #REF!
St4 10 1.52 18.00 #REF! #REF!
St4 10 0.80 18.00 #REF! #REF!

C8 Sec-1 20 4.90 18.00 #REF! #REF!


St1 10 2.66 18.00 #REF! #REF!
St2 10 2.12 18.00 #REF! #REF!
St3 10 2.16 18.00 #REF! #REF!
St4 10 1.52 18.00 #REF! #REF!
St4 10 0.80 18.00 #REF! #REF!

C9 Sec-5 20 5.00 20.00 #REF! #REF!


St1 10 2.86 18.00 #REF! #REF!
St2 10 2.39 18.00 #REF! #REF!
St3 10 1.88 18.00 #REF! #REF!
St4 10 2.32 18.00 #REF! #REF!
St5 10 1.72 18.00 #REF! #REF!

C9' Sec-5 20 5.00 20.00 #REF! #REF!


St1 10 2.86 18.00 #REF! #REF!
St2 10 2.39 18.00 #REF! #REF!
St3 10 1.88 18.00 #REF! #REF!
St4 10 2.32 18.00 #REF! #REF!
St5 10 1.72 18.00 #REF! #REF!

C10 Sec-1 20 4.90 18.00 #REF! #REF!


St1 10 2.66 18.00 #REF! #REF!
St2 10 2.12 18.00 #REF! #REF!
St3 10 2.16 18.00 #REF! #REF!
St4 10 1.52 18.00 #REF! #REF!
St4 10 0.80 18.00 #REF! #REF!

C11 Sec-1 20 4.90 18.00 #REF! #REF!


St1 10 2.66 18.00 #REF! #REF!
St2 10 2.12 18.00 #REF! #REF!
St3 10 2.16 18.00 #REF! #REF!
St4 10 1.52 18.00 #REF! #REF!
St4 10 0.80 18.00 #REF! #REF!

C12 Sec-13 20 4.90 18.00 #REF! #REF!


St1 10 2.26 18.00 #REF! #REF!
St2 10 1.76 18.00 #REF! #REF!
St3 10 0.61 18.00 #REF! #REF!

C13 Sec-1 20 4.90 18.00 #REF! #REF!


St1 10 2.66 18.00 #REF! #REF!
Project Residence
Location ADDIS ABABA
SUB - STRUCTURE

Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
St2 10 2.12 18.00 #REF! #REF!
St3 10 2.16 18.00 #REF! #REF!
St4 10 1.52 18.00 #REF! #REF!
St4 10 0.80 18.00 #REF! #REF!

C13' Sec-1 20 4.90 18.00 #REF! #REF!


St1 10 2.66 18.00 #REF! #REF!
St2 10 2.12 18.00 #REF! #REF!
St3 10 2.16 18.00 #REF! #REF!
St4 10 1.52 18.00 #REF! #REF!
St4 10 0.80 18.00 #REF! #REF!

C14 Sec-5 20 4.90 20.00 #REF! #REF!


St1 10 2.86 18.00 #REF! #REF!
St2 10 2.39 18.00 #REF! #REF!
St3 10 1.88 18.00 #REF! #REF!
St4 10 2.32 18.00 #REF! #REF!
St5 10 1.72 18.00 #REF! #REF!

C14' Sec-5 20 4.90 20.00 #REF! #REF!


St1 10 2.86 18.00 #REF! #REF!
St2 10 2.39 18.00 #REF! #REF!
St3 10 1.88 18.00 #REF! #REF!
St4 10 2.32 18.00 #REF! #REF!
St5 10 1.72 18.00 #REF! #REF!

C15 Sec-5 20 4.90 20.00 #REF! #REF!


St1 10 2.86 18.00 #REF! #REF!
St2 10 2.39 18.00 #REF! #REF!
St3 10 1.88 18.00 #REF! #REF!
St4 10 2.32 18.00 #REF! #REF!
St5 10 1.72 18.00 #REF! #REF!

C15' Sec-5 20 4.90 20.00 0 0.00


St1 10 2.86 18.00 0 0.00
St2 10 2.39 18.00 0 0.00
St3 10 1.88 18.00 0 0.00
St4 10 2.32 18.00 0 0.00
St5 10 1.72 18.00 0 0.00

Shear Wall
SW-1 20 6.10 88.00 1 536.80
12 7.42 62.00 1 460.04

SW-2 20 6.10 70.00 1 427.00


12 5.97 62.00 1 370.14

Elevator shaft-2 1 12 8.52 62.00 1 528.24


2 12 6.95 62.00 1 430.90
3 12 4.27 62.00 1 264.74
4 12 1.46 62.00 1 90.52

20 6.10 292.00 1 1,781.20


12 2.66 7.00 1 18.62
8 0.80 4.00 1 3.20

Elevater Shaft 1 12 8.52 62.00 1 528.24


2 12 3.52 62.00 1 218.24
3 12 3.04 62.00 4 753.92
4 12 2.02 62.00 3 375.72
5 12 1.71 62.00 1 105.90
6 12 1.47 62.00 1 91.14
7 12 1.37 62.00 1 84.94

20 6.10 292.00 #REF! #REF!


12 2.66 7.00 #REF! #REF!
8 0.80 4.00 #REF! #REF!
2 10 1.64 32.00 59 3,096.32

RC Retaining Wall
Foundation level
Along Ax-A 12 3.50 706.00 1 2,471.00
12 12.00 36.00 5 2,160.00

Along Ax-L 12 3.50 710.00 1 2,485.00


12 12.00 36.00 5 2,160.00

Along Ax-1 12 3.50 788.00 1 2,758.00


12 12.00 36.00 5 2,160.00
At Basment floor
Along Ax-A 12 3.57 706.00 1 2,520.42
12 12.00 42.00 5 2,520.00

Along Ax-L 12 3.57 710.00 1 2,534.70


12 12.00 42.00 5 2,520.00
Project Residence
Location ADDIS ABABA
SUB - STRUCTURE

Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
Along Ax-1 12 3.57 788.00 1 2,813.16
12 12.00 42.00 5 2,520.00
Project Residence
Location ADDIS ABABA
SUB - STRUCTURE

Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
Beams
Basment Beam
Right wings
MX1 & MX2 20 9.96 4.00 2 79.68
20 7.00 24.00 2 336.00
20 11.31 4.00 2 90.48
24 2.70 3.00 2 16.17
24 3.76 3.00 2 22.53
24 3.87 3.00 2 23.22
24 4.00 15.00 2 120.00
24 4.34 3.00 2 26.04
24 3.15 3.00 2 18.90
20 6.42 6.00 2 77.04
20 7.00 34.00 2 476.00
20 7.87 5.00 2 78.70
10 1.80 473.00 2 1,702.80

MX3 & MX4 20 9.96 4.00 2 79.68


20 7.00 24.00 2 336.00
20 11.31 4.00 2 90.48
24 2.70 3.00 2 16.17
24 3.76 3.00 2 22.53
24 3.87 3.00 2 23.22
24 4.00 16.00 2 128.00
20 6.42 5.00 2 64.20
20 7.10 9.00 2 127.80
24 7.20 19.00 2 273.60
20 7.00 4.00 2 56.00
20 7.87 4.00 2 62.96
8 1.80 473.00 2 1,702.80

MX5& MX6 20 9.96 3.00 2 59.76


20 7.00 3.00 2 42.00
20 10.01 4.00 2 80.08
24 2.70 3.00 2 16.17
24 3.76 3.00 2 22.53
24 3.87 3.00 2 23.22
24 4.00 3.00 2 24.00
24 2.51 3.00 2 15.06
10 1.80 204.00 2 734.40

20 11.91 6.00 2 142.92


16 6.06 4.00 2 48.48
16 8.06 5.00 2 80.60
10 1.80 197.00 2 709.20

24 10.05 4.00 2 80.40


20 7.10 4.00 2 56.80
20 11.31 4.00 2 90.48
24 2.51 3.00 2 15.06
24 4.00 7.00 2 56.00
24 4.34 4.00 2 34.72
24 3.15 3.00 2 18.90
24 6.67 4.00 2 53.36
20 7.10 4.00 2 56.80
20 7.00 3.00 2 42.00
20 7.87 4.00 2 62.96
10 1.80 421.00 2 1,515.60

MX7 & MX8 20 9.96 3.00 2 59.76


20 7.00 24.00 2 336.00
20 11.31 4.00 2 90.48
20 2.70 4.00 2 21.56
20 3.76 3.00 2 22.53
20 3.87 4.00 2 30.96
20 4.00 12.00 2 96.00
20 4.34 4.00 2 34.72
20 3.15 4.00 2 25.20
20 6.42 5.00 2 64.20
20 7.00 37.00 2 518.00
16 7.87 4.00 2 62.96
10 1.80 217.00 2 781.20

SY11',SY12,SY13& SY14 20 9.51 3.00 4 114.12


20 8.05 3.00 4 96.60
20 8.50 4.00 4 136.00
20 7.08 4.00 4 113.20
20 6.38 4.00 4 102.00
20 9.01 3.00 4 108.12
20 2.45 3.00 4 29.40
20 3.84 3.00 4 46.08
20 4.70 3.00 4 56.40
24 5.00 3.00 4 60.00
24 4.05 4.00 4 64.80
24 3.59 7.00 4 100.52
20 2.36 3.00 4 28.32
20 5.77 4.00 4 92.32
20 7.60 3.00 4 91.20
20 8.50 10.00 4 340.00
Project Residence
Location ADDIS ABABA
SUB - STRUCTURE

Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
20 5.65 4.00 4 90.40
20 7.10 5.00 4 142.00
20 5.52 4.00 4 88.32
10 1.80 324.00 4 2,332.80

SY13 20 9.51 3.00 1 28.53


20 8.05 3.00 1 24.15
20 8.50 4.00 1 34.00
20 7.08 4.00 1 28.30
20 6.38 4.00 1 25.50
20 9.01 3.00 1 27.03
20 2.45 3.00 1 7.35
20 3.84 3.00 1 11.52
20 4.70 3.00 1 14.10
24 5.00 3.00 1 15.00
24 4.05 4.00 1 16.20
24 3.59 7.00 1 25.13
20 2.36 3.00 1 7.08
20 5.77 4.00 1 23.08
20 7.60 3.00 1 22.80
20 8.50 10.00 1 85.00
20 5.65 4.00 1 22.60
20 7.10 5.00 1 35.50
20 5.52 4.00 1 22.08
10 1.80 324.00 1 583.20

SY15& SY16 20 9.51 3.00 2 57.06


20 4.31 4.00 2 34.48
20 2.45 2.00 2 9.80
20 3.84 2.00 2 15.36
24 2.77 3.00 2 16.62
20 5.77 3.00 2 34.62
20 7.17 4.00 2 57.36
10 1.80 100.00 2 360.00
2
SY15 & Sy16 20 4.76 4.00 2 38.08
20 7.08 3.00 2 42.45
20 6.38 3.00 2 38.25
20 9.01 3.00 2 54.06
24 3.01 3.00 2 18.06
24 4.05 3.00 2 24.30
20 3.59 6.00 2 43.08
20 2.36 3.00 2 14.16
20 8.07 5.00 2 80.70
20 5.65 3.00 2 33.90
20 7.10 3.00 2 42.60
20 5.52 3.00 2 33.12
10 1.80 196.00 2 705.60

SY17 20 9.51 3.00 1 28.53


20 8.05 3.00 1 24.15
20 8.50 4.00 1 34.00
20 7.08 4.00 1 28.30
20 6.38 3.00 1 19.13
20 9.01 3.00 1 27.03
20 2.45 3.00 1 7.35
20 3.84 3.00 1 11.52
24 4.70 3.00 1 14.10
24 5.00 3.00 1 15.00
24 5.00 3.00 1 15.00
20 4.05 4.00 1 16.20
20 3.59 6.00 1 21.54
20 2.36 3.00 1 7.08
20 5.77 3.00 1 17.31
20 7.60 3.00 1 22.80
20 8.50 9.00 1 76.50
20 5.65 3.00 1 16.95
20 7.10 3.00 1 21.30
20 5.52 3.00 1 16.56
10 1.80 363.00 1 653.40

SY19, Y20 & Y21 20 9.51 3.00 3 85.59


20 8.05 3.00 3 72.45
20 8.50 4.00 3 102.00
20 7.08 4.00 3 84.90
20 6.38 3.00 3 57.38
20 9.01 3.00 3 81.09
20 2.45 3.00 3 22.05
20 3.84 3.00 3 34.56
24 4.70 3.00 3 42.30
24 5.00 3.00 3 45.00
24 5.00 3.00 3 45.00
20 4.05 4.00 3 48.60
20 3.59 6.00 3 64.62
20 2.36 3.00 3 21.24
20 5.77 3.00 3 51.93
20 7.60 3.00 3 68.40
20 8.50 9.00 3 229.50
20 5.65 3.00 3 50.85
Project Residence
Location ADDIS ABABA
SUB - STRUCTURE

Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
20 7.10 3.00 3 63.90
20 5.52 3.00 3 49.68
10 1.80 363.00 3 1,960.20
left wings
MX1 16 9.01 4.00 1 36.04
16 6.90 4.00 1 27.60
16 6.60 4.00 1 26.40
16 6.80 8.00 1 54.40
16 11.55 4.00 1 46.20
16 8.05 4.00 1 32.20
16 9.68 4.00 1 38.72

16 2.31 2.00 1 4.62


16 3.70 2.00 1 7.40
16 4.07 2.00 1 8.14
16 3.87 2.00 1 7.74
16 4.00 4.00 1 16.00
16 2.84 2.00 1 5.68
16 2.01 4.00 1 8.04
16 2.34 2.00 1 4.68
16 2.84 2.00 1 5.68
16 3.88 2.00 1 7.76
16 2.69 2.00 1 5.38

16 5.27 4.00 1 21.08


16 7.40 4.00 1 29.60
16 6.40 4.00 1 25.60
16 6.80 27.20 1 184.96
16 6.42 4.00 1 25.68
10 1.80 453.00 1 815.40

MX2,Mx3 & Mx4 16 6.12 4.00 3 73.44


16 2.31 4.00 3 27.72
16 5.24 4.00 3 62.88
1.5 10 1.80 39.00 3 210.60

16 9.81 4.00 3 117.72


16 6.80 8.00 3 163.20
16 11.55 4.00 3 138.60
16 8.05 4.00 3 96.60
16 9.86 3.00 3 88.74

16 2.68 3.00 3 24.12


16 3.87 3.00 3 34.83
16 4.00 10.00 3 120.00
16 3.89 2.00 3 23.31
16 2.70 2.00 3 16.17

20 6.47 4.00 3 77.64


20 7.00 24.00 3 504.00
20 6.52 3.00 3 58.68
10 1.80 358.00 3 1,933.20

Mx-5 16 9.11 3.00 1 27.33


20 7.10 8.00 1 56.80
16 6.56 4.00 1 26.24
1
16 2.31 2.00 1 4.62
16 3.70 2.00 1 7.40
16 4.07 2.00 1 8.14
20 5.13 3.00 1 15.39

16 5.37 4.00 1 21.48


20 7.60 5.00 1 38.00
20 8.92 4.00 1 35.68
10 1.80 167.00 1 300.60

Mx5 & MX6 20 4.52 4.00 2 36.16


20 1.73 8.00 2 27.68
20 3.64 7.00 2 50.96
10 1.80 29.00 2 104.40

Mx-6 16 9.11 3.00 1 27.33


20 7.10 4.00 1 28.40
16 6.56 3.00 1 19.68
1
16 2.31 2.00 1 4.62
16 3.70 2.00 1 7.40
16 4.07 2.00 1 8.14
20 5.13 3.00 1 15.39

20 11.90 5.00 1 59.50


20 8.92 4.00 1 35.68
10 1.80 167.00 1 300.60

Mx5 & MX6 16 8.66 4.00 2 69.28


16 8.05 4.00 2 64.40
16 6.80 4.00 2 54.40
16 9.86 4.00 2 78.88
Project Residence
Location ADDIS ABABA
SUB - STRUCTURE

Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32

20 2.52 3.00 2 15.12


16 4.00 6.00 2 48.00
16 3.89 2.00 2 15.54
16 2.70 2.00 2 10.78

20 6.57 3.00 2 39.42


20 7.00 12.00 2 168.00
20 6.52 4.00 2 52.16
10 1.80 243.00 2 874.80

Mx-7 16 10.61 4.00 1 42.44


16 6.60 4.00 1 26.40
16 6.80 7.00 1 47.60
16 11.55 3.00 1 34.65
16 8.05 4.00 1 32.20
16 9.86 4.00 1 39.44

16 1.65 2.00 1 3.30


16 2.21 2.00 1 4.42
16 3.24 2.00 1 6.48
16 3.87 5.00 1 19.35
16 4.00 10.00 1 40.00
16 2.70 2.00 1 5.39

20 7.47 4.00 1 29.88


20 6.80 3.00 1 20.40
20 7.00 23.00 1 161.00
20 6.52 4.00 1 26.08

10 1.80 447.00 1 804.60

Mx-8 16 8.11 4.00 1 32.44


16 6.60 4.00 1 26.40
16 6.80 8.00 1 54.40
16 11.55 3.00 1 34.65
16 8.05 4.00 1 32.20
16 9.86 4.00 1 39.44

16 2.18 2.00 1 4.36


16 3.24 2.00 1 6.48
16 3.87 4.00 1 15.48
16 4.00 10.00 1 40.00
16 2.70 2.00 1 5.39

20 10.57 3.00 1 31.71


20 6.80 3.00 1 20.40
20 7.00 23.00 1 161.00
20 6.52 4.00 1 26.08

10 1.80 400.00 1 720.00

SY1 16 4.96 4.00 1 19.84


16 8.30 3.00 1 24.90
16 6.88 3.00 1 20.63
16 6.18 3.00 1 18.53
16 8.91 3.00 1 26.73

16 3.31 2.00 1 6.62


16 5.00 2.00 1 10.00
16 4.05 2.00 1 8.10
16 3.59 4.00 1 14.36
16 2.36 2.00 1 4.72

20 8.27 4.00 1 33.08


20 8.30 4.00 1 33.20
16 5.45 4.00 1 21.80
16 6.90 4.00 1 27.60
16 5.42 4.00 1 21.68
10 1.80 267.00 1 480.60

SY2 16 4.61 4.00 1 18.44


20 8.05 3.00 1 24.15
16 8.40 4.00 1 33.60
16 6.88 4.00 1 27.50
16 6.18 4.00 1 24.70
16 8.91 4.00 1 35.64

16 3.01 2.00 1 6.02


20 4.70 5.00 1 23.50
20 5.00 2.00 1 10.00
16 4.05 2.00 1 8.10
16 3.59 4.00 1 14.36
16 2.36 2.00 1 4.72

20 7.37 4.00 1 29.48


20 8.30 12.00 1 99.60
Project Residence
Location ADDIS ABABA
SUB - STRUCTURE

Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
16 5.45 4.00 1 21.80
16 11.52 4.00 1 46.08
2.2 10 1.80 324.00 1 583.20
2.05
SY3 & SY4 16 10.16 4.00 2 81.28
20 8.05 3.00 2 48.30
16 8.40 4.00 2 67.20
16 6.88 4.00 2 55.00
16 6.18 4.00 2 49.40
16 8.91 4.00 2 71.28

16 3.01 2.00 2 12.04


20 4.70 5.00 2 47.00
20 5.00 2.00 2 20.00
16 4.05 2.00 2 16.20
16 3.59 4.00 2 28.72
16 2.36 2.00 2 9.44

20 7.37 4.00 2 58.96


20 8.30 12.00 2 199.20
16 5.45 4.00 2 43.60
16 11.52 4.00 2 92.16
2.2 10 1.80 324.00 2 1,166.40

SY5 16 9.01 2.00 1 18.02


20 4.31 2.00 1 8.62

16 3.45 4.00 1 13.80


16 3.74 4.00 1 14.96
16 3.77 4.00 1 15.08

16 8.25 6.00 1 49.50


2.2 20 5.16 2.00 1 10.32
2.05 10 1.80 109.00 1 196.20

SY5 & SY6 20 4.76 3.00 2 28.56


20 7.08 3.00 2 42.45
16 6.38 4.00 2 51.00
16 9.01 4.00 2 72.08

16 3.01 4.00 2 24.08


20 4.05 3.00 2 24.30
16 3.59 3.00 2 21.54
20 3.59 4.00 2 28.72
16 2.36 2.00 2 9.44

20 8.08 6.00 2 96.90


16 5.65 4.00 2 45.20
16 7.10 4.00 2 56.80
16 5.52 4.00 2 44.16
2.2 10 1.80 201.00 2 723.60

SY5 16 9.01 2.00 1 18.02


20 4.31 2.00 1 8.62

16 3.45 4.00 1 13.80


16 3.74 4.00 1 14.96
16 3.77 4.00 1 15.08

16 8.25 6.00 1 49.50


2.2 20 5.16 2.00 1 10.32
2.05 10 1.80 109.00 1 196.20

S7, Y8 & Y9 16 9.41 3.00 3 84.69


16 7.85 4.00 3 94.20
16 8.30 4.00 3 99.60
16 6.87 4.00 3 82.44
16 6.17 4.00 3 74.04
16 8.91 4.00 3 106.92

16 2.45 2.00 3 14.70


16 3.84 3.00 3 34.56
20 4.70 3.00 3 42.30
20 5.00 3.00 3 45.00
20 4.05 4.00 3 48.60
16 3.59 6.00 3 64.62
16 2.36 3.00 3 21.24

20 5.77 4.00 3 69.24


16 7.60 5.00 3 114.00
20 8.50 12.00 3 306.00
16 5.65 4.00 3 67.80
20 7.10 4.00 3 85.20
16 5.52 4.00 3 66.24
10 1.80 363.00 3 1,960.20

S10 16 10.61 3.00 3 95.49


16 7.85 4.00 3 94.20
16 8.30 4.00 3 99.60
Project Residence
Location ADDIS ABABA
SUB - STRUCTURE

Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
16 6.87 4.00 3 82.44
16 6.17 4.00 3 74.04
16 8.91 4.00 3 106.92

16 2.45 2.00 3 14.70


16 3.84 3.00 3 34.56
20 4.70 3.00 3 42.30
20 5.00 3.00 3 45.00
20 4.05 4.00 3 48.60
16 3.59 6.00 3 64.62
16 2.36 3.00 3 21.24

20 6.97 4.00 3 83.64


20 7.60 5.00 3 114.00
20 8.50 12.00 3 306.00
16 5.65 4.00 3 67.80
20 7.10 4.00 3 85.20
16 5.52 4.00 3 66.24
10 1.80 363.00 3 1,960.20

S11 16 9.51 3.00 3 85.59


16 8.05 3.00 3 72.45
16 8.50 4.00 3 102.00
16 7.08 4.00 3 84.90
16 6.38 3.00 3 57.38
16 9.01 3.00 3 81.09
16 2.45 3.00 3 22.05
16 3.84 3.00 3 34.56
16 4.70 3.00 3 42.30
16 5.00 3.00 3 45.00
16 5.00 3.00 3 45.00
16 4.05 4.00 3 48.60
16 3.59 6.00 3 64.62
16 2.36 3.00 3 21.24
16 5.77 3.00 3 51.93
16 7.60 3.00 3 68.40
16 8.50 9.00 3 229.50
16 5.65 3.00 3 50.85
16 7.10 3.00 3 63.90
16 5.52 3.00 3 49.68
10 1.80 363.00 3 1,960.20
Basment beams

Ground floor beam


Right wings
MX1 & MX2 20 9.96 4.00 2 79.68
20 7.00 24.00 2 336.00
20 11.31 4.00 2 90.48
24 2.70 3.00 2 16.17
24 3.76 3.00 2 22.53
24 3.87 3.00 2 23.22
24 4.00 15.00 2 120.00
24 4.34 3.00 2 26.04
24 3.15 3.00 2 18.90
20 6.42 6.00 2 77.04
20 7.00 34.00 2 476.00
20 7.87 5.00 2 78.70
10 1.80 473.00 2 1,702.80

MX3 & MX4 20 9.96 4.00 2 79.68


20 7.00 24.00 2 336.00
20 11.31 4.00 2 90.48
24 2.70 3.00 2 16.17
24 3.76 3.00 2 22.53
24 3.87 3.00 2 23.22
24 4.00 16.00 2 128.00
20 6.42 5.00 2 64.20
20 7.10 9.00 2 127.80
24 7.20 19.00 2 273.60
20 7.00 4.00 2 56.00
20 7.87 4.00 2 62.96
8 1.80 473.00 2 1,702.80

MX5& MX6 20 9.96 3.00 2 59.76


20 7.00 3.00 2 42.00
20 10.01 4.00 2 80.08
24 2.70 3.00 2 16.17
24 3.76 3.00 2 22.53
24 3.87 3.00 2 23.22
24 4.00 3.00 2 24.00
24 2.51 3.00 2 15.06
10 1.80 204.00 2 734.40
Project Residence
Location ADDIS ABABA
SUB - STRUCTURE

Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
20 11.91 6.00 2 142.92
16 6.06 4.00 2 48.48
16 8.06 5.00 2 80.60
10 1.80 197.00 2 709.20

24 10.05 4.00 2 80.40


20 7.10 4.00 2 56.80
20 11.31 4.00 2 90.48
24 2.51 3.00 2 15.06
24 4.00 7.00 2 56.00
24 4.34 4.00 2 34.72
24 3.15 3.00 2 18.90
24 6.67 4.00 2 53.36
20 7.10 4.00 2 56.80
20 7.00 3.00 2 42.00
20 7.87 4.00 2 62.96
10 1.80 421.00 2 1,515.60

MX7 & MX8 20 9.96 3.00 2 59.76


20 7.00 24.00 2 336.00
20 11.31 4.00 2 90.48
20 2.70 4.00 2 21.56
20 3.76 3.00 2 22.53
20 3.87 4.00 2 30.96
20 4.00 12.00 2 96.00
20 4.34 4.00 2 34.72
20 3.15 4.00 2 25.20
20 6.42 5.00 2 64.20
20 7.00 37.00 2 518.00
16 7.87 4.00 2 62.96
10 1.80 217.00 2 781.20

SY11',SY12,SY13& SY14 20 9.51 3.00 4 114.12


20 8.05 3.00 4 96.60
20 8.50 4.00 4 136.00
20 7.08 4.00 4 113.20
20 6.38 4.00 4 102.00
20 9.01 3.00 4 108.12
20 2.45 3.00 4 29.40
20 3.84 3.00 4 46.08
20 4.70 3.00 4 56.40
24 5.00 3.00 4 60.00
24 4.05 4.00 4 64.80
24 3.59 7.00 4 100.52
20 2.36 3.00 4 28.32
20 5.77 4.00 4 92.32
20 7.60 3.00 4 91.20
20 8.50 10.00 4 340.00
20 5.65 4.00 4 90.40
20 7.10 5.00 4 142.00
20 5.52 4.00 4 88.32
10 1.80 324.00 4 2,332.80

SY13 20 9.51 3.00 1 28.53


20 8.05 3.00 1 24.15
20 8.50 4.00 1 34.00
20 7.08 4.00 1 28.30
20 6.38 4.00 1 25.50
20 9.01 3.00 1 27.03
20 2.45 3.00 1 7.35
20 3.84 3.00 1 11.52
20 4.70 3.00 1 14.10
24 5.00 3.00 1 15.00
24 4.05 4.00 1 16.20
24 3.59 7.00 1 25.13
20 2.36 3.00 1 7.08
20 5.77 4.00 1 23.08
20 7.60 3.00 1 22.80
20 8.50 10.00 1 85.00
20 5.65 4.00 1 22.60
20 7.10 5.00 1 35.50
20 5.52 4.00 1 22.08
10 1.80 324.00 1 583.20

SY15& SY16 20 9.51 3.00 2 57.06


20 4.31 4.00 2 34.48
20 2.45 2.00 2 9.80
20 3.84 2.00 2 15.36
24 2.77 3.00 2 16.62
20 5.77 3.00 2 34.62
20 7.17 4.00 2 57.36
10 1.80 100.00 2 360.00
2
SY15 & Sy16 20 4.76 4.00 2 38.08
20 7.08 3.00 2 42.45
20 6.38 3.00 2 38.25
20 9.01 3.00 2 54.06
24 3.01 3.00 2 18.06
24 4.05 3.00 2 24.30
Project Residence
Location ADDIS ABABA
SUB - STRUCTURE

Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
20 3.59 6.00 2 43.08
20 2.36 3.00 2 14.16
20 8.07 5.00 2 80.70
20 5.65 3.00 2 33.90
20 7.10 3.00 2 42.60
20 5.52 3.00 2 33.12
10 1.80 196.00 2 705.60

SY17 20 9.51 3.00 1 28.53


20 8.05 3.00 1 24.15
20 8.50 4.00 1 34.00
20 7.08 4.00 1 28.30
20 6.38 3.00 1 19.13
20 9.01 3.00 1 27.03
20 2.45 3.00 1 7.35
20 3.84 3.00 1 11.52
24 4.70 3.00 1 14.10
24 5.00 3.00 1 15.00
24 5.00 3.00 1 15.00
20 4.05 4.00 1 16.20
20 3.59 6.00 1 21.54
20 2.36 3.00 1 7.08
20 5.77 3.00 1 17.31
20 7.60 3.00 1 22.80
20 8.50 9.00 1 76.50
20 5.65 3.00 1 16.95
20 7.10 3.00 1 21.30
20 5.52 3.00 1 16.56
10 1.80 363.00 1 653.40

SY19, Y20 & Y21 20 9.51 3.00 3 85.59


20 8.05 3.00 3 72.45
20 8.50 4.00 3 102.00
20 7.08 4.00 3 84.90
20 6.38 3.00 3 57.38
20 9.01 3.00 3 81.09
20 2.45 3.00 3 22.05
20 3.84 3.00 3 34.56
24 4.70 3.00 3 42.30
24 5.00 3.00 3 45.00
24 5.00 3.00 3 45.00
20 4.05 4.00 3 48.60
20 3.59 6.00 3 64.62
20 2.36 3.00 3 21.24
20 5.77 3.00 3 51.93
20 7.60 3.00 3 68.40
20 8.50 9.00 3 229.50
20 5.65 3.00 3 50.85
20 7.10 3.00 3 63.90
20 5.52 3.00 3 49.68
10 1.80 363.00 3 1,960.20
Right wing
MX1 16 9.01 4.00 1 36.04
16 6.90 4.00 1 27.60
16 6.60 4.00 1 26.40
16 6.80 8.00 1 54.40
16 11.55 4.00 1 46.20
16 8.05 4.00 1 32.20
16 9.68 4.00 1 38.72

16 2.31 2.00 1 4.62


16 3.70 2.00 1 7.40
16 4.07 2.00 1 8.14
16 3.87 2.00 1 7.74
16 4.00 4.00 1 16.00
16 2.84 2.00 1 5.68
16 2.01 4.00 1 8.04
16 2.34 2.00 1 4.68
16 2.84 2.00 1 5.68
16 3.88 2.00 1 7.76
16 2.69 2.00 1 5.38

16 5.27 4.00 1 21.08


16 7.40 4.00 1 29.60
16 6.40 4.00 1 25.60
16 6.80 27.20 1 184.96
16 6.42 4.00 1 25.68
10 1.80 453.00 1 815.40

MX2,Mx3 & Mx4 16 6.12 4.00 3 73.44


16 2.31 4.00 3 27.72
16 5.24 4.00 3 62.88
1.5 10 1.80 39.00 3 210.60

16 9.81 4.00 3 117.72


16 6.80 8.00 3 163.20
16 11.55 4.00 3 138.60
16 8.05 4.00 3 96.60
16 9.86 3.00 3 88.74
Project Residence
Location ADDIS ABABA
SUB - STRUCTURE

Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32

16 2.68 3.00 3 24.12


16 3.87 3.00 3 34.83
16 4.00 10.00 3 120.00
16 3.89 2.00 3 23.31
16 2.70 2.00 3 16.17

20 6.47 4.00 3 77.64


20 7.00 24.00 3 504.00
20 6.52 3.00 3 58.68
10 1.80 358.00 3 1,933.20

Mx-5 16 9.11 3.00 1 27.33


20 7.10 8.00 1 56.80
16 6.56 4.00 1 26.24
1
16 2.31 2.00 1 4.62
16 3.70 2.00 1 7.40
16 4.07 2.00 1 8.14
20 5.13 3.00 1 15.39

16 5.37 4.00 1 21.48


20 7.60 5.00 1 38.00
20 8.92 4.00 1 35.68
10 1.80 167.00 1 300.60

Mx5 & MX6 20 4.52 4.00 2 36.16


20 1.73 8.00 2 27.68
20 3.64 7.00 2 50.96
10 1.80 29.00 2 104.40

Mx-6 16 9.11 3.00 1 27.33


20 7.10 4.00 1 28.40
16 6.56 3.00 1 19.68
1
16 2.31 2.00 1 4.62
16 3.70 2.00 1 7.40
16 4.07 2.00 1 8.14
20 5.13 3.00 1 15.39

20 11.90 5.00 1 59.50


20 8.92 4.00 1 35.68
10 1.80 167.00 1 300.60

Mx5 & MX6 16 8.66 4.00 2 69.28


16 8.05 4.00 2 64.40
16 6.80 4.00 2 54.40
16 9.86 4.00 2 78.88

20 2.52 3.00 2 15.12


16 4.00 6.00 2 48.00
16 3.89 2.00 2 15.54
16 2.70 2.00 2 10.78

20 6.57 3.00 2 39.42


20 7.00 12.00 2 168.00
20 6.52 4.00 2 52.16
10 1.80 243.00 2 874.80

Mx-7 16 10.61 4.00 1 42.44


16 6.60 4.00 1 26.40
16 6.80 7.00 1 47.60
16 11.55 3.00 1 34.65
16 8.05 4.00 1 32.20
16 9.86 4.00 1 39.44

16 1.65 2.00 1 3.30


16 2.21 2.00 1 4.42
16 3.24 2.00 1 6.48
16 3.87 5.00 1 19.35
16 4.00 10.00 1 40.00
16 2.70 2.00 1 5.39

20 7.47 4.00 1 29.88


20 6.80 3.00 1 20.40
20 7.00 23.00 1 161.00
20 6.52 4.00 1 26.08

10 1.80 447.00 1 804.60

Mx-8 16 8.11 4.00 1 32.44


16 6.60 4.00 1 26.40
16 6.80 8.00 1 54.40
16 11.55 3.00 1 34.65
16 8.05 4.00 1 32.20
16 9.86 4.00 1 39.44

16 2.18 2.00 1 4.36


Project Residence
Location ADDIS ABABA
SUB - STRUCTURE

Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
16 3.24 2.00 1 6.48
16 3.87 4.00 1 15.48
16 4.00 10.00 1 40.00
16 2.70 2.00 1 5.39

20 10.57 3.00 1 31.71


20 6.80 3.00 1 20.40
20 7.00 23.00 1 161.00
20 6.52 4.00 1 26.08

10 1.80 400.00 1 720.00

SY1 16 4.96 4.00 1 19.84


16 8.30 3.00 1 24.90
16 6.88 3.00 1 20.63
16 6.18 3.00 1 18.53
16 8.91 3.00 1 26.73

16 3.31 2.00 1 6.62


16 5.00 2.00 1 10.00
16 4.05 2.00 1 8.10
16 3.59 4.00 1 14.36
16 2.36 2.00 1 4.72

20 8.27 4.00 1 33.08


20 8.30 4.00 1 33.20
16 5.45 4.00 1 21.80
16 6.90 4.00 1 27.60
16 5.42 4.00 1 21.68
10 1.80 267.00 1 480.60

SY2 16 4.61 4.00 1 18.44


20 8.05 3.00 1 24.15
16 8.40 4.00 1 33.60
16 6.88 4.00 1 27.50
16 6.18 4.00 1 24.70
16 8.91 4.00 1 35.64

16 3.01 2.00 1 6.02


20 4.70 5.00 1 23.50
20 5.00 2.00 1 10.00
16 4.05 2.00 1 8.10
16 3.59 4.00 1 14.36
16 2.36 2.00 1 4.72

20 7.37 4.00 1 29.48


20 8.30 12.00 1 99.60
16 5.45 4.00 1 21.80
16 11.52 4.00 1 46.08
2.2 10 1.80 324.00 1 583.20
2.05
SY3 & SY4 16 10.16 4.00 2 81.28
20 8.05 3.00 2 48.30
16 8.40 4.00 2 67.20
16 6.88 4.00 2 55.00
16 6.18 4.00 2 49.40
16 8.91 4.00 2 71.28

16 3.01 2.00 2 12.04


20 4.70 5.00 2 47.00
20 5.00 2.00 2 20.00
16 4.05 2.00 2 16.20
16 3.59 4.00 2 28.72
16 2.36 2.00 2 9.44

20 7.37 4.00 2 58.96


20 8.30 12.00 2 199.20
16 5.45 4.00 2 43.60
16 11.52 4.00 2 92.16
2.2 10 1.80 324.00 2 1,166.40

SY5 16 9.01 2.00 1 18.02


20 4.31 2.00 1 8.62

16 3.45 4.00 1 13.80


16 3.74 4.00 1 14.96
16 3.77 4.00 1 15.08

16 8.25 6.00 1 49.50


2.2 20 5.16 2.00 1 10.32
2.05 10 1.80 109.00 1 196.20

SY5 & SY6 20 4.76 3.00 2 28.56


20 7.08 3.00 2 42.45
16 6.38 4.00 2 51.00
16 9.01 4.00 2 72.08

16 3.01 4.00 2 24.08


Project Residence
Location ADDIS ABABA
SUB - STRUCTURE

Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
20 4.05 3.00 2 24.30
16 3.59 3.00 2 21.54
20 3.59 4.00 2 28.72
16 2.36 2.00 2 9.44

20 8.08 6.00 2 96.90


16 5.65 4.00 2 45.20
16 7.10 4.00 2 56.80
16 5.52 4.00 2 44.16
2.2 10 1.80 201.00 2 723.60

SY5 16 9.01 2.00 1 18.02


20 4.31 2.00 1 8.62

16 3.45 4.00 1 13.80


16 3.74 4.00 1 14.96
16 3.77 4.00 1 15.08

16 8.25 6.00 1 49.50


2.2 20 5.16 2.00 1 10.32
2.05 10 1.80 109.00 1 196.20

S7, Y8 & Y9 16 9.41 3.00 3 84.69


16 7.85 4.00 3 94.20
16 8.30 4.00 3 99.60
16 6.87 4.00 3 82.44
16 6.17 4.00 3 74.04
16 8.91 4.00 3 106.92

16 2.45 2.00 3 14.70


16 3.84 3.00 3 34.56
20 4.70 3.00 3 42.30
20 5.00 3.00 3 45.00
20 4.05 4.00 3 48.60
16 3.59 6.00 3 64.62
16 2.36 3.00 3 21.24

20 5.77 4.00 3 69.24


16 7.60 5.00 3 114.00
20 8.50 12.00 3 306.00
16 5.65 4.00 3 67.80
20 7.10 4.00 3 85.20
16 5.52 4.00 3 66.24
10 1.80 363.00 3 1,960.20

S10 16 10.61 3.00 3 95.49


16 7.85 4.00 3 94.20
16 8.30 4.00 3 99.60
16 6.87 4.00 3 82.44
16 6.17 4.00 3 74.04
16 8.91 4.00 3 106.92

16 2.45 2.00 3 14.70


16 3.84 3.00 3 34.56
20 4.70 3.00 3 42.30
20 5.00 3.00 3 45.00
20 4.05 4.00 3 48.60
16 3.59 6.00 3 64.62
16 2.36 3.00 3 21.24

20 6.97 4.00 3 83.64


20 7.60 5.00 3 114.00
20 8.50 12.00 3 306.00
16 5.65 4.00 3 67.80
20 7.10 4.00 3 85.20
16 5.52 4.00 3 66.24
10 1.80 363.00 3 1,960.20

S11 16 9.51 3.00 3 85.59


16 8.05 3.00 3 72.45
16 8.50 4.00 3 102.00
16 7.08 4.00 3 84.90
16 6.38 3.00 3 57.38
16 9.01 3.00 3 81.09
16 2.45 3.00 3 22.05
16 3.84 3.00 3 34.56
16 4.70 3.00 3 42.30
16 5.00 3.00 3 45.00
16 5.00 3.00 3 45.00
16 4.05 4.00 3 48.60
16 3.59 6.00 3 64.62
16 2.36 3.00 3 21.24
16 5.77 3.00 3 51.93
16 7.60 3.00 3 68.40
16 8.50 9.00 3 229.50
16 5.65 3.00 3 50.85
16 7.10 3.00 3 63.90
16 5.52 3.00 3 49.68
10 1.80 363.00 3 1,960.20
Project Residence
Location ADDIS ABABA
SUB - STRUCTURE

Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32

Ground Floor Slab


20 6.47 4.00 3 77.64
SY1-SY2/Mx-1-6 20 7.00 24.00 3 504.00
20 6.52 3.00 3 58.68
10 1.80 358.00 3 1,933.20
10 5.97 33.00 3 591.03

SY3-SY4/Mx-1-6 10 8.02 179.00 1 1,435.58


10 9.52 52.00 1 495.04
10 5.90 46.00 1 271.40
10 5.83 10.00 1 58.30

SY4-SY6/Mx-1-6 10 6.30 173.00 2 2,179.80


SY6-SY8/Mx-1-7 10 6.30 247.00 2 3,112.20
SY8-SY10/Mx-1-8 10 6.30 214.00 2 2,696.40
SY10-SY11/Mx-1-8 10 8.09 278.00 1 2,247.63
10 8.35 11.00 1 91.85

SY11'-SY12/Mx-1-8 10 8.09 211.00 1 1,705.94


SY12-SY13/Mx-1-8 10 6.30 205.00 1 1,291.50
10 8.85 50.00 1 442.50

SY13-SY14/Mx-1-8 10 6.30 218.00 1 1,373.40


10 8.55 37.00 1 316.35
10 8.25 41.00 1 338.25

SY15-SY16/Mx-1-8 10 6.30 206.00 1 1,297.80


10 6.04 41.00 1 247.64

SY16-SY17/Mx-1-8 10 6.30 208.00 1 1,310.40

SY18-SY20/Mx-1-8 10 6.30 175.00 2 2,205.00


10 9.90 41.00 1 405.90
10 6.30 41.00 1 258.30

SY20-SY21/Mx-1-8 10 9.89 292.00 2 5,775.76

negative bar
MX2 10 3.59 677.00 1 2,430.43
MX3 10 3.59 640.00 1 2,297.60
MX4 10 4.05 569.00 1 2,304.45
MX5 10 5.00 536.00 1 2,680.00
MX6 10 4.92 21.00 1 103.32
10 3.82 586.00 1 2,238.52

MX1--MX2/SY1 SY21 10 6.78 579.00 1 3,923.88


MX2--MX3/SY1 SY3 10 6.40 551.00 1 3,526.40
10 8.90 28.00 1 249.20

MX3--MX4/SY1 SY21 10 4.95 535.00 1 2,648.25

MX4--MX5/SY1 SY3 10 7.80 524.00 1 4,087.20


10 10.55 28.00 1 295.40
10 10.20 18.00 1 183.60

MX5--MX6/SY1 SY21 10 11.85 22.00 1 260.70


10 10.60 19.00 1 201.40
10 7.80 415.00 1 3,237.00

MX6--MX7/SY2 SY4 10 8.40 22.00 1 184.80


10 6.90 478.00 1 3,298.20
10 9.05 32.00 1 289.60

MX7--MX8/SY2 SY4 10 7.08 282.00 1 1,996.28


10 9.78 61.00 1 596.58
6.00 10 8.79 112.00 1 984.48
10 7.79 111.00 1 864.69
10 8.65 35.00 1 302.75
negative bar
SY2 10 3.70 49.00 1 181.30
SY3 10 3.59 100.00 1 359.00
SY4 10 3.87 291.00 1 1,126.17
SY5 10 4.00 222.00 1 888.00
SY6 10 4.00 205.00 1 820.00
SY7 10 4.00 271.00 1 1,084.00
SY8 10 4.00 294.00 1 1,176.00
SY9 10 4.00 278.00 1 1,112.00
SY10 10 3.83 294.00 1 1,126.02
SY12 10 4.07 261.00 1 1,062.27
SY13 10 3.87 252.00 1 975.24
SY14 10 4.00 248.00 1 992.00
SY15 10 4.00 216.00 1 864.00
SY16 10 4.00 222.00 1 888.00
SY17 10 4.00 294.00 1 1,176.00
SY19 10 4.00 278.00 1 1,112.00
SY20 10 3.88 312.00 1 1,210.56
Project Residence
Location ADDIS ABABA
SUB - STRUCTURE

Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32

Basment Slab
8 1.05 #REF! 1 #REF!

Ramp Slab
10 1.05 #REF! 1 #REF!

Staircase
Staircase -1
1 16 4.75 12.00 2 114.00
2 16 2.72 12.00 1 32.64
16 3.81 12.00 1 45.66
3 16 2.35 12.00 1 28.20
16 3.43 12.00 1 41.16
4 16 3.68 12.00 1 44.10
16 2.61 12.00 1 31.26
6 16 3.99 12.00 1 47.88
16 2.87 12.00 1 34.44
8 1.03 8.00 20 164.00
8 1.45 10.00 2 29.00
8 1.45 15.00 2 43.50

8 1.05 144.00 1 151.20


Staircase -2
1 14 7.00 8.00 1 56.00
2 14 2.55 8.00 1 20.40
3 14 1.80 8.00 1 14.40
4 8 1.00 8.00 1 8.00
5 8 1.20 8.00 1 9.60
3.4 8 1.20 23.00 1 27.60

1 14 7.00 8.00 3 168.00


2 14 2.55 8.00 3 61.20
3 14 1.80 8.00 3 43.20
4 8 1.00 8.00 3 24.00
5 8 1.20 8.00 3 28.80
3.4 8 1.20 23.00 3 82.80
0.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0.00 0.00
0.22 0.395 0.617 0.888 1.208 1.578 2.468 3.551 4.831 6.310
Total weight (kg) 0.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0.000 0.000
Add 5% wastage 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05
Total weight (kg) 0.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0.00 0.00
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
Elevation column
C-1 20 4.84 124.00 17 10,202.72
20 3.75 12.00 17 765.00
Section 1-1
St1 10 2.26 120.00 17 4,610.40
St2 10 1.76 120.00 34 7,197.12
St3 10 0.61 120.00 34 2,468.40
Section 2-2
St1 10 1.86 144.00 17 4,553.28
St2 10 1.32 144.00 34 6,452.93

C2 24 5.04 16.00 4 322.56


24 4.94 16.00 4 316.16
20 4.84 100.00 4 1,936.00
20 3.75 14.00 4 210.00
Section 1-1
St1 10 2.26 120.00 4 1,084.80
St2 10 1.76 120.00 8 1,693.44
St3 10 0.61 120.00 8 580.80

Section 2-2
St1 10 1.86 144.00 4 1,071.36
St2 10 1.32 144.00 8 1,518.34

Section 3-3
St6 10 2.86 48.00 4 549.12
St7 10 2.32 48.00 4 445.44
St8 10 2.05 48.00 4 393.60
St9 10 1.72 48.00 4 330.24

C3 24 5.04 54.00 2 544.32


20 4.84 82.00 2 793.76
20 4.74 34.00 2 322.32
20 3.75 16.00 2 120.00
Sec-6-6
St1 10 3.06 23.00 2 140.76
St2 10 2.52 23.00 2 115.92
St3 10 2.36 23.00 2 108.74
St4 10 1.92 23.00 2 88.32
St4 10 0.80 23.00 2 37.03

Sec-7-7
St6 10 2.86 48.00 2 274.56
St7 10 2.32 48.00 2 222.72
St9 10 1.72 48.00 2 165.12
St20 10 2.26 48.00 2 217.34
St19 10 0.80 48.00 2 77.28

Sec-8-8
St21 10 2.66 48.00 2 255.36
St22 10 2.12 48.00 2 203.52
St23 10 2.16 48.00 2 207.74
St24 10 1.52 48.00 2 145.92
St19 10 0.80 48.00 2 77.28

Section 4-4
St10 10 2.46 48.00 2 236.16
St11 10 1.99 48.00 2 191.23
St12 10 1.48 48.00 2 142.08
St13 10 1.78 48.00 2 171.26

Section 1-1
St1 10 2.26 96.00 2 433.92
St2 10 1.76 96.00 4 677.38
St3 10 0.61 96.00 4 232.32

C3 24 5.04 54.00 2 544.32


20 4.84 82.00 2 793.76
20 4.74 34.00 2 322.32
20 3.75 16.00 2 120.00
Sec-6-6
St1 10 3.06 24.00 2 146.88
St2 10 2.52 24.00 2 120.96
St3 10 2.36 24.00 2 113.47
St4 10 1.92 24.00 2 92.16
St4 10 0.80 24.00 2 38.64

Sec-7-7
St6 10 2.86 48.00 2 274.56
St7 10 2.32 48.00 2 222.72
St9 10 1.72 48.00 2 165.12
St20 10 2.26 48.00 2 217.34
St19 10 0.80 48.00 2 77.28

Sec-8-8
St21 10 2.66 48.00 2 255.36
St22 10 2.12 48.00 2 203.52
St23 10 2.16 48.00 2 207.74
St24 10 1.52 48.00 2 145.92
St19 10 0.80 48.00 2 77.28

Section 4-4
St10 10 2.46 48.00 2 236.16
St11 10 1.99 48.00 2 191.23
St12 10 1.48 48.00 2 142.08
St13 10 1.78 48.00 2 171.26

Section 1-1
St1 10 2.26 96.00 2 433.92
St2 10 1.76 96.00 4 677.38
St3 10 0.61 96.00 4 232.32

C4 24 5.04 16.00 1 80.64


24 4.94 16.00 1 79.04
20 4.84 86.00 1 416.24
20 4.74 30.00 1 142.20
20 3.75 14.00 1 52.50

Sec-8'-8'
St1 10 2.66 47.00 1 125.02
St2 10 2.12 47.00 1 99.64
St3 10 1.98 47.00 1 93.25
St4 10 1.52 47.00 1 71.44
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32

Section 4-4
St10 10 2.46 48.00 1 118.08
St11 10 1.99 48.00 1 95.62
St12 10 1.48 48.00 1 71.04
St13 10 1.78 48.00 1 85.63

Section 5-5
St1 10 2.26 72.00 1 162.72
St12 10 1.76 72.00 1 127.01
St3 10 0.60 72.00 1 43.20
St14 10 1.58 72.00 1 114.05

Section 9-9
St4 10 1.86 96.00 1 178.56
St5 10 1.32 96.00 1 126.53
St25 10 1.46 96.00 1 140.54
St26 10 0.51 96.00 1 48.48

C5 24 5.04 16.00 3 241.92


24 4.94 16.00 3 237.12
20 4.84 82.00 3 1,190.64
20 4.74 16.00 3 227.52
24 3.75 12.00 3 135.00
Sec-8'-8'
St1 10 2.66 47.00 3 375.06
St2 10 2.12 47.00 3 298.92
St3 10 1.98 47.00 3 279.74
St4 10 1.52 47.00 3 214.32

Section 4-4
St10 10 2.46 24.00 3 177.12
St11 10 1.99 24.00 3 143.42
St12 10 1.48 24.00 3 106.56
St13 10 1.78 24.00 3 128.45

Section 5-5
St1 10 2.26 120.00 3 813.60
St12 10 1.76 120.00 3 635.04
St3 10 0.60 120.00 3 216.00
St14 10 1.58 120.00 3 570.24

Section 5'-5'
St4 10 2.26 24.00 3 162.72
St5 10 1.58 24.00 6 228.10

C6 20 8.58 16.00 5 686.40


20 4.84 84.00 5 2,032.80
20 4.74 14.00 5 331.80
20 3.75 14.00 5 262.50
Sec-8'-8'
St1 10 2.66 53.00 5 704.90
St2 10 2.12 53.00 5 561.80
St3 10 1.98 53.00 5 525.76
St4 10 1.52 53.00 5 402.80

Section 5-5
St1 10 2.26 96.00 5 1,084.80
St12 10 1.76 96.00 5 846.72
St3 10 0.60 96.00 5 288.00
St14 10 1.58 96.00 5 760.32

Section 9-9
St4 10 1.86 96.00 5 892.80
St5 10 1.32 96.00 5 632.64
St25 10 1.46 96.00 5 702.72
St26 10 0.51 96.00 5 242.40

C7 20 4.84 100.00 33 15,972.00


20 4.74 30.00 33 4,692.60
20 3.75 42.00 33 5,197.50
Section 4-4
St10 10 2.46 47.00 33 3,815.46
St11 10 1.99 47.00 33 3,089.59
St12 10 1.48 47.00 33 2,295.48
St13 10 1.78 47.00 33 2,766.98

Section 5-5
St1 10 2.26 96.00 33 7,159.68
St12 10 1.76 96.00 33 5,588.35
St3 10 0.60 96.00 33 1,900.80
St14 10 1.58 96.00 33 5,018.11

Section 9-9
St4 10 1.86 96.00 33 5,892.48
St5 10 1.32 96.00 33 4,175.42
St25 10 1.46 96.00 33 4,637.95
St26 10 0.51 96.00 33 1,599.84

C8 20 4.84 32.00 1 154.88


20 4.74 16.00 1 75.84
Section 4-4
St10 10 2.46 47.00 1 115.62
St11 10 1.99 47.00 1 93.62
St12 10 1.48 47.00 1 69.56
St13 10 1.78 47.00 1 83.85

Section 5-5
St1 10 2.26 96.00 1 216.96
St12 10 1.76 96.00 1 169.34
St3 10 0.60 96.00 1 57.60
St14 10 1.58 96.00 1 152.06

Section 2-2
St1 10 1.86 72.00 1 133.92
St2 10 1.32 72.00 2 189.79

Section 2'-2'
St1 10 1.86 24.00 1 44.64
St2 10 1.32 24.00 2 63.26

C9 24 4.37 16.00 4 279.68


24 5.10 16.00 4 326.40
Section 4-4
St10 10 2.46 47.00 4 462.48
St11 10 1.99 47.00 4 374.50
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
St12 10 1.48 47.00 4 278.24
St13 10 1.78 47.00 4 335.39
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32

Section 5-5
St1 10 2.26 96.00 4 867.84
St12 10 1.76 96.00 4 677.38
St3 10 0.60 96.00 4 230.40
St14 10 1.58 96.00 4 608.26

Section 2-2
St1 10 1.86 72.00 4 535.68
St2 10 1.32 72.00 8 759.17

Section 2'-2'
St1 10 1.86 24.00 4 178.56
St2 10 1.32 24.00 8 253.06

C10 20 4.84 114.00 3 1,655.28


20 4.74 16.00 3 227.52
20 3.75 14.00 3 157.50
Section 4-4
St10 10 2.46 47.00 3 346.86
St11 10 1.99 47.00 3 280.87
St12 10 1.48 47.00 3 208.68
St13 10 1.78 47.00 3 251.54

Section 5-5
St1 10 2.26 192.00 3 1,301.76
St12 10 1.76 192.00 3 1,016.06
St3 10 0.60 192.00 3 345.60
St14 10 1.58 192.00 3 912.38

C11 24 5.04 42.00 6 1,270.08


24 3.75 14.00 6 315.00
Sec-10-10
St1 10 2.26 119.00 6 1,613.64
St2 10 1.76 119.00 6 1,259.50
St3 10 1.58 119.00 6 1,130.98
St4 10 0.61 119.00 6 431.97

C12 20 4.84 32.00 2 309.76


20 3.75 16.00 2 120.00
Section 1-1
St1 10 2.26 72.00 2 325.44
St2 10 1.76 72.00 4 508.03
St3 10 0.61 72.00 4 174.24

right wing
C-1 20 4.84 102.00 5 2,468.40
20 4.74 30.00 5 711.00
24 5.04 12.00 5 302.40
24 3.75 12.00 5 225.00

Section 2-2 St6 10 2.46 75.00 5 922.50


St7 10 1.99 75.00 5 747.00
St8 10 1.48 75.00 5 555.00
St9 10 1.78 75.00 5 669.00

Section 3-3 St9 10 2.26 150.00 5 1,695.00


St10 10 1.76 150.00 5 1,323.00
St11 10 1.58 150.00 5 1,188.00
St12 10 0.61 150.00 5 453.75

Section 4-4 St9 10 2.26 50.00 5 565.00


St11 10 1.58 50.00 5 396.00

C2 20 4.05 20.00 3 243.00


20 4.74 30.00 3 426.60
24 5.04 12.00 3 181.44
24 3.75 12.00 3 135.00

Section 1-1 St1 10 2.66 49.00 3 391.02


St2 10 2.12 49.00 3 311.64
St3 10 2.16 49.00 3 318.11
St4 10 1.52 49.00 3 223.44
St5 10 0.64 49.00 3 94.08

Section 2-2 St6 10 2.46 75.00 3 553.50


St7 10 1.99 75.00 3 448.20
St8 10 1.48 75.00 3 333.00
St9 10 1.78 75.00 3 401.40

Section 3-3 St9 10 2.26 75.00 3 508.50


St10 10 1.76 75.00 3 396.90
St11 10 1.58 75.00 3 356.40
St12 10 0.61 75.00 3 136.13

Section 4-4 St18 10 1.86 50.00 3 279.00


St19 10 1.58 50.00 6 475.20

C3 24 5.04 136.00 2 1,370.88


24 4.94 48.00 2 474.24
20 4.84 32.00 2 309.76
20 3.75 16.00 2 120.00
Sec8-8
St27 10 3.26 90.00 2 586.80
St28 10 2.79 90.00 2 502.56
St29 10 2.28 90.00 2 410.40
St30 10 2.83 90.00 2 510.12
St31 10 2.36 90.00 2 425.52
St32 10 1.89 90.00 2 340.92
St33 10 0.71 90.00 2 126.90

Sec9-9
St33 10 0.71 108.00 2 152.28
St34 10 3.06 108.00 2 660.96
St35 10 2.59 108.00 2 559.87
St36 10 2.08 108.00 2 449.28
St37 10 2.54 108.00 2 549.50
St38 10 1.98 108.00 2 428.54

Sec10-10'
No detail Section for t St1 10 2.66 26.00 2 138.32
St39 10 1.98 26.00 2 103.17
St40 10 2.12 26.00 2 110.24
St41 10 1.52 26.00 2 79.04

Sec10-10
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
St1 10 2.66 78.00 2 414.96
St39 10 1.98 78.00 2 309.50
St40 10 2.12 78.00 2 330.72
St41 10 1.52 78.00 2 237.12

C4 20 4.84 106.00 1 513.04


20 4.74 34.00 1 161.16
20 3.75 14.00 1 52.50

Sec1-1
St1 10 2.66 48.00 1 127.68
St2 10 2.12 48.00 1 101.76
St3 10 2.16 48.00 1 103.87
St4 10 1.52 48.00 1 72.96
St5 10 0.80 48.00 1 38.64

Sec2-2
St6 10 2.46 75.00 1 184.50
St7 10 1.99 75.00 1 149.40
St8 10 1.48 75.00 1 111.00
St9 10 1.78 75.00 1 133.80

Sec3-3
St9 10 2.26 75.00 1 169.50
St10 10 1.76 75.00 1 132.30
St11 10 1.58 75.00 1 118.80
St12 10 0.61 75.00 1 45.38

Sec6-6
St18 10 1.86 75.00 1 139.50
St19 10 1.32 75.00 2 197.70

C5 20 8.58 18.00 3 463.32


20 4.84 74.00 3 1,074.48
20 4.74 16.00 3 227.52
24 5.04 14.00 3 211.68
24 3.75 14.00 3 157.50

Sec1-1
St1 10 2.66 55.00 3 438.90
St2 10 2.12 55.00 3 349.80
St3 10 2.16 55.00 3 357.06
St4 10 1.52 55.00 3 250.80
St5 10 0.80 55.00 3 132.83

Sec2-2
St6 10 2.46 75.00 3 553.50
St7 10 1.99 75.00 3 448.20
St8 10 1.48 75.00 3 333.00
St9 10 1.78 75.00 3 401.40

Sec3-3
St9 10 2.26 81.00 3 549.18
St10 10 1.76 81.00 3 428.65
St11 10 1.58 81.00 3 384.91
St12 10 0.61 81.00 3 147.02

Sec11-11
St9 10 2.26 81.00 3 549.18
St10 10 1.76 81.00 3 428.65
St11 10 1.58 81.00 3 384.91
St12 10 0.61 81.00 3 147.02

C6 20 4.84 114.00 7 3,862.32


20 4.74 18.00 7 597.24
24 5.04 12.00 7 423.36
24 3.75 12.00 7 315.00

Sec-12-12
St1 10 2.46 50.00 7 861.00
St2 10 1.48 50.00 7 518.00
St3 10 1.99 50.00 7 697.20
St4 10 1.96 50.00 7 687.40
St5 10 0.71 50.00 7 246.75

Sec-13-13
St1 10 2.26 150.00 7 2,373.00
St2 10 1.76 150.00 14 3,704.40
St3 10 0.61 150.00 14 1,270.50

Sec-4-4
St9 10 2.26 150.00 7 2,373.00
St11 10 1.58 150.00 14 3,326.40

C7 20 4.84 102.00 4 1,974.72


20 4.74 30.00 4 568.80
20 3.75 14.00 4 210.00
Sec2-2
St6 10 2.46 75.00 4 738.00
St7 10 1.99 75.00 4 597.60
St8 10 1.48 75.00 4 444.00
St9 10 1.78 75.00 4 535.20

Sec3-3
St9 10 2.26 135.00 4 1,220.40
St10 10 1.76 135.00 4 952.56
St11 10 1.58 135.00 4 855.36
St12 10 0.61 135.00 4 326.70

Sec14-14
St4 10 1.86 54.00 4 401.76
St5 10 1.32 54.00 4 284.69
St25 10 1.46 54.00 4 316.22
St26 10 0.51 54.00 4 109.08

C8 20 4.84 72.00 3 1,045.44


20 4.74 30.00 3 426.60
20 3.75 12.00 3 135.00

Sec2-2
St6 10 2.46 75.00 3 553.50
St7 10 1.99 75.00 3 448.20
St8 10 1.48 75.00 3 333.00
St9 10 1.78 75.00 3 401.40
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32

Sec3-3
St9 10 2.26 81.00 3 549.18
St10 10 1.76 81.00 3 428.65
St11 10 1.58 81.00 3 384.91
St12 10 0.61 81.00 3 147.02

Sec15-15
St4 10 1.86 54.00 3 301.32
St5 10 1.32 54.00 6 427.03

C9 20 4.84 78.00 7 2,642.64


20 4.74 34.00 7 1,128.12
24 3.75 14.00 7 367.50

Sec1-1
St1 10 2.66 50.00 7 931.00
St2 10 2.12 50.00 7 742.00
St3 10 2.16 50.00 7 757.40
St4 10 1.52 50.00 7 532.00
St5 10 0.80 50.00 7 281.75

Sec2-2
St6 10 2.46 50.00 7 861.00
St7 10 1.99 50.00 7 697.20
St8 10 1.48 50.00 7 518.00
St9 10 1.78 50.00 7 624.40

Sec3-3
St9 10 2.26 54.00 7 854.28
St10 10 1.76 54.00 7 666.79
St11 10 1.58 54.00 7 598.75
St12 10 0.61 54.00 7 228.69

Sec11-11
St9 10 2.26 54.00 7 854.28
St10 10 1.76 54.00 7 666.79
St11 10 1.58 54.00 7 598.75
St12 10 0.61 54.00 7 228.69

C9' 20 4.84 76.00 3 1,103.52


20 4.74 34.00 3 483.48
20 3.75 12.00 3 135.00

Sec1-1
St1 10 2.66 50.00 3 399.00
St2 10 2.12 50.00 3 318.00
St3 10 2.16 50.00 3 324.60
St4 10 1.52 50.00 3 228.00
St5 10 0.80 50.00 3 120.75

Sec2-2
St6 10 2.46 75.00 3 553.50
St7 10 1.99 75.00 3 448.20
St8 10 1.48 75.00 3 333.00
St9 10 1.78 75.00 3 401.40

Sec3-3
St9 10 2.26 27.00 3 183.06
St10 10 1.76 27.00 3 142.88
St11 10 1.58 27.00 3 128.30
St12 10 0.61 27.00 3 49.01

Sec15-15
St4 10 1.86 54.00 3 301.32
St5 10 1.32 54.00 6 427.03

C10 20 4.84 88.00 9 3,833.28


20 4.74 16.00 9 682.56
24 3.75 12.00 9 405.00
Sec2-2
St6 10 2.46 75.00 9 1,660.50
St7 10 1.99 75.00 9 1,344.60
St8 10 1.48 75.00 9 999.00
St9 10 1.78 75.00 9 1,204.20

Sec3-3
St9 10 2.26 108.00 9 2,196.72
St10 10 1.76 108.00 9 1,714.61
St11 10 1.58 108.00 9 1,539.65
St12 10 0.61 108.00 9 588.06

Sec-4-4
St9 10 2.26 25.00 9 508.50
St11 10 1.58 25.00 18 712.80

C11 20 4.84 80.00 3 1,161.60


20 4.74 16.00 3 227.52
24 5.04 14.00 3 211.68
24 3.75 14.00 3 157.50

Sec2-2
St6 10 2.46 75.00 3 553.50
St7 10 1.99 75.00 3 448.20
St8 10 1.48 75.00 3 333.00
St9 10 1.78 75.00 3 401.40

Sec3-3
St9 10 2.26 81.00 3 549.18
St10 10 1.76 81.00 3 428.65
St11 10 1.58 81.00 3 384.91
St12 10 0.61 81.00 3 147.02

Sec11-11
St9 10 2.26 54.00 3 366.12
St10 10 1.76 54.00 3 285.77
St11 10 1.58 54.00 3 256.61
St12 10 0.61 54.00 3 98.01

C12 20 4.84 112.00 3 1,626.24


20 3.65 16.00 3 175.20

Sec-13-13
St1 10 2.26 200.00 3 1,356.00
St2 10 1.76 200.00 6 2,116.80
St3 10 0.61 200.00 6 726.00
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32

C13 20 4.84 80.00 2 774.40


24 5.19 16.00 2 166.18

Sec2-2
St6 10 2.46 158.00 2 777.36
St7 10 1.99 158.00 2 629.47
St8 10 1.48 158.00 2 467.68
0.8785 St9 10 1.78 158.00 2 563.74
1.757
C13' 20 4.84 80.00 2 774.40
24 4.13 16.00 2 132.03

Sec2-2
St6 10 2.46 150.00 2 738.00
St7 10 1.99 150.00 2 597.60
St8 10 1.48 150.00 2 444.00
St9 10 1.78 150.00 2 535.20

C14 20 4.84 84.00 2 813.12


24 5.19 16.00 2 166.18

Sec1-1
St1 10 2.66 50.00 2 266.00
St2 10 2.12 50.00 2 212.00
St3 10 2.16 50.00 2 216.40
St4 10 1.52 50.00 2 152.00
St5 10 0.80 50.00 2 80.50

Sec2-2
St6 10 2.46 75.00 2 369.00
St7 10 1.99 75.00 2 298.80
St8 10 1.48 75.00 2 222.00
St9 10 1.78 75.00 2 267.60

Sec3-3
St9 10 2.26 27.00 2 122.04
St10 10 1.76 27.00 2 95.26
St11 10 1.58 27.00 2 85.54
St12 10 0.61 27.00 2 32.67

C14' 20 4.84 84.00 2 813.12


24 4.13 16.00 2 132.03

Sec1-1
St1 10 2.66 50.00 2 266.00
St2 10 2.12 50.00 2 212.00
St3 10 2.16 50.00 2 216.40
St4 10 1.52 50.00 2 152.00
St5 10 0.80 50.00 2 80.50

Sec2-2
St6 10 2.46 100.00 2 492.00
St7 10 1.99 100.00 2 398.40
St8 10 1.48 100.00 2 296.00
St9 10 1.78 100.00 2 356.80

C15 20 4.84 90.00 2 871.20


24 5.19 18.00 2 186.95

Sec1-1
St1 10 2.66 50.00 2 266.00
St2 10 2.12 50.00 2 212.00
St3 10 2.16 50.00 2 216.40
St4 10 1.52 50.00 2 152.00
St5 10 0.80 50.00 2 80.50

No detail Sec17-17 Sec2-2/Sec17-17


St6 10 2.46 108.00 2 531.36
St7 10 1.99 108.00 2 430.27
St8 10 1.48 108.00 2 319.68
St9 10 1.78 108.00 2 385.34

C15' 20 4.84 90.00 2 871.20


24 4.13 18.00 2 148.54

Sec1-1
St1 10 2.66 50.00 2 266.00
St2 10 2.12 50.00 2 212.00
St3 10 2.16 50.00 2 216.40
St4 10 1.52 50.00 2 152.00
St5 10 0.80 50.00 2 80.50

No detail Sec17-17 Sec2-2/Sec17-17


St6 10 2.46 100.00 2 492.00
St7 10 1.99 108.00 2 430.27
St8 10 1.48 108.00 2 319.68
St9 10 1.78 108.00 2 385.34

Shear Wall
At Basment Floor
SW-1 20 6.10 88.00 1 536.80
12 7.42 62.00 1 460.04

SW-2 20 6.10 70.00 1 427.00


12 5.97 62.00 1 370.14

Elevator shaft-2 1 12 8.52 62.00 1 528.24


2 12 6.95 62.00 1 430.90
3 12 4.27 62.00 1 264.74
4 12 1.46 62.00 1 90.52

20 6.10 292.00 1 1,781.20


12 2.66 7.00 1 18.62
8 0.80 4.00 1 3.20

Elevater Shaft 1 12 8.52 62.00 1 528.24


2 12 3.52 62.00 1 218.24
3 12 3.04 62.00 4 753.92
4 12 2.02 62.00 3 375.72
5 12 1.71 62.00 1 105.90
6 12 1.47 62.00 1 91.14
7 12 1.37 62.00 1 84.94
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
20 6.10 292.00 #REF! #REF!
12 2.66 7.00 #REF! #REF!
8 0.80 4.00 #REF! #REF!
2 10 1.64 32.00 59 3,096.32

Mezzanine floor
left wing
MX1 20 9.11 4.00 1 36.44
20 7.10 3.00 1 21.30
20 6.80 3.00 1 20.40
20 8.84 3.00 1 26.52
20 2.31 4.00 1 9.24
20 3.70 3.00 1 11.10
20 4.07 4.00 1 16.28
20 3.87 4.00 1 15.48
20 4.27 3.00 1 12.79
20 2.70 5.00 1 13.48
24 5.47 5.00 1 27.35
20 7.80 5.00 1 39.00
24 6.80 4.00 1 27.20
24 7.96 4.00 1 31.84
10 1.80 210.00 1 378.00

MX2 20 9.11 3.00 1 27.33


20 7.10 3.00 1 21.30
20 6.80 3.00 1 20.40
20 6.15 3.00 1 18.45
20 5.19 4.00 1 20.76
20 9.96 3.00 1 29.88
20 2.31 5.00 1 11.55
20 3.70 4.00 1 14.80
20 4.07 4.00 1 16.28
20 3.87 4.00 1 15.48
24 4.65 3.00 1 13.95
24 3.69 4.00 1 14.76
20 3.89 5.00 1 19.42
20 2.65 4.00 1 10.60
24 5.37 4.00 1 21.48
20 7.70 4.00 1 30.80
20 6.60 4.00 1 26.40
20 8.71 4.00 1 34.84
20 7.85 5.00 1 39.25
24 6.62 4.00 1 26.48
10 1.80 328.00 1 590.40

MX3 & MX4 20 9.11 3.00 2 54.66


16 7.10 4.00 2 56.80
20 6.80 3.00 2 40.80
20 5.01 6.00 2 60.12
20 9.96 3.00 2 59.76
24 2.31 3.00 2 13.86
24 3.70 4.00 2 29.60
24 4.07 3.00 2 24.42
24 3.87 3.00 2 23.22
24 3.51 4.00 2 28.08
24 4.51 3.00 2 27.06
24 3.89 3.00 2 23.31
24 2.70 4.00 2 21.56
24 5.44 4.00 2 43.52
24 7.80 3.00 2 46.80
24 6.80 3.00 2 40.80
24 7.67 3.00 2 46.02
10 1.80 316.00 2 1,137.60

MX5 20 9.11 4.00 1 36.44


20 7.20 3.00 1 21.60
24 6.66 4.00 1 26.64
20 2.31 3.00 1 6.93
20 3.70 4.00 1 14.80
20 3.77 4.00 1 15.08
24 5.13 4.00 1 20.52
24 5.47 3.00 1 16.41
20 7.80 4.00 1 31.20
24 9.02 5.00 1 45.10
10 1.80 167.00 1 300.60

MX6 & MX7 20 4.32 6.00 2 51.84


16 1.63 4.00 2 13.04
16 3.64 2.00 2 14.56
1.01666666666667 1.16666666666667 10 1.80 29.00 2 104.40

MX6 20 6.32 3.00 2 37.89


20 7.20 3.00 2 43.20
24 6.66 4.00 2 53.28
20 4.72 4.00 2 37.72
20 4.07 4.00 2 32.56
24 5.13 4.00 2 41.04
20 9.28 4.00 2 74.20
24 9.02 5.00 2 90.20
10 1.80 148.00 2 532.80

20 10.01 4.00 2 80.08


20 7.00 7.00 2 98.00
20 9.96 3.00 2 59.76
24 2.52 5.00 2 25.20
20 4.00 3.00 2 24.00
24 4.00 6.00 2 48.00
24 3.89 3.00 2 23.31
24 2.70 4.00 2 21.56
24 6.67 4.00 2 53.36
24 7.20 10.00 2 144.00
24 6.62 4.00 2 52.96
10 1.80 216.00 2 777.60

MX7 20 9.96 3.00 2 59.76


20 7.00 24.00 2 336.00
20 11.31 4.00 2 90.48
20 2.70 4.00 2 21.56
20 3.76 3.00 2 22.53
20 3.87 4.00 2 30.96
20 4.00 12.00 2 96.00
20 4.34 4.00 2 34.72
20 3.15 4.00 2 25.20
20 6.42 5.00 2 64.20
20 7.00 37.00 2 518.00
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
16 7.87 4.00 2 62.96
10 1.80 217.00 2 781.20

SY11',SY12,SY13& SY14 20 9.51 3.00 4 114.12


20 8.05 3.00 4 96.60
20 8.50 4.00 4 136.00
20 7.08 4.00 4 113.20
20 6.38 4.00 4 102.00
20 9.01 3.00 4 108.12
20 2.45 3.00 4 29.40
20 3.84 3.00 4 46.08
20 4.70 3.00 4 56.40
24 5.00 3.00 4 60.00
24 4.05 4.00 4 64.80
24 3.59 7.00 4 100.52
20 2.36 3.00 4 28.32
20 5.77 4.00 4 92.32
20 7.60 3.00 4 91.20
20 8.50 10.00 4 340.00
20 5.65 4.00 4 90.40
20 7.10 5.00 4 142.00
20 5.52 4.00 4 88.32
10 1.80 324.00 4 2,332.80

SY13 20 9.51 3.00 1 28.53


20 8.05 3.00 1 24.15
20 8.50 4.00 1 34.00
20 7.08 4.00 1 28.30
20 6.38 4.00 1 25.50
20 9.01 3.00 1 27.03
20 2.45 3.00 1 7.35
20 3.84 3.00 1 11.52
20 4.70 3.00 1 14.10
24 5.00 3.00 1 15.00
24 4.05 4.00 1 16.20
24 3.59 7.00 1 25.13
20 2.36 3.00 1 7.08
20 5.77 4.00 1 23.08
20 7.60 3.00 1 22.80
20 8.50 10.00 1 85.00
20 5.65 4.00 1 22.60
20 7.10 5.00 1 35.50
20 5.52 4.00 1 22.08
10 1.80 324.00 1 583.20

SY15& SY16 20 9.51 3.00 2 57.06


20 4.31 4.00 2 34.48
20 2.45 2.00 2 9.80
20 3.84 2.00 2 15.36
24 2.77 3.00 2 16.62
20 5.77 3.00 2 34.62
20 7.17 4.00 2 57.36
10 1.80 100.00 2 360.00
2
SY15 & Sy16 20 4.76 4.00 2 38.08
20 7.08 3.00 2 42.45
20 6.38 3.00 2 38.25
20 9.01 3.00 2 54.06
24 3.01 3.00 2 18.06
24 4.05 3.00 2 24.30
20 3.59 6.00 2 43.08
20 2.36 3.00 2 14.16
20 8.07 5.00 2 80.70
20 5.65 3.00 2 33.90
20 7.10 3.00 2 42.60
20 5.52 3.00 2 33.12
10 1.80 196.00 2 705.60

SY17 20 9.51 3.00 1 28.53


20 8.05 3.00 1 24.15
20 8.50 4.00 1 34.00
20 7.08 4.00 1 28.30
20 6.38 3.00 1 19.13
20 9.01 3.00 1 27.03
20 2.45 3.00 1 7.35
20 3.84 3.00 1 11.52
24 4.70 3.00 1 14.10
24 5.00 3.00 1 15.00
24 5.00 3.00 1 15.00
20 4.05 4.00 1 16.20
20 3.59 6.00 1 21.54
20 2.36 3.00 1 7.08
20 5.77 3.00 1 17.31
20 7.60 3.00 1 22.80
20 8.50 9.00 1 76.50
20 5.65 3.00 1 16.95
20 7.10 3.00 1 21.30
20 5.52 3.00 1 16.56
10 1.80 363.00 1 653.40

SY19, Y20 & Y21 20 9.51 3.00 3 85.59


20 8.05 3.00 3 72.45
20 8.50 4.00 3 102.00
20 7.08 4.00 3 84.90
20 6.38 3.00 3 57.38
20 9.01 3.00 3 81.09
20 2.45 3.00 3 22.05
20 3.84 3.00 3 34.56
24 4.70 3.00 3 42.30
24 5.00 3.00 3 45.00
24 5.00 3.00 3 45.00
20 4.05 4.00 3 48.60
20 3.59 6.00 3 64.62
20 2.36 3.00 3 21.24
20 5.77 3.00 3 51.93
20 7.60 3.00 3 68.40
20 8.50 9.00 3 229.50
20 5.65 3.00 3 50.85
20 7.10 3.00 3 63.90
20 5.52 3.00 3 49.68
10 1.80 363.00 3 1,960.20

Right wing
MX1 16 9.01 4.00 1 36.04
16 6.90 4.00 1 27.60
16 6.60 4.00 1 26.40
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
16 6.80 8.00 1 54.40
16 11.55 4.00 1 46.20
16 8.05 4.00 1 32.20
16 9.68 4.00 1 38.72

16 2.31 2.00 1 4.62


16 3.70 2.00 1 7.40
16 4.07 2.00 1 8.14
16 3.87 2.00 1 7.74
16 4.00 4.00 1 16.00
16 2.84 2.00 1 5.68
16 2.01 4.00 1 8.04
16 2.34 2.00 1 4.68
16 2.84 2.00 1 5.68
16 3.88 2.00 1 7.76
16 2.69 2.00 1 5.38

16 5.27 4.00 1 21.08


16 7.40 4.00 1 29.60
16 6.40 4.00 1 25.60
16 6.80 27.20 1 184.96
16 6.42 4.00 1 25.68
10 1.80 453.00 1 815.40

MX2,Mx3 & Mx4 16 6.12 4.00 3 73.44


16 2.31 4.00 3 27.72
16 5.24 4.00 3 62.88
1.5 10 1.80 39.00 3 210.60

16 9.81 4.00 3 117.72


16 6.80 8.00 3 163.20
16 11.55 4.00 3 138.60
16 8.05 4.00 3 96.60
16 9.86 3.00 3 88.74

16 2.68 3.00 3 24.12


16 3.87 3.00 3 34.83
16 4.00 10.00 3 120.00
16 3.89 2.00 3 23.31
16 2.70 2.00 3 16.17

20 6.47 4.00 3 77.64


20 7.00 24.00 3 504.00
20 6.52 3.00 3 58.68
10 1.80 358.00 3 1,933.20

Mx-5 16 9.11 3.00 1 27.33


20 7.10 8.00 1 56.80
16 6.56 4.00 1 26.24
1
16 2.31 2.00 1 4.62
16 3.70 2.00 1 7.40
16 4.07 2.00 1 8.14
20 5.13 3.00 1 15.39

16 5.37 4.00 1 21.48


20 7.60 5.00 1 38.00
20 8.92 4.00 1 35.68
10 1.80 167.00 1 300.60

Mx5 & MX6 20 4.52 4.00 2 36.16


20 1.73 8.00 2 27.68
20 3.64 7.00 2 50.96
10 1.80 29.00 2 104.40

Mx-6 16 9.11 3.00 1 27.33


20 7.10 4.00 1 28.40
16 6.56 3.00 1 19.68
1
16 2.31 2.00 1 4.62
16 3.70 2.00 1 7.40
16 4.07 2.00 1 8.14
20 5.13 3.00 1 15.39

20 11.90 5.00 1 59.50


20 8.92 4.00 1 35.68
10 1.80 167.00 1 300.60

Mx5 & MX6 16 8.66 4.00 2 69.28


16 8.05 4.00 2 64.40
16 6.80 4.00 2 54.40
16 9.86 4.00 2 78.88

20 2.52 3.00 2 15.12


16 4.00 6.00 2 48.00
16 3.89 2.00 2 15.54
16 2.70 2.00 2 10.78

20 6.57 3.00 2 39.42


20 7.00 12.00 2 168.00
20 6.52 4.00 2 52.16
10 1.80 243.00 2 874.80

Mx-7 16 10.61 4.00 1 42.44


16 6.60 4.00 1 26.40
16 6.80 7.00 1 47.60
16 11.55 3.00 1 34.65
16 8.05 4.00 1 32.20
16 9.86 4.00 1 39.44

16 1.65 2.00 1 3.30


16 2.21 2.00 1 4.42
16 3.24 2.00 1 6.48
16 3.87 5.00 1 19.35
16 4.00 10.00 1 40.00
16 2.70 2.00 1 5.39

20 7.47 4.00 1 29.88


20 6.80 3.00 1 20.40
20 7.00 23.00 1 161.00
20 6.52 4.00 1 26.08

10 1.80 447.00 1 804.60

Mx-8 16 8.11 4.00 1 32.44


Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
16 6.60 4.00 1 26.40
16 6.80 8.00 1 54.40
16 11.55 3.00 1 34.65
16 8.05 4.00 1 32.20
16 9.86 4.00 1 39.44

16 2.18 2.00 1 4.36


16 3.24 2.00 1 6.48
16 3.87 4.00 1 15.48
16 4.00 10.00 1 40.00
16 2.70 2.00 1 5.39

20 10.57 3.00 1 31.71


20 6.80 3.00 1 20.40
20 7.00 23.00 1 161.00
20 6.52 4.00 1 26.08

10 1.80 400.00 1 720.00

SY1 16 4.96 4.00 1 19.84


16 8.30 3.00 1 24.90
16 6.88 3.00 1 20.63
16 6.18 3.00 1 18.53
16 8.91 3.00 1 26.73

16 3.31 2.00 1 6.62


16 5.00 2.00 1 10.00
16 4.05 2.00 1 8.10
16 3.59 4.00 1 14.36
16 2.36 2.00 1 4.72

20 8.27 4.00 1 33.08


20 8.30 4.00 1 33.20
16 5.45 4.00 1 21.80
16 6.90 4.00 1 27.60
16 5.42 4.00 1 21.68
10 1.80 267.00 1 480.60

SY2 16 4.61 4.00 1 18.44


20 8.05 3.00 1 24.15
16 8.40 4.00 1 33.60
16 6.88 4.00 1 27.50
16 6.18 4.00 1 24.70
16 8.91 4.00 1 35.64

16 3.01 2.00 1 6.02


20 4.70 5.00 1 23.50
20 5.00 2.00 1 10.00
16 4.05 2.00 1 8.10
16 3.59 4.00 1 14.36
16 2.36 2.00 1 4.72

20 7.37 4.00 1 29.48


20 8.30 12.00 1 99.60
16 5.45 4.00 1 21.80
16 11.52 4.00 1 46.08
2.2 10 1.80 324.00 1 583.20
2.05
SY3 & SY4 16 10.16 4.00 2 81.28
20 8.05 3.00 2 48.30
16 8.40 4.00 2 67.20
16 6.88 4.00 2 55.00
16 6.18 4.00 2 49.40
16 8.91 4.00 2 71.28

16 3.01 2.00 2 12.04


20 4.70 5.00 2 47.00
20 5.00 2.00 2 20.00
16 4.05 2.00 2 16.20
16 3.59 4.00 2 28.72
16 2.36 2.00 2 9.44

20 7.37 4.00 2 58.96


20 8.30 12.00 2 199.20
16 5.45 4.00 2 43.60
16 11.52 4.00 2 92.16
2.2 10 1.80 324.00 2 1,166.40

SY5 16 9.01 2.00 1 18.02


20 4.31 2.00 1 8.62

16 3.45 4.00 1 13.80


16 3.74 4.00 1 14.96
16 3.77 4.00 1 15.08

16 8.25 6.00 1 49.50


2.2 20 5.16 2.00 1 10.32
2.05 10 1.80 109.00 1 196.20

SY5 & SY6 20 4.76 3.00 2 28.56


20 7.08 3.00 2 42.45
16 6.38 4.00 2 51.00
16 9.01 4.00 2 72.08

16 3.01 4.00 2 24.08


20 4.05 3.00 2 24.30
16 3.59 3.00 2 21.54
20 3.59 4.00 2 28.72
16 2.36 2.00 2 9.44

20 8.08 6.00 2 96.90


16 5.65 4.00 2 45.20
16 7.10 4.00 2 56.80
16 5.52 4.00 2 44.16
2.2 10 1.80 201.00 2 723.60

SY5 16 9.01 2.00 1 18.02


20 4.31 2.00 1 8.62

16 3.45 4.00 1 13.80


16 3.74 4.00 1 14.96
16 3.77 4.00 1 15.08

16 8.25 6.00 1 49.50


2.2 20 5.16 2.00 1 10.32
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
2.05 10 1.80 109.00 1 196.20

S7, Y8 & Y9 16 9.41 3.00 3 84.69


16 7.85 4.00 3 94.20
16 8.30 4.00 3 99.60
16 6.87 4.00 3 82.44
16 6.17 4.00 3 74.04
16 8.91 4.00 3 106.92

16 2.45 2.00 3 14.70


16 3.84 3.00 3 34.56
20 4.70 3.00 3 42.30
20 5.00 3.00 3 45.00
20 4.05 4.00 3 48.60
16 3.59 6.00 3 64.62
16 2.36 3.00 3 21.24

20 5.77 4.00 3 69.24


16 7.60 5.00 3 114.00
20 8.50 12.00 3 306.00
16 5.65 4.00 3 67.80
20 7.10 4.00 3 85.20
16 5.52 4.00 3 66.24
10 1.80 363.00 3 1,960.20

S10 16 10.61 3.00 3 95.49


16 7.85 4.00 3 94.20
16 8.30 4.00 3 99.60
16 6.87 4.00 3 82.44
16 6.17 4.00 3 74.04
16 8.91 4.00 3 106.92

16 2.45 2.00 3 14.70


16 3.84 3.00 3 34.56
20 4.70 3.00 3 42.30
20 5.00 3.00 3 45.00
20 4.05 4.00 3 48.60
16 3.59 6.00 3 64.62
16 2.36 3.00 3 21.24

20 6.97 4.00 3 83.64


20 7.60 5.00 3 114.00
20 8.50 12.00 3 306.00
16 5.65 4.00 3 67.80
20 7.10 4.00 3 85.20
16 5.52 4.00 3 66.24
10 1.80 363.00 3 1,960.20

S11 16 9.51 3.00 3 85.59


16 8.05 3.00 3 72.45
16 8.50 4.00 3 102.00
16 7.08 4.00 3 84.90
16 6.38 3.00 3 57.38
16 9.01 3.00 3 81.09
16 2.45 3.00 3 22.05
16 3.84 3.00 3 34.56
16 4.70 3.00 3 42.30
16 5.00 3.00 3 45.00
16 5.00 3.00 3 45.00
16 4.05 4.00 3 48.60
16 3.59 6.00 3 64.62
16 2.36 3.00 3 21.24
16 5.77 3.00 3 51.93
16 7.60 3.00 3 68.40
16 8.50 9.00 3 229.50
16 5.65 3.00 3 50.85
16 7.10 3.00 3 63.90
16 5.52 3.00 3 49.68
10 1.80 363.00 3 1,960.20
Second floor
FFB-1 16 6.00 3.00 1 18.00
16 7.00 3.00 1 21.00
16 12.00 3.00 1 36.00
16 7.50 3.00 1 22.50
20 5.00 2.00 1 10.00
20 4.00 6.00 1 24.00
20 6.00 2.00 1 12.00
16 10.00 4.00 1 40.00
16 12.00 4.00 1 48.00
16 10.50 4.00 1 42.00
1.95 8 1.60 265.00 1 424.00

FFB-2 16 7.00 6.00 1 42.00


16 6.00 3.00 1 18.00
16 12.00 3.00 1 36.00
20 5.00 2.00 1 10.00
20 4.00 6.00 1 24.00
20 4.50 2.00 1 9.00
16 4.00 4.00 1 16.00
16 12.00 4.00 1 48.00
16 8.00 4.00 1 32.00
16 9.00 4.00 1 36.00
2.73 8 1.60 271.00 1 433.60

FFB-3 16 6.00 3.00 1 18.00


16 7.00 3.00 1 21.00
16 12.00 3.00 1 36.00
16 8.00 3.00 1 24.00
20 5.00 2.00 1 10.00
20 4.00 6.00 1 24.00
20 6.50 2.00 1 13.00
16 10.00 4.00 1 40.00
16 12.00 4.00 1 48.00
16 12.00 4.00 1 48.00
16 7.50 4.00 1 30.00
8 1.60 255.00 1 408.00

FFB-4 16 7.50 3.00 1 22.50


16 6.00 3.00 1 18.00
16 12.00 3.00 1 36.00
16 7.00 3.00 1 21.00
20 5.50 2.00 1 11.00
20 4.00 6.00 1 24.00
20 4.50 2.00 1 9.00
16 4.50 4.00 1 18.00
16 12.00 4.00 1 48.00
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
16 8.00 4.00 1 32.00
16 9.00 4.00 1 36.00
2.12 8 1.60 260.00 1 416.00

FFB-5 16 4.00 3.00 1 12.00


16 7.00 3.00 1 21.00
16 12.00 7.00 1 84.00
16 10.50 3.00 1 31.50
20 3.00 4.00 1 12.00
20 4.00 8.00 1 32.00
16 7.50 4.00 1 30.00
16 8.00 4.00 1 32.00
16 7.00 4.00 1 28.00
8 1.60 263.00 1 420.80

FFB-6 16 10.00 3.00 1 30.00


16 12.00 10.00 1 120.00
16 5.00 3.00 1 15.00
20 2.00 2.00 1 4.00
20 4.00 10.00 1 40.00
20 2.40 2.00 1 4.80
16 6.00 4.00 1 24.00
16 8.00 8.00 1 64.00
16 7.00 4.00 1 28.00
8 1.60 290.00 1 464.00

FFB-7 16 5.50 3.00 3 49.50


16 7.00 3.00 3 63.00
16 12.00 3.00 3 108.00
16 10.50 3.00 3 94.50
20 3.00 4.00 3 36.00
20 4.00 10.00 3 120.00
20 3.00 2.00 3 18.00
16 9.00 4.00 3 108.00
16 12.00 4.00 3 144.00
16 8.00 4.00 3 96.00
16 7.00 4.00 3 84.00
1.31 8 1.60 272.00 3 1,305.60

FFB-8 16 10.00 3.00 3 90.00


16 12.00 6.00 3 216.00
16 6.00 3.00 3 54.00
20 2.00 2.00 3 12.00
20 4.00 12.00 3 144.00
16 6.00 4.00 3 72.00
16 8.00 8.00 3 192.00
16 12.00 4.00 3 144.00
16 8.50 4.00 3 102.00
8 1.60 310.00 3 1,488.00

FFB-9 16 11.10 3.00 1 33.30


20 3.50 2.00 1 7.00
20 6.00 2.00 1 12.00
16 11.10 4.00 1 44.40
1.31 8 1.60 98.00 1 156.80

FFB-10 16 9.50 3.00 1 28.50


16 10.50 3.00 1 31.50
20 2.40 2.00 1 4.80
20 4.00 4.00 1 16.00
20 3.00 2.00 1 6.00
16 6.60 4.00 1 26.40
16 8.00 4.00 1 32.00
16 7.00 4.00 1 28.00
8 1.60 156.00 1 249.60

FFB-11 16 10.00 3.00 1 30.00


16 12.00 3.00 1 36.00
16 4.00 3.00 1 12.00
20 2.00 2.00 1 4.00
20 4.00 6.00 1 24.00
20 2.40 2.00 1 4.80
16 6.50 4.00 1 26.00
16 12.00 4.00 1 48.00
16 7.00 4.00 1 28.00
8 1.60 203.00 1 324.80

FFB-12 16 11.10 7.00 1 77.70


20 6.00 2.00 1 12.00
20 3.50 2.00 1 7.00
8 1.60 70.00 1 112.00

FFB-13 16 5.00 3.00 3 45.00


16 7.00 3.00 3 63.00
16 12.00 3.00 3 108.00
16 10.50 3.00 3 94.50
20 4.00 10.00 3 120.00
20 3.00 2.00 3 18.00
16 7.50 4.00 3 90.00
16 9.00 4.00 3 108.00
16 12.00 4.00 3 144.00
16 8.00 4.00 3 96.00
16 7.00 4.00 3 84.00
1.31 8 1.60 272.00 3 1,305.60

FFB-14 16 10.00 3.00 3 90.00


16 12.00 6.00 3 216.00
16 6.00 3.00 3 54.00
20 2.00 2.00 3 12.00
20 4.00 10.00 3 120.00
20 3.50 2.00 3 21.00
16 6.00 4.00 3 72.00
16 8.00 12.00 3 288.00
16 12.00 4.00 3 144.00
8 1.60 318.00 3 1,526.40

FFB-15 16 5.00 3.00 1 15.00


16 7.00 7.00 1 49.00
16 10.50 3.00 1 31.50
20 4.00 2.00 1 8.00
20 4.00 10.00 1 40.00
20 3.00 2.00 1 6.00
16 9.00 4.00 1 36.00
16 12.00 4.00 1 48.00
16 8.00 4.00 1 32.00
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
8 1.60 273.00 1 436.80

FFB-16 16 10.00 3.00 1 30.00


16 12.00 10.00 1 120.00
16 6.00 3.00 1 18.00
20 2.00 2.00 1 4.00
20 4.00 10.00 1 40.00
20 3.50 2.00 1 7.00
16 6.00 4.00 1 24.00
1.82333333333333 16 8.00 12.00 1 96.00
8 1.60 322.00 1 515.20

FFB-17 16 12.00 9.00 2 216.00


16 7.00 3.00 2 42.00
16 8.00 6.00 2 96.00
16 9.50 3.00 2 57.00
20 4.50 2.00 2 18.00
20 4.00 18.00 2 144.00
20 3.00 2.00 2 12.00
16 9.00 4.00 2 72.00
16 7.00 16.00 2 224.00
8 1.60 529.00 2 1,692.80

FFB-18 16 12.00 20.00 2 480.00


16 7.00 6.00 2 84.00
16 8.00 3.00 2 48.00
20 4.50 2.00 2 18.00
20 4.00 20.00 2 160.00
16 9.00 4.00 2 72.00
16 7.00 12.00 2 168.00
16 8.00 4.00 2 64.00
16 8.50 4.00 2 68.00
8 1.60 545.00 2 1,744.00

FFB-19 16 12.00 6.00 2 144.00


16 7.00 3.00 2 42.00
16 6.00 3.00 2 36.00
20 4.50 4.00 2 36.00
20 4.00 8.00 2 64.00
16 9.00 4.00 2 72.00
16 7.00 4.00 2 56.00
16 12.00 4.00 2 96.00
16 9.00 4.00 2 72.00
1.872 8 1.60 293.00 2 937.60

FFB-20 16 12.00 3.00 2 72.00


16 11.00 3.00 2 66.00
20 4.00 8.00 2 64.00
16 8.50 4.00 2 68.00
16 7.00 4.00 2 56.00
16 8.50 4.00 2 68.00
1.61 8 1.60 182.00 2 582.40

FFB-21 16 12.00 12.00 4 576.00


16 7.00 15.00 4 420.00
16 8.00 7.00 4 224.00
20 4.00 22.00 4 352.00
16 9.00 4.00 4 144.00
16 8.50 4.00 4 136.00
1.61 8 1.60 555.00 4 3,552.00

FFB-22 16 5.50 3.00 1 16.50


16 12.00 10.00 1 120.00
16 8.00 6.00 1 48.00
16 9.50 3.00 1 28.50
20 4.00 14.00 1 56.00
20 3.00 2.00 1 6.00
16 8.50 4.00 1 34.00
16 6.00 4.00 1 24.00
16 8.00 4.00 1 32.00
16 7.00 12.00 1 84.00
1.25 8 1.60 430.00 1 688.00

FFB-23 16 5.50 3.00 2 33.00


16 12.00 10.00 2 240.00
16 8.00 6.00 2 96.00
16 7.00 7.00 2 98.00
20 4.00 12.00 2 96.00
20 3.50 2.00 2 14.00
20 6.00 2.00 2 24.00
16 8.50 4.00 2 68.00
16 6.00 4.00 2 48.00
16 8.00 4.00 2 64.00
16 10.50 4.00 2 84.00
1.25 8 1.60 430.00 2 1,376.00

FFB-24 16 6.80 8.00 1 54.40


5.7 8 1.60 61.00 1 97.60

FFB-25 16 6.80 8.00 1 54.40


5.7 8 1.60 61.00 1 97.60

FFB-26 16 9.00 4.00 1 36.00


16 4.00 4.00 1 16.00
16 6.00 4.00 1 24.00
16 7.00 4.00 1 28.00
5.7 8 1.60 122.00 1 195.20

FFB-27 16 10.00 8.00 1 80.00


16 7.00 8.00 1 56.00
16 6.00 4.00 1 24.00
5.7 8 1.60 183.00 1 292.80
Second floor
SFB-1 16 6.00 3.00 1 18.00
16 7.00 3.00 1 21.00
16 12.00 3.00 1 36.00
16 7.50 3.00 1 22.50
20 5.00 2.00 1 10.00
20 4.00 6.00 1 24.00
20 6.00 2.00 1 12.00
16 10.00 4.00 1 40.00
16 12.00 4.00 1 48.00
16 10.50 4.00 1 42.00
1.95 8 1.60 265.00 1 424.00
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
SFB-2 16 7.00 6.00 1 42.00
16 6.00 3.00 1 18.00
16 12.00 3.00 1 36.00
20 5.00 2.00 1 10.00
20 4.00 6.00 1 24.00
20 4.50 2.00 1 9.00
16 4.00 4.00 1 16.00
16 12.00 4.00 1 48.00
16 8.00 4.00 1 32.00
16 9.00 4.00 1 36.00
2.73 8 1.60 271.00 1 433.60

SFB-3 16 6.00 3.00 1 18.00


16 7.00 3.00 1 21.00
16 12.00 3.00 1 36.00
16 8.00 3.00 1 24.00
20 5.00 2.00 1 10.00
20 4.00 6.00 1 24.00
20 6.50 2.00 1 13.00
16 10.00 4.00 1 40.00
16 12.00 4.00 1 48.00
16 12.00 4.00 1 48.00
16 7.50 4.00 1 30.00
8 1.60 255.00 1 408.00

SFB-4 16 7.50 3.00 1 22.50


16 6.00 3.00 1 18.00
16 12.00 3.00 1 36.00
16 7.00 3.00 1 21.00
20 5.50 2.00 1 11.00
20 4.00 6.00 1 24.00
20 4.50 2.00 1 9.00
16 4.50 4.00 1 18.00
16 12.00 4.00 1 48.00
16 8.00 4.00 1 32.00
16 9.00 4.00 1 36.00
2.12 8 1.60 260.00 1 416.00

SFB-5 16 4.00 3.00 1 12.00


16 7.00 3.00 1 21.00
16 12.00 7.00 1 84.00
16 10.50 3.00 1 31.50
20 3.00 4.00 1 12.00
20 4.00 8.00 1 32.00
16 7.50 4.00 1 30.00
16 8.00 4.00 1 32.00
16 7.00 4.00 1 28.00
8 1.60 263.00 1 420.80

SFB-6 16 10.00 3.00 1 30.00


16 12.00 10.00 1 120.00
16 5.00 3.00 1 15.00
20 2.00 2.00 1 4.00
20 4.00 10.00 1 40.00
20 2.40 2.00 1 4.80
16 6.00 4.00 1 24.00
16 8.00 8.00 1 64.00
16 7.00 4.00 1 28.00
8 1.60 290.00 1 464.00

SFB-7 16 5.50 3.00 3 49.50


16 7.00 3.00 3 63.00
16 12.00 3.00 3 108.00
16 10.50 3.00 3 94.50
20 3.00 4.00 3 36.00
20 4.00 10.00 3 120.00
20 3.00 2.00 3 18.00
16 9.00 4.00 3 108.00
16 12.00 4.00 3 144.00
16 8.00 4.00 3 96.00
16 7.00 4.00 3 84.00
1.31 8 1.60 272.00 3 1,305.60

SFB-8 16 10.00 3.00 3 90.00


16 12.00 6.00 3 216.00
16 6.00 3.00 3 54.00
20 2.00 2.00 3 12.00
20 4.00 12.00 3 144.00
16 6.00 4.00 3 72.00
16 8.00 8.00 3 192.00
16 12.00 4.00 3 144.00
16 8.50 4.00 3 102.00
8 1.60 310.00 3 1,488.00

SFB-9 16 11.10 3.00 1 33.30


20 3.50 2.00 1 7.00
20 6.00 2.00 1 12.00
16 11.10 4.00 1 44.40
1.31 8 1.60 98.00 1 156.80

SFB-10 16 9.50 3.00 1 28.50


16 10.50 3.00 1 31.50
20 2.40 2.00 1 4.80
20 4.00 4.00 1 16.00
20 3.00 2.00 1 6.00
16 6.60 4.00 1 26.40
16 8.00 4.00 1 32.00
16 7.00 4.00 1 28.00
8 1.60 156.00 1 249.60

SFB-11 16 10.00 3.00 1 30.00


16 12.00 3.00 1 36.00
16 4.00 3.00 1 12.00
20 2.00 2.00 1 4.00
20 4.00 6.00 1 24.00
20 2.40 2.00 1 4.80
16 6.50 4.00 1 26.00
16 12.00 4.00 1 48.00
16 7.00 4.00 1 28.00
8 1.60 203.00 1 324.80

SFB-12 16 11.10 7.00 1 77.70


20 6.00 2.00 1 12.00
20 3.50 2.00 1 7.00
8 1.60 70.00 1 112.00
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32

SFB-13 16 5.00 3.00 3 45.00


16 7.00 3.00 3 63.00
16 12.00 3.00 3 108.00
16 10.50 3.00 3 94.50
20 4.00 10.00 3 120.00
20 3.00 2.00 3 18.00
16 7.50 4.00 3 90.00
16 9.00 4.00 3 108.00
16 12.00 4.00 3 144.00
16 8.00 4.00 3 96.00
16 7.00 4.00 3 84.00
1.31 8 1.60 272.00 3 1,305.60

SFB-14 16 10.00 3.00 3 90.00


16 12.00 6.00 3 216.00
16 6.00 3.00 3 54.00
20 2.00 2.00 3 12.00
20 4.00 10.00 3 120.00
20 3.50 2.00 3 21.00
16 6.00 4.00 3 72.00
16 8.00 12.00 3 288.00
16 12.00 4.00 3 144.00
8 1.60 318.00 3 1,526.40

SFB-15 16 5.00 3.00 1 15.00


16 7.00 7.00 1 49.00
16 10.50 3.00 1 31.50
20 4.00 2.00 1 8.00
20 4.00 10.00 1 40.00
20 3.00 2.00 1 6.00
16 9.00 4.00 1 36.00
16 12.00 4.00 1 48.00
16 8.00 4.00 1 32.00
8 1.60 273.00 1 436.80

SFB-16 16 10.00 3.00 1 30.00


16 12.00 10.00 1 120.00
16 6.00 3.00 1 18.00
20 2.00 2.00 1 4.00
20 4.00 10.00 1 40.00
20 3.50 2.00 1 7.00
16 6.00 4.00 1 24.00
1.82333333333333 16 8.00 12.00 1 96.00
8 1.60 322.00 1 515.20

SFB-17 16 12.00 9.00 2 216.00


16 7.00 3.00 2 42.00
16 8.00 6.00 2 96.00
16 9.50 3.00 2 57.00
20 4.50 2.00 2 18.00
20 4.00 18.00 2 144.00
20 3.00 2.00 2 12.00
16 9.00 4.00 2 72.00
16 7.00 16.00 2 224.00
8 1.60 529.00 2 1,692.80

SFB-18 16 12.00 20.00 2 480.00


16 7.00 6.00 2 84.00
16 8.00 3.00 2 48.00
20 4.50 2.00 2 18.00
20 4.00 20.00 2 160.00
16 9.00 4.00 2 72.00
16 7.00 12.00 2 168.00
16 8.00 4.00 2 64.00
16 8.50 4.00 2 68.00
8 1.60 545.00 2 1,744.00

SFB-19 16 12.00 6.00 2 144.00


16 7.00 3.00 2 42.00
16 6.00 3.00 2 36.00
20 4.50 4.00 2 36.00
20 4.00 8.00 2 64.00
16 9.00 4.00 2 72.00
16 7.00 4.00 2 56.00
16 12.00 4.00 2 96.00
16 9.00 4.00 2 72.00
1.872 8 1.60 293.00 2 937.60

SFB-20 16 12.00 3.00 2 72.00


16 11.00 3.00 2 66.00
20 4.00 8.00 2 64.00
16 8.50 4.00 2 68.00
16 7.00 4.00 2 56.00
16 8.50 4.00 2 68.00
1.61 8 1.60 182.00 2 582.40

SFB-21 16 12.00 12.00 4 576.00


16 7.00 15.00 4 420.00
16 8.00 7.00 4 224.00
20 4.00 22.00 4 352.00
16 9.00 4.00 4 144.00
16 8.50 4.00 4 136.00
1.61 8 1.60 555.00 4 3,552.00

SFB-22 16 5.50 3.00 1 16.50


16 12.00 10.00 1 120.00
16 8.00 6.00 1 48.00
16 9.50 3.00 1 28.50
20 4.00 14.00 1 56.00
20 3.00 2.00 1 6.00
16 8.50 4.00 1 34.00
16 6.00 4.00 1 24.00
16 8.00 4.00 1 32.00
16 7.00 12.00 1 84.00
1.25 8 1.60 430.00 1 688.00

SFB-23 16 5.50 3.00 2 33.00


16 12.00 10.00 2 240.00
16 8.00 6.00 2 96.00
16 7.00 7.00 2 98.00
20 4.00 12.00 2 96.00
20 3.50 2.00 2 14.00
20 6.00 2.00 2 24.00
16 8.50 4.00 2 68.00
16 6.00 4.00 2 48.00
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
16 8.00 4.00 2 64.00
16 10.50 4.00 2 84.00
1.25 8 1.60 430.00 2 1,376.00

SFB-24 16 6.80 8.00 1 54.40


5.7 8 1.60 61.00 1 97.60

SFB-25 16 6.80 8.00 1 54.40


5.7 8 1.60 61.00 1 97.60

SFB-26 16 9.00 4.00 1 36.00


16 4.00 4.00 1 16.00
16 6.00 4.00 1 24.00
16 7.00 4.00 1 28.00
5.7 8 1.60 122.00 1 195.20

SFB-27 16 10.00 8.00 1 80.00


16 7.00 8.00 1 56.00
16 6.00 4.00 1 24.00
5.7 8 1.60 183.00 1 292.80
Service floor
SB-1 16 6.00 3.00 1 18.00
16 7.00 3.00 1 21.00
16 12.00 3.00 1 36.00
16 7.50 3.00 1 22.50
20 5.00 2.00 1 10.00
20 4.00 6.00 1 24.00
20 6.00 2.00 1 12.00
16 10.00 4.00 1 40.00
16 12.00 4.00 1 48.00
16 10.50 4.00 1 42.00
1.95 8 1.60 265.00 1 424.00

SB-2 16 7.00 6.00 1 42.00


16 6.00 3.00 1 18.00
16 12.00 3.00 1 36.00
20 5.00 2.00 1 10.00
20 4.00 6.00 1 24.00
20 4.50 2.00 1 9.00
16 4.00 4.00 1 16.00
16 12.00 4.00 1 48.00
16 8.00 4.00 1 32.00
16 9.00 4.00 1 36.00
2.73 8 1.60 271.00 1 433.60

SB-3 16 6.00 3.00 1 18.00


16 7.00 3.00 1 21.00
16 12.00 3.00 1 36.00
16 8.00 3.00 1 24.00
20 5.00 2.00 1 10.00
20 4.00 6.00 1 24.00
20 6.50 2.00 1 13.00
16 10.00 4.00 1 40.00
16 12.00 4.00 1 48.00
16 12.00 4.00 1 48.00
16 7.50 4.00 1 30.00
8 1.60 255.00 1 408.00

SB-4 16 7.50 3.00 1 22.50


16 6.00 3.00 1 18.00
16 12.00 3.00 1 36.00
16 7.00 3.00 1 21.00
20 5.50 2.00 1 11.00
20 4.00 6.00 1 24.00
20 4.50 2.00 1 9.00
16 4.50 4.00 1 18.00
16 12.00 4.00 1 48.00
16 8.00 4.00 1 32.00
16 9.00 4.00 1 36.00
2.12 8 1.60 260.00 1 416.00

SB-5 16 4.00 3.00 1 12.00


16 7.00 3.00 1 21.00
16 12.00 7.00 1 84.00
16 10.50 3.00 1 31.50
20 3.00 4.00 1 12.00
20 4.00 8.00 1 32.00
16 7.50 4.00 1 30.00
16 8.00 4.00 1 32.00
16 7.00 4.00 1 28.00
8 1.60 263.00 1 420.80

SB-6 16 10.00 3.00 1 30.00


16 12.00 10.00 1 120.00
16 5.00 3.00 1 15.00
20 2.00 2.00 1 4.00
20 4.00 10.00 1 40.00
20 2.40 2.00 1 4.80
16 6.00 4.00 1 24.00
16 8.00 8.00 1 64.00
16 7.00 4.00 1 28.00
8 1.60 290.00 1 464.00

SB-7 16 5.50 3.00 3 49.50


16 7.00 3.00 3 63.00
16 12.00 3.00 3 108.00
16 10.50 3.00 3 94.50
20 3.00 4.00 3 36.00
20 4.00 10.00 3 120.00
20 3.00 2.00 3 18.00
16 9.00 4.00 3 108.00
16 12.00 4.00 3 144.00
16 8.00 4.00 3 96.00
16 7.00 4.00 3 84.00
1.31 8 1.60 272.00 3 1,305.60

SB-8 16 10.00 3.00 3 90.00


16 12.00 6.00 3 216.00
16 6.00 3.00 3 54.00
20 2.00 2.00 3 12.00
20 4.00 12.00 3 144.00
16 6.00 4.00 3 72.00
16 8.00 8.00 3 192.00
16 12.00 4.00 3 144.00
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
16 8.50 4.00 3 102.00
8 1.60 310.00 3 1,488.00

SB-9 16 11.10 3.00 1 33.30


20 3.50 2.00 1 7.00
20 6.00 2.00 1 12.00
16 11.10 4.00 1 44.40
1.31 8 1.60 98.00 1 156.80

SB-10 16 9.50 3.00 1 28.50


16 10.50 3.00 1 31.50
20 2.40 2.00 1 4.80
20 4.00 4.00 1 16.00
20 3.00 2.00 1 6.00
16 6.60 4.00 1 26.40
16 8.00 4.00 1 32.00
16 7.00 4.00 1 28.00
8 1.60 156.00 1 249.60

SB-11 16 10.00 3.00 1 30.00


16 12.00 3.00 1 36.00
16 4.00 3.00 1 12.00
20 2.00 2.00 1 4.00
20 4.00 6.00 1 24.00
20 2.40 2.00 1 4.80
16 6.50 4.00 1 26.00
16 12.00 4.00 1 48.00
16 7.00 4.00 1 28.00
8 1.60 203.00 1 324.80

SB-12 16 11.10 7.00 1 77.70


20 6.00 2.00 1 12.00
20 3.50 2.00 1 7.00
8 1.60 70.00 1 112.00

SB-13 16 5.00 3.00 3 45.00


16 7.00 3.00 3 63.00
16 12.00 3.00 3 108.00
16 10.50 3.00 3 94.50
20 4.00 10.00 3 120.00
20 3.00 2.00 3 18.00
16 7.50 4.00 3 90.00
16 9.00 4.00 3 108.00
16 12.00 4.00 3 144.00
16 8.00 4.00 3 96.00
16 7.00 4.00 3 84.00
1.31 8 1.60 272.00 3 1,305.60

SB-14 16 10.00 3.00 3 90.00


16 12.00 6.00 3 216.00
16 6.00 3.00 3 54.00
20 2.00 2.00 3 12.00
20 4.00 10.00 3 120.00
20 3.50 2.00 3 21.00
16 6.00 4.00 3 72.00
16 8.00 12.00 3 288.00
16 12.00 4.00 3 144.00
8 1.60 318.00 3 1,526.40

SB-15 16 5.00 3.00 1 15.00


16 7.00 7.00 1 49.00
16 10.50 3.00 1 31.50
20 4.00 2.00 1 8.00
20 4.00 10.00 1 40.00
20 3.00 2.00 1 6.00
16 9.00 4.00 1 36.00
16 12.00 4.00 1 48.00
16 8.00 4.00 1 32.00
8 1.60 273.00 1 436.80

SB-16 16 10.00 3.00 1 30.00


16 12.00 10.00 1 120.00
16 6.00 3.00 1 18.00
20 2.00 2.00 1 4.00
20 4.00 10.00 1 40.00
20 3.50 2.00 1 7.00
16 6.00 4.00 1 24.00
1.82333333333333 16 8.00 12.00 1 96.00
8 1.60 322.00 1 515.20

SB-17 16 12.00 9.00 2 216.00


16 7.00 3.00 2 42.00
16 8.00 6.00 2 96.00
16 9.50 3.00 2 57.00
20 4.50 2.00 2 18.00
20 4.00 18.00 2 144.00
20 3.00 2.00 2 12.00
16 9.00 4.00 2 72.00
16 7.00 16.00 2 224.00
8 1.60 529.00 2 1,692.80

SB-18 16 12.00 20.00 2 480.00


16 7.00 6.00 2 84.00
16 8.00 3.00 2 48.00
20 4.50 2.00 2 18.00
20 4.00 20.00 2 160.00
16 9.00 4.00 2 72.00
16 7.00 12.00 2 168.00
16 8.00 4.00 2 64.00
16 8.50 4.00 2 68.00
8 1.60 545.00 2 1,744.00

SB-19 16 12.00 6.00 2 144.00


16 7.00 3.00 2 42.00
16 6.00 3.00 2 36.00
20 4.50 4.00 2 36.00
20 4.00 8.00 2 64.00
16 9.00 4.00 2 72.00
16 7.00 4.00 2 56.00
16 12.00 4.00 2 96.00
16 9.00 4.00 2 72.00
1.872 8 1.60 293.00 2 937.60

SB-20 16 12.00 3.00 2 72.00


16 11.00 3.00 2 66.00
20 4.00 8.00 2 64.00
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
16 8.50 4.00 2 68.00
16 7.00 4.00 2 56.00
16 8.50 4.00 2 68.00
1.61 8 1.60 182.00 2 582.40

SB-21 16 12.00 12.00 4 576.00


16 7.00 15.00 4 420.00
16 8.00 7.00 4 224.00
20 4.00 22.00 4 352.00
16 9.00 4.00 4 144.00
16 8.50 4.00 4 136.00
1.61 8 1.60 555.00 4 3,552.00

SB-22 16 5.50 3.00 1 16.50


16 12.00 10.00 1 120.00
16 8.00 6.00 1 48.00
16 9.50 3.00 1 28.50
20 4.00 14.00 1 56.00
20 3.00 2.00 1 6.00
16 8.50 4.00 1 34.00
16 6.00 4.00 1 24.00
16 8.00 4.00 1 32.00
16 7.00 12.00 1 84.00
1.25 8 1.60 430.00 1 688.00

SB-23 16 5.50 3.00 2 33.00


16 12.00 10.00 2 240.00
16 8.00 6.00 2 96.00
16 7.00 7.00 2 98.00
20 4.00 12.00 2 96.00
20 3.50 2.00 2 14.00
20 6.00 2.00 2 24.00
16 8.50 4.00 2 68.00
16 6.00 4.00 2 48.00
16 8.00 4.00 2 64.00
16 10.50 4.00 2 84.00
1.25 8 1.60 430.00 2 1,376.00

SFB-24 16 6.80 8.00 1 54.40


5.7 8 1.60 61.00 1 97.60

3rd-15th
TB-1 16 7.50 7.00 26 1,365.00
20 2.40 4.00 26 249.60
8 1.60 144.00 26 5,990.40

TB-2 16 7.50 7.00 26 1,365.00


20 2.40 4.00 26 249.60
8 1.60 53.00 26 2,204.80

TB-3 16 10.00 6.00 26 1,560.00


16 7.00 12.00 26 2,184.00
20 3.00 4.00 26 312.00
20 4.00 4.00 26 416.00
8 1.60 155.00 26 6,448.00

TB-4 16 4.00 3.00 130 1,560.00


16 7.00 3.00 130 2,730.00
16 12.00 3.00 130 4,680.00
16 10.50 3.00 130 4,095.00
20 3.00 2.00 130 780.00
20 4.00 8.00 130 4,160.00
16 7.50 4.00 130 3,900.00
16 12.00 4.00 130 6,240.00
16 8.00 4.00 130 4,160.00
16 7.00 4.00 130 3,640.00
8 1.60 155.00 130 32,240.00

TB-5 16 10.50 7.00 52 3,822.00


20 3.00 2.00 52 312.00
20 6.00 2.00 52 624.00
16 7.50 7.00 52 2,730.00
20 3.00 4.00 52 624.00

16 10.50 7.00 52 3,822.00


20 5.50 2.00 52 572.00
20 3.00 2.00 52 312.00
8 1.60 198.00 52 16,473.60

TB-6 16 7.00 7.00 26 1,274.00


20 2.40 2.00 26 124.80
20 3.00 2.00 26 156.00
8 1.60 155.00 26 6,448.00

TB-7 16 3.50 3.00 26 273.00


16 12.00 3.00 26 936.00
20 2.40 2.00 26 124.80
20 4.50 2.00 26 234.00
20 4.00 2.00 26 208.00
16 7.50 4.00 26 780.00
16 8.50 4.00 26 884.00
8 1.60 107.00 26 4,451.20

TB-8 16 12.00 3.00 26 936.00


16 3.50 3.00 26 273.00
20 4.00 2.00 26 208.00
20 4.50 2.00 26 234.00
20 2.40 2.00 26 124.80
16 8.50 4.00 26 884.00
16 7.50 4.00 26 780.00
8 1.60 116.00 26 4,825.60

TB-9 16 7.50 7.00 52 2,730.00


20 2.40 4.00 52 499.20
8 1.60 65.00 52 5,408.00

TB-10 16 7.50 7.00 52 2,730.00


20 2.40 4.00 52 499.20
8 1.60 52.00 52 4,326.40

TB-11 16 7.50 7.00 52 2,730.00


20 2.40 4.00 52 499.20
8 1.60 52.00 52 4,326.40

TB-12 16 7.50 7.00 52 2,730.00


Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
20 2.40 4.00 52 499.20
8 1.60 52.00 52 4,326.40
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32

TB-13 16 10.00 6.00 52 3,120.00


20 3.00 4.00 52 624.00
20 4.00 4.00 52 832.00
16 8.00 4.00 52 1,664.00
16 7.00 4.00 52 1,456.00
16 6.50 4.00 52 1,352.00
8 1.60 52.00 52 4,326.40

TB-14 16 7.50 7.00 52 2,730.00


20 2.40 4.00 52 499.20
8 1.60 52.00 52 4,326.40

TB-15 16 10.00 6.00 52 3,120.00


20 3.00 4.00 52 624.00
20 4.00 4.00 52 832.00
16 8.00 4.00 52 1,664.00
16 7.00 4.00 52 1,456.00
16 6.50 4.00 52 1,352.00
8 1.60 52.00 52 4,326.40

TB-16 16 6.80 7.00 52 2,475.20


8 1.60 61.00 52 5,075.20

TB-17 16 10.00 3.00 26 780.00


16 7.00 3.00 26 546.00
16 12.00 3.00 26 936.00
16 6.00 3.00 26 468.00
16 3.00 2.00 26 156.00
20 4.00 8.00 26 832.00
20 4.50 2.00 26 234.00
16 7.50 4.00 26 780.00
16 7.00 4.00 26 728.00
16 12.00 4.00 26 1,248.00
16 9.00 4.00 26 936.00
8 1.60 270.00 26 11,232.00

TB-18 16 12.00 3.00 26 936.00


16 9.50 3.00 26 741.00
20 4.00 6.00 26 624.00
20 3.00 2.00 26 156.00
16 8.50 4.00 26 884.00
16 7.00 8.00 26 1,456.00
1.143 8 1.60 164.00 26 6,822.40

TB-19 16 12.00 3.00 26 936.00


16 9.50 3.00 26 741.00
20 4.00 6.00 26 624.00
20 3.00 2.00 26 156.00
16 8.50 4.00 26 884.00
16 7.00 8.00 26 1,456.00
8 1.60 520.00 26 21,632.00

TB-20 16 10.00 4.00 26 1,040.00


16 4.00 4.00 26 416.00
16 7.00 8.00 26 1,456.00
8 1.60 116.00 26 4,825.60

TB-21 16 6.80 6.00 104 4,243.20


8 1.60 58.00 104 9,651.20

TB-22 16 2.80 6.00 52 873.60


8 1.60 21.00 52 1,747.20

TB-23 16 3.50 6.00 26 546.00


8 1.60 28.00 26 1,164.80

TB-24 16 7.20 6.00 52 2,246.40


8 1.60 58.00 52 4,825.60

Comunical
TB-1 16 7.50 7.00 2 105.00
20 2.40 4.00 2 19.20
8 1.60 144.00 2 460.80

TB-2 16 7.50 7.00 2 105.00


20 2.40 4.00 2 19.20
8 1.60 53.00 2 169.60

TB-3 16 10.00 6.00 2 120.00


16 7.00 12.00 2 168.00
20 3.00 4.00 2 24.00
20 4.00 4.00 2 32.00
8 1.60 155.00 2 496.00

TB-4 16 4.00 3.00 10 120.00


16 7.00 3.00 10 210.00
16 12.00 3.00 10 360.00
16 10.50 3.00 10 315.00
20 3.00 2.00 10 60.00
20 4.00 8.00 10 320.00
16 7.50 4.00 10 300.00
16 12.00 4.00 10 480.00
16 8.00 4.00 10 320.00
16 7.00 4.00 10 280.00
8 1.60 155.00 10 2,480.00

TB-5 16 10.50 7.00 4 294.00


20 3.00 2.00 4 24.00
20 6.00 2.00 4 48.00
16 7.50 7.00 4 210.00
20 3.00 4.00 4 48.00

16 10.50 7.00 4 294.00


Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
20 5.50 2.00 4 44.00
20 3.00 2.00 4 24.00
8 1.60 198.00 4 1,267.20

TB-6 16 7.00 7.00 2 98.00


20 2.40 2.00 2 9.60
20 3.00 2.00 2 12.00
8 1.60 155.00 2 496.00

TB-7 16 3.50 3.00 2 21.00


16 12.00 3.00 2 72.00
20 2.40 2.00 2 9.60
20 4.50 2.00 2 18.00
20 4.00 2.00 2 16.00
16 7.50 4.00 2 60.00
16 8.50 4.00 2 68.00
8 1.60 107.00 2 342.40

TB-8 16 12.00 3.00 2 72.00


16 3.50 3.00 2 21.00
20 4.00 2.00 2 16.00
20 4.50 2.00 2 18.00
20 2.40 2.00 2 9.60
16 8.50 4.00 2 68.00
16 7.50 4.00 2 60.00
8 1.60 116.00 2 371.20

TB-9 16 7.50 7.00 4 210.00


20 2.40 4.00 4 38.40
8 1.60 65.00 4 416.00

TB-10 16 7.50 7.00 4 210.00


20 2.40 4.00 4 38.40
8 1.60 52.00 4 332.80

TB-11 16 7.50 7.00 4 210.00


20 2.40 4.00 4 38.40
8 1.60 52.00 4 332.80

TB-12 16 7.50 7.00 4 210.00


20 2.40 4.00 4 38.40
8 1.60 52.00 4 332.80

TB-13 16 10.00 6.00 4 240.00


20 3.00 4.00 4 48.00
20 4.00 4.00 4 64.00
16 8.00 4.00 4 128.00
16 7.00 4.00 4 112.00
16 6.50 4.00 4 104.00
8 1.60 52.00 4 332.80

TB-14 16 7.50 7.00 4 210.00


20 2.40 4.00 4 38.40
8 1.60 52.00 4 332.80

TB-15 16 10.00 6.00 4 240.00


20 3.00 4.00 4 48.00
20 4.00 4.00 4 64.00
16 8.00 4.00 4 128.00
16 7.00 4.00 4 112.00
16 6.50 4.00 4 104.00
8 1.60 52.00 4 332.80

TB-16 16 6.80 7.00 4 190.40


8 1.60 61.00 4 390.40

TB-17 16 10.00 3.00 2 60.00


16 7.00 3.00 2 42.00
16 12.00 3.00 2 72.00
16 6.00 3.00 2 36.00
16 3.00 2.00 2 12.00
20 4.00 8.00 2 64.00
20 4.50 2.00 2 18.00
16 7.50 4.00 2 60.00
16 7.00 4.00 2 56.00
16 12.00 4.00 2 96.00
16 9.00 4.00 2 72.00
8 1.60 270.00 2 864.00

TB-18 16 12.00 3.00 2 72.00


16 9.50 3.00 2 57.00
20 4.00 6.00 2 48.00
20 3.00 2.00 2 12.00
16 8.50 4.00 2 68.00
16 7.00 8.00 2 112.00
1.143 8 1.60 164.00 2 524.80

TB-19 16 12.00 3.00 2 72.00


16 9.50 3.00 2 57.00
20 4.00 6.00 2 48.00
20 3.00 2.00 2 12.00
16 8.50 4.00 2 68.00
16 7.00 8.00 2 112.00
8 1.60 520.00 2 1,664.00

TB-20 16 10.00 4.00 2 80.00


16 4.00 4.00 2 32.00
16 7.00 8.00 2 112.00
8 1.60 116.00 2 371.20

TB-21 16 6.80 6.00 8 326.40


8 1.60 58.00 8 742.40

TB-22 16 2.80 6.00 4 67.20


8 1.60 21.00 4 134.40

TB-23 16 3.50 6.00 2 42.00


8 1.60 28.00 2 89.60

TB-24 16 7.20 6.00 4 172.80


8 1.60 58.00 4 371.20

Roof
TB-1 16 7.50 7.00 2 105.00
20 2.40 4.00 2 19.20
8 1.60 144.00 2 460.80
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32

TB-2 16 7.50 7.00 2 105.00


20 2.40 4.00 2 19.20
8 1.60 53.00 2 169.60

TB-3 16 10.00 6.00 2 120.00


16 7.00 12.00 2 168.00
20 3.00 4.00 2 24.00
20 4.00 4.00 2 32.00
8 1.60 155.00 2 496.00

TB-4 16 4.00 3.00 10 120.00


16 7.00 3.00 10 210.00
16 12.00 3.00 10 360.00
16 10.50 3.00 10 315.00
20 3.00 2.00 10 60.00
20 4.00 8.00 10 320.00
16 7.50 4.00 10 300.00
16 12.00 4.00 10 480.00
16 8.00 4.00 10 320.00
16 7.00 4.00 10 280.00
8 1.60 155.00 10 2,480.00

TB-5 16 10.50 7.00 4 294.00


20 3.00 2.00 4 24.00
20 6.00 2.00 4 48.00
16 7.50 7.00 4 210.00
20 3.00 4.00 4 48.00

16 10.50 7.00 4 294.00


20 5.50 2.00 4 44.00
20 3.00 2.00 4 24.00
8 1.60 198.00 4 1,267.20

TB-6 16 7.00 7.00 2 98.00


20 2.40 2.00 2 9.60
20 3.00 2.00 2 12.00
8 1.60 155.00 2 496.00

TB-7 16 3.50 3.00 2 21.00


16 12.00 3.00 2 72.00
20 2.40 2.00 2 9.60
20 4.50 2.00 2 18.00
20 4.00 2.00 2 16.00
16 7.50 4.00 2 60.00
16 8.50 4.00 2 68.00
8 1.60 107.00 2 342.40

TB-8 16 12.00 3.00 2 72.00


16 3.50 3.00 2 21.00
20 4.00 2.00 2 16.00
20 4.50 2.00 2 18.00
20 2.40 2.00 2 9.60
16 8.50 4.00 2 68.00
16 7.50 4.00 2 60.00
8 1.60 116.00 2 371.20

TB-9 16 7.50 7.00 4 210.00


20 2.40 4.00 4 38.40
8 1.60 65.00 4 416.00

TB-10 16 7.50 7.00 4 210.00


20 2.40 4.00 4 38.40
8 1.60 52.00 4 332.80

TB-11 16 7.50 7.00 4 210.00


20 2.40 4.00 4 38.40
8 1.60 52.00 4 332.80

TB-12 16 7.50 7.00 4 210.00


20 2.40 4.00 4 38.40
8 1.60 52.00 4 332.80

TB-13 16 10.00 6.00 4 240.00


20 3.00 4.00 4 48.00
20 4.00 4.00 4 64.00
16 8.00 4.00 4 128.00
16 7.00 4.00 4 112.00
16 6.50 4.00 4 104.00
8 1.60 52.00 4 332.80

TB-14 16 7.50 7.00 4 210.00


20 2.40 4.00 4 38.40
8 1.60 52.00 4 332.80

TB-15 16 10.00 6.00 4 240.00


20 3.00 4.00 4 48.00
20 4.00 4.00 4 64.00
16 8.00 4.00 4 128.00
16 7.00 4.00 4 112.00
16 6.50 4.00 4 104.00
8 1.60 52.00 4 332.80

TB-16 16 6.80 7.00 4 190.40


8 1.60 61.00 4 390.40

TB-17 16 10.00 3.00 2 60.00


16 7.00 3.00 2 42.00
16 12.00 3.00 2 72.00
16 6.00 3.00 2 36.00
16 3.00 2.00 2 12.00
20 4.00 8.00 2 64.00
20 4.50 2.00 2 18.00
16 7.50 4.00 2 60.00
16 7.00 4.00 2 56.00
16 12.00 4.00 2 96.00
16 9.00 4.00 2 72.00
8 1.60 270.00 2 864.00

TB-18 16 12.00 3.00 2 72.00


16 9.50 3.00 2 57.00
20 4.00 6.00 2 48.00
20 3.00 2.00 2 12.00
16 8.50 4.00 2 68.00
16 7.00 8.00 2 112.00
1.143 8 1.60 164.00 2 524.80
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32

TB-19 16 12.00 3.00 2 72.00


16 9.50 3.00 2 57.00
20 4.00 6.00 2 48.00
20 3.00 2.00 2 12.00
16 8.50 4.00 2 68.00
16 7.00 8.00 2 112.00
8 1.60 520.00 2 1,664.00

TB-20 16 10.00 4.00 2 80.00


16 4.00 4.00 2 32.00
16 7.00 8.00 2 112.00
8 1.60 116.00 2 371.20

TB-21 16 6.80 6.00 8 326.40


8 1.60 58.00 8 742.40

TB-22 16 2.80 6.00 4 67.20


8 1.60 21.00 4 134.40

TB-23 16 3.50 6.00 2 42.00


8 1.60 28.00 2 89.60

TB-24 16 7.20 6.00 4 172.80


8 1.60 58.00 4 371.20

Upper roof
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
RB-1 16 4.00 6.00 2 48.00
16 12.00 3.00 2 72.00
20 3.00 4.00 2 24.00
20 4.00 4.00 2 32.00
16 7.00 12.00 2 168.00
8 1.60 159.00 2 508.80

RB-2 16 4.00 14.00 4 224.00


16 7.50 7.00 4 210.00
20 3.00 4.00 4 48.00
8 1.60 101.00 4 646.40

RB-3 16 4.20 6.00 2 50.40


8 1.60 37.00 2 118.40

RB-4 16 7.50 14.00 2 210.00


20 5.40 2.00 2 21.60
16 4.00 4.00 2 32.00
8 1.60 159.00 2 508.80

RB-5 16 4.00 3.00 2 24.00


16 12.00 3.00 2 72.00
20 3.00 2.00 2 12.00
20 4.00 4.00 2 32.00
16 7.00 12.00 2 168.00
8 1.60 159.00 2 508.80

RB-6 16 4.00 6.00 2 48.00


16 12.00 3.00 2 72.00
20 3.00 2.00 2 12.00
20 4.00 4.00 2 32.00
16 7.00 12.00 2 168.00
8 1.60 159.00 2 508.80

RB-7 16 10.00 3.00 2 60.00


16 12.00 3.00 2 72.00
16 10.50 3.00 2 63.00
20 3.00 4.00 2 24.00
20 4.00 6.00 2 48.00
16 7.00 12.00 2 168.00
16 12.00 4.00 2 96.00
8 1.60 265.00 2 848.00

RB-8 16 8.80 3.00 2 52.80


20 2.40 2.00 2 9.60
20 4.00 2.00 2 16.00
16 8.80 4.00 2 70.40
8 1.60 73.00 2 233.60

RB-9 16 12.00 3.00 2 72.00


16 4.00 4.00 2 32.00
20 3.50 2.00 2 14.00
20 4.00 2.00 2 16.00
20 3.00 2.00 2 12.00
16 8.50 4.00 2 68.00
16 7.00 4.00 2 56.00
8 1.60 119.00 2 380.80

RB-10 16 10.00 3.00 2 60.00


16 12.00 3.00 2 72.00
16 10.50 3.00 2 63.00
20 3.00 4.00 2 24.00
20 4.00 8.00 2 64.00
16 7.50 4.00 2 60.00
16 7.00 8.00 2 112.00
16 12.00 4.00 2 96.00
8 1.60 119.00 2 380.80

RB-11 16 10.00 3.00 2 60.00


16 12.00 3.00 2 72.00
16 10.50 3.00 2 63.00
20 3.00 4.00 2 24.00
20 4.00 6.00 2 48.00
16 7.50 4.00 2 60.00
16 12.00 4.00 2 96.00
16 7.00 8.00 2 112.00
8 1.60 265.00 2 848.00

Slab
First floor
SY1-SY2
MX1-MX2 (V) 10 7.85 23.00 1 180.55
Mx-2-3 10 6.40 23.00 1 147.20
Mx-3-4 10 4.95 23.00 1 113.85
Mx-4-5 10 7.80 25.00 1 195.00
Mx-5-6 10 5.19 25.00 1 129.75

SY1-SY2 1
Mx-1-2 (H) 10 8.11 24.00 1 194.64
Mx-2-3 10 8.11 31.00 1 251.41
Mx-3-4 10 6.05 42.00 1 254.10
Mx-4-5 10 8.75 37.00 1 323.75
negative bar
MX1 1
H 10 3.70 30.00 1 111.00
MX2 10 3.59 23.00 1 82.57
10 2.43 31.00 1 75.21
10 3.70 44.00 1 162.80
MX3 10 3.59 23.00 1 82.57
10 3.70 24.00 1 88.80
10 2.43 21.00 1 51.03
MX4 10 4.05 23.00 1 93.15
10 2.43 21.00 1 51.03
10 3.70 36.00 1 133.20
MX5 10 4.92 21.00 1 103.32
10 3.70 64.00 0.00

SY2-SY3
V M1-M2 10 7.85 33.00 1 259.05
M2-M3 10 6.40 33.00 1 211.20
M3-M4 10 4.95 33.00 1 163.35
M4-M5 10 7.80 37.00 1 288.60
M5-M6 10 7.80 33.00 1 257.40
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
M6-M7 10 6.80 27.00 1 183.60

(H) M1-M2 10 6.90 24.00 1 165.60


M2-M3 10 6.90 33.00 1 227.70
M3-M4 10 6.90 23.00 1 158.70
M4-M5 10 8.09 52.00 1 420.42
M5-M6 10 9.50 52.00 1 494.00
M6-M7
negative bar
SY3 10 4.07 32.00 1 130.24
M2 10 3.59 43.00 1 154.37
SY3 10 4.07 42.00 1 170.94
M3 10 3.59 43.00 1 154.37
SY3 10 4.07 42.00 1 170.94
M4 10 4.05 38.00 1 153.90
SY3 12 4.07 52.00 1 211.64
M5 10 5.00 38.00 1 190.00
SY3 10 4.07 66.00 1 268.62
M6 10 4.70 43.00 1 202.10
SY3 10 4.07 48.00 1 195.36

SY3-SY4
V 10 7.85 30.00 1 235.50
10 6.40 30.00 1 192.00
10 4.95 28.00 1 138.60
10 7.80 28.00 1 218.40
10 7.80 28.00 1 218.40
10 6.90 28.00 1 193.20
10 7.79 28.00 1 218.12

(H) 10 5.90 25.00 1 147.50


10 5.90 33.00 1 194.70
10 5.90 23.00 1 135.70
10 5.90 52.00 1 306.80
10 9.62 52.00 1 500.24
10 9.62 52.00 1 500.24
10 9.72 34.00 1 330.48
negative bar
10 3.87 32.00 1 123.84
10 3.59 36.00 1 129.24
10 3.87 42.00 1 162.54
10 3.59 36.00 1 129.24
10 3.87 23.00 1 89.01
10 4.05 32.00 1 129.60
12 3.87 56.00 1 216.72
10 5.00 32.00 1 160.00
10 4.70 36.00 1 169.20
10 3.84 36.00 1 138.24
10 3.87 32.00 1 123.84
1
SY4-SY5
V 10 7.85 30.00 1 235.50
10 6.40 30.00 1 192.00
10 4.95 30.00 1 148.50
10 7.80 33.00 1 257.40
10 7.80 30.00 1 234.00
10 6.90 30.00 1 207.00
10 7.79 28.00 1 218.12
10 5.75 28.00 1 161.00

(H) 10 6.30 23.00 1 144.90


10 6.30 30.00 1 189.00
10 6.30 23.00 1 144.90
10 6.30 41.00 1 258.30
10 6.30 33.00 1 207.90
10 6.30 34.00 1 214.20

negative bar
10 4.00 30.00 1 120.00
10 3.59 39.00 1 140.01
10 4.00 40.00 1 160.00
10 3.59 39.00 1 140.01
10 4.00 23.00 1 92.00
10 4.05 32.00 1 129.60
12 4.05 35.00 1 141.75
10 4.00 56.00 1 224.00
10 5.00 15.00 1 75.00
10 4.70 17.00 1 79.90
10 4.00 43.00 1 172.00
10 3.84 49.00 1 188.16
10 4.00 32.00 1 128.00

SY5-SY6
V 10 7.85 49.00 1 384.65
10 6.40 30.00 1 192.00
10 4.95 30.00 1 148.50
10 7.80 33.00 1 257.40
10 7.80 19.00 1 148.20
10 6.90 30.00 1 207.00
10 7.79 30.00 1 233.70

(H) 10 8.50 23.00 1 195.50


10 6.30 30.00 1 189.00
10 6.30 23.00 1 144.90
10 6.30 41.00 1 258.30
10 6.30 33.00 1 207.90
10 6.30 24.00 1 151.20

negative bar
10 2.48 23.00 1 57.04
10 3.59 39.00 1 140.01
10 2.53 30.00 1 75.90
10 3.59 39.00 1 140.01
10 4.00 23.00 1 92.00
10 4.05 32.00 1 129.60
12 4.00 56.00 1 224.00
10 5.00 20.00 1 100.00
10 5.00 15.00 1 75.00
10 4.70 20.00 1 94.00
10 4.00 43.00 1 172.00
10 3.84 39.00 1 149.76
10 4.00 32.00 1 128.00
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32

SY6-SY6' and SY7


V 10 7.85 19.00 1 149.15
10 4.22 33.00 1 139.10
10 4.95 30.00 1 148.50
10 7.80 33.00 1 257.40
10 7.80 33.00 1 257.40
10 6.90 30.00 1 207.00
10 7.79 30.00 1 233.70

(H) 10 6.30 37.00 1 233.10


10 6.30 23.00 1 144.90
10 6.30 41.00 1 258.30
10 6.30 41.00 1 258.30
10 10.50 41.00 1 430.50
10 6.30 33.00 1 207.90
10 6.30 24.00 1 151.20

negative bar
12 3.59 49.00 1 175.91
10 4.00 30.00 1 120.00
10 4.05 35.00 1 141.75
10 4.00 49.00 1 196.00
10 5.00 35.00 1 175.00
10 4.70 39.00 1 183.30
12 4.00 43.00 1 172.00
10 3.84 39.00 1 149.76
10 4.00 32.00 1 128.00

SY7-SY7' and SY8 6.355


V 10 7.26 30.00 1 217.80
10 10.55 49.00 1 516.95
10 9.65 30.00 1 289.50
10 8.76 30.00 1 262.80

(H) 10 6.30 34.00 1 214.20


10 6.30 23.00 1 144.90
10 6.30 41.00 1 258.30
10 6.30 33.00 1 207.90
10 6.30 24.00 1 151.20
10 6.30 33.00 1 207.90

negative bar
10 4.00 32.00 1 128.00
10 3.84 39.00 1 149.76
10 4.00 43.00 1 172.00
10 4.00 56.00 1 224.00
10 4.05 35.00 1 141.75
10 4.00 23.00 1 92.00
12 3.59 49.00 1 175.91
10 3.27 49.00 1 160.23
10 2.75 37.00 1 101.75

SY8-SY9
V 10 7.85 30.00 1 235.50
10 6.40 30.00 1 192.00
10 4.90 30.00 1 147.00
10 10.55 33.00 1 348.15
10 9.65 30.00 1 289.50
10 7.79 30.00 1 233.70

(H) 10 6.30 24.00 1 151.20


10 6.30 33.00 1 207.90
10 6.30 41.00 1 258.30
10 6.30 23.00 1 144.90
10 6.30 30.00 1 189.00
10 9.26 23.00 1 212.98

negative bar
10 4.00 30.00 1 120.00
10 3.59 49.00 1 175.91
10 4.00 40.00 1 160.00
10 3.59 49.00 1 175.91
10 4.00 23.00 1 92.00
10 4.05 35.00 1 141.75
12 4.00 56.00 1 224.00
10 4.00 43.00 1 172.00
10 3.84 39.00 1 149.76
10 4.00 32.00 1 128.00

SY9-SY10
V 10 7.85 30.00 1 235.50
10 6.40 30.00 1 192.00
10 4.90 30.00 1 147.00
10 10.55 33.00 1 348.15
10 9.65 30.00 1 289.50
10 7.79 30.00 1 233.70

(H) 10 6.30 24.00 1 151.20


10 6.30 33.00 1 207.90
10 6.30 41.00 1 258.30
10 6.30 23.00 1 144.90
10 6.30 30.00 1 189.00
10 6.30 23.00 1 144.90

negative bar
10 3.88 37.00 1 143.56
10 3.59 49.00 1 175.91
10 3.88 49.00 1 190.12
10 3.59 49.00 1 175.91
10 3.88 23.00 1 89.24
10 4.05 35.00 1 141.75
12 3.88 56.00 1 217.28
10 3.88 43.00 1 166.84
10 3.84 39.00 1 149.76
10 3.88 32.00 1 124.16

SY10-SY11
V 10 7.85 34.00 1 266.90
10 6.40 34.00 1 217.60
10 4.95 34.00 1 168.30
10 10.55 46.00 1 485.30
10 9.65 46.00 1 443.90
10 7.79 46.00 1 358.34
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32

(H) 10 8.09 30.00 1 242.55


10 8.09 40.00 1 323.40
10 8.09 61.00 1 493.19
10 8.09 28.00 1 226.38
10 8.09 37.00 1 299.15
10 8.09 28.00 1 226.38

negative bar
10 3.59 46.00 1 165.14
10 3.59 49.00 1 175.91
10 4.05 39.00 1 157.95
10 3.84 37.00 1 142.08

SY11'-SY12
V 10 7.85 28.00 1 219.80
10 6.40 28.00 1 179.20
10 4.95 31.00 1 153.45
10 7.80 31.00 1 241.80
10 7.80 34.00 1 265.20
10 9.35 39.00 1 364.65

(H) 10 8.09 46.00 1 371.91


10 8.09 46.00 1 371.91
10 8.09 41.00 1 331.49
10 8.09 25.00 1 202.13
10 8.09 30.00 1 242.55
10 8.09 23.00 1 185.96
10 8.09 23.00 1 185.96

negative bar
10 3.89 32.00 1 124.32
10 3.59 37.00 1 132.83
10 3.89 42.00 1 163.17
10 3.59 37.00 1 132.83
10 3.89 23.00 1 89.35
10 4.05 32.00 1 129.60
10 3.89 52.00 1 202.02
10 5.00 32.00 1 160.00
10 3.89 52.00 1 202.02
10 4.70 37.00 1 173.90

SY12-SY13
V 10 7.85 33.00 1 259.05
10 6.40 33.00 1 211.20
10 4.95 33.00 1 163.35
10 7.80 33.00 1 257.40
10 7.80 30.00 1 234.00
10 6.90 30.00 1 207.00
10 7.79 30.00 1 233.70

(H) 10 8.55 24.00 1 205.20


10 6.30 33.00 1 207.90
10 6.30 37.00 1 233.10
10 6.30 41.00 1 258.30
10 8.55 25.00 1 213.75
10 6.30 33.00 1 207.90
10 6.30 25.00 1 157.50

negative bar
10 4.00 32.00 1 128.00
10 3.59 39.00 1 140.01
10 4.00 42.00 1 168.00
10 3.59 39.00 1 140.01
10 4.05 35.00 1 141.75
10 4.00 56.00 1 224.00
10 5.00 35.00 1 175.00
10 4.00 49.00 1 196.00
10 4.70 39.00 1 183.30
10 4.00 43.00 1 172.00
10 3.84 39.00 1 149.76

SY13-SY14
V 10 7.85 30.00 1 235.50
10 8.69 30.00 1 260.70
10 10.55 33.00 1 348.15
10 7.80 33.00 1 257.40
10 6.90 30.00 1 207.00
10 9.18 30.00 1 275.25

(H) 10 6.30 24.00 1 151.20


10 6.30 33.00 1 207.90
10 6.30 41.00 1 258.30
10 6.30 41.00 1 258.30
10 6.30 30.00 1 189.00
10 6.30 23.00 1 144.90

negative bar
10 4.00 30.00 1 120.00
10 3.59 39.00 1 140.01
10 4.00 30.00 1 120.00
10 4.00 56.00 1 224.00
10 5.00 35.00 1 175.00
10 4.00 49.00 1 196.00
10 4.70 39.00 1 183.30
10 4.00 43.00 1 172.00
10 3.84 39.00 1 149.76
10 4.00 32.00 1 128.00

SY14-SY15
V 10 7.85 30.00 1 235.50
10 6.40 30.00 1 192.00
10 4.95 30.00 1 148.50
10 7.80 33.00 1 257.40
10 7.80 33.00 1 257.40
10 6.90 30.00 1 207.00
10 9.18 30.00 1 275.25

(H) 10 6.30 24.00 1 151.20


10 6.30 33.00 1 207.90
10 8.25 41.00 1 338.25
10 6.30 41.00 1 258.30
10 8.55 37.00 1 316.35
10 6.30 30.00 1 189.00
10 6.30 23.00 1 144.90
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
negative bar
10 4.00 23.00 1 92.00
10 3.59 39.00 1 140.01
10 4.00 30.00 1 120.00
10 3.59 39.00 1 140.01
10 4.00 34.00 1 136.00
10 4.05 35.00 1 141.75
10 4.00 56.00 1 224.00
10 5.00 35.00 1 175.00
10 4.70 39.00 1 183.30
10 4.00 43.00 1 172.00
10 3.84 39.00 1 149.76
10 4.00 32.00 1 128.00

SY15-SY16
V 10 7.85 30.00 1 235.50
10 6.40 49.00 1 313.60
10 4.95 30.00 1 148.50
10 7.80 33.00 1 257.40
10 7.80 19.00 1 148.20
10 6.90 30.00 1 207.00
10 7.79 30.00 1 233.70

(H) 10 6.30 24.00 1 151.20


10 6.30 33.00 1 207.90
10 6.04 42.00 1 253.68
10 6.30 41.00 1 258.30
10 6.30 23.00 1 144.90
10 6.30 30.00 1 189.00
10 6.30 23.00 1 144.90

negative bar
10 4.00 30.00 1 120.00
10 3.59 49.00 1 175.91
10 4.00 40.00 1 160.00
10 3.59 53.00 1 190.27
10 4.00 30.00 1 120.00
10 4.05 35.00 1 141.75
10 4.00 49.00 1 196.00
10 5.00 20.00 1 100.00
10 4.70 22.00 1 103.40
10 4.00 43.00 1 172.00
10 3.84 39.00 1 149.76
10 4.00 32.00 1 128.00

SY16-SY17
V 10 7.85 49.00 1 384.65
10 6.40 49.00 1 313.60
10 4.95 33.00 1 163.35
10 7.80 33.00 1 257.40
10 7.80 17.00 1 132.60
10 6.90 23.00 1 158.70
10 7.79 30.00 1 233.70

(H) 10 6.30 24.00 1 151.20


10 6.30 33.00 1 207.90
10 6.30 41.00 1 258.30
10 6.30 41.00 1 258.30
10 6.30 25.00 1 157.50
10 6.30 49.00 1 308.70
10 9.18 37.00 1 339.48

negative bar
10 4.00 37.00 1 148.00
10 3.59 49.00 1 175.91
10 4.00 49.00 1 196.00
10 3.59 49.00 1 175.91
10 4.00 23.00 1 92.00
10 4.05 35.00 1 141.75
10 4.00 56.00 1 224.00
10 5.00 20.00 1 100.00
10 4.00 56.00 1 224.00
10 4.00 43.00 1 172.00
10 4.70 20.00 1 94.00
10 4.00 43.00 1 172.00
10 3.84 35.00 1 134.40
10 4.00 32.00 1 128.00

SY17-SY19
V 10 7.85 30.00 1 235.50
10 6.40 30.00 1 192.00
10 4.95 33.00 1 163.35
10 7.80 33.00 1 257.40
10 7.80 33.00 1 257.40
10 6.90 30.00 1 207.00
10 9.17 30.00 1 275.10

(H) 10 6.30 24.00 1 151.20


10 6.30 33.00 1 207.90
10 9.92 41.00 1 406.72
10 6.30 41.00 1 258.30
10 6.30 25.00 1 157.50
10 6.30 30.00 1 189.00
10 6.30 23.00 1 144.90

negative bar
10 4.00 30.00 1 120.00
10 3.59 35.00 1 125.65
10 4.00 40.00 1 160.00
10 3.59 35.00 1 125.65
10 4.00 23.00 1 92.00
10 4.05 35.00 1 141.75
10 4.00 49.00 1 196.00
10 5.00 35.00 1 175.00
10 4.00 56.00 1 224.00
10 4.00 43.00 1 172.00
10 4.70 35.00 1 164.50
10 4.00 43.00 1 172.00
10 3.84 35.00 1 134.40
10 4.00 32.00 1 128.00

SY19-SY20
V 10 7.85 30.00 1 235.50
10 6.40 30.00 1 192.00
10 4.95 33.00 1 163.35
10 7.80 33.00 1 257.40
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
10 7.80 33.00 1 257.40
10 6.90 30.00 1 207.00
10 7.79 30.00 1 233.70

(H) 10 6.30 24.00 1 151.20


10 6.30 33.00 1 207.90
10 6.30 41.00 1 258.30
10 6.30 41.00 1 258.30
10 6.30 25.00 1 157.50
10 6.30 30.00 1 189.00
10 6.30 23.00 1 144.90

negative bar
10 4.34 37.00 1 160.58
10 3.59 35.00 1 125.65
10 4.34 40.00 1 173.60
10 3.59 35.00 1 125.65
10 4.34 23.00 1 99.82
10 4.05 35.00 1 141.75
10 4.34 56.00 1 243.04
10 5.00 35.00 1 175.00
10 4.34 56.00 1 243.04
10 4.00 43.00 1 172.00
10 4.70 35.00 1 164.50
10 4.34 54.00 1 234.36
10 3.84 35.00 1 134.40
10 4.34 39.00 1 169.26

SY20-SY21
V 10 7.85 43.00 1 337.55
10 6.40 43.00 1 275.20
10 4.95 57.00 1 282.15
10 7.80 57.00 1 444.60
10 7.80 57.00 1 444.60
10 6.90 43.00 1 296.70
10 9.27 12.00 1 111.24

(H) 10 9.13 30.00 1 273.90


10 9.13 40.00 1 365.20
10 9.13 61.00 1 556.93
10 10.19 61.00 1 621.59
10 10.19 37.00 1 377.03
10 9.13 37.00 1 337.81
10 9.13 28.00 1 255.64

negative bar
10 4.46 37.00 1 165.02
10 3.59 49.00 1 175.91
10 4.46 52.00 1 231.92
10 3.59 49.00 1 175.91
10 4.05 49.00 1 198.45
10 5.00 49.00 1 245.00
10 4.46 61.00 1 272.06
10 4.70 49.00 1 230.30
10 4.46 54.00 1 240.84
10 3.84 49.00 1 188.16
10 4.46 39.00 1 173.94

SY21, MX1-MX2
10 7.85 12.00 1 94.20
SY21, MX2-MX3 10 9.30 12.00 1 111.60
SY21, MX5-MX6 10 10.85 15.00 1 162.75
SY21, MX6-MX7 10 6.90 6.00 1 41.40
SY21, MX7-MX8 10 7.79 6.00 1 46.74

Second Floor
SY1-SY2
MX1-MX2 (V) 10 7.85 22.00 1 172.70
Mx-2-3 10 6.40 22.00 1 140.80
Mx-3-4 10 4.95 22.00 1 108.90
Mx-4-5 10 7.80 24.00 1 187.20
Mx-5-6 10 5.19 27.00 1 140.13

SY1-SY2 1
Mx-1-2 (H) 10 8.11 26.00 1 210.86
Mx-2-3 10 8.11 30.00 1 243.30
Mx-3-4 10 7.85 25.00 1 196.13
Mx-4-5 10 5.68 37.00 1 210.01
Mx-5-6 10 4.66 37.00 1 172.26

negative bar
H 1
MX1
MX2 10 3.59 22.00 1 78.98
MX3 10 3.59 23.00 1 82.57
MX4 10 4.05 23.00 1 93.15
MX5 10 5.00 21.00 1 105.00

SY2/Mx1-Mx6 10 3.70 223.00 1 825.10

SY2-SY3
V M1-M2 10 7.85 33.00 1 259.05
M2-M3 10 6.40 33.00 1 211.20
M3-M4 10 4.95 33.00 1 163.35
M4-M5 10 7.80 36.00 1 280.80
M5-M6 10 7.80 33.00 1 257.40
M6-M8 10 11.70 26.00 1 304.20

(H) M1-M2 10 6.90 28.00 1 193.20


M2-M3 10 6.90 33.00 1 227.70
M3-M4 10 6.90 23.00 1 158.70
M4-M5 10 6.90 52.00 1 358.80
M5-M6 10 10.80 52.00 1 561.70
M6-M7 10 5.43 52.00 1 282.10
M6-M7 10 2.05 52.00 1 106.60

negative bar
SY3/M1-M8 10 4.07 264.00 1 1,074.48
M2/Sy2-Sy3 10 3.59 43.00 1 154.37
M3 /Sy2-Sy3 10 3.59 43.00 1 154.37
M4 /Sy2-Sy3 10 4.05 38.00 1 153.90
M5 /Sy2-Sy3 10 5.00 38.00 1 190.00
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
M6/Sy2-Sy3 10 4.70 43.00 1 202.10

SY3-SY4
V M1-M2 10 7.85 30.00 1 235.50
M2-M3 10 6.40 30.00 1 192.00
M3-M4 10 4.95 28.00 1 138.60
M4-M5 10 7.80 28.00 1 218.40
M5-M6 10 7.80 28.00 1 218.40
M6-M7 10 6.90 28.00 1 193.20
M7-M8 10 7.79 28.00 1 218.12

(H) M1-M2 10 5.90 25.00 1 147.50


M2-M3 10 5.90 33.00 1 194.70
M3-M4 10 5.90 23.00 1 135.70
M4-M5 10 5.90 52.00 1 306.80
M5-M6 10 9.62 52.00 1 500.24
M6-M7 10 52.00 1 0.00
M7-M8 10 34.00 1 0.00

negative bar
SY4/M1-M8 10 3.87 280.00 1 1,083.60

M2/Sy3-Sy4 10 3.59 36.00 1 129.24


M3 Sy3-Sy4 10 3.59 36.00 1 129.24
M4 /Sy3-Sy4 10 4.05 32.00 1 129.60
M5 /Sy3-Sy4 10 5.00 32.00 1 160.00
M6/Sy3-Sy4 10 4.70 36.00 1 169.20
M7/Sy3-Sy4 10 3.84 36.00 1 138.24
1
SY4-SY5

V M1-M2 10 7.85 30.00 1 235.50


M2-M3 10 6.40 30.00 1 192.00
M3-M4 10 4.95 30.00 1 148.50
M4-M5 10 7.80 33.00 1 257.40
M5-M6 10 7.80 13.00 1 101.40
M6-M7 10 6.90 30.00 1 207.00
M7-M8 10 9.95 30.00 1 298.50

(H) 10 6.30 23.00 1 144.90


10 6.30 30.00 1 189.00
10 6.30 23.00 1 144.90
10 6.30 41.00 1 258.30
10 6.30 33.00 1 207.90
10 6.30 34.00 1 214.20

negative bar
SY5/M1-M8 10 4.00 228.00 1 912.00

M2/Sy4-Sy5 10 3.59 39.00 1 140.01


M3 /Sy4-Sy5 10 3.59 39.00 1 140.01
M4 //Sy4-Sy5 10 4.05 32.00 1 129.60
M5 //Sy4-Sy5 12 5.00 15.00 1 75.00
M6//Sy4-Sy5 10 4.70 17.00 1 79.90
M7//Sy4-Sy5 10 3.84 39.00 1 149.76

SY5-SY6
V M1-M2 10 7.85 30.00 1 235.50
M2-M3 10 6.40 30.00 1 192.00
M3-M4 10 4.95 30.00 1 148.50
M4-M5 10 7.80 33.00 1 257.40
M5-M6 10 7.80 19.00 1 148.20
M6-M7 10 6.90 30.00 1 207.00
M7-M8 10 7.79 30.00 1 233.70

(H) 10 8.50 23.00 1 195.50


10 6.30 30.00 1 189.00
10 6.30 23.00 1 144.90
10 6.30 41.00 1 258.30
10 6.30 33.00 1 207.90
10 6.30 24.00 1 151.20

negative bar
SY6/M2-M3 10 2.50 28.00 1 70.00
10 4.30 28.00 1 120.40

SY6/M3-M8 10 4.00 154.00 1 616.00

M2/Sy5-Sy6 10 3.59 39.00 1 140.01


M3 /Sy5-Sy6 10 3.59 39.00 1 140.01
M4 //Sy5-Sy6 10 4.05 32.00 1 129.60
M5 //Sy5-Sy6 12 5.00 15.00 1 75.00
M6//Sy5-Sy6 10 4.70 17.00 1 79.90
M7//Sy5-Sy6 10 3.84 39.00 1 149.76

SY6 SY7
V 10 7.85 19.00 1 149.15
10 6.40 26.00 1 166.40
10 4.95 30.00 1 148.50
10 7.80 33.00 1 257.40
10 7.80 33.00 1 257.40
10 6.90 30.00 1 207.00
10 9.30 30.00 1 279.00

(H) 10 6.30 37.00 1 233.10


10 6.30 23.00 1 144.90
10 6.30 41.00 1 258.30
10 6.30 41.00 1 258.30
10 10.50 41.00 1 430.50
10 6.30 33.00 1 207.90
10 6.30 24.00 1 151.20

negative bar
SY7/M1-M8 10 4.00 169.00 1 676.00

M2/Sy6-Sy7 12 3.59 16.00 1 57.44


M3/Sy6-Sy7 12 3.59 49.00 1 175.91
M4/Sy6-Sy7 10 4.05 35.00 1 141.75
M5/Sy6-Sy7 10 5.00 35.00 1 175.00
M6/Sy6-Sy7 10 4.70 39.00 1 183.30
M7/Sy6-Sy7 10 3.84 39.00 1 149.76
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
SY7- SY8 6.355
V 10 7.85 10.00 1 78.50
10 9.08 30.00 1 272.40
10 10.55 49.00 1 516.95
10 9.65 30.00 1 289.50
10 9.01 30.00 1 270.42

3.985 (H) 10 6.30 34.00 1 214.20


10 6.30 23.00 1 144.90
10 6.30 41.00 1 258.30
10 6.30 33.00 1 207.90
10 6.30 24.00 1 151.20

negative bar
SY8/M1-M8 10 4.00 245.00 1 980.00

M2/SY7-SY8 10 3.84 39.00 1 149.76


M3/SY7-SY8 10 3.84 39.00 1 149.76
M4/SY7-SY8 10 4.05 35.00 1 141.75
M7/SY7-SY8 10 3.84 49.00 1 188.16

SY8-SY9
V M1-M2 10 7.85 30.00 1 235.50
M2-M3 10 6.40 30.00 1 192.00
M2-M4 10 4.95 30.00 1 148.50
M2-M5 10 10.55 33.00 1 348.15
M2-M6 10 9.65 30.00 1 289.50
M2-M7 10 7.79 30.00 1 233.70

(H) 10 8.60 26.00 1 223.60


10 6.30 33.00 1 207.90
10 6.30 23.00 1 144.90
10 6.30 41.00 1 258.30
10 6.30 33.00 1 207.90
10 6.30 23.00 1 144.90

negative bar
SY9/M1-M8 10 4.00 245.00 1 980.00

M2/SY8-SY9 12 3.59 49.00 1 175.91


M3/SY8-SY9 12 3.59 49.00 1 175.91
M4/SY8-SY9 10 4.05 35.00 1 141.75
M7/SY8-SY9 10 3.84 39.00 1 149.76

SY9-SY10
5.35 V 10 7.85 30.00 1 235.50
10 6.40 30.00 1 192.00
10 4.95 30.00 1 148.50
10 10.55 33.00 1 348.15
10 9.65 30.00 1 289.50
10 7.79 30.00 1 233.70

(H) 10 6.30 32.00 1 201.60


10 6.30 30.00 1 189.00
10 6.30 28.00 1 176.40
10 6.30 41.00 1 258.30
10 6.30 33.00 1 207.90
10 6.30 23.00 1 144.90

negative bar
SY9/M1-M8 10 3.88 245.00 1 950.60

12 3.59 49.00 1 175.91


12 3.59 49.00 1 175.91
10 4.05 35.00 1 141.75
10 3.84 39.00 1 149.76

SY10-SY11
V 10 7.85 34.00 1 266.90
10 6.40 34.00 1 217.60
10 4.95 34.00 1 168.30
10 7.78 46.00 1 357.88
10 7.80 46.00 1 358.80
10 6.90 34.00 1 234.60
10 9.79 34.00 1 332.86

(H) 10 8.09 32.00 1 258.72


10 8.09 40.00 1 323.40
10 8.09 28.00 1 226.38
10 8.09 61.00 1 493.19
10 10.50 61.00 1 640.50
10 8.09 37.00 1 299.15
10 8.09 37.00 1 299.15

negative bar
12 3.59 46.00 1 165.14
12 3.59 39.00 1 140.01
10 4.05 39.00 1 157.95
10 5.00 39.00 1 195.00
10 4.70 39.00 1 183.30
10 3.84 37.00 1 142.08

SY11'-SY12
V 10 7.85 28.00 1 219.80
10 6.40 28.00 1 179.20
10 4.95 31.00 1 153.45
10 7.80 31.00 1 241.80
10 7.80 34.00 1 265.20
10 9.35 39.00 1 364.65

5.35 (H) 10 8.09 26.00 1 210.21


10 8.09 33.00 1 266.81
10 8.09 25.00 1 202.13
10 8.09 41.00 1 331.49
10 8.09 46.00 1 371.91
10 8.09 46.00 1 371.91
1

negative bar
10 3.89 32.00 1 124.32
10 3.59 37.00 1 132.83
10 3.89 42.00 1 163.17
10 3.59 37.00 1 132.83
10 3.89 23.00 1 89.35
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
10 4.05 32.00 1 129.60
10 3.89 52.00 1 202.02
10 5.00 32.00 1 160.00
10 3.89 52.00 1 202.02
10 4.70 37.00 1 173.90

SY12-SY13
V 10 7.85 33.00 1 259.05
10 6.40 33.00 1 211.20
10 4.95 33.00 1 163.35
10 7.80 33.00 1 257.40
10 7.80 30.00 1 234.00
10 6.90 30.00 1 207.00
10 7.79 30.00 1 233.70

(H) 10 8.55 24.00 1 205.20


10 6.30 33.00 1 207.90
10 6.30 37.00 1 233.10
10 6.30 41.00 1 258.30
10 8.55 25.00 1 213.75
10 6.30 33.00 1 207.90
10 6.30 25.00 1 157.50

negative bar
10 4.00 32.00 1 128.00
10 3.59 39.00 1 140.01
10 4.00 42.00 1 168.00
10 3.59 39.00 1 140.01
10 4.05 35.00 1 141.75
10 4.00 56.00 1 224.00
10 5.00 35.00 1 175.00
10 4.00 49.00 1 196.00
10 4.70 39.00 1 183.30
10 4.00 43.00 1 172.00
10 3.84 39.00 1 149.76

SY13-SY14
V 10 7.85 30.00 1 235.50
10 8.69 30.00 1 260.70
10 10.55 33.00 1 348.15
10 7.80 33.00 1 257.40
10 6.90 30.00 1 207.00
10 9.18 30.00 1 275.25

(H) 10 6.30 24.00 1 151.20


10 6.30 33.00 1 207.90
10 6.30 41.00 1 258.30
10 6.30 41.00 1 258.30
10 6.30 30.00 1 189.00
10 6.30 23.00 1 144.90

negative bar

10 4.00 30.00 1 120.00


10 3.59 39.00 1 140.01
10 4.00 30.00 1 120.00
10 4.00 56.00 1 224.00
10 5.00 35.00 1 175.00
10 4.00 49.00 1 196.00
10 4.70 39.00 1 183.30
10 4.00 43.00 1 172.00
10 3.84 39.00 1 149.76
10 4.00 32.00 1 128.00

SY14-SY15
V 10 7.85 30.00 1 235.50
10 6.40 30.00 1 192.00
10 4.95 30.00 1 148.50
10 7.80 33.00 1 257.40
10 7.80 33.00 1 257.40
10 6.90 30.00 1 207.00
10 9.18 30.00 1 275.25

(H) 10 6.30 24.00 1 151.20


10 6.30 33.00 1 207.90
10 8.25 41.00 1 338.25
10 6.30 41.00 1 258.30
10 8.55 37.00 1 316.35
10 6.30 30.00 1 189.00
10 6.30 23.00 1 144.90

negative bar
10 4.00 23.00 1 92.00
10 3.59 39.00 1 140.01
10 4.00 30.00 1 120.00
10 3.59 39.00 1 140.01
10 4.00 34.00 1 136.00
10 4.05 35.00 1 141.75
10 4.00 56.00 1 224.00
10 5.00 35.00 1 175.00
10 4.70 39.00 1 183.30
10 4.00 43.00 1 172.00
10 3.84 39.00 1 149.76
10 4.00 32.00 1 128.00

SY15-SY16
V 10 7.85 30.00 1 235.50
10 6.40 49.00 1 313.60
10 4.95 30.00 1 148.50
10 7.80 33.00 1 257.40
10 7.80 19.00 1 148.20
10 6.90 30.00 1 207.00
10 7.79 30.00 1 233.70

(H) 10 6.30 24.00 1 151.20


10 6.30 33.00 1 207.90
10 6.04 42.00 1 253.68
10 6.30 41.00 1 258.30
10 6.30 23.00 1 144.90
10 6.30 30.00 1 189.00
10 6.30 23.00 1 144.90

negative bar
10 4.00 30.00 1 120.00
10 3.59 49.00 1 175.91
10 4.00 40.00 1 160.00
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
10 3.59 53.00 1 190.27
10 4.00 30.00 1 120.00
10 4.05 35.00 1 141.75
10 4.00 49.00 1 196.00
10 5.00 20.00 1 100.00
10 4.70 22.00 1 103.40
10 4.00 43.00 1 172.00
10 3.84 39.00 1 149.76
10 4.00 32.00 1 128.00

SY16-SY17
V 10 7.85 49.00 1 384.65
10 6.40 49.00 1 313.60
10 4.95 33.00 1 163.35
10 7.80 33.00 1 257.40
10 7.80 17.00 1 132.60
10 6.90 23.00 1 158.70
10 7.79 30.00 1 233.70

(H) 10 6.30 24.00 1 151.20


10 6.30 33.00 1 207.90
10 6.30 41.00 1 258.30
10 6.30 41.00 1 258.30
10 6.30 25.00 1 157.50
10 6.30 49.00 1 308.70
10 9.18 37.00 1 339.48

negative bar
10 4.00 37.00 1 148.00
10 3.59 49.00 1 175.91
10 4.00 49.00 1 196.00
10 3.59 49.00 1 175.91
10 4.00 23.00 1 92.00
10 4.05 35.00 1 141.75
10 4.00 56.00 1 224.00
10 5.00 20.00 1 100.00
10 4.00 56.00 1 224.00
10 4.00 43.00 1 172.00
10 4.70 20.00 1 94.00
10 4.00 43.00 1 172.00
10 3.84 35.00 1 134.40
10 4.00 32.00 1 128.00

SY17-SY19
V 10 7.85 30.00 1 235.50
10 6.40 30.00 1 192.00
10 4.95 33.00 1 163.35
10 7.80 33.00 1 257.40
10 7.80 33.00 1 257.40
10 6.90 30.00 1 207.00
10 9.17 30.00 1 275.10

(H) 10 6.30 24.00 1 151.20


10 6.30 33.00 1 207.90
10 9.92 41.00 1 406.72
10 6.30 41.00 1 258.30
10 6.30 25.00 1 157.50
10 6.30 30.00 1 189.00
10 6.30 23.00 1 144.90

negative bar
10 4.00 30.00 1 120.00
10 3.59 35.00 1 125.65
10 4.00 40.00 1 160.00
10 3.59 35.00 1 125.65
10 4.00 23.00 1 92.00
10 4.05 35.00 1 141.75
10 4.00 49.00 1 196.00
10 5.00 35.00 1 175.00
10 4.00 56.00 1 224.00
10 4.00 43.00 1 172.00
10 4.70 35.00 1 164.50
10 4.00 43.00 1 172.00
10 3.84 35.00 1 134.40
10 4.00 32.00 1 128.00

SY19-SY20
V 10 7.85 30.00 1 235.50
10 6.40 30.00 1 192.00
10 4.95 33.00 1 163.35
10 7.80 33.00 1 257.40
10 7.80 33.00 1 257.40
10 6.90 30.00 1 207.00
10 7.79 30.00 1 233.70

(H) 10 6.30 24.00 1 151.20


10 6.30 33.00 1 207.90
10 6.30 41.00 1 258.30
10 6.30 41.00 1 258.30
10 6.30 25.00 1 157.50
10 6.30 30.00 1 189.00
10 6.30 23.00 1 144.90

negative bar
10 4.34 37.00 1 160.58
10 3.59 35.00 1 125.65
10 4.34 40.00 1 173.60
10 3.59 35.00 1 125.65
10 4.34 23.00 1 99.82
10 4.05 35.00 1 141.75
10 4.34 56.00 1 243.04
10 5.00 35.00 1 175.00
10 4.34 56.00 1 243.04
10 4.00 43.00 1 172.00
10 4.70 35.00 1 164.50
10 4.34 54.00 1 234.36
10 3.84 35.00 1 134.40
10 4.34 39.00 1 169.26

SY20-SY21
V 10 7.85 43.00 1 337.55
10 6.40 43.00 1 275.20
10 4.95 57.00 1 282.15
10 7.80 57.00 1 444.60
10 7.80 57.00 1 444.60
10 6.90 43.00 1 296.70
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
10 9.27 12.00 1 111.24

(H) 10 9.13 30.00 1 273.90


10 9.13 40.00 1 365.20
10 9.13 61.00 1 556.93
10 10.19 61.00 1 621.59
10 10.19 37.00 1 377.03
10 9.13 37.00 1 337.81
10 9.13 28.00 1 255.64

negative bar
10 4.46 37.00 1 165.02
10 3.59 49.00 1 175.91
10 4.46 52.00 1 231.92
10 3.59 49.00 1 175.91
10 4.05 49.00 1 198.45
10 5.00 49.00 1 245.00
10 4.46 61.00 1 272.06
10 4.70 49.00 1 230.30
10 4.46 54.00 1 240.84
10 3.84 49.00 1 188.16
10 4.46 39.00 1 173.94

SY21, MX1-MX2
10 7.85 12.00 1 94.20
SY21, MX2-MX3 10 9.30 12.00 1 111.60
SY21, MX5-MX6 10 10.85 15.00 1 162.75
SY21, MX6-MX7 10 6.90 6.00 1 41.40
SY21, MX7-MX8 10 7.79 6.00 1 46.74

Third Floor
SY1-SY2
MX1-MX2 (V) 10 7.45 22.00 1 163.90
Mx-2-3 10 6.40 22.00 1 140.80
Mx-3-4 10 4.95 22.00 1 108.90
Mx-4-5 10 7.80 24.00 1 187.20
Mx-5-6 10 7.80 27.00 1 210.60

SY1-SY2 1
Mx-1-2 (H) 10 8.11 26.00 1 210.86
Mx-2-3 10 8.11 30.00 1 243.30
Mx-3-4 10 7.85 25.00 1 196.13
Mx-4-5 10 5.68 37.00 1 210.01
Mx-5-6 10 4.66 37.00 1 172.26

negative bar
H 1
MX1
MX2 10 3.59 22.00 1 78.98
MX3 10 3.59 22.00 1 78.98
MX4 10 4.05 22.00 1 89.10
MX5 10 5.00 22.00 1 110.00

SY2/Mx1-Mx6 10 3.70 223.00 1 825.10

SY2-SY3
V M1-M2 10 7.45 33.00 1 245.85
M2-M3 10 6.40 33.00 1 211.20
M3-M4 10 4.95 33.00 1 163.35
M4-M5 10 7.80 36.00 1 280.80
M5-M6 10 7.80 33.00 1 257.40
M6-M8 10 11.70 26.00 1 304.20

(H) M1-M2 10 6.90 28.00 1 193.20


M2-M3 10 6.90 33.00 1 227.70
M3-M4 10 6.90 23.00 1 158.70
M4-M5 10 6.90 52.00 1 358.80
M5-M6 10 10.80 52.00 1 561.70
M6-M7 10 5.43 46.00 1 249.55
M7-M8 10 34.00 1 0.00

negative bar
SY3/M1-M8 10 4.07 278.00 1 1,131.46

M2/Sy2-Sy3 10 3.59 43.00 1 154.37


M3 /Sy2-Sy3 10 3.59 43.00 1 154.37
M4 /Sy2-Sy3 10 4.05 38.00 1 153.90
M5 /Sy2-Sy3 10 5.00 38.00 1 190.00
M6/Sy2-Sy3 10 4.70 43.00 1 202.10
M6/Sy2-Sy3 10 3.85 43.00 1 165.55

SY3-SY4
V M1-M2 10 7.45 30.00 1 223.50
M2-M3 10 6.40 30.00 1 192.00
M3-M4 10 4.95 28.00 1 138.60
M4-M5 10 7.80 28.00 1 218.40
M5-M6 10 7.80 28.00 1 218.40
M6-M7 10 6.90 28.00 1 193.20
M7-M8 10 7.79 28.00 1 218.12

(H) M1-M2 10 5.90 25.00 1 147.50


M2-M3 10 5.90 33.00 1 194.70
M3-M4 10 8.02 23.00 1 184.46
M4-M5 10 5.90 52.00 1 306.80
M5-M6 10 9.62 52.00 1 500.24
M6-M7 10 52.00 1 0.00
M7-M8 10 5.80 34.00 1 197.20

negative bar
SY4/M1-M8 10 3.87 261.00 1 1,010.07

M2/Sy3-Sy4 10 3.59 36.00 1 129.24


M3 Sy3-Sy4 10 3.59 36.00 1 129.24
M4 /Sy3-Sy4 10 4.05 32.00 1 129.60
M5 /Sy3-Sy4 10 5.00 32.00 1 160.00
M6/Sy3-Sy4 10 4.70 36.00 1 169.20
M7/Sy3-Sy4 10 3.84 36.00 1 138.24
1
SY4-SY5

V M1-M2 10 7.45 30.00 1 223.50


M2-M3 10 6.40 30.00 1 192.00
M4-M5 10 10.55 14.00 1 147.70
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
10 10.20 20.00 1 204.00
M5-M6 10 7.80 13.00 1 101.40
M6-M7 10 6.90 30.00 1 207.00
10 9.05 18.00 1 162.90
M7-M8 10 7.79 30.00 1 233.70

(H) M1-M2 10 6.30 23.00 1 144.90


M2-M3 10 6.30 30.00 1 189.00
M3-M4
M4-M5 10 6.30 41.00 1 258.30
M5-M6
M6-M7 10 6.30 33.00 1 207.90
M7-M8 10 6.30 34.00 1 214.20

negative bar
SY5/M1-M8 10 4.00 205.00 1 820.00

M2/Sy4-Sy5 10 3.59 39.00 1 140.01


M3 /Sy4-Sy5
M4 //Sy4-Sy5
M5 //Sy4-Sy5 12 5.00 15.00 1 75.00
M6//Sy4-Sy5 10 4.70 17.00 1 79.90
M7//Sy4-Sy5 10 3.84 39.00 1 149.76

SY5-SY6
V M1-M2
M2-M3 10 6.45 30.00 1 193.50
M3-M4 10 4.95 30.00 1 148.50
M4-M5 10 7.80 33.00 1 257.40
M5-M6 10 7.80 19.00 1 148.20
M6-M7 10 6.90 16.00 1 110.40
10 9.05 14.00 0.00
M7-M8 10 3.84 30.00 1 115.20

(H) M1-M2 10 30.00 1 0.00


M2-M3 10 6.30 30.00 1 189.00
M3-M4 10 8.55 30.00 1 256.50
M4-M5 10 6.30 33.00 1 207.90
M5-M6 10 5.44 33.00 1 179.52
M6-M7 10 6.30 30.00 1 189.00
M7-M8 10 6.30 30.00 1 189.00

negative bar
SY6/M2-M3 10 2.50 24.00 1 60.00
SY6/M3-M8 10 4.00 154.00 1 616.00

M2/Sy5-Sy6 10 2.50 24.00 1 60.00


M3 /Sy5-Sy6 10 3.59 39.00 1 140.01
M4 //Sy5-Sy6 10 4.05 35.00 1 141.75
M5 //Sy5-Sy6 12 5.00 18.00 1 90.00
M6//Sy5-Sy6 10 4.70 20.00 1 94.00
M7//Sy5-Sy6 10 3.84 39.00 1 149.76

SY6 SY7
V M1-M2 10 8.00 8.00 1 64.00
10 6.75 35.00 1 236.25
M2-M3 10 7.80 33.00 1 257.40
M3-M4 10 7.80 30.00 1 234.00
M4-M5 10 7.80 30.00 1 234.00
M5-M6 10 7.80 33.00 1 257.40
M6-M7 10 6.90 30.00 1 207.00
9.97 M7-M8 10 8.88 30.00 1 266.40

(H) M1-M2 10 6.30 16.00 1 100.80


M2-M3 10 6.30 23.00 1 144.90
M3-M4 10 6.30 36.00 1 226.80
M4-M5 10 6.30 41.00 1 258.30
M5-M6 10 8.55 41.00 1 350.55
M6-M7 10 6.30 33.00 1 207.90
M7-M8 10 6.30 24.00 1 151.20

negative bar
SY7/M1-M8 10 4.00 178.00 1 712.00

M3/Sy6-Sy7 12 3.62 49.00 1 177.38


M4/Sy6-Sy7 10 4.05 49.00 1 198.45
M5/Sy6-Sy7 10 5.00 35.00 1 175.00
M6/Sy6-Sy7 10 4.70 35.00 1 164.50
M7/Sy6-Sy7 10 3.84 39.00 1 149.76
1

SY7- SY8 6.355


V M2-M4 10 6.73 30.00 1 201.90
M4-M5 10 10.55 30.00 1 316.50
M5-M6 10 7.80 49.00 1 382.20
M6-M7 10 9.65 30.00 1 289.50
M7-M8 10 7.79 30.00 1 233.70

3.985 H M3-M4 10 6.30 16.00 1 100.80


M3-M4 10 6.30 23.00 1 144.90
M4-M5 10 6.30 41.00 1 258.30
M5-M6 10 8.55 41.00 1 350.55
M6-M7 10 6.30 33.00 1 207.90
M7-M8 10 6.30 24.00 1 151.20

negative bar
SY8/M1-M8 10 4.00 245.00 1 980.00

M3/SY7-SY8 10 3.62 49.00 1 177.38


M4/SY7-SY8 10 4.05 35.00 1 141.75
M5/SY7-SY8 10 5.00 35.00 1 175.00
M6/SY7-SY8 10 4.70 39.00 1 183.30
M7/SY7-SY8 10 3.84 39.00 1 149.76

SY8-SY9
V M1-M2
M2-M3 10 6.42 30.00 1 192.60
M2-M4 10 4.95 30.00 1 148.50
M2-M5 10 10.55 33.00 1 348.15
M6-M7 10 9.65 30.00 1 289.50
M7-M8 10 7.79 30.00 1 233.70
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32

H M1-M2 10 1.59 15.00 1 23.78


M2-M3 10 6.30 31.00 1 195.30
M3-M4 10 6.30 23.00 1 144.90
M4-M5 10 6.30 41.00 1 258.30
M5-M6
M6-M7 10 6.30 33.00 1 207.90
M7-M8 10 6.30 23.00 1 144.90

negative bar
SY9/M1-M8 10 5.16 19.00 1 98.12
10 4.00 203.00 1 812.00
M2/SY8-SY9 12 3.34 27.00 1 90.18
M3/SY8-SY9 12 3.59 49.00 1 175.91
M4/SY8-SY9 10 4.05 35.00 1 141.75
M7/SY8-SY9 10 3.84 39.00 1 149.76

SY9-SY10
5.35 V M1-M2 10 7.45 30.00 1 223.50
M2-M3 10 6.40 30.00 1 192.00
M3-M4 10 4.95 30.00 1 148.50
M4-M5 10 10.55 33.00 1 348.15
M6-M7 10 9.65 30.00 1 289.50
M7-M8 10 7.79 30.00 1 233.70

H M1-M2 10 4.86 26.00 1 126.48


M2-M3 10 6.30 30.00 1 189.00
M3-M4 10 6.30 28.00 1 176.40
M4-M5 10 6.30 41.00 1 258.30
M6-M7 10 6.30 33.00 1 207.90
M7-M8 10 6.30 23.00 1 144.90

negative bar
SY9/M1-M8 10 3.88 245.00 1 950.60

M2/SY8-SY9 12 3.59 49.00 1 175.91


M3/SY8-SY9 12 3.59 49.00 1 175.91
M4/SY8-SY9 10 4.05 35.00 1 141.75
M7/SY8-SY9 10 3.84 39.00 1 149.76

SY10-SY11
V M1-M2 10 7.45 34.00 1 253.30
M2-M3 10 6.40 34.00 1 217.60
M3-M4 10 4.95 34.00 1 168.30
M4-M5 10 10.55 46.00 1 485.30
M6-M7 10 9.65 46.00 1 443.90
M7-M8 10 6.90 34.00 1 234.60

H M1-M2 10 8.09 32.00 1 258.72


M2-M3 10 8.09 37.00 1 299.15
M3-M4 10 8.09 28.00 1 226.38
M4-M5 10 8.09 61.00 1 493.19
M6-M7 10 8.09 54.00 1 436.59
M7-M8 10 8.09 30.00 1 242.55

negative bar
M2/SY10-SY11 12 3.59 46.00 1 165.14
M3/SY10-SY12 12 3.59 46.00 1 165.14
M4/SY10-SY13 10 4.05 39.00 1 157.95
M4/SY10-SY13 10 3.84 37.00 1 142.08

SY11'-SY12
V 10 7.85 28.00 1 219.80
10 6.40 28.00 1 179.20
10 4.95 31.00 1 153.45
10 7.80 31.00 1 241.80
10 7.80 34.00 1 265.20
10 9.35 39.00 1 364.65

5.35 (H) 10 8.09 26.00 1 210.21


10 8.09 33.00 1 266.81
10 8.09 25.00 1 202.13
10 8.09 41.00 1 331.49
10 8.09 46.00 1 371.91
10 8.09 46.00 1 371.91
1

negative bar
10 3.89 32.00 1 124.32
10 3.59 37.00 1 132.83
10 3.89 42.00 1 163.17
10 3.59 37.00 1 132.83
10 3.89 23.00 1 89.35
10 4.05 32.00 1 129.60
10 3.89 52.00 1 202.02
10 5.00 32.00 1 160.00
10 3.89 52.00 1 202.02
10 4.70 37.00 1 173.90

SY12-SY13
V 10 7.85 33.00 1 259.05
10 6.40 33.00 1 211.20
10 4.95 33.00 1 163.35
10 7.80 33.00 1 257.40
10 7.80 30.00 1 234.00
10 6.90 30.00 1 207.00
10 7.79 30.00 1 233.70

(H) 10 8.55 24.00 1 205.20


10 6.30 33.00 1 207.90
10 6.30 37.00 1 233.10
10 6.30 41.00 1 258.30
10 8.55 25.00 1 213.75
10 6.30 33.00 1 207.90
10 6.30 25.00 1 157.50

negative bar
10 4.00 32.00 1 128.00
10 3.59 39.00 1 140.01
10 4.00 42.00 1 168.00
10 3.59 39.00 1 140.01
10 4.05 35.00 1 141.75
10 4.00 56.00 1 224.00
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
10 5.00 35.00 1 175.00
10 4.00 49.00 1 196.00
10 4.70 39.00 1 183.30
10 4.00 43.00 1 172.00
10 3.84 39.00 1 149.76

SY13-SY14
V 10 7.85 30.00 1 235.50
10 8.69 30.00 1 260.70
10 10.55 33.00 1 348.15
10 7.80 33.00 1 257.40
10 6.90 30.00 1 207.00
10 9.18 30.00 1 275.25

(H) 10 6.30 24.00 1 151.20


10 6.30 33.00 1 207.90
10 6.30 41.00 1 258.30
10 6.30 41.00 1 258.30
10 6.30 30.00 1 189.00
10 6.30 23.00 1 144.90

negative bar

10 4.00 30.00 1 120.00


10 3.59 39.00 1 140.01
10 4.00 30.00 1 120.00
10 4.00 56.00 1 224.00
10 5.00 35.00 1 175.00
10 4.00 49.00 1 196.00
10 4.70 39.00 1 183.30
10 4.00 43.00 1 172.00
10 3.84 39.00 1 149.76
10 4.00 32.00 1 128.00

SY14-SY15
V 10 7.85 30.00 1 235.50
10 6.40 30.00 1 192.00
10 4.95 30.00 1 148.50
10 7.80 33.00 1 257.40
10 7.80 33.00 1 257.40
10 6.90 30.00 1 207.00
10 9.18 30.00 1 275.25

(H) 10 6.30 24.00 1 151.20


10 6.30 33.00 1 207.90
10 8.25 41.00 1 338.25
10 6.30 41.00 1 258.30
10 8.55 37.00 1 316.35
10 6.30 30.00 1 189.00
10 6.30 23.00 1 144.90

negative bar
10 4.00 23.00 1 92.00
10 3.59 39.00 1 140.01
10 4.00 30.00 1 120.00
10 3.59 39.00 1 140.01
10 4.00 34.00 1 136.00
10 4.05 35.00 1 141.75
10 4.00 56.00 1 224.00
10 5.00 35.00 1 175.00
10 4.70 39.00 1 183.30
10 4.00 43.00 1 172.00
10 3.84 39.00 1 149.76
10 4.00 32.00 1 128.00

SY15-SY16
V 10 7.85 30.00 1 235.50
10 6.40 49.00 1 313.60
10 4.95 30.00 1 148.50
10 7.80 33.00 1 257.40
10 7.80 19.00 1 148.20
10 6.90 30.00 1 207.00
10 7.79 30.00 1 233.70

(H) 10 6.30 24.00 1 151.20


10 6.30 33.00 1 207.90
10 6.04 42.00 1 253.68
10 6.30 41.00 1 258.30
10 6.30 23.00 1 144.90
10 6.30 30.00 1 189.00
10 6.30 23.00 1 144.90

negative bar
10 4.00 30.00 1 120.00
10 3.59 49.00 1 175.91
10 4.00 40.00 1 160.00
10 3.59 53.00 1 190.27
10 4.00 30.00 1 120.00
10 4.05 35.00 1 141.75
10 4.00 49.00 1 196.00
10 5.00 20.00 1 100.00
10 4.70 22.00 1 103.40
10 4.00 43.00 1 172.00
10 3.84 39.00 1 149.76
10 4.00 32.00 1 128.00

SY16-SY17
V 10 7.85 49.00 1 384.65
10 6.40 49.00 1 313.60
10 4.95 33.00 1 163.35
10 7.80 33.00 1 257.40
10 7.80 17.00 1 132.60
10 6.90 23.00 1 158.70
10 7.79 30.00 1 233.70

(H) 10 6.30 24.00 1 151.20


10 6.30 33.00 1 207.90
10 6.30 41.00 1 258.30
10 6.30 41.00 1 258.30
10 6.30 25.00 1 157.50
10 6.30 49.00 1 308.70
10 9.18 37.00 1 339.48

negative bar
10 4.00 37.00 1 148.00
10 3.59 49.00 1 175.91
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
10 4.00 49.00 1 196.00
10 3.59 49.00 1 175.91
10 4.00 23.00 1 92.00
10 4.05 35.00 1 141.75
10 4.00 56.00 1 224.00
10 5.00 20.00 1 100.00
10 4.00 56.00 1 224.00
10 4.00 43.00 1 172.00
10 4.70 20.00 1 94.00
10 4.00 43.00 1 172.00
10 3.84 35.00 1 134.40
10 4.00 32.00 1 128.00

SY17-SY19
V 10 7.85 30.00 1 235.50
10 6.40 30.00 1 192.00
10 4.95 33.00 1 163.35
10 7.80 33.00 1 257.40
10 7.80 33.00 1 257.40
10 6.90 30.00 1 207.00
10 9.17 30.00 1 275.10

(H) 10 6.30 24.00 1 151.20


10 6.30 33.00 1 207.90
10 9.92 41.00 1 406.72
10 6.30 41.00 1 258.30
10 6.30 25.00 1 157.50
10 6.30 30.00 1 189.00
10 6.30 23.00 1 144.90

negative bar
10 4.00 30.00 1 120.00
10 3.59 35.00 1 125.65
10 4.00 40.00 1 160.00
10 3.59 35.00 1 125.65
10 4.00 23.00 1 92.00
10 4.05 35.00 1 141.75
10 4.00 49.00 1 196.00
10 5.00 35.00 1 175.00
10 4.00 56.00 1 224.00
10 4.00 43.00 1 172.00
10 4.70 35.00 1 164.50
10 4.00 43.00 1 172.00
10 3.84 35.00 1 134.40
10 4.00 32.00 1 128.00

SY19-SY20
V 10 7.85 30.00 1 235.50
10 6.40 30.00 1 192.00
10 4.95 33.00 1 163.35
10 7.80 33.00 1 257.40
10 7.80 33.00 1 257.40
10 6.90 30.00 1 207.00
10 7.79 30.00 1 233.70

(H) 10 6.30 24.00 1 151.20


10 6.30 33.00 1 207.90
10 6.30 41.00 1 258.30
10 6.30 41.00 1 258.30
10 6.30 25.00 1 157.50
10 6.30 30.00 1 189.00
10 6.30 23.00 1 144.90

negative bar
10 4.34 37.00 1 160.58
10 3.59 35.00 1 125.65
10 4.34 40.00 1 173.60
10 3.59 35.00 1 125.65
10 4.34 23.00 1 99.82
10 4.05 35.00 1 141.75
10 4.34 56.00 1 243.04
10 5.00 35.00 1 175.00
10 4.34 56.00 1 243.04
10 4.00 43.00 1 172.00
10 4.70 35.00 1 164.50
10 4.34 54.00 1 234.36
10 3.84 35.00 1 134.40
10 4.34 39.00 1 169.26

SY20-SY21
V 10 7.85 43.00 1 337.55
10 6.40 43.00 1 275.20
10 4.95 57.00 1 282.15
10 7.80 57.00 1 444.60
10 7.80 57.00 1 444.60
10 6.90 43.00 1 296.70
10 9.27 12.00 1 111.24

(H) 10 9.13 30.00 1 273.90


10 9.13 40.00 1 365.20
10 9.13 61.00 1 556.93
10 10.19 61.00 1 621.59
10 10.19 37.00 1 377.03
10 9.13 37.00 1 337.81
10 9.13 28.00 1 255.64

negative bar
10 4.46 37.00 1 165.02
10 3.59 49.00 1 175.91
10 4.46 52.00 1 231.92
10 3.59 49.00 1 175.91
10 4.05 49.00 1 198.45
10 5.00 49.00 1 245.00
10 4.46 61.00 1 272.06
10 4.70 49.00 1 230.30
10 4.46 54.00 1 240.84
10 3.84 49.00 1 188.16
10 4.46 39.00 1 173.94

SY21, MX1-MX2
10 7.85 12.00 1 94.20
SY21, MX2-MX3 10 9.30 12.00 1 111.60
SY21, MX5-MX6 10 10.85 15.00 1 162.75
SY21, MX6-MX7 10 6.90 6.00 1 41.40
SY21, MX7-MX8 10 7.79 6.00 1 46.74
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
4th floor
SY1-SY2
MX1-MX2 (V) 10 7.45 24.00 1 178.80
Mx-2-3 10 6.40 24.00 1 153.60
Mx-3-4 10 4.95 24.00 1 118.80
Mx-4-5 10 7.80 24.00 1 187.20
Mx-5-6 10 7.80 24.00 1 187.20

H Mx-1-2 10 7.92 26.00 1 205.86


Mx-2-3 10 5.35 30.00 1 160.58
Mx-3-4 10 5.35 25.00 1 133.81
Mx-4-5 10 5.57 37.00 1 205.95
Mx-5-6 10 2.91 37.00 1 107.52

negative bar
SY2/Mx1-Mx6 10 3.70 223.00 1 825.10

H 1
MX1
MX2 10 3.59 22.00 1 78.98
MX3 10 3.59 22.00 1 78.98
MX4 10 4.05 22.00 1 89.10
MX5 10 5.00 22.00 1 110.00

SY2-SY3
V M1-M2 10 7.45 33.00 1 245.85
M2-M3 10 6.40 33.00 1 211.20
M3-M4 10 4.95 33.00 1 163.35
M4-M5 10 7.80 36.00 1 280.80
M5-M6 10 7.80 33.00 1 257.40
M6-M8 10 6.18 26.00 1 160.58

(H) M1-M2 10 6.90 28.00 1 193.20


M2-M3 10 6.90 33.00 1 227.70
M3-M4 10 6.90 23.00 1 158.70
M4-M5 10 6.90 52.00 1 358.80
M5-M6 10 10.80 46.00 1 496.89
M6-M7 10 1 0.00
M7-M8 10 1 0.00

negative bar
SY3/M1-M8 10 4.07 278.00 1 1,131.46

M2/Sy2-Sy3 10 3.59 43.00 1 154.37


M3 /Sy2-Sy3 10 3.59 43.00 1 154.37
M4 /Sy2-Sy3 10 4.05 38.00 1 153.90
M5 /Sy2-Sy3 10 5.00 38.00 1 190.00
M6/Sy2-Sy3 10 4.70 43.00 1 202.10
M6/Sy2-Sy3 10 3.85 43.00 1 165.55

SY3-SY4
V M1-M2 10 7.45 30.00 1 223.50
M2-M3 10 6.40 30.00 1 192.00
M3-M4 10 4.95 28.00 1 138.60
M4-M5 10 7.80 28.00 1 218.40
M5-M6 10 7.80 28.00 1 218.40
M6-M7 10 6.90 28.00 1 193.20
M7-M8 10 7.79 28.00 1 218.12

(H) M1-M2 10 5.90 25.00 1 147.50


M2-M3 10 5.90 33.00 1 194.70
M3-M4 10 8.02 23.00 1 184.46
M4-M5 10 5.90 52.00 1 306.80
M5-M6 10 9.62 52.00 1 500.24
M6-M7 10 11.00 52.00 1 572.00
M7-M8 10 8.54 34.00 1 290.19

negative bar
SY4/M1-M8 10 3.87 261.00 1 1,010.07
10 3.87 75.00 1 290.25

M2/Sy3-Sy4 10 3.59 36.00 1 129.24


M3 Sy3-Sy4 10 3.59 36.00 1 129.24
M4 /Sy3-Sy4 10 4.05 32.00 1 129.60
M5 /Sy3-Sy4 10 5.00 32.00 1 160.00
M6/Sy3-Sy4 10 4.70 36.00 1 169.20
M7/Sy3-Sy4 10 3.84 36.00 1 138.24
1
SY4-SY5

V M1-M2 10 7.45 30.00 1 223.50


M2-M3 10 8.69 30.00 1 260.70
M4-M5 10 10.55 14.00 1 147.70
10 10.20 20.00 1 204.00
M5-M6 10 7.80 13.00 1 101.40
M6-M7 10 6.90 13.00 1 89.70
10 9.05 18.00 1 162.90
M7-M8 10 6.23 30.00 1 186.95

(H) M1-M2 10 6.22 26.00 1 161.62


M2-M3 10 6.30 30.00 1 189.00
M3-M4
M4-M5 10 6.30 41.00 1 258.30
M5-M6
M6-M7 10 6.30 33.00 1 207.90
M7-M8 10 6.30 34.00 1 214.20

negative bar
SY5/M1-M8 10 4.00 188.00 1 752.00

M2/Sy4-Sy5 10 3.59 39.00 1 140.01


M3 /Sy4-Sy5
M4 //Sy4-Sy5
M5 //Sy4-Sy5 12 5.00 15.00 1 75.00
M6//Sy4-Sy5 10 4.70 17.00 1 79.90
M7//Sy4-Sy5 10 3.84 39.00 1 149.76

SY5-SY6
V M1-M2
M2-M3 10 5.92 30.00 1 177.52
M3-M4 10 4.95 30.00 1 148.50
M4-M5 10 7.80 18.00 1 140.40
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
10 10.20 16.00 1 163.20
M5-M6 10 7.80 18.00 1 140.40
M6-M7 10 6.90 16.00 1 110.40
10 9.05 14.00 0.00
M7-M8 10 9.50 30.00 1 284.97

(H) M1-M2 10 30.00 1 0.00


M2-M3 10 4.28 30.00 1 128.37
M3-M4 10 10.80 23.00 1 248.40
M4-M5 10 6.30 41.00 1 258.30
M5-M6 10 7.74 33.00 1 255.42
M6-M7 10 6.30 33.00 1 207.90
M7-M8 10 6.30 23.00 1 144.90

negative bar
SY6/M2-M3 10 2.50 24.00 1 60.00
SY6/M3-M8 10 4.00 131.00 1 524.00

M2/Sy5-Sy6 12 1.60 21.00 1 33.60


M3 /Sy5-Sy6 10 3.59 39.00 1 140.01
M4 //Sy5-Sy6 10 4.05 35.00 1 141.75
M5 //Sy5-Sy6 12 5.00 18.00 1 90.00
M6//Sy5-Sy6 10 4.70 20.00 1 94.00
M7//Sy5-Sy6 10 3.84 39.00 1 149.76

SY6 SY7
V M1-M2

M2-M3 10 3.16 30.00 1 94.80


M3-M4
M4-M5 10 10.56 33.00 1 348.32
M5-M6 10 7.80 33.00 1 257.40
M6-M7 10 6.90 30.00 1 207.00
9.97 M7-M8 10 7.79 30.00 1 233.70

(H) M1-M2
M2-M3 10 6.30 23.00 1 144.90
M3-M4
M4-M5 10 6.30 41.00 1 258.30
M5-M6 10 8.55 41.00 1 350.55
M6-M7 10 6.30 33.00 1 207.90
M7-M8 10 6.30 24.00 1 151.20

negative bar
SY7/M1-M8 10 4.00 178.00 1 712.00

M3/Sy6-Sy7 12 3.62 49.00 1 177.38


M4/Sy6-Sy7 10 4.05 49.00 1 198.45
M5/Sy6-Sy7 10 5.00 35.00 1 175.00
M6/Sy6-Sy7 10 4.70 35.00 1 164.50
M7/Sy6-Sy7 10 3.84 39.00 1 149.76
1

SY7- SY8 6.355


V M2-M3 10 3.17 30.00 1 94.98
M4-M5 10 10.55 33.00 1 348.15
M5-M6 10 7.80 33.00 1 257.40
M6-M7 10 6.90 30.00 1 207.00
M7-M8 10 7.79 30.00 1 233.70

3.985 H M3-M4 10 6.30 16.00 1 100.80


M3-M4
M4-M5 10 6.30 41.00 1 258.30
M5-M6 10 6.30 41.00 1 258.30
M6-M7 10 6.30 33.00 1 207.90
M7-M8 10 6.30 24.00 1 151.20

negative bar
SY8/M2-M8 10 4.00 194.00 1 776.00

M3/SY7-SY8
M4/SY7-SY8
M5/SY7-SY8 10 5.00 35.00 1 175.00
M6/SY7-SY8 10 4.70 39.00 1 183.30
M7/SY7-SY8 10 3.84 39.00 1 149.76

SY8-SY9
V M1-M2
M2-M3 10 6.19 30.00 1 185.72
M3-M4 10 4.95 30.00 1 148.50
M4-M5 10 7.80 33.00 1 257.40
M5-M6 10 7.80 33.00 1 257.40
M6-M7 10 6.90 30.00 1 207.00
M7-M8 10 8.50 30.00 1 255.00

H M1-M2 10 1.59 15.00 1 23.78


M2-M3 10 4.25 30.00 1 127.53
M3-M4 10 8.55 23.00 1 196.65
M4-M5 10 6.30 41.00 1 258.30
M5-M6 10 8.55 41.00 1 350.55
M6-M7 10 6.30 33.00 1 207.90
M7-M8 10 6.30 23.00 1 144.90

negative bar
SY9/M1-M8 10 5.16 19.00 1 98.12
10 4.00 203.00 1 812.00

M2/SY8-SY9 12 2.50 27.00 1 67.50


M3/SY8-SY9 12 3.59 49.00 1 175.91
M4/SY8-SY9 10 4.05 35.00 1 141.75
M5/SY8-SY10 10 5.00 35.00 1 175.00
M6/SY8-SY10 10 4.70 39.00 1 183.30
M7/SY8-SY9 10 3.84 39.00 1 149.76

SY9-SY10
5.35 V M1-M2 10 7.45 30.00 1 223.50
M2-M3 10 6.40 30.00 1 192.00
M3-M4 10 4.95 30.00 1 148.50
M4-M5 10 10.55 33.00 1 348.15
M6-M7 10 9.65 30.00 1 289.50
M7-M8 10 7.79 30.00 1 233.70
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
H M1-M2 10 4.86 26.00 1 126.48
M2-M3 10 6.30 30.00 1 189.00
M3-M4 10 6.30 28.00 1 176.40
M4-M5 10 6.30 41.00 1 258.30
M6-M7 10 6.30 33.00 1 207.90
M7-M8 10 6.30 23.00 1 144.90

negative bar
SY9/M1-M8 10 3.88 189.00 1 733.32
12 3.88 56.00 1 217.28

M2/SY8-SY9 12 3.59 49.00 1 175.91


M3/SY8-SY9 12 3.59 49.00 1 175.91
M4/SY8-SY9 10 4.05 35.00 1 141.75
M7/SY8-SY9 10 3.84 39.00 1 149.76

SY10-SY11
V M1-M2 10 7.45 34.00 1 253.30
M2-M3 10 6.40 34.00 1 217.60
M3-M4 10 4.95 34.00 1 168.30
M4-M5 10 10.55 46.00 1 485.30
M6-M7 10 9.65 46.00 1 443.90
M7-M8 10 6.90 34.00 1 234.60

H M1-M2 10 8.09 32.00 1 258.72


M2-M3 10 8.09 37.00 1 299.15
M3-M4 10 8.09 28.00 1 226.38
M4-M5 10 8.09 61.00 1 493.19
M6-M7 10 8.09 40.00 1 323.40
M7-M8 10 8.09 30.00 1 242.55

negative bar
M2/SY10-SY11 12 3.59 46.00 1 165.14
M3/SY10-SY12 12 3.59 46.00 1 165.14
M4/SY10-SY13 10 4.05 39.00 1 157.95
M4/SY10-SY13 10 3.84 37.00 1 142.08

SY11'-SY12
V M1-M2 10 7.45 28.00 1 208.60
M2-M3 10 6.40 28.00 1 179.20
M3-M4 10 4.95 31.00 1 153.45
M4-M5 10 10.83 31.00 1 335.73
M5-M6
M6-M7 10 9.60 39.00 1 374.40
M7-M8

H M1-M2 10 8.09 26.00 1 210.21


M2-M3 10 8.09 33.00 1 266.81
M3-M4 10 8.09 25.00 1 202.13
M4-M5 10 8.09 41.00 1 331.49
M5-M6
M6-M7 10 8.09 46.00 1 371.91
M7-M8

negative bar
SY12/M1-M8 10 3.88 193.00 1 748.84

M2/SY10-SY11 10 3.59 37.00 1 132.83


M3/SY10-SY11 10 3.59 37.00 1 132.83
M4/SY10-SY11 10 4.05 32.00 1 129.60
M5/SY10-SY11
M6S/SY10-SY11
M7/SY10-SY11

SY12-SY13
V M1-M2 10 7.45 33.00 1 245.85
M2-M3 10 6.40 33.00 1 211.20
M3-M4 10 4.95 33.00 1 163.35
M4-M5 10 7.80 33.00 1 257.40
M5-M6 10 7.80 30.00 1 234.00
M6-M7 10 6.90 30.00 1 207.00
M7-M8 10 7.79 30.00 1 233.70

H M1-M2 10 8.55 24.00 1 205.20


M2-M3 10 6.30 33.00 1 207.90
M3-M4 10 6.30 37.00 1 233.10
M4-M5 10 6.30 41.00 1 258.30
M5-M6 10 8.55 25.00 1 213.75
M6-M7 10 6.30 33.00 1 207.90
M7-M8 10 6.30 25.00 1 157.50

negative bar
SY12/M1-M8 10 4.00 193.00 1 772.00

M2/SY10-SY11 10 3.59 39.00 1 140.01


M3/SY10-SY11 10 3.59 39.00 1 140.01
M4/SY10-SY11 10 4.05 35.00 1 141.75
M5/SY10-SY11 1
M6S/SY10-SY11 1
M7/SY10-SY11 10 3.84 39.00 1 149.76

SY13-SY14
V M1-M2 10 7.45 30.00 1 223.50
M2-M3 10 8.69 30.00 1 260.70
M3-M4 10 10.55 33.00 1 348.15
M4-M5
M5-M6 10 7.80 33.00 1 257.40
M6-M7 10 6.90 30.00 1 207.00
M7-M8 10 9.18 30.00 1 275.25

H M1-M2 10 6.30 24.00 1 151.20


M2-M3 10 6.30 33.00 1 207.90
M3-M4
M4-M5 10 6.30 41.00 1 258.30
M5-M6 10 6.30 41.00 1 258.30
M6-M7 10 6.30 30.00 1 189.00
M7-M8 10 6.30 23.00 1 144.90

negative bar
SY13/M1-M8 10 4.00 219.00 1 876.00

M2/SY10-SY11 10 3.59 39.00 1 140.01


M3/SY10-SY11
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
M4/SY10-SY11
M5/SY10-SY11 10 5.00 35.00 1 175.00
M6S/SY10-SY11 10 4.70 39.00 1 183.30
M7/SY10-SY11 10 3.84 39.00 1 149.76
10 3.84 39.00 1 149.76

SY14-SY15
V M1-M2 10 7.45 30.00 1 223.50
M2-M3 10 6.40 30.00 1 192.00
M3-M4 10 4.95 30.00 1 148.50
M4-M5 10 7.80 33.00 1 257.40
M5-M6 10 7.80 33.00 1 257.40
M6-M7 10 6.90 30.00 1 207.00
M7-M8 10 9.18 30.00 1 275.25

H M1-M2 10 6.30 24.00 1 151.20


M2-M3 10 6.30 33.00 1 207.90
M3-M4 10 8.25 41.00 1 338.25
M4-M5 10 6.30 41.00 1 258.30
M5-M6 10 8.55 37.00 1 316.35
M6-M7 10 6.30 30.00 1 189.00
M7-M8 10 6.30 23.00 1 144.90

negative bar
SY14/M1-M8 10 4.00 242.00 1 968.00

M2/SY10-SY11 10 3.59 39.00 1 140.01


M3/SY10-SY11 10 3.59 39.00 2 280.02
M4/SY10-SY11 10 4.05 35.00 1 141.75
M5/SY10-SY11 10 5.00 35.00 0.00
M6S/SY10-SY11 10 4.70 39.00 1 183.30
M7/SY10-SY11 10 3.84 39.00 1 149.76

SY15-SY16
V M1-M2 10 7.45 30.00 1 223.50
M2-M3 10 6.40 49.00 1 313.60
M3-M4 10 4.95 30.00 1 148.50
M4-M5 10 7.80 33.00 1 257.40
M5-M6 10 7.80 19.00 1 148.20
M6-M7 10 6.90 13.00 1 89.70
10 6.91 18.00 1 124.29
M7-M8 10 7.79 30.00 1 233.70

H M1-M2 10 6.30 39.00 1 245.70


M2-M3 10 6.30 54.00 1 340.20
M3-M4 10 6.30 23.00 1 144.90
M4-M5 10 6.30 41.00 1 258.30
M5-M6 10 6.04 41.00 1 247.64
M6-M7 10 6.30 33.00 1 207.90
M7-M8 10 6.30 23.00 1 144.90

negative bar
SY15/M1-M8 10 4.00 276.00 1 1,104.00

M2/SY10-SY11 10 3.59 49.00 1 175.91


M3/SY10-SY11 10 3.59 53.00 1 190.27
M4/SY10-SY11 10 4.05 35.00 1 141.75
M5/SY10-SY11 10 5.00 20.00 1 100.00
M6S/SY10-SY11 10 4.70 22.00 1 103.40
M7/SY10-SY11 10 3.84 39.00 1 149.76

SY16-SY17
V M1-M2 10 7.45 49.00 1 365.05
M2-M3 10 6.40 49.00 1 313.60
M3-M4 10 4.95 33.00 1 163.35
M4-M5 10 7.80 33.00 1 257.40
M5-M6 10 7.80 17.00 1 132.60
M6-M7 10 6.90 13.00 1 89.70
10 6.91 18.00 1 124.29
M7-M8 10 7.79 30.00 1 233.70

HM1-M2 10 6.30 24.00 1 151.20


M2-M3 10 6.30 30.00 1 189.00
M3-M4 10 6.30 25.00 1 157.50
M4-M5 10 6.30 41.00 1 258.30
M5-M6 10 9.96 41.00 1 408.36
M6-M7 10 6.30 33.00 1 207.90
M7-M8 10 6.30 23.00 1 144.90

negative bar
SY17/M1-M8 10 4.00 276.00 1 1,104.00

M2/SY16-SY17 10 3.59 49.00 1 175.91


M3//SY16-SY17 10 3.59 49.00 1 175.91
M4//SY16-SY17 10 4.05 35.00 1 141.75
M5//SY16-SY17 10 5.00 20.00 1 100.00
M6S//SY16-SY17 10 4.70 20.00 1 94.00
M7//SY16-SY17 10 3.84 35.00 1 134.40

SY17-SY19
V M1-M2 10 7.45 30.00 1 223.50
M2-M3 10 6.40 30.00 1 192.00
M3-M4 10 4.95 33.00 1 163.35
M4-M5 10 7.80 33.00 1 257.40
M5-M6 10 7.80 33.00 1 257.40
M6-M7 10 6.90 30.00 1 207.00
M7-M8 10 7.79 30.00 1 233.70

H M1-M1' 10 8.85 9.00 1 79.65


M1-M2 10 6.30 24.00 1 151.20
M2-M3 10 6.30 33.00 1 207.90
M3-M4 10 9.92 41.00 1 406.72
M4-M5 10 6.30 41.00 1 258.30
M5-M6 10 6.30 25.00 1 157.50
M6-M7 10 6.30 30.00 1 189.00
M7-M8 10 6.30 23.00 1 144.90

negative bar

SY17/M1-M8 10 4.00 286.00 1 1,144.00

M1/SY17-SY19
M2/SY17-SY19 10 3.59 35.00 1 125.65
M3/SY17-SY19 10 3.59 35.00 1 125.65
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
M4/SY17-SY19 10 4.05 35.00 1 141.75
M5/SY17-SY19 10 5.00 35.00 1 175.00
M6S/SY17-SY19 10 4.70 35.00 1 164.50
M7SSY17-SY19 10 3.84 35.00 1 134.40

SY19-SY20
V M1-M2 10 7.85 30.00 1 235.50
M2-M3 10 6.40 30.00 1 192.00
M3-M4 10 4.95 33.00 1 163.35
M4-M5 10 7.80 33.00 1 257.40
M5-M6 10 7.80 33.00 1 257.40
M6-M7 10 6.90 30.00 1 207.00
M7-M8 10 7.79 30.00 1 233.70

H M1-M1'
M1-M2 10 6.30 24.00 1 151.20
M2-M3 10 6.30 33.00 1 207.90
M3-M4 10 6.30 41.00 1 258.30
M4-M5 10 6.30 41.00 1 258.30
M5-M6 10 6.30 25.00 1 157.50
M6-M7 10 6.30 30.00 1 189.00
M7-M8 10 6.30 23.00 1 144.90

negative bar
SY120/M1-M8 10 4.34 297.00 1 1,288.98

M1/SY19-SY20
M2/SSY19-SY20 10 3.59 35.00 1 125.65
M3/SY19-SY20 10 3.59 35.00 1 125.65
M4/SY19-SY20 10 4.05 35.00 1 141.75
M5/SY19-SY20 10 5.00 35.00 1 175.00
M6S/SY19-SY20 10 4.70 35.00 1 164.50
M7SSSY19-SY20 10 3.84 35.00 1 134.40

SY20-SY21
V M1-M2 10 7.85 43.00 1 337.55
M2-M3 10 6.40 43.00 1 275.20
M3-M4 10 4.95 57.00 1 282.15
M4-M5 10 7.80 57.00 1 444.60
M5-M6 10 7.80 57.00 1 444.60
M6-M7 10 6.90 43.00 1 296.70
M7-M8 10 9.27 12.00 1 111.24

H M1-M1'
M1-M2 10 9.13 30.00 1 273.90
M2-M3 10 9.13 40.00 1 365.20
M3-M4 10 9.13 61.00 1 556.93
M4-M5 10 10.19 61.00 1 621.59
M5-M6 10 10.19 37.00 1 377.03
M6-M7 10 9.13 37.00 1 337.81
M7-M8 10 9.13 28.00 1 255.64

negative bar
SY120/M1-M8 10 4.46 297.00 1 1,324.62

M1/SY19-SY20 10 9.13 13.00 1 118.69


M2/SSY19-SY20 10 3.59 49.00 1 175.91
M3/SY19-SY20 10 3.59 49.00 1 175.91
M4/SY19-SY20 10 4.05 49.00 1 198.45
M5/SY19-SY20 10 5.00 49.00 1 245.00
M6S/SY19-SY20 10 4.70 49.00 1 230.30
M7SSSY19-SY20 10 3.84 49.00 1 188.16
5th Floor
SY1-SY2
MX1-MX2 (V) 10 7.45 22.00 1 163.90
Mx-2-3 10 6.40 22.00 1 140.80
Mx-3-4 10 4.95 22.00 1 108.90
Mx-4-5 10 7.80 24.00 1 187.20
Mx-5-6 10 7.80 27.00 1 210.60

1
Mx-1-2 (H) 10 8.01 26.00 1 208.32
Mx-2-3 10 5.66 30.00 1 169.73
Mx-3-4 10 5.66 25.00 1 141.44
Mx-4-5 10 5.80 37.00 1 214.55
Mx-5-6 10 4.20 37.00 1 155.31

SY2/Mx1-Mx6 10 3.70 223.00 1 825.10

negative bar
H 1
MX1
MX2 10 3.59 22.00 1 78.98
MX3 10 3.59 22.00 1 78.98
MX4 10 4.05 22.00 1 89.10
MX5 10 5.00 22.00 1 110.00

SY2/Mx1-Mx6 10 3.70 223.00 1 825.10

SY2-SY3
V M1-M2 10 7.45 33.00 1 245.85
M2-M3 10 6.40 33.00 1 211.20
M3-M4 10 4.95 33.00 1 163.35
M4-M5 10 7.80 36.00 1 280.80
M5-M6 10 7.80 33.00 1 257.40
M6-M7 10 3.45 33.00 1 113.85
M7-M8 10 3.45 33.00 1 113.85

(H) M1-M2 10 6.90 28.00 1 193.20


M2-M3 10 6.90 33.00 1 227.70
M3-M4 10 6.90 23.00 1 158.70
M4-M5 10 6.90 52.00 1 358.80
M5-M6 10 6.90 46.00 1 317.40
M6-M7 10 6.33 46.00 1 291.11
M7-M8 10 34.00 1 0.00

negative bar
SY3/M1-M8 10 4.07 278.00 1 1,131.46

M2/Sy2-Sy3 10 3.59 43.00 1 154.37


M3 /Sy2-Sy3 10 3.59 43.00 1 154.37
M4 /Sy2-Sy3 10 4.05 38.00 1 153.90
M5 /Sy2-Sy3 10 5.00 38.00 1 190.00
M6/Sy2-Sy3 10 4.70 43.00 1 202.10
M6/Sy2-Sy3 10 3.85 27.00 1 103.95
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32

SY3-SY4
V M1-M2 10 7.45 30.00 1 223.50
M2-M3 10 6.40 30.00 1 192.00
M3-M4 10 4.95 28.00 1 138.60
M4-M5 10 7.80 28.00 1 218.40
M5-M6 10 7.80 28.00 1 218.40
M6-M7 10 6.90 28.00 1 193.20
M7-M8 10 8.52 28.00 1 238.43

(H) M1-M2 10 5.90 28.00 1 165.20


M2-M3 10 5.90 33.00 1 194.70
M3-M4 10 5.90 23.00 1 135.70
M4-M5 10 5.90 52.00 1 306.80
M5-M6 10 9.52 52.00 1 495.04
M6-M7 10 5.90 46.00 1 271.40
M7-M8 10 7.70 34.00 1 261.80

negative bar
SY4/M1-M8 10 3.87 288.00 1 1,114.56

M2/Sy3-Sy4 10 3.59 36.00 1 129.24


M3 Sy3-Sy4 10 3.59 36.00 1 129.24
M4 /Sy3-Sy4 10 4.05 32.00 1 129.60
M5 /Sy3-Sy4 10 5.00 32.00 1 160.00
M6/Sy3-Sy4 10 4.70 36.00 1 169.20
M7/Sy3-Sy4 10 3.84 36.00 1 138.24
1
SY4-SY5

V M1-M2 10 7.45 30.00 1 223.50


M2-M3 10 6.40 30.00 1 192.00
M3-M4 10 4.95 14.00 1 69.30
M4-M5 10 7.80 14.00 1 109.20
10 10.20 20.00 1 204.00
M5-M6 10 7.80 13.00 1 101.40
M6-M7 10 6.90 13.00 1 89.70
10 9.05 18.00 1 162.90
M7-M8 10 8.52 33.00 1 281.01

(H) M1-M2 10 5.62 26.00 1 146.12


M2-M3 10 6.30 30.00 1 189.00
M3-M4 10 6.30 23.00 1 144.90
M4-M5 10 6.30 41.00 1 258.30
M5-M6
M6-M7 10 6.30 33.00 1 207.90
M7-M8 10 6.30 34.00 1 214.20

negative bar
SY5/M1-M8 10 4.00 228.00 1 912.00

M2/Sy4-Sy5 10 3.59 39.00 1 140.01


M3 /Sy4-Sy5 10 3.59 39.00 1 140.01
M4 //Sy4-Sy5 10 4.05 39.00 1 157.95
M5 //Sy4-Sy5 12 5.00 15.00 1 75.00
M6//Sy4-Sy5 10 4.70 17.00 1 79.90
M7//Sy4-Sy5 10 3.84 39.00 1 149.76

SY5-SY6
V M1-M2
M2-M3 10 6.45 30.00 1 193.50
M3-M4 10 4.95 30.00 1 148.50
M4-M5 10 7.80 18.00 1 140.40
10 10.20 16.00 1 163.20
M5-M6 10 7.80 18.00 1 140.40
M6-M7 10 6.90 16.00 1 110.40
10 9.05 14.00 1 126.70
M7-M8 10 7.79 30.00 1 233.70

(H) M1-M2 10 30.00 1 0.00


M2-M3 10 4.15 30.00 1 124.50
M3-M4 10 6.30 23.00 1 144.90
M4-M5 10 6.30 41.00 1 258.30
M5-M6 10 5.13 41.00 1 210.33
M6-M7 10 6.30 33.00 1 207.90
M7-M8 10 6.30 24.00 1 151.20

negative bar
SY6/M2-M3 10 3.00 24.00 1 72.00
SY6/M3-M8 10 4.00 154.00 1 616.00

M2/Sy5-Sy6 12 2.50 24.00 1 60.00


M3 /Sy5-Sy6 10 3.59 39.00 1 140.01
M4 //Sy5-Sy6 10 4.05 35.00 1 141.75
M5 //Sy5-Sy6 12 5.00 18.00 1 90.00
M6//Sy5-Sy6 10 4.70 20.00 1 94.00
M7//Sy5-Sy6 10 3.84 39.00 1 149.76

SY6 SY7
V M1-M2 10 0.00
M1-M3 10 0.00
M3-M4 10 6.13 33.00 1 202.29
M4-M5 10 7.80 30.00 1 234.00
M5-M6 10 7.80 33.00 1 257.40
M6-M7 10 6.90 30.00 1 207.00
9.97 M7-M8 10 8.88 30.00 1 266.40

(H) M1-M2
M2-M3 10 6.30 11.00 1 69.30
M3-M4 10 6.30 23.00 1 144.90
M4-M5 10 6.30 41.00 1 258.30
M5-M6 10 8.25 41.00 1 338.25
M6-M7 10 6.30 33.00 1 207.90
M7-M8 10 6.30 24.00 1 151.20

negative bar
SY7/M1-M8 10 4.00 219.00 1 876.00

M3/Sy6-Sy7 12 3.03 49.00 1 148.23


M4/Sy6-Sy7 10 4.05 35.00 1 141.75
M5/Sy6-Sy7 10 5.00 35.00 1 175.00
M6/Sy6-Sy7 10 4.70 39.00 1 183.30
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
M7/Sy6-Sy7 10 3.84 39.00 1 149.76
1

SY7- SY8 6.355


V M2-M3 10 6.58 30.00 1 197.40
M4-M5 10 10.55 33.00 1 348.15
M5-M6 10 7.80 33.00 1 257.40
M6-M7 10 9.65 30.00 1 289.50
M7-M8 10 7.79 30.00 1 233.70

3.985 H M2-M3 10 6.30 11.00 1 69.30


M3-M4 10 6.30 23.00 1 144.90
M4-M5 10 6.30 41.00 1 258.30
M5-M6 10 8.55 41.00 1 350.55
M6-M7 10 6.30 33.00 1 207.90
M7-M8 10 6.30 24.00 1 151.20

negative bar
SY8/M1-M8 10 4.00 217.00 1 868.00

M3/SY7-SY8 12 3.02 49.00 1 147.98


M4/SY7-SY8 10 4.05 35.00 1 141.75
M5/SY7-SY8 10 5.00 35.00 1 175.00
M6/SY7-SY8 10 4.70 39.00 1 183.30
M7/SY7-SY8 10 3.84 39.00 1 149.76

SY8-SY9
V M1-M2
M2-M3 10 5.78 30.00 1 173.28
M3-M4 10 4.95 30.00 1 148.50
M4-M5 10 10.55 33.00 1 348.15
M5-M6 10 7.80 33.00 0.00
M6-M7 10 6.90 30.00 1 207.00
M7-M8 10 7.79 30.00 1 233.70

H M2-M3 10 8.60 30.00 1 258.00


M3-M4 10 6.30 23.00 1 144.90
M4-M5 10 6.30 44.00 1 277.20
M5-M6 10 6.30 41.00 1 258.30
M6-M7 10 6.30 33.00 1 207.90
M7-M8 10 6.30 24.00 1 151.20

negative bar
SY9/M1-M8 10 4.00 259.00 1 1,036.00

M2/SY8-SY9 12 3.59 19.00 1 68.21


M3/SY8-SY9 12 3.59 49.00 1 175.91
M4/SY8-SY9 10 4.05 35.00 1 141.75
M5/SY8-SY10 10 5.00 35.00 1 175.00
M6/SY8-SY11 10 4.70 39.00 1 183.30
M7/SY8-SY9 10 3.84 39.00 1 149.76

SY9-SY10
5.35 V M1-M2 10 7.45 30.00 1 223.50
M2-M3 10 6.40 30.00 1 192.00
M3-M4 10 4.95 30.00 1 148.50
M4-M5 10 10.55 33.00 1 348.15
M5-M6 10 7.80 33.00 1 257.40
M6-M7 10 6.90 30.00 1 207.00
M7-M8 10 7.78 30.00 1 233.40

H M1-M2 10 4.62 32.00 1 147.84


M2-M3 10 6.30 30.00 1 189.00
M3-M4 10 6.30 23.00 1 144.90
M4-M5 10 6.30 41.00 1 258.30
M5-M6 10 8.85 41.00 1 362.85
M6-M7 10 6.30 33.00 1 207.90
M7-M8 10 6.30 24.00 1 151.20

negative bar
SY10/M1-M8 10 3.88 189.00 1 733.32
12 3.88 56.00 1 217.28

M2/SY9-SY10 12 3.59 49.00 1 175.91


M3/SY9-SY10 12 3.59 49.00 1 175.91
M4/SY9-SY10 10 4.05 35.00 1 141.75
M5/SY9-SY10 10 5.00 35.00 1 175.00
M6SY9-SY10 10 4.70 39.00 1 183.30
M7/SY9-SY10 10 3.84 39.00 1 149.76

SY10-SY11
V M1-M2 10 7.45 34.00 1 253.30
M2-M3 10 6.40 34.00 1 217.60
M3-M4 10 4.95 34.00 1 168.30
M4-M5 10 10.55 46.00 1 485.30
M5-M6 10 46.00 1 0.00
M6-M7 10 9.65 34.00 1 328.10
M7-M8 10 9.79 34.00 1 332.86

H M1-M2 10 8.09 32.00 1 258.72


M2-M3 10 8.09 40.00 1 323.40
M3-M4 10 8.09 28.00 1 226.38
M4-M5 10 8.09 61.00 1 493.19
M5-M6
M6-M7 10 8.09 40.00 1 323.40
M7-M8 10 8.09 32.00 1 258.72

negative bar
M2/SY10-SY11 12 3.59 46.00 1 165.14
M3/SY10-SY11 12 3.59 49.00 1 175.91
M4/SY10-SY11 10 4.05 39.00 1 157.95
M5/SY10-SY11
M6S/SY10-SY11
M7/SY10-SY11 10 3.84 37.00 1 142.08

SY11'-SY12
V M1-M2 10 7.45 28.00 1 208.60
M2-M3 10 6.40 28.00 1 179.20
M3-M4 10 4.95 31.00 1 153.45
M4-M5 10 10.83 31.00 1 335.73
M5-M6
M6-M7 10 9.60 39.00 1 374.40
M7-M8

H M1-M2 10 8.09 26.00 1 210.21


M2-M3 10 8.09 33.00 1 266.81
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
M3-M4 10 8.09 25.00 1 202.13
M4-M5 10 8.09 41.00 1 331.49
M5-M6
M6-M7 10 8.09 46.00 1 371.91
M7-M8

negative bar
SY12/M1-M8 10 3.88 193.00 1 748.84

M2/SY10-SY11 10 3.59 37.00 1 132.83


M3/SY10-SY11 10 3.59 37.00 1 132.83
M4/SY10-SY11 10 4.05 32.00 1 129.60
M5/SY10-SY11
M6S/SY10-SY11
M7/SY10-SY11

SY12-SY13
V M1-M2 10 7.45 33.00 1 245.85
M2-M3 10 6.40 33.00 1 211.20
M3-M4 10 4.95 33.00 1 163.35
M4-M5 10 7.80 33.00 1 257.40
M5-M6 10 7.80 30.00 1 234.00
M6-M7 10 6.90 30.00 1 207.00
M7-M8 10 7.79 30.00 1 233.70

H M1-M2 10 8.55 24.00 1 205.20


M2-M3 10 6.30 33.00 1 207.90
M3-M4 10 6.30 37.00 1 233.10
M4-M5 10 6.30 41.00 1 258.30
M5-M6 10 8.55 25.00 1 213.75
M6-M7 10 6.30 33.00 1 207.90
M7-M8 10 6.30 25.00 1 157.50

negative bar
SY12/M1-M8 10 4.00 193.00 1 772.00

M2/SY10-SY11 10 3.59 39.00 1 140.01


M3/SY10-SY11 10 3.59 39.00 1 140.01
M4/SY10-SY11 10 4.05 35.00 1 141.75
M5/SY10-SY11 1
M6S/SY10-SY11 1
M7/SY10-SY11 10 3.84 39.00 1 149.76

SY13-SY14
V M1-M2 10 7.45 30.00 1 223.50
M2-M3 10 8.69 30.00 1 260.70
M3-M4 10 10.55 33.00 1 348.15
M4-M5
M5-M6 10 7.80 33.00 1 257.40
M6-M7 10 6.90 30.00 1 207.00
M7-M8 10 9.18 30.00 1 275.25

H M1-M2 10 6.30 24.00 1 151.20


M2-M3 10 6.30 33.00 1 207.90
M3-M4
M4-M5 10 6.30 41.00 1 258.30
M5-M6 10 6.30 41.00 1 258.30
M6-M7 10 6.30 30.00 1 189.00
M7-M8 10 6.30 23.00 1 144.90

negative bar
SY13/M1-M8 10 4.00 219.00 1 876.00

M2/SY10-SY11 10 3.59 39.00 1 140.01


M3/SY10-SY11
M4/SY10-SY11
M5/SY10-SY11 10 5.00 35.00 1 175.00
M6S/SY10-SY11 10 4.70 39.00 1 183.30
M7/SY10-SY11 10 3.84 39.00 1 149.76
10 3.84 39.00 1 149.76

SY14-SY15
V M1-M2 10 7.45 30.00 1 223.50
M2-M3 10 6.40 30.00 1 192.00
M3-M4 10 4.95 30.00 1 148.50
M4-M5 10 7.80 33.00 1 257.40
M5-M6 10 7.80 33.00 1 257.40
M6-M7 10 6.90 30.00 1 207.00
M7-M8 10 9.18 30.00 1 275.25

H M1-M2 10 6.30 24.00 1 151.20


M2-M3 10 6.30 33.00 1 207.90
M3-M4 10 8.25 41.00 1 338.25
M4-M5 10 6.30 41.00 1 258.30
M5-M6 10 8.55 37.00 1 316.35
M6-M7 10 6.30 30.00 1 189.00
M7-M8 10 6.30 23.00 1 144.90

negative bar
SY14/M1-M8 10 4.00 242.00 1 968.00

M2/SY10-SY11 10 3.59 39.00 1 140.01


M3/SY10-SY11 10 3.59 39.00 2 280.02
M4/SY10-SY11 10 4.05 35.00 1 141.75
M5/SY10-SY11 10 5.00 35.00 0.00
M6S/SY10-SY11 10 4.70 39.00 1 183.30
M7/SY10-SY11 10 3.84 39.00 1 149.76

SY15-SY16
V M1-M2 10 7.45 30.00 1 223.50
M2-M3 10 6.40 49.00 1 313.60
M3-M4 10 4.95 30.00 1 148.50
M4-M5 10 7.80 33.00 1 257.40
M5-M6 10 7.80 19.00 1 148.20
M6-M7 10 6.90 13.00 1 89.70
10 6.91 18.00 1 124.29
M7-M8 10 7.79 30.00 1 233.70

H M1-M2 10 6.30 39.00 1 245.70


M2-M3 10 6.30 54.00 1 340.20
M3-M4 10 6.30 23.00 1 144.90
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
M4-M5 10 6.30 41.00 1 258.30
M5-M6 10 6.04 41.00 1 247.64
M6-M7 10 6.30 33.00 1 207.90
M7-M8 10 6.30 23.00 1 144.90

negative bar
SY15/M1-M8 10 4.00 276.00 1 1,104.00

M2/SY10-SY11 10 3.59 49.00 1 175.91


M3/SY10-SY11 10 3.59 53.00 1 190.27
M4/SY10-SY11 10 4.05 35.00 1 141.75
M5/SY10-SY11 10 5.00 20.00 1 100.00
M6S/SY10-SY11 10 4.70 22.00 1 103.40
M7/SY10-SY11 10 3.84 39.00 1 149.76

SY16-SY17
V M1-M2 10 7.45 49.00 1 365.05
M2-M3 10 6.40 49.00 1 313.60
M3-M4 10 4.95 33.00 1 163.35
M4-M5 10 7.80 33.00 1 257.40
M5-M6 10 7.80 17.00 1 132.60
M6-M7 10 6.90 13.00 1 89.70
10 6.91 18.00 1 124.29
M7-M8 10 7.79 30.00 1 233.70

HM1-M2 10 6.30 24.00 1 151.20


M2-M3 10 6.30 30.00 1 189.00
M3-M4 10 6.30 25.00 1 157.50
M4-M5 10 6.30 41.00 1 258.30
M5-M6 10 9.96 41.00 1 408.36
M6-M7 10 6.30 33.00 1 207.90
M7-M8 10 6.30 23.00 1 144.90

negative bar
SY17/M1-M8 10 4.00 276.00 1 1,104.00

M2/SY16-SY17 10 3.59 49.00 1 175.91


M3//SY16-SY17 10 3.59 49.00 1 175.91
M4//SY16-SY17 10 4.05 35.00 1 141.75
M5//SY16-SY17 10 5.00 20.00 1 100.00
M6S//SY16-SY17 10 4.70 20.00 1 94.00
M7//SY16-SY17 10 3.84 35.00 1 134.40

SY17-SY19
V M1-M2 10 7.45 30.00 1 223.50
M2-M3 10 6.40 30.00 1 192.00
M3-M4 10 4.95 33.00 1 163.35
M4-M5 10 7.80 33.00 1 257.40
M5-M6 10 7.80 33.00 1 257.40
M6-M7 10 6.90 30.00 1 207.00
M7-M8 10 7.79 30.00 1 233.70

H M1-M1' 10 8.85 9.00 1 79.65


M1-M2 10 6.30 24.00 1 151.20
M2-M3 10 6.30 33.00 1 207.90
M3-M4 10 9.92 41.00 1 406.72
M4-M5 10 6.30 41.00 1 258.30
M5-M6 10 6.30 25.00 1 157.50
M6-M7 10 6.30 30.00 1 189.00
M7-M8 10 6.30 23.00 1 144.90

negative bar

SY17/M1-M8 10 4.00 286.00 1 1,144.00

M1/SY17-SY19
M2/SY17-SY19 10 3.59 35.00 1 125.65
M3/SY17-SY19 10 3.59 35.00 1 125.65
M4/SY17-SY19 10 4.05 35.00 1 141.75
M5/SY17-SY19 10 5.00 35.00 1 175.00
M6S/SY17-SY19 10 4.70 35.00 1 164.50
M7SSY17-SY19 10 3.84 35.00 1 134.40

SY19-SY20
V M1-M2 10 7.85 30.00 1 235.50
M2-M3 10 6.40 30.00 1 192.00
M3-M4 10 4.95 33.00 1 163.35
M4-M5 10 7.80 33.00 1 257.40
M5-M6 10 7.80 33.00 1 257.40
M6-M7 10 6.90 30.00 1 207.00
M7-M8 10 7.79 30.00 1 233.70

H M1-M1'
M1-M2 10 6.30 24.00 1 151.20
M2-M3 10 6.30 33.00 1 207.90
M3-M4 10 6.30 41.00 1 258.30
M4-M5 10 6.30 41.00 1 258.30
M5-M6 10 6.30 25.00 1 157.50
M6-M7 10 6.30 30.00 1 189.00
M7-M8 10 6.30 23.00 1 144.90

negative bar
SY120/M1-M8 10 4.34 297.00 1 1,288.98

M1/SY19-SY20
M2/SSY19-SY20 10 3.59 35.00 1 125.65
M3/SY19-SY20 10 3.59 35.00 1 125.65
M4/SY19-SY20 10 4.05 35.00 1 141.75
M5/SY19-SY20 10 5.00 35.00 1 175.00
M6S/SY19-SY20 10 4.70 35.00 1 164.50
M7SSSY19-SY20 10 3.84 35.00 1 134.40

SY20-SY21
V M1-M2 10 7.85 43.00 1 337.55
M2-M3 10 6.40 43.00 1 275.20
M3-M4 10 4.95 57.00 1 282.15
M4-M5 10 7.80 57.00 1 444.60
M5-M6 10 7.80 57.00 1 444.60
M6-M7 10 6.90 43.00 1 296.70
M7-M8 10 9.27 12.00 1 111.24

H M1-M1'
M1-M2 10 9.13 30.00 1 273.90
M2-M3 10 9.13 40.00 1 365.20
M3-M4 10 9.13 61.00 1 556.93
M4-M5 10 10.19 61.00 1 621.59
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
M5-M6 10 10.19 37.00 1 377.03
M6-M7 10 9.13 37.00 1 337.81
M7-M8 10 9.13 28.00 1 255.64

negative bar
SY120/M1-M8 10 4.46 297.00 1 1,324.62

M1/SY19-SY20 10 9.13 13.00 1 118.69


M2/SSY19-SY20 10 3.59 49.00 1 175.91
M3/SY19-SY20 10 3.59 49.00 1 175.91
M4/SY19-SY20 10 4.05 49.00 1 198.45
M5/SY19-SY20 10 5.00 49.00 1 245.00
M6S/SY19-SY20 10 4.70 49.00 1 230.30
M7SSSY19-SY20 10 3.84 49.00 1 188.16

6th Floor
SY1-SY2
MX1-MX2 (V) 10 7.45 22.00 1 163.90
Mx-2-3 10 6.40 22.00 1 140.80
Mx-3-4 10 4.95 22.00 1 108.90
Mx-4-5 10 7.80 24.00 1 187.20
Mx-5-6 10 7.80 27.00 1 210.60

1
Mx-1-2 (H) 10 8.01 26.00 1 208.32
Mx-2-3 10 5.66 30.00 1 169.73
Mx-3-4 10 5.66 25.00 1 141.44
Mx-4-5 10 5.80 37.00 1 214.55
Mx-5-6 10 4.20 37.00 1 155.31

SY2/Mx1-Mx6 10 3.70 223.00 1 825.10

negative bar
H 1
MX1
MX2 10 3.59 22.00 1 78.98
MX3 10 3.59 22.00 1 78.98
MX4 10 4.05 22.00 1 89.10
MX5 10 5.00 22.00 1 110.00

SY2/Mx1-Mx6 10 3.70 223.00 1 825.10

SY2-SY3
V M1-M2 10 7.45 33.00 1 245.85
M2-M3 10 6.40 33.00 1 211.20
M3-M4 10 4.95 33.00 1 163.35
M4-M5 10 7.80 36.00 1 280.80
M5-M6 10 7.80 33.00 1 257.40
M6-M7 10 3.45 33.00 1 113.85
M7-M8 10 3.45 33.00 1 113.85

(H) M1-M2 10 6.90 28.00 1 193.20


M2-M3 10 6.90 33.00 1 227.70
M3-M4 10 6.90 23.00 1 158.70
M4-M5 10 6.90 52.00 1 358.80
M5-M6 10 6.90 46.00 1 317.40
M6-M7 10 6.33 46.00 1 291.11
M7-M8 10 34.00 1 0.00

negative bar
SY3/M1-M8 10 4.07 278.00 1 1,131.46

M2/Sy2-Sy3 10 3.59 43.00 1 154.37


M3 /Sy2-Sy3 10 3.59 43.00 1 154.37
M4 /Sy2-Sy3 10 4.05 38.00 1 153.90
M5 /Sy2-Sy3 10 5.00 38.00 1 190.00
M6/Sy2-Sy3 10 4.70 43.00 1 202.10
M6/Sy2-Sy3 10 3.85 27.00 1 103.95

SY3-SY4
V M1-M2 10 7.45 30.00 1 223.50
M2-M3 10 6.40 30.00 1 192.00
M3-M4 10 4.95 28.00 1 138.60
M4-M5 10 7.80 28.00 1 218.40
M5-M6 10 7.80 28.00 1 218.40
M6-M7 10 6.90 28.00 1 193.20
M7-M8 10 8.52 28.00 1 238.43

(H) M1-M2 10 5.90 28.00 1 165.20


M2-M3 10 5.90 33.00 1 194.70
M3-M4 10 5.90 23.00 1 135.70
M4-M5 10 5.90 52.00 1 306.80
M5-M6 10 9.52 52.00 1 495.04
M6-M7 10 5.90 46.00 1 271.40
M7-M8 10 7.70 34.00 1 261.80

negative bar
SY4/M1-M8 10 3.87 288.00 1 1,114.56

M2/Sy3-Sy4 10 3.59 36.00 1 129.24


M3 Sy3-Sy4 10 3.59 36.00 1 129.24
M4 /Sy3-Sy4 10 4.05 32.00 1 129.60
M5 /Sy3-Sy4 10 5.00 32.00 1 160.00
M6/Sy3-Sy4 10 4.70 36.00 1 169.20
M7/Sy3-Sy4 10 3.84 36.00 1 138.24
1
SY4-SY5

V M1-M2 10 7.45 30.00 1 223.50


M2-M3 10 6.40 30.00 1 192.00
M3-M4 10 4.95 14.00 1 69.30
M4-M5 10 7.80 14.00 1 109.20
10 10.20 20.00 1 204.00
M5-M6 10 7.80 13.00 1 101.40
M6-M7 10 6.90 13.00 1 89.70
10 9.05 18.00 1 162.90
M7-M8 10 8.52 33.00 1 281.01

(H) M1-M2 10 5.62 26.00 1 146.12


M2-M3 10 6.30 30.00 1 189.00
M3-M4 10 6.30 23.00 1 144.90
M4-M5 10 6.30 41.00 1 258.30
M5-M6
M6-M7 10 6.30 33.00 1 207.90
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
M7-M8 10 6.30 34.00 1 214.20

negative bar
SY5/M1-M8 10 4.00 228.00 1 912.00

M2/Sy4-Sy5 10 3.59 39.00 1 140.01


M3 /Sy4-Sy5 10 3.59 39.00 1 140.01
M4 //Sy4-Sy5 10 4.05 39.00 1 157.95
M5 //Sy4-Sy5 12 5.00 15.00 1 75.00
M6//Sy4-Sy5 10 4.70 17.00 1 79.90
M7//Sy4-Sy5 10 3.84 39.00 1 149.76

SY5-SY6
V M1-M2
M2-M3 10 6.45 30.00 1 193.50
M3-M4 10 4.95 30.00 1 148.50
M4-M5 10 7.80 18.00 1 140.40
10 10.20 16.00 1 163.20
M5-M6 10 7.80 18.00 1 140.40
M6-M7 10 6.90 16.00 1 110.40
10 9.05 14.00 1 126.70
M7-M8 10 7.79 30.00 1 233.70

(H) M1-M2 10 30.00 1 0.00


M2-M3 10 4.15 30.00 1 124.50
M3-M4 10 6.30 23.00 1 144.90
M4-M5 10 6.30 41.00 1 258.30
M5-M6 10 5.13 41.00 1 210.33
M6-M7 10 6.30 33.00 1 207.90
M7-M8 10 6.30 24.00 1 151.20

negative bar
SY6/M2-M3 10 3.00 24.00 1 72.00
SY6/M3-M8 10 4.00 154.00 1 616.00

M2/Sy5-Sy6 12 2.50 24.00 1 60.00


M3 /Sy5-Sy6 10 3.59 39.00 1 140.01
M4 //Sy5-Sy6 10 4.05 35.00 1 141.75
M5 //Sy5-Sy6 12 5.00 18.00 1 90.00
M6//Sy5-Sy6 10 4.70 20.00 1 94.00
M7//Sy5-Sy6 10 3.84 39.00 1 149.76

SY6 SY7
V M1-M2 10 0.00
M1-M3 10 0.00
M3-M4 10 6.13 33.00 1 202.29
M4-M5 10 7.80 30.00 1 234.00
M5-M6 10 7.80 33.00 1 257.40
M6-M7 10 6.90 30.00 1 207.00
9.97 M7-M8 10 8.88 30.00 1 266.40

(H) M1-M2
M2-M3 10 6.30 11.00 1 69.30
M3-M4 10 6.30 23.00 1 144.90
M4-M5 10 6.30 41.00 1 258.30
M5-M6 10 8.25 41.00 1 338.25
M6-M7 10 6.30 33.00 1 207.90
M7-M8 10 6.30 24.00 1 151.20

negative bar
SY7/M1-M8 10 4.00 219.00 1 876.00

M3/Sy6-Sy7 12 3.03 49.00 1 148.23


M4/Sy6-Sy7 10 4.05 35.00 1 141.75
M5/Sy6-Sy7 10 5.00 35.00 1 175.00
M6/Sy6-Sy7 10 4.70 39.00 1 183.30
M7/Sy6-Sy7 10 3.84 39.00 1 149.76
1

SY7- SY8 6.355


V M2-M3 10 6.58 30.00 1 197.40
M4-M5 10 10.55 33.00 1 348.15
M5-M6 10 7.80 33.00 1 257.40
M6-M7 10 9.65 30.00 1 289.50
M7-M8 10 7.79 30.00 1 233.70

3.985 H M2-M3 10 6.30 11.00 1 69.30


M3-M4 10 6.30 23.00 1 144.90
M4-M5 10 6.30 41.00 1 258.30
M5-M6 10 8.55 41.00 1 350.55
M6-M7 10 6.30 33.00 1 207.90
M7-M8 10 6.30 24.00 1 151.20

negative bar
SY8/M1-M8 10 4.00 217.00 1 868.00

M3/SY7-SY8 12 3.02 49.00 1 147.98


M4/SY7-SY8 10 4.05 35.00 1 141.75
M5/SY7-SY8 10 5.00 35.00 1 175.00
M6/SY7-SY8 10 4.70 39.00 1 183.30
M7/SY7-SY8 10 3.84 39.00 1 149.76

SY8-SY9
V M1-M2
M2-M3 10 5.78 30.00 1 173.28
M3-M4 10 4.95 30.00 1 148.50
M4-M5 10 10.55 33.00 1 348.15
M5-M6 10 7.80 33.00 0.00
M6-M7 10 6.90 30.00 1 207.00
M7-M8 10 7.79 30.00 1 233.70

H M2-M3 10 8.60 30.00 1 258.00


M3-M4 10 6.30 23.00 1 144.90
M4-M5 10 6.30 44.00 1 277.20
M5-M6 10 6.30 41.00 1 258.30
M6-M7 10 6.30 33.00 1 207.90
M7-M8 10 6.30 24.00 1 151.20

negative bar
SY9/M1-M8 10 4.00 259.00 1 1,036.00

M2/SY8-SY9 12 3.59 19.00 1 68.21


M3/SY8-SY9 12 3.59 49.00 1 175.91
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
M4/SY8-SY9 10 4.05 35.00 1 141.75
M5/SY8-SY10 10 5.00 35.00 1 175.00
M6/SY8-SY11 10 4.70 39.00 1 183.30
M7/SY8-SY9 10 3.84 39.00 1 149.76

SY9-SY10
5.35 V M1-M2 10 7.45 30.00 1 223.50
M2-M3 10 6.40 30.00 1 192.00
M3-M4 10 4.95 30.00 1 148.50
M4-M5 10 10.55 33.00 1 348.15
M5-M6 10 7.80 33.00 1 257.40
M6-M7 10 6.90 30.00 1 207.00
M7-M8 10 7.78 30.00 1 233.40

H M1-M2 10 4.62 32.00 1 147.84


M2-M3 10 6.30 30.00 1 189.00
M3-M4 10 6.30 23.00 1 144.90
M4-M5 10 6.30 41.00 1 258.30
M5-M6 10 8.85 41.00 1 362.85
M6-M7 10 6.30 33.00 1 207.90
M7-M8 10 6.30 24.00 1 151.20

negative bar
SY10/M1-M8 10 3.88 189.00 1 733.32
12 3.88 56.00 1 217.28

M2/SY9-SY10 12 3.59 49.00 1 175.91


M3/SY9-SY10 12 3.59 49.00 1 175.91
M4/SY9-SY10 10 4.05 35.00 1 141.75
M5/SY9-SY10 10 5.00 35.00 1 175.00
M6SY9-SY10 10 4.70 39.00 1 183.30
M7/SY9-SY10 10 3.84 39.00 1 149.76

SY10-SY11
V M1-M2 10 7.45 34.00 1 253.30
M2-M3 10 6.40 34.00 1 217.60
M3-M4 10 4.95 34.00 1 168.30
M4-M5 10 7.80 46.00 1 358.80
M5-M6 10 7.80 46.00 1 358.80
M6-M7 10 9.65 34.00 1 328.10
M7-M8 10 9.79 34.00 1 332.86

H M1-M2 10 8.09 32.00 1 258.72


M2-M3 10 8.09 40.00 1 323.40
M3-M4 10 8.09 28.00 1 226.38
M4-M5 10 8.09 61.00 1 493.19
M5-M6 10 8.09 46.00 1 371.91
M6-M7 10 8.09 40.00 1 323.40
M7-M8 10 8.09 32.00 1 258.72

negative bar
M2/SY10-SY11 12 3.59 46.00 1 165.14
M3/SY10-SY11 12 3.59 49.00 1 175.91
M4/SY10-SY11 10 4.05 39.00 1 157.95
M5/SY10-SY11 10 5.00 32.00 1 160.00
M6S/SY10-SY11 10 4.70 36.00 1 169.20
M7/SY10-SY11 10 3.84 37.00 1 142.08

SY11'-SY12
V M1-M2 10 7.45 28.00 1 208.60
M2-M3 10 6.40 28.00 1 179.20
M3-M4 10 4.95 31.00 1 153.45
M4-M5 10 10.83 31.00 1 335.73
M5-M6
M6-M7 10 9.60 39.00 1 374.40
M7-M8

H M1-M2 10 8.09 26.00 1 210.21


M2-M3 10 8.09 33.00 1 266.81
M3-M4 10 8.09 25.00 1 202.13
M4-M5 10 8.09 41.00 1 331.49
M5-M6
M6-M7 10 8.09 46.00 1 371.91
M7-M8

negative bar
SY12/M1-M8 10 3.88 193.00 1 748.84

M2/SY10-SY11 10 3.59 37.00 1 132.83


M3/SY10-SY11 10 3.59 37.00 1 132.83
M4/SY10-SY11 10 4.05 32.00 1 129.60
M5/SY10-SY11
M6S/SY10-SY11
M7/SY10-SY11

SY12-SY13
V M1-M2 10 7.45 33.00 1 245.85
M2-M3 10 6.40 33.00 1 211.20
M3-M4 10 4.95 33.00 1 163.35
M4-M5 10 7.80 33.00 1 257.40
M5-M6 10 7.80 30.00 1 234.00
M6-M7 10 6.90 30.00 1 207.00
M7-M8 10 7.79 30.00 1 233.70

H M1-M2 10 8.55 24.00 1 205.20


M2-M3 10 6.30 33.00 1 207.90
M3-M4 10 6.30 37.00 1 233.10
M4-M5 10 6.30 41.00 1 258.30
M5-M6 10 8.55 25.00 1 213.75
M6-M7 10 6.30 33.00 1 207.90
M7-M8 10 6.30 25.00 1 157.50

negative bar
SY12/M1-M8 10 4.00 193.00 1 772.00

M2/SY10-SY11 10 3.59 39.00 1 140.01


M3/SY10-SY11 10 3.59 39.00 1 140.01
M4/SY10-SY11 10 4.05 35.00 1 141.75
M5/SY10-SY11 1
M6S/SY10-SY11 1
M7/SY10-SY11 10 3.84 39.00 1 149.76

SY13-SY14
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
V M1-M2 10 7.45 30.00 1 223.50
M2-M3 10 8.69 30.00 1 260.70
M3-M4 10 10.55 33.00 1 348.15
M4-M5
M5-M6 10 7.80 33.00 1 257.40
M6-M7 10 6.90 30.00 1 207.00
M7-M8 10 9.18 30.00 1 275.25

H M1-M2 10 6.30 24.00 1 151.20


M2-M3 10 6.30 33.00 1 207.90
M3-M4
M4-M5 10 6.30 41.00 1 258.30
M5-M6 10 6.30 41.00 1 258.30
M6-M7 10 6.30 30.00 1 189.00
M7-M8 10 6.30 23.00 1 144.90

negative bar
SY13/M1-M8 10 4.00 219.00 1 876.00

M2/SY10-SY11 10 3.59 39.00 1 140.01


M3/SY10-SY11
M4/SY10-SY11
M5/SY10-SY11 10 5.00 35.00 1 175.00
M6S/SY10-SY11 10 4.70 39.00 1 183.30
M7/SY10-SY11 10 3.84 39.00 1 149.76
10 3.84 39.00 1 149.76

SY14-SY15
V M1-M2 10 7.45 30.00 1 223.50
M2-M3 10 6.40 30.00 1 192.00
M3-M4 10 4.95 30.00 1 148.50
M4-M5 10 7.80 33.00 1 257.40
M5-M6 10 7.80 33.00 1 257.40
M6-M7 10 6.90 30.00 1 207.00
M7-M8 10 9.18 30.00 1 275.25

H M1-M2 10 6.30 24.00 1 151.20


M2-M3 10 6.30 33.00 1 207.90
M3-M4 10 8.25 41.00 1 338.25
M4-M5 10 6.30 41.00 1 258.30
M5-M6 10 8.55 37.00 1 316.35
M6-M7 10 6.30 30.00 1 189.00
M7-M8 10 6.30 23.00 1 144.90

negative bar
SY14/M1-M8 10 4.00 242.00 1 968.00

M2/SY10-SY11 10 3.59 39.00 1 140.01


M3/SY10-SY11 10 3.59 39.00 2 280.02
M4/SY10-SY11 10 4.05 35.00 1 141.75
M5/SY10-SY11 10 5.00 35.00 0.00
M6S/SY10-SY11 10 4.70 39.00 1 183.30
M7/SY10-SY11 10 3.84 39.00 1 149.76

SY15-SY16
V M1-M2 10 7.45 30.00 1 223.50
M2-M3 10 6.40 49.00 1 313.60
M3-M4 10 4.95 30.00 1 148.50
M4-M5 10 7.80 33.00 1 257.40
M5-M6 10 7.80 19.00 1 148.20
M6-M7 10 6.90 13.00 1 89.70
10 6.91 18.00 1 124.29
M7-M8 10 7.79 30.00 1 233.70

H M1-M2 10 6.30 39.00 1 245.70


M2-M3 10 6.30 54.00 1 340.20
M3-M4 10 6.30 23.00 1 144.90
M4-M5 10 6.30 41.00 1 258.30
M5-M6 10 6.04 41.00 1 247.64
M6-M7 10 6.30 33.00 1 207.90
M7-M8 10 6.30 23.00 1 144.90

negative bar
SY15/M1-M8 10 4.00 276.00 1 1,104.00

M2/SY10-SY11 10 3.59 49.00 1 175.91


M3/SY10-SY11 10 3.59 53.00 1 190.27
M4/SY10-SY11 10 4.05 35.00 1 141.75
M5/SY10-SY11 10 5.00 20.00 1 100.00
M6S/SY10-SY11 10 4.70 22.00 1 103.40
M7/SY10-SY11 10 3.84 39.00 1 149.76

SY16-SY17
V M1-M2 10 7.45 49.00 1 365.05
M2-M3 10 6.40 49.00 1 313.60
M3-M4 10 4.95 33.00 1 163.35
M4-M5 10 7.80 33.00 1 257.40
M5-M6 10 7.80 17.00 1 132.60
M6-M7 10 6.90 13.00 1 89.70
10 6.91 18.00 1 124.29
M7-M8 10 7.79 30.00 1 233.70

HM1-M2 10 6.30 24.00 1 151.20


M2-M3 10 6.30 30.00 1 189.00
M3-M4 10 6.30 25.00 1 157.50
M4-M5 10 6.30 41.00 1 258.30
M5-M6 10 9.96 41.00 1 408.36
M6-M7 10 6.30 33.00 1 207.90
M7-M8 10 6.30 23.00 1 144.90

negative bar
SY17/M1-M8 10 4.00 276.00 1 1,104.00

M2/SY16-SY17 10 3.59 49.00 1 175.91


M3//SY16-SY17 10 3.59 49.00 1 175.91
M4//SY16-SY17 10 4.05 35.00 1 141.75
M5//SY16-SY17 10 5.00 20.00 1 100.00
M6S//SY16-SY17 10 4.70 20.00 1 94.00
M7//SY16-SY17 10 3.84 35.00 1 134.40

SY17-SY19
V M1-M2 10 7.45 30.00 1 223.50
M2-M3 10 6.40 30.00 1 192.00
M3-M4 10 4.95 33.00 1 163.35
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
M4-M5 10 7.80 33.00 1 257.40
M5-M6 10 7.80 33.00 1 257.40
M6-M7 10 6.90 30.00 1 207.00
M7-M8 10 7.79 30.00 1 233.70

H M1-M1' 10 8.85 9.00 1 79.65


M1-M2 10 6.30 24.00 1 151.20
M2-M3 10 6.30 33.00 1 207.90
M3-M4 10 9.92 41.00 1 406.72
M4-M5 10 6.30 41.00 1 258.30
M5-M6 10 6.30 25.00 1 157.50
M6-M7 10 6.30 30.00 1 189.00
M7-M8 10 6.30 23.00 1 144.90

negative bar

SY17/M1-M8 10 4.00 286.00 1 1,144.00

M1/SY17-SY19
M2/SY17-SY19 10 3.59 35.00 1 125.65
M3/SY17-SY19 10 3.59 35.00 1 125.65
M4/SY17-SY19 10 4.05 35.00 1 141.75
M5/SY17-SY19 10 5.00 35.00 1 175.00
M6S/SY17-SY19 10 4.70 35.00 1 164.50
M7SSY17-SY19 10 3.84 35.00 1 134.40

SY19-SY20
V M1-M2 10 3.24 30.00 1 97.20
M2-M3 1
M3-M4 1
M4-M5 1
M5-M6 1
M6-M7 1
M7-M8 10 4.50 30.00 1 135.00

H M1-M1'
M1-M2 10 6.30 10.00 1 63.00
M2-M3
M3-M4
M4-M5
M5-M6
M6-M7
M7-M8 10 6.30 23.00 1 144.90

negative bar
SY120/M1-M8 10 4.34 36.00 1 156.24

M1/SY19-SY20
M2/SSY19-SY20
M3/SY19-SY20
M4/SY19-SY20
M5/SY19-SY20
M6S/SY19-SY20
M7SSSY19-SY20

SY20-SY21
V M1-M2 10 3.24 43.00 1 139.32
10 7.45 12.00 1 89.40
M2-M3 10 6.40 12.00 1 76.80
M3-M4 10 4.95 12.00 1 59.40
M4-M5 10 7.80 12.00 1 93.60
M5-M6 10 7.80 12.00 1 93.60
M6-M7 10 6.90 12.00 1 82.80
M7-M8 10 9.27 12.00 1 111.24

H M1-M1'
M1-M2 10 9.13 13.00 1 118.69
3.84 23.00 1
M2-M3 10 3.84 23.00 1 88.32
M3-M4 10 3.84 23.00 1 88.32
M4-M5 10 3.84 23.00 1 88.32
M5-M6 10 3.84 23.00 1 88.32
M6-M7 10 3.84 23.00 1 88.32
M7-M8 10 3.84 23.00 1 88.32

negative bar
SY120/M1-M8 10 4.46 1 0.00

M1/SY19-SY20
M2/SSY19-SY20 10 3.59 13.00 1 46.67
M3/SY19-SY20 10 3.59 13.00 1 46.67
M4/SY19-SY20 10 4.05 13.00 1 52.65
M5/SY19-SY20 10 5.00 13.00 1 65.00
M6S/SY19-SY20 10 4.70 13.00 1 61.10
M7SSSY19-SY20 10 3.84 13.00 1 49.92
7th Floor
SY1-SY2
MX1-MX2 (V) 10 7.45 22.00 1 163.90
Mx-2-3 10 6.40 22.00 1 140.80
Mx-3-4 10 4.95 22.00 1 108.90
Mx-4-5 10 7.80 24.00 1 187.20
Mx-5-6 10 7.80 27.00 1 210.60

1
Mx-1-2 (H) 10 8.01 26.00 1 208.32
Mx-2-3 10 5.66 30.00 1 169.73
Mx-3-4 10 5.66 25.00 1 141.44
Mx-4-5 10 5.80 37.00 1 214.55
Mx-5-6 10 4.20 37.00 1 155.31

SY2/Mx1-Mx6 10 3.70 223.00 1 825.10

negative bar
H 1
MX1
MX2 10 3.59 22.00 1 78.98
MX3 10 3.59 22.00 1 78.98
MX4 10 4.05 22.00 1 89.10
MX5 10 5.00 22.00 1 110.00

SY2/Mx1-Mx6 10 3.70 223.00 1 825.10

SY2-SY3
V M1-M2 10 7.45 33.00 1 245.85
M2-M3 10 6.40 33.00 1 211.20
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
M3-M4 10 4.95 33.00 1 163.35
M4-M5 10 7.80 36.00 1 280.80
M5-M6 10 7.80 33.00 1 257.40
M6-M7 10 3.45 33.00 1 113.85
M7-M8 10 3.45 33.00 1 113.85

(H) M1-M2 10 6.90 28.00 1 193.20


M2-M3 10 6.90 33.00 1 227.70
M3-M4 10 6.90 23.00 1 158.70
M4-M5 10 6.90 52.00 1 358.80
M5-M6 10 6.90 46.00 1 317.40
M6-M7 10 6.33 46.00 1 291.11
M7-M8 10 34.00 1 0.00

negative bar
SY3/M1-M8 10 4.07 278.00 1 1,131.46

M2/Sy2-Sy3 10 3.59 43.00 1 154.37


M3 /Sy2-Sy3 10 3.59 43.00 1 154.37
M4 /Sy2-Sy3 10 4.05 38.00 1 153.90
M5 /Sy2-Sy3 10 5.00 38.00 1 190.00
M6/Sy2-Sy3 10 4.70 43.00 1 202.10
M6/Sy2-Sy3 10 3.85 27.00 1 103.95

SY3-SY4
V M1-M2 10 7.45 30.00 1 223.50
M2-M3 10 6.40 30.00 1 192.00
M3-M4 10 4.95 28.00 1 138.60
M4-M5 10 7.80 28.00 1 218.40
M5-M6 10 7.80 28.00 1 218.40
M6-M7 10 6.90 28.00 1 193.20
M7-M8 10 8.52 28.00 1 238.43

(H) M1-M2 10 5.90 28.00 1 165.20


M2-M3 10 5.90 33.00 1 194.70
M3-M4 10 5.90 23.00 1 135.70
M4-M5 10 5.90 52.00 1 306.80
M5-M6 10 9.52 52.00 1 495.04
M6-M7 10 5.90 46.00 1 271.40
M7-M8 10 7.70 34.00 1 261.80

negative bar
SY4/M1-M8 10 3.87 288.00 1 1,114.56

M2/Sy3-Sy4 10 3.59 36.00 1 129.24


M3 Sy3-Sy4 10 3.59 36.00 1 129.24
M4 /Sy3-Sy4 10 4.05 32.00 1 129.60
M5 /Sy3-Sy4 10 5.00 32.00 1 160.00
M6/Sy3-Sy4 10 4.70 36.00 1 169.20
M7/Sy3-Sy4 10 3.84 36.00 1 138.24
1
SY4-SY5

V M1-M2 10 7.45 30.00 1 223.50


M2-M3 10 6.40 30.00 1 192.00
M3-M4 10 4.95 14.00 1 69.30
M4-M5 10 7.80 14.00 1 109.20
10 10.20 20.00 1 204.00
M5-M6 10 7.80 13.00 1 101.40
M6-M7 10 6.90 13.00 1 89.70
10 9.05 18.00 1 162.90
M7-M8 10 8.52 33.00 1 281.01

(H) M1-M2 10 5.62 26.00 1 146.12


M2-M3 10 6.30 30.00 1 189.00
M3-M4 10 6.30 23.00 1 144.90
M4-M5 10 6.30 41.00 1 258.30
M5-M6
M6-M7 10 6.30 33.00 1 207.90
M7-M8 10 6.30 34.00 1 214.20

negative bar
SY5/M1-M8 10 4.00 228.00 1 912.00

M2/Sy4-Sy5 10 3.59 39.00 1 140.01


M3 /Sy4-Sy5 10 3.59 39.00 1 140.01
M4 //Sy4-Sy5 10 4.05 39.00 1 157.95
M5 //Sy4-Sy5 12 5.00 15.00 1 75.00
M6//Sy4-Sy5 10 4.70 17.00 1 79.90
M7//Sy4-Sy5 10 3.84 39.00 1 149.76

SY5-SY6
V M1-M2
M2-M3 10 6.45 30.00 1 193.50
M3-M4 10 4.95 30.00 1 148.50
M4-M5 10 7.80 18.00 1 140.40
10 10.20 16.00 1 163.20
M5-M6 10 7.80 18.00 1 140.40
M6-M7 10 6.90 16.00 1 110.40
10 9.05 14.00 1 126.70
M7-M8 10 7.79 30.00 1 233.70

(H) M1-M2 10 30.00 1 0.00


M2-M3 10 4.15 30.00 1 124.50
M3-M4 10 6.30 23.00 1 144.90
M4-M5 10 6.30 41.00 1 258.30
M5-M6 10 5.13 41.00 1 210.33
M6-M7 10 6.30 33.00 1 207.90
M7-M8 10 6.30 24.00 1 151.20

negative bar
SY6/M2-M3 10 3.00 24.00 1 72.00
SY6/M3-M8 10 4.00 154.00 1 616.00

M2/Sy5-Sy6 12 2.50 24.00 1 60.00


M3 /Sy5-Sy6 10 3.59 39.00 1 140.01
M4 //Sy5-Sy6 10 4.05 35.00 1 141.75
M5 //Sy5-Sy6 12 5.00 18.00 1 90.00
M6//Sy5-Sy6 10 4.70 20.00 1 94.00
M7//Sy5-Sy6 10 3.84 39.00 1 149.76

SY6 SY7
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
V M1-M2 10 0.00
M1-M3 10 0.00
M3-M4 10 6.13 33.00 1 202.29
M4-M5 10 7.80 30.00 1 234.00
M5-M6 10 7.80 33.00 1 257.40
M6-M7 10 6.90 30.00 1 207.00
9.97 M7-M8 10 8.88 30.00 1 266.40

(H) M1-M2
M2-M3 10 6.30 11.00 1 69.30
M3-M4 10 6.30 23.00 1 144.90
M4-M5 10 6.30 41.00 1 258.30
M5-M6 10 8.25 41.00 1 338.25
M6-M7 10 6.30 33.00 1 207.90
M7-M8 10 6.30 24.00 1 151.20

negative bar
SY7/M1-M8 10 4.00 219.00 1 876.00

M3/Sy6-Sy7 12 3.03 49.00 1 148.23


M4/Sy6-Sy7 10 4.05 35.00 1 141.75
M5/Sy6-Sy7 10 5.00 35.00 1 175.00
M6/Sy6-Sy7 10 4.70 39.00 1 183.30
M7/Sy6-Sy7 10 3.84 39.00 1 149.76
1

SY7- SY8 6.355


V M2-M3 10 6.58 30.00 1 197.40
M4-M5 10 10.55 33.00 1 348.15
M5-M6 10 7.80 33.00 1 257.40
M6-M7 10 9.65 30.00 1 289.50
M7-M8 10 7.79 30.00 1 233.70

3.985 H M2-M3 10 6.30 11.00 1 69.30


M3-M4 10 6.30 23.00 1 144.90
M4-M5 10 6.30 41.00 1 258.30
M5-M6 10 8.55 41.00 1 350.55
M6-M7 10 6.30 33.00 1 207.90
M7-M8 10 6.30 24.00 1 151.20

negative bar
SY8/M1-M8 10 4.00 217.00 1 868.00

M3/SY7-SY8 12 3.02 49.00 1 147.98


M4/SY7-SY8 10 4.05 35.00 1 141.75
M5/SY7-SY8 10 5.00 35.00 1 175.00
M6/SY7-SY8 10 4.70 39.00 1 183.30
M7/SY7-SY8 10 3.84 39.00 1 149.76

SY8-SY9
V M1-M2
M2-M3 10 5.78 30.00 1 173.28
M3-M4 10 4.95 30.00 1 148.50
M4-M5 10 10.55 33.00 1 348.15
M5-M6 10 7.80 33.00 0.00
M6-M7 10 6.90 30.00 1 207.00
M7-M8 10 7.79 30.00 1 233.70

H M2-M3 10 8.60 30.00 1 258.00


M3-M4 10 6.30 23.00 1 144.90
M4-M5 10 6.30 44.00 1 277.20
M5-M6 10 6.30 41.00 1 258.30
M6-M7 10 6.30 33.00 1 207.90
M7-M8 10 6.30 24.00 1 151.20

negative bar
SY9/M1-M8 10 4.00 259.00 1 1,036.00

M2/SY8-SY9 12 3.59 19.00 1 68.21


M3/SY8-SY9 12 3.59 49.00 1 175.91
M4/SY8-SY9 10 4.05 35.00 1 141.75
M5/SY8-SY10 10 5.00 35.00 1 175.00
M6/SY8-SY11 10 4.70 39.00 1 183.30
M7/SY8-SY9 10 3.84 39.00 1 149.76

SY9-SY10
5.35 V M1-M2 10 7.45 30.00 1 223.50
M2-M3 10 6.40 30.00 1 192.00
M3-M4 10 4.95 30.00 1 148.50
M4-M5 10 10.55 33.00 1 348.15
M5-M6 10 7.80 33.00 1 257.40
M6-M7 10 6.90 30.00 1 207.00
M7-M8 10 7.78 30.00 1 233.40

H M1-M2 10 4.62 32.00 1 147.84


M2-M3 10 6.30 30.00 1 189.00
M3-M4 10 6.30 23.00 1 144.90
M4-M5 10 6.30 41.00 1 258.30
M5-M6 10 8.85 41.00 1 362.85
M6-M7 10 6.30 33.00 1 207.90
M7-M8 10 6.30 24.00 1 151.20

negative bar
SY10/M1-M8 10 3.88 189.00 1 733.32
12 3.88 56.00 1 217.28

M2/SY9-SY10 12 3.59 49.00 1 175.91


M3/SY9-SY10 12 3.59 49.00 1 175.91
M4/SY9-SY10 10 4.05 35.00 1 141.75
M5/SY9-SY10 10 5.00 35.00 1 175.00
M6SY9-SY10 10 4.70 39.00 1 183.30
M7/SY9-SY10 10 3.84 39.00 1 149.76

SY10-SY11
V M1-M2 10 7.45 34.00 1 253.30
M2-M3 10 6.40 34.00 1 217.60
M3-M4 10 4.95 34.00 1 168.30
M4-M5 10 7.80 46.00 1 358.80
M5-M6 10 7.80 46.00 1 358.80
M6-M7 10 9.65 34.00 1 328.10
M7-M8 10 9.79 34.00 1 332.86

H M1-M2 10 8.09 32.00 1 258.72


M2-M3 10 8.09 40.00 1 323.40
M3-M4 10 8.09 28.00 1 226.38
M4-M5 10 8.09 61.00 1 493.19
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
M5-M6 10 8.09 46.00 1 371.91
M6-M7 10 8.09 40.00 1 323.40
M7-M8 10 8.09 32.00 1 258.72

negative bar
M2/SY10-SY11 12 3.59 46.00 1 165.14
M3/SY10-SY11 12 3.59 49.00 1 175.91
M4/SY10-SY11 10 4.05 39.00 1 157.95
M5/SY10-SY11 10 5.00 32.00 1 160.00
M6S/SY10-SY11 10 4.70 36.00 1 169.20
M7/SY10-SY11 10 3.84 37.00 1 142.08

SY11'-SY12
V M1-M2 10 7.45 28.00 1 208.60
M2-M3 10 6.40 28.00 1 179.20
M3-M4 10 4.95 31.00 1 153.45
M4-M5 10 10.83 31.00 1 335.73
M5-M6
M6-M7 10 9.60 39.00 1 374.40
M7-M8

H M1-M2 10 8.09 26.00 1 210.21


M2-M3 10 8.09 33.00 1 266.81
M3-M4 10 8.09 25.00 1 202.13
M4-M5 10 8.09 41.00 1 331.49
M5-M6
M6-M7 10 8.09 46.00 1 371.91
M7-M8

negative bar
SY12/M1-M8 10 3.88 193.00 1 748.84

M2/SY10-SY11 10 3.59 37.00 1 132.83


M3/SY10-SY11 10 3.59 37.00 1 132.83
M4/SY10-SY11 10 4.05 32.00 1 129.60
M5/SY10-SY11
M6S/SY10-SY11
M7/SY10-SY11

SY12-SY13
V M1-M2 10 7.45 33.00 1 245.85
M2-M3 10 6.40 33.00 1 211.20
M3-M4 10 4.95 33.00 1 163.35
M4-M5 10 7.80 33.00 1 257.40
M5-M6 10 7.80 30.00 1 234.00
M6-M7 10 6.90 30.00 1 207.00
M7-M8 10 7.79 30.00 1 233.70

H M1-M2 10 8.55 24.00 1 205.20


M2-M3 10 6.30 33.00 1 207.90
M3-M4 10 6.30 37.00 1 233.10
M4-M5 10 6.30 41.00 1 258.30
M5-M6 10 8.55 25.00 1 213.75
M6-M7 10 6.30 33.00 1 207.90
M7-M8 10 6.30 25.00 1 157.50

negative bar
SY12/M1-M8 10 4.00 193.00 1 772.00

M2/SY10-SY11 10 3.59 39.00 1 140.01


M3/SY10-SY11 10 3.59 39.00 1 140.01
M4/SY10-SY11 10 4.05 35.00 1 141.75
M5/SY10-SY11 1
M6S/SY10-SY11 1
M7/SY10-SY11 10 3.84 39.00 1 149.76

SY13-SY14
V M1-M2 10 7.45 30.00 1 223.50
M2-M3 10 8.69 30.00 1 260.70
M3-M4 10 10.55 33.00 1 348.15
M4-M5
M5-M6 10 7.80 33.00 1 257.40
M6-M7 10 6.90 30.00 1 207.00
M7-M8 10 9.18 30.00 1 275.25

H M1-M2 10 6.30 24.00 1 151.20


M2-M3 10 6.30 33.00 1 207.90
M3-M4
M4-M5 10 6.30 41.00 1 258.30
M5-M6 10 6.30 41.00 1 258.30
M6-M7 10 6.30 30.00 1 189.00
M7-M8 10 6.30 23.00 1 144.90

negative bar
SY13/M1-M8 10 4.00 219.00 1 876.00

M2/SY10-SY11 10 3.59 39.00 1 140.01


M3/SY10-SY11
M4/SY10-SY11
M5/SY10-SY11 10 5.00 35.00 1 175.00
M6S/SY10-SY11 10 4.70 39.00 1 183.30
M7/SY10-SY11 10 3.84 39.00 1 149.76
10 3.84 39.00 1 149.76

SY14-SY15
V M1-M2 10 7.45 30.00 1 223.50
M2-M3 10 6.40 30.00 1 192.00
M3-M4 10 4.95 30.00 1 148.50
M4-M5 10 7.80 33.00 1 257.40
M5-M6 10 7.80 33.00 1 257.40
M6-M7 10 6.90 30.00 1 207.00
M7-M8 10 9.18 30.00 1 275.25

H M1-M2 10 6.30 24.00 1 151.20


M2-M3 10 6.30 33.00 1 207.90
M3-M4 10 8.25 41.00 1 338.25
M4-M5 10 6.30 41.00 1 258.30
M5-M6 10 8.55 37.00 1 316.35
M6-M7 10 6.30 30.00 1 189.00
M7-M8 10 6.30 23.00 1 144.90

negative bar
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
SY14/M1-M8 10 4.00 242.00 1 968.00

M2/SY10-SY11 10 3.59 39.00 1 140.01


M3/SY10-SY11 10 3.59 39.00 2 280.02
M4/SY10-SY11 10 4.05 35.00 1 141.75
M5/SY10-SY11 10 5.00 35.00 0.00
M6S/SY10-SY11 10 4.70 39.00 1 183.30
M7/SY10-SY11 10 3.84 39.00 1 149.76

SY15-SY16
V M1-M2 10 7.45 30.00 1 223.50
M2-M3 10 6.40 49.00 1 313.60
M3-M4 10 4.95 30.00 1 148.50
M4-M5 10 7.80 33.00 1 257.40
M5-M6 10 7.80 19.00 1 148.20
M6-M7 10 6.90 13.00 1 89.70
10 6.91 18.00 1 124.29
M7-M8 10 7.79 30.00 1 233.70

H M1-M2 10 6.30 39.00 1 245.70


M2-M3 10 6.30 54.00 1 340.20
M3-M4 10 6.30 23.00 1 144.90
M4-M5 10 6.30 41.00 1 258.30
M5-M6 10 6.04 41.00 1 247.64
M6-M7 10 6.30 33.00 1 207.90
M7-M8 10 6.30 23.00 1 144.90

negative bar
SY15/M1-M8 10 4.00 276.00 1 1,104.00

M2/SY10-SY11 10 3.59 49.00 1 175.91


M3/SY10-SY11 10 3.59 53.00 1 190.27
M4/SY10-SY11 10 4.05 35.00 1 141.75
M5/SY10-SY11 10 5.00 20.00 1 100.00
M6S/SY10-SY11 10 4.70 22.00 1 103.40
M7/SY10-SY11 10 3.84 39.00 1 149.76

SY16-SY17
V M1-M2 10 7.45 49.00 1 365.05
M2-M3 10 6.40 49.00 1 313.60
M3-M4 10 4.95 33.00 1 163.35
M4-M5 10 7.80 33.00 1 257.40
M5-M6 10 7.80 17.00 1 132.60
M6-M7 10 6.90 13.00 1 89.70
10 6.91 18.00 1 124.29
M7-M8 10 7.79 30.00 1 233.70

HM1-M2 10 6.30 24.00 1 151.20


M2-M3 10 6.30 30.00 1 189.00
M3-M4 10 6.30 25.00 1 157.50
M4-M5 10 6.30 41.00 1 258.30
M5-M6 10 9.96 41.00 1 408.36
M6-M7 10 6.30 33.00 1 207.90
M7-M8 10 6.30 23.00 1 144.90

negative bar
SY17/M1-M8 10 4.00 276.00 1 1,104.00

M2/SY16-SY17 10 3.59 49.00 1 175.91


M3//SY16-SY17 10 3.59 49.00 1 175.91
M4//SY16-SY17 10 4.05 35.00 1 141.75
M5//SY16-SY17 10 5.00 20.00 1 100.00
M6S//SY16-SY17 10 4.70 20.00 1 94.00
M7//SY16-SY17 10 3.84 35.00 1 134.40

SY20-SY21
V M1-M2
10 7.45 12.00 1 89.40
M2-M3 10 6.40 12.00 1 76.80
M3-M4 10 4.95 12.00 1 59.40
M4-M5 10 7.80 12.00 1 93.60
M5-M6 10 7.80 12.00 1 93.60
M6-M7 10 6.90 12.00 1 82.80
M7-M8 10 9.27 12.00 1 111.24

H M1-M1'
M1-M2
10 3.84 23.00 1 88.32
M2-M3 10 3.84 23.00 1 88.32
M3-M4 10 3.84 23.00 1 88.32
M4-M5 10 3.84 23.00 1 88.32
M5-M6 10 3.84 23.00 1 88.32
M6-M7 10 3.84 23.00 1 88.32
M7-M8 10 3.84 23.00 1 88.32

negative bar
SY120/M1-M8

M1/SY19-SY20
M2/SSY19-SY20 10 3.59 13.00 1 46.67
M3/SY19-SY20 10 3.59 13.00 1 46.67
M4/SY19-SY20 10 4.05 13.00 1 52.65
M5/SY19-SY20 10 5.00 13.00 1 65.00
M6S/SY19-SY20 10 4.70 13.00 1 61.10
M7SSSY19-SY20 10 3.84 13.00 1 49.92

8th Floor
SY1-SY2
MX1-MX2 (V) 10 7.45 22.00 1 163.90
Mx-2-3 10 6.40 22.00 1 140.80
Mx-3-4 10 4.95 22.00 1 108.90
Mx-4-5 10 7.80 24.00 1 187.20
Mx-5-6 10 7.80 27.00 1 210.60

1
Mx-1-2 (H) 10 8.01 26.00 1 208.32
Mx-2-3 10 5.66 30.00 1 169.73
Mx-3-4 10 5.66 25.00 1 141.44
Mx-4-5 10 5.80 37.00 1 214.55
Mx-5-6 10 4.20 37.00 1 155.31

SY2/Mx1-Mx6 10 3.70 223.00 1 825.10

negative bar
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
H 1
MX1
MX2 10 3.59 22.00 1 78.98
MX3 10 3.59 22.00 1 78.98
MX4 10 4.05 22.00 1 89.10
MX5 10 5.00 22.00 1 110.00

SY2/Mx1-Mx6 10 3.70 223.00 1 825.10

SY2-SY3
V M1-M2 10 7.45 33.00 1 245.85
M2-M3 10 6.40 33.00 1 211.20
M3-M4 10 4.95 33.00 1 163.35
M4-M5 10 7.80 36.00 1 280.80
M5-M6 10 7.80 33.00 1 257.40
M6-M7 10 3.45 33.00 1 113.85
M7-M8 10 3.45 33.00 1 113.85

(H) M1-M2 10 6.90 28.00 1 193.20


M2-M3 10 6.90 33.00 1 227.70
M3-M4 10 6.90 23.00 1 158.70
M4-M5 10 6.90 52.00 1 358.80
M5-M6 10 6.90 46.00 1 317.40
M6-M7 10 6.33 46.00 1 291.11
M7-M8 10 34.00 1 0.00

negative bar
SY3/M1-M8 10 4.07 278.00 1 1,131.46

M2/Sy2-Sy3 10 3.59 43.00 1 154.37


M3 /Sy2-Sy3 10 3.59 43.00 1 154.37
M4 /Sy2-Sy3 10 4.05 38.00 1 153.90
M5 /Sy2-Sy3 10 5.00 38.00 1 190.00
M6/Sy2-Sy3 10 4.70 43.00 1 202.10
M6/Sy2-Sy3 10 3.85 27.00 1 103.95

SY3-SY4
V M1-M2 10 7.45 30.00 1 223.50
M2-M3 10 6.40 30.00 1 192.00
M3-M4 10 4.95 28.00 1 138.60
M4-M5 10 7.80 28.00 1 218.40
M5-M6 10 7.80 28.00 1 218.40
M6-M7 10 6.90 28.00 1 193.20
M7-M8 10 8.52 28.00 1 238.43

(H) M1-M2 10 5.90 28.00 1 165.20


M2-M3 10 5.90 33.00 1 194.70
M3-M4 10 5.90 23.00 1 135.70
M4-M5 10 5.90 52.00 1 306.80
M5-M6 10 9.52 52.00 1 495.04
M6-M7 10 5.90 46.00 1 271.40
M7-M8 10 7.70 34.00 1 261.80

negative bar
SY4/M1-M8 10 3.87 288.00 1 1,114.56

M2/Sy3-Sy4 10 3.59 36.00 1 129.24


M3 Sy3-Sy4 10 3.59 36.00 1 129.24
M4 /Sy3-Sy4 10 4.05 32.00 1 129.60
M5 /Sy3-Sy4 10 5.00 32.00 1 160.00
M6/Sy3-Sy4 10 4.70 36.00 1 169.20
M7/Sy3-Sy4 10 3.84 36.00 1 138.24
1
SY4-SY5

V M1-M2 10 7.45 30.00 1 223.50


M2-M3 10 6.40 30.00 1 192.00
M3-M4 10 4.95 14.00 1 69.30
M4-M5 10 7.80 14.00 1 109.20
10 10.20 20.00 1 204.00
M5-M6 10 7.80 13.00 1 101.40
M6-M7 10 6.90 13.00 1 89.70
10 9.05 18.00 1 162.90
M7-M8 10 8.52 33.00 1 281.01

(H) M1-M2 10 5.62 26.00 1 146.12


M2-M3 10 6.30 30.00 1 189.00
M3-M4 10 6.30 23.00 1 144.90
M4-M5 10 6.30 41.00 1 258.30
M5-M6
M6-M7 10 6.30 33.00 1 207.90
M7-M8 10 6.30 34.00 1 214.20

negative bar
SY5/M1-M8 10 4.00 228.00 1 912.00

M2/Sy4-Sy5 10 3.59 39.00 1 140.01


M3 /Sy4-Sy5 10 3.59 39.00 1 140.01
M4 //Sy4-Sy5 10 4.05 39.00 1 157.95
M5 //Sy4-Sy5 12 5.00 15.00 1 75.00
M6//Sy4-Sy5 10 4.70 17.00 1 79.90
M7//Sy4-Sy5 10 3.84 39.00 1 149.76

SY5-SY6
V M1-M2
M2-M3 10 6.45 30.00 1 193.50
M3-M4 10 4.95 30.00 1 148.50
M4-M5 10 7.80 18.00 1 140.40
10 10.20 16.00 1 163.20
M5-M6 10 7.80 18.00 1 140.40
M6-M7 10 6.90 16.00 1 110.40
10 9.05 14.00 1 126.70
M7-M8 10 7.79 30.00 1 233.70

(H) M1-M2 10 30.00 1 0.00


M2-M3 10 4.15 30.00 1 124.50
M3-M4 10 6.30 23.00 1 144.90
M4-M5 10 6.30 41.00 1 258.30
M5-M6 10 5.13 41.00 1 210.33
M6-M7 10 6.30 33.00 1 207.90
M7-M8 10 6.30 24.00 1 151.20
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
negative bar
SY6/M2-M3 10 3.00 24.00 1 72.00
SY6/M3-M8 10 4.00 154.00 1 616.00

M2/Sy5-Sy6 12 2.50 24.00 1 60.00


M3 /Sy5-Sy6 10 3.59 39.00 1 140.01
M4 //Sy5-Sy6 10 4.05 35.00 1 141.75
M5 //Sy5-Sy6 12 5.00 18.00 1 90.00
M6//Sy5-Sy6 10 4.70 20.00 1 94.00
M7//Sy5-Sy6 10 3.84 39.00 1 149.76

SY6 SY7
V M1-M2 10 0.00
M1-M3 10 0.00
M3-M4 10 6.13 33.00 1 202.29
M4-M5 10 7.80 30.00 1 234.00
M5-M6 10 7.80 33.00 1 257.40
M6-M7 10 6.90 30.00 1 207.00
9.97 M7-M8 10 8.88 30.00 1 266.40

(H) M1-M2
M2-M3 10 6.30 11.00 1 69.30
M3-M4 10 6.30 23.00 1 144.90
M4-M5 10 6.30 41.00 1 258.30
M5-M6 10 8.25 41.00 1 338.25
M6-M7 10 6.30 33.00 1 207.90
M7-M8 10 6.30 24.00 1 151.20

negative bar
SY7/M1-M8 10 4.00 219.00 1 876.00

M3/Sy6-Sy7 12 3.03 49.00 1 148.23


M4/Sy6-Sy7 10 4.05 35.00 1 141.75
M5/Sy6-Sy7 10 5.00 35.00 1 175.00
M6/Sy6-Sy7 10 4.70 39.00 1 183.30
M7/Sy6-Sy7 10 3.84 39.00 1 149.76
1

SY7- SY8 6.355


V M2-M3 10 6.58 30.00 1 197.40
M4-M5 10 10.55 33.00 1 348.15
M5-M6 10 7.80 33.00 1 257.40
M6-M7 10 9.65 30.00 1 289.50
M7-M8 10 7.79 30.00 1 233.70

3.985 H M2-M3 10 6.30 11.00 1 69.30


M3-M4 10 6.30 23.00 1 144.90
M4-M5 10 6.30 41.00 1 258.30
M5-M6 10 8.55 41.00 1 350.55
M6-M7 10 6.30 33.00 1 207.90
M7-M8 10 6.30 24.00 1 151.20

negative bar
SY8/M1-M8 10 4.00 217.00 1 868.00

M3/SY7-SY8 12 3.02 49.00 1 147.98


M4/SY7-SY8 10 4.05 35.00 1 141.75
M5/SY7-SY8 10 5.00 35.00 1 175.00
M6/SY7-SY8 10 4.70 39.00 1 183.30
M7/SY7-SY8 10 3.84 39.00 1 149.76

SY8-SY9
V M1-M2
M2-M3 10 5.78 30.00 1 173.28
M3-M4 10 4.95 30.00 1 148.50
M4-M5 10 10.55 33.00 1 348.15
M5-M6 10 7.80 33.00 0.00
M6-M7 10 6.90 30.00 1 207.00
M7-M8 10 7.79 30.00 1 233.70

H M2-M3 10 8.60 30.00 1 258.00


M3-M4 10 6.30 23.00 1 144.90
M4-M5 10 6.30 44.00 1 277.20
M5-M6 10 6.30 41.00 1 258.30
M6-M7 10 6.30 33.00 1 207.90
M7-M8 10 6.30 24.00 1 151.20

negative bar
SY9/M1-M8 10 4.00 259.00 1 1,036.00

M2/SY8-SY9 12 3.59 19.00 1 68.21


M3/SY8-SY9 12 3.59 49.00 1 175.91
M4/SY8-SY9 10 4.05 35.00 1 141.75
M5/SY8-SY10 10 5.00 35.00 1 175.00
M6/SY8-SY11 10 4.70 39.00 1 183.30
M7/SY8-SY9 10 3.84 39.00 1 149.76

SY9-SY10
5.35 V M1-M2 10 7.45 30.00 1 223.50
M2-M3 10 6.40 30.00 1 192.00
M3-M4 10 4.95 30.00 1 148.50
M4-M5 10 10.55 33.00 1 348.15
M5-M6 10 7.80 33.00 1 257.40
M6-M7 10 6.90 30.00 1 207.00
M7-M8 10 7.78 30.00 1 233.40

H M1-M2 10 4.62 32.00 1 147.84


M2-M3 10 6.30 30.00 1 189.00
M3-M4 10 6.30 23.00 1 144.90
M4-M5 10 6.30 41.00 1 258.30
M5-M6 10 8.85 41.00 1 362.85
M6-M7 10 6.30 33.00 1 207.90
M7-M8 10 6.30 24.00 1 151.20

negative bar
SY10/M1-M8 10 3.88 189.00 1 733.32
12 3.88 56.00 1 217.28

M2/SY9-SY10 12 3.59 49.00 1 175.91


M3/SY9-SY10 12 3.59 49.00 1 175.91
M4/SY9-SY10 10 4.05 35.00 1 141.75
M5/SY9-SY10 10 5.00 35.00 1 175.00
M6SY9-SY10 10 4.70 39.00 1 183.30
M7/SY9-SY10 10 3.84 39.00 1 149.76
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
SY10-SY11
V M1-M2 10 3.45 34.00 1 117.30
M2-M3
M3-M4
M4-M5 10 3.35 29.00 1 97.15
M5-M6 10 7.80 46.00 1 358.80
10 9.13 21.00 1 191.73
M6-M7 10 6.90 21.00 1 144.90
10 3.35 29.00 1 97.15
M7-M8 10 9.79 34.00 1 332.86

H M1-M2 10 8.09 10.00 1 80.85


M2-M3
M3-M4
M4-M5 10 8.09 10.00 1 80.85
M5-M6 10 8.09 3.00 1 24.26
M6-M7 10 8.09 12.00 1 97.02
M7-M8 10 8.09 32.00 1 258.72

negative bar
M2/SY10-SY11
M3/SY10-SY11
M4/SY10-SY11 10 4.12 15.00 1 61.80
M5/SY10-SY11 10 1 0.00
M6S/SY10-SY11 10 4.70 15.00 1 70.50
M7/SY10-SY11 10 3.76 37.00 1 139.12

SY11'-SY12
V M1-M2 10 3.10 28.00 1 86.80
M2-M3
M3-M4
M4-M5 10 3.15 20.00 1 63.00
10 9.13 17.00 1 155.21
M5-M6 1
M6-M7 10 6.90 39.00 1 269.10
10 3.80 17.00 1 64.60
M7-M8 10 9.79 37.00 1 362.23

H M1-M2 10 8.09 9.00 1 72.77


M2-M3
M3-M4 5.50
M4-M5 10 8.09 11.00 1 88.94
M5-M6 10 2.94 46.00 1 135.24
M6-M7 10 2.94 35.00 1 102.90
10 8.09 13.00 1 105.11
M7-M8 10 8.09 34.00 1 274.89

negative bar
SY12/M1-M8 10 3.88 193.00 1 748.84

M2/SY10-SY11 10 3.59 37.00 1 132.83


M3/SY10-SY11 10 3.59 37.00 1 132.83
M4/SY10-SY11 10 4.05 32.00 1 129.60
M5/SY10-SY11 10 4.12 11.00 1 45.32
M6S/SY10-SY11 10 4.70 11.00 1 51.70
M7/SY10-SY11 10 3.76 35.00 1 131.60

SY12-SY13
V M1-M2 10 5.22 33.00 1 172.26
M2-M3
M3-M4
M4-M5 10 3.35 33.00 1 110.55
M5-M6
M6-M7 10 3.35 42.00 1 140.70
M7-M8

H M1-M2 10 8.09 16.00 1 129.36


M2-M3
M3-M4
M4-M5 10 8.09 13.00 1 105.11
M5-M6
M6-M7 10 8.05 13.00 1 104.65
M7-M8

negative bar
SY12/M1-M8 10 3.89 46.00 1 178.71

SY13-SY14
V M1-M2 10 5.22 33.00 1 172.26
M2-M3
M3-M4
M4-M5 10 3.35 33.00 1 110.55
M5-M6
M6-M7 10 3.35 42.00 1 140.70
M7-M8

H M1-M2 10 8.09 16.00 1 129.36


M2-M3
M3-M4
M4-M5 10 8.09 13.00 1 105.11
M5-M6
M6-M7 10 8.05 13.00 1 104.65
M7-M8 10 8.55 34.00 1 290.70

negative bar
SY12/M1-M8 10 4.00 78.00 1 312.00

M2/SY10-SY11
M3/SY10-SY11
M4/SY10-SY11
M5/SY10-SY11
M6S/SY10-SY11
M7/SY10-SY11 10 3.76 39.00 1 146.64

SY14-SY15
V M1-M2 10 5.22 33.00 1 172.26
M2-M3
M3-M4
M4-M5 10 3.35 33.00 1 110.55
M5-M6
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
M6-M7 10 3.35 42.00 1 140.70
M7-M8

H M1-M2 10 8.09 16.00 1 129.36


M2-M3
M3-M4
M4-M5 10 8.09 13.00 1 105.11
M5-M6
M6-M7 10 8.05 13.00 1 104.65
M7-M8 10 8.55 34.00 1 290.70

negative bar
SY12/M1-M8 10 4.00 78.00 1 312.00

M2/SY10-SY11
M3/SY10-SY11
M4/SY10-SY11
M5/SY10-SY11
M6S/SY10-SY11
M7/SY10-SY11 10 3.76 39.00 1 146.64

SY15-SY16
V M1-M2 10 5.22 33.00 1 172.26
M2-M3
M3-M4
M4-M5 10 3.35 33.00 1 110.55
M5-M6 10 9.11 33.00 1 300.63
M6-M7 10 6.90 18.00 1 124.20
10 9.05 13.00 1 117.65
M7-M8 10 7.80 33.00 1 257.40

H M1-M2 10 8.09 10.00 1 80.85


M2-M3
M3-M4
M4-M5 10 6.30 10.00 1 63.00
M5-M6 10 6.04 41.00 1 247.64
M6-M7 10 8.85 46.00 1 407.10
M7-M8 10 6.30 34.00 1 214.20

negative bar
SY12/M1-M8 10 4.00 99.00 1 396.00

M2/SY10-SY11
M3/SY10-SY11
M4/SY10-SY11 10 4.10 21.00 1 86.10
10 2.68 15.00 1 40.20
M5/SY10-SY11
M6S/SY10-SY11 10 4.70 20.00 1 94.00
M7/SY10-SY11 10 3.84 39.00 1 149.76

SY16-SY17
V M1-M2 10 3.55 33.00 1 117.15
M2-M3
M3-M4
M4-M5 10 2.68 20.00 1 53.60
10 9.11 16.00 1 145.76
M5-M6
M6-M7 10 9.05 18.00 1 162.90
10 6.90 13.00 1 89.70
M7-M8 10 7.90 30.00 1 237.00

H M1-M2 10 8.09 16.00 1 129.36


M2-M3
M3-M4
M4-M5 10 8.55 13.00 1 111.15
M5-M6 10 5.43 41.00 1 222.63
M6-M7 10 8.05 13.00 1 104.65
M7-M8 10 8.55 34.00 1 290.70

negative bar
SY12/M1-M8

M2/SY10-SY11
M3/SY10-SY11
M4/SY10-SY11
M5/SY10-SY11 10 4.10 15.00 1 61.50
M6S/SY10-SY11 10 4.70 15.00 1 70.50
M7/SY10-SY11 10 3.76 39.00 1 146.64

9th Floor
SY1-SY2
MX1-MX2 (V) 10 7.45 22.00 1 163.90
Mx-2-3 10 6.40 22.00 1 140.80
Mx-3-4 10 4.95 22.00 1 108.90
Mx-4-5 10 7.80 24.00 1 187.20
Mx-5-6 10 7.80 27.00 1 210.60

1
Mx-1-2 (H) 10 8.01 26.00 1 208.32
Mx-2-3 10 5.66 30.00 1 169.73
Mx-3-4 10 5.66 25.00 1 141.44
Mx-4-5 10 5.80 37.00 1 214.55
Mx-5-6 10 4.20 37.00 1 155.31

SY2/Mx1-Mx6 10 3.70 223.00 1 825.10

negative bar
H 1
MX1
MX2 10 3.59 22.00 1 78.98
MX3 10 3.59 22.00 1 78.98
MX4 10 4.05 22.00 1 89.10
MX5 10 5.00 22.00 1 110.00

SY2/Mx1-Mx6 10 3.70 223.00 1 825.10

SY2-SY3
V M1-M2 10 7.45 33.00 1 245.85
M2-M3 10 6.40 33.00 1 211.20
M3-M4 10 4.95 33.00 1 163.35
M4-M5 10 7.80 36.00 1 280.80
M5-M6 10 7.80 33.00 1 257.40
M6-M7 10 3.45 33.00 1 113.85
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
M7-M8 10 3.45 33.00 1 113.85

(H) M1-M2 10 6.90 28.00 1 193.20


M2-M3 10 6.90 33.00 1 227.70
M3-M4 10 6.90 23.00 1 158.70
M4-M5 10 6.90 52.00 1 358.80
M5-M6 10 6.90 46.00 1 317.40
M6-M7 10 6.33 46.00 1 291.11
M7-M8 10 34.00 1 0.00

negative bar
SY3/M1-M8 10 4.07 278.00 1 1,131.46

M2/Sy2-Sy3 10 3.59 43.00 1 154.37


M3 /Sy2-Sy3 10 3.59 43.00 1 154.37
M4 /Sy2-Sy3 10 4.05 38.00 1 153.90
M5 /Sy2-Sy3 10 5.00 38.00 1 190.00
M6/Sy2-Sy3 10 4.70 43.00 1 202.10
M6/Sy2-Sy3 10 3.85 27.00 1 103.95

SY3-SY4
V M1-M2 10 7.45 30.00 1 223.50
M2-M3 10 6.40 30.00 1 192.00
M3-M4 10 4.95 28.00 1 138.60
M4-M5 10 7.80 28.00 1 218.40
M5-M6 10 7.80 28.00 1 218.40
M6-M7 10 6.90 28.00 1 193.20
M7-M8 10 8.52 28.00 1 238.43

(H) M1-M2 10 5.90 28.00 1 165.20


M2-M3 10 5.90 33.00 1 194.70
M3-M4 10 5.90 23.00 1 135.70
M4-M5 10 5.90 52.00 1 306.80
M5-M6 10 9.52 52.00 1 495.04
M6-M7 10 5.90 46.00 1 271.40
M7-M8 10 7.70 34.00 1 261.80

negative bar
SY4/M1-M8 10 3.87 288.00 1 1,114.56

M2/Sy3-Sy4 10 3.59 36.00 1 129.24


M3 Sy3-Sy4 10 3.59 36.00 1 129.24
M4 /Sy3-Sy4 10 4.05 32.00 1 129.60
M5 /Sy3-Sy4 10 5.00 32.00 1 160.00
M6/Sy3-Sy4 10 4.70 36.00 1 169.20
M7/Sy3-Sy4 10 3.84 36.00 1 138.24
1
SY4-SY5

V M1-M2 10 7.45 30.00 1 223.50


M2-M3 10 6.40 30.00 1 192.00
M3-M4 10 4.95 14.00 1 69.30
M4-M5 10 7.80 14.00 1 109.20
10 10.20 20.00 1 204.00
M5-M6 10 7.80 13.00 1 101.40
M6-M7 10 6.90 13.00 1 89.70
10 9.05 18.00 1 162.90
M7-M8 10 8.52 33.00 1 281.01

(H) M1-M2 10 5.62 26.00 1 146.12


M2-M3 10 6.30 30.00 1 189.00
M3-M4 10 6.30 23.00 1 144.90
M4-M5 10 6.30 41.00 1 258.30
M5-M6
M6-M7 10 6.30 33.00 1 207.90
M7-M8 10 6.30 34.00 1 214.20

negative bar
SY5/M1-M8 10 4.00 228.00 1 912.00

M2/Sy4-Sy5 10 3.59 39.00 1 140.01


M3 /Sy4-Sy5 10 3.59 39.00 1 140.01
M4 //Sy4-Sy5 10 4.05 39.00 1 157.95
M5 //Sy4-Sy5 12 5.00 15.00 1 75.00
M6//Sy4-Sy5 10 4.70 17.00 1 79.90
M7//Sy4-Sy5 10 3.84 39.00 1 149.76

SY5-SY6
V M1-M2
M2-M3 10 6.45 30.00 1 193.50
M3-M4 10 4.95 30.00 1 148.50
M4-M5 10 7.80 18.00 1 140.40
10 10.20 16.00 1 163.20
M5-M6 10 7.80 18.00 1 140.40
M6-M7 10 6.90 16.00 1 110.40
10 9.05 14.00 1 126.70
M7-M8 10 7.79 30.00 1 233.70

(H) M1-M2 10 30.00 1 0.00


M2-M3 10 4.15 30.00 1 124.50
M3-M4 10 6.30 23.00 1 144.90
M4-M5 10 6.30 41.00 1 258.30
M5-M6 10 5.13 41.00 1 210.33
M6-M7 10 6.30 33.00 1 207.90
M7-M8 10 6.30 24.00 1 151.20

negative bar
SY6/M2-M3 10 3.00 24.00 1 72.00
SY6/M3-M8 10 4.00 154.00 1 616.00

M2/Sy5-Sy6 12 2.50 24.00 1 60.00


M3 /Sy5-Sy6 10 3.59 39.00 1 140.01
M4 //Sy5-Sy6 10 4.05 35.00 1 141.75
M5 //Sy5-Sy6 12 5.00 18.00 1 90.00
M6//Sy5-Sy6 10 4.70 20.00 1 94.00
M7//Sy5-Sy6 10 3.84 39.00 1 149.76

SY6 SY7
V M1-M2 10 0.00
M1-M3 10 0.00
M3-M4 10 6.13 33.00 1 202.29
M4-M5 10 7.80 30.00 1 234.00
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
M5-M6 10 7.80 33.00 1 257.40
M6-M7 10 6.90 30.00 1 207.00
9.97 M7-M8 10 8.88 30.00 1 266.40

(H) M1-M2
M2-M3 10 6.30 11.00 1 69.30
M3-M4 10 6.30 23.00 1 144.90
M4-M5 10 6.30 41.00 1 258.30
M5-M6 10 8.25 41.00 1 338.25
M6-M7 10 6.30 33.00 1 207.90
M7-M8 10 6.30 24.00 1 151.20

negative bar
SY7/M1-M8 10 4.00 219.00 1 876.00

M3/Sy6-Sy7 12 3.03 49.00 1 148.23


M4/Sy6-Sy7 10 4.05 35.00 1 141.75
M5/Sy6-Sy7 10 5.00 35.00 1 175.00
M6/Sy6-Sy7 10 4.70 39.00 1 183.30
M7/Sy6-Sy7 10 3.84 39.00 1 149.76
1

SY7- SY8 6.355


V M2-M3 10 6.58 30.00 1 197.40
M4-M5 10 10.55 33.00 1 348.15
M5-M6 10 7.80 33.00 1 257.40
M6-M7 10 9.65 30.00 1 289.50
M7-M8 10 7.79 30.00 1 233.70

3.985 H M2-M3 10 6.30 11.00 1 69.30


M3-M4 10 6.30 23.00 1 144.90
M4-M5 10 6.30 41.00 1 258.30
M5-M6 10 8.55 41.00 1 350.55
M6-M7 10 6.30 33.00 1 207.90
M7-M8 10 6.30 24.00 1 151.20

negative bar
SY8/M1-M8 10 4.00 217.00 1 868.00

M3/SY7-SY8 12 3.02 49.00 1 147.98


M4/SY7-SY8 10 4.05 35.00 1 141.75
M5/SY7-SY8 10 5.00 35.00 1 175.00
M6/SY7-SY8 10 4.70 39.00 1 183.30
M7/SY7-SY8 10 3.84 39.00 1 149.76

SY8-SY9
V M1-M2
M2-M3 10 5.78 30.00 1 173.28
M3-M4 10 4.95 30.00 1 148.50
M4-M5 10 10.55 33.00 1 348.15
M5-M6 10 7.80 33.00 0.00
M6-M7 10 6.90 30.00 1 207.00
M7-M8 10 7.79 30.00 1 233.70

H M2-M3 10 8.60 30.00 1 258.00


M3-M4 10 6.30 23.00 1 144.90
M4-M5 10 6.30 44.00 1 277.20
M5-M6 10 6.30 41.00 1 258.30
M6-M7 10 6.30 33.00 1 207.90
M7-M8 10 6.30 24.00 1 151.20

negative bar
SY9/M1-M8 10 4.00 259.00 1 1,036.00

M2/SY8-SY9 12 3.59 19.00 1 68.21


M3/SY8-SY9 12 3.59 49.00 1 175.91
M4/SY8-SY9 10 4.05 35.00 1 141.75
M5/SY8-SY10 10 5.00 35.00 1 175.00
M6/SY8-SY11 10 4.70 39.00 1 183.30
M7/SY8-SY9 10 3.84 39.00 1 149.76

SY9-SY10
5.35 V M1-M2 10 7.45 30.00 1 223.50
M2-M3 10 6.40 30.00 1 192.00
M3-M4 10 4.95 30.00 1 148.50
M4-M5 10 10.55 33.00 1 348.15
M5-M6 10 7.80 33.00 1 257.40
M6-M7 10 6.90 30.00 1 207.00
M7-M8 10 7.78 30.00 1 233.40

H M1-M2 10 4.62 32.00 1 147.84


M2-M3 10 6.30 30.00 1 189.00
M3-M4 10 6.30 23.00 1 144.90
M4-M5 10 6.30 41.00 1 258.30
M5-M6 10 8.85 41.00 1 362.85
M6-M7 10 6.30 33.00 1 207.90
M7-M8 10 6.30 24.00 1 151.20

negative bar
SY10/M1-M8 10 3.88 189.00 1 733.32
12 3.88 56.00 1 217.28

M2/SY9-SY10 12 3.59 49.00 1 175.91


M3/SY9-SY10 12 3.59 49.00 1 175.91
M4/SY9-SY10 10 4.05 35.00 1 141.75
M5/SY9-SY10 10 5.00 35.00 1 175.00
M6SY9-SY10 10 4.70 39.00 1 183.30
M7/SY9-SY10 10 3.84 39.00 1 149.76

SY10-SY11
V M1-M2 10 3.45 34.00 1 117.30
M2-M3
M3-M4
M4-M5 10 3.35 29.00 1 97.15
M5-M6 10 7.80 46.00 1 358.80
10 9.13 21.00 1 191.73
M6-M7 10 6.90 21.00 1 144.90
10 3.35 29.00 1 97.15
M7-M8 10 9.79 34.00 1 332.86

H M1-M2 10 8.09 10.00 1 80.85


M2-M3
M3-M4
M4-M5 10 8.09 10.00 1 80.85
M5-M6 10 8.09 3.00 1 24.26
M6-M7 10 8.09 12.00 1 97.02
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
M7-M8 10 8.09 32.00 1 258.72

negative bar
M2/SY10-SY11
M3/SY10-SY11
M4/SY10-SY11 10 4.12 15.00 1 61.80
M5/SY10-SY11 10 1 0.00
M6S/SY10-SY11 10 4.70 15.00 1 70.50
M7/SY10-SY11 10 3.76 37.00 1 139.12

SY11'-SY12
V M1-M2 10 3.10 28.00 1 86.80
M2-M3
M3-M4
M4-M5 10 3.15 20.00 1 63.00

M5-M6 10 9.13 9.00 1 82.17


M6-M7 10 6.90 9.00 1 62.10
10 2.18 30.00 1 65.25
M7-M8 10 9.76 9.00 1 87.84
10 11.57 27.00 1 312.39

H M1-M2 10 8.09 6.00 1 48.51


M2-M3
M3-M4
M4-M5
M5-M6 10 2.94 46.00 1 135.24
M6-M7 10 2.94 30.00 1 88.20
10 8.09 13.00 1 105.11
M7-M8 10 9.79 9.00 1 88.11
10 8.31 28.00 1 232.60

negative bar
SY12/M1-M8 10 1 0.00

M2/SY10-SY11
M3/SY10-SY11
M4/SY10-SY11
M5/SY10-SY11
M6S/SY10-SY11
M7/SY10-SY11 10 3.76 32.00 1 120.32

SY11'-SY12
V M1-M2 10 4.05 28.00 1 113.40
M2-M3
M3-M4
M4-M5

M5-M6
M6-M7

M6-M8 10 9.62 28.00 1 269.36

2.014 H M1-M2 10 8.09 11.00 1 88.94


M2-M3
M3-M4
M4-M5
M5-M6
M6-M7 10 8.09 12.00 1 97.02

M7-M8 10 8.09 34.00 1 274.89

negative bar
SY12/M1-M8 10 3.89 59.00 1 229.21

M2/SY10-SY11
M3/SY10-SY11
M4/SY10-SY11
M5/SY10-SY11
M6S/SY10-SY11
M7/SY10-SY11 10 3.76 37.00 1 139.12

SY12-SY13
V M1-M2 10 4.06 37.00 1 150.04
M2-M3
M3-M4
M4-M5
M5-M6
M6-M7
M7-M8 10 10.70 37.00 1 395.90

H M1-M2 10 6.30 16.00 1 100.80


M2-M3
M3-M4
M4-M5
M5-M6
M6-M7 10 6.30 15.00 1 94.50
M7-M8 10 6.30 36.00 1 226.80

negative bar
SY12/M1-M8 10 4.00 46.00 1 184.00

SY13-SY14
V M1-M2 10 4.05 37.00 1 149.85
M2-M3
M3-M4
M4-M5 1
M5-M6
M6-M7 1
M7-M8 10 9.62 30.00 0.00

H M1-M2 10 6.30 10.00 1 63.00


M2-M3
M3-M4
M4-M5
M5-M6
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
M6-M7
M6-M8 10 6.30 49.00 1 308.70

negative bar
SY14/M1-M8 10 4.00 59.00 1 236.00

M2/SY10-SY11
M3/SY10-SY11
M4/SY10-SY11
M5/SY10-SY11
M6S/SY10-SY11
M7/SY10-SY11 10 3.76 39.00 1 146.64

SY14-SY15
V M1-M2 10 4.05 33.00 1 133.65
M2-M3
M3-M4
M4-M5
M5-M6
M6-M7
M7-M8 10 9.63 42.00 1 404.25

H M1-M2 10 6.30 12.00 1 75.60


M2-M3
M3-M4
M4-M5 1
M5-M6
M6-M7 10 6.30 13.00 1 81.90
M7-M8 10 6.30 34.00 1 214.20

negative bar
SY15/M1-M8 10 4.00 59.00 1 236.00

M2/SY10-SY11
M3/SY10-SY11
M4/SY10-SY11
M5/SY10-SY11
M6S/SY10-SY11
M7/SY10-SY11 10 3.76 39.00 1 146.64

SY15-SY16
V M1-M2 10 4.05 33.00 1 133.72
M2-M3
M3-M4
M4-M5
M5-M6 10 8.43 20.00 1 168.60
M6-M7 10 6.90 15.00 1 103.50
10 9.05 16.00 1 144.80
M7-M8 10 7.80 30.00 1 234.00

H M1-M2 10 8.85 12.00 1 106.20


M2-M3
M3-M4
M4-M5
M5-M6 10 6.04 41.00 1 247.64
M6-M7 10 8.85 33.00 1 292.05
M7-M8 10 6.30 24.00 1 151.20

negative bar
SY12/M1-M8 10 4.00 80.00 1 320.00

M2/SY10-SY11
M3/SY10-SY11
M4/SY10-SY11

M5/SY10-SY11 10 3.42 17.00 1 58.14


M6S/SY10-SY11 10 4.70 17.00 1 79.90
M7/SY10-SY11 10 3.84 39.00 1 149.76

SY16-SY17
V M1-M2 10 3.55 33.00 1 117.15
M2-M3
M3-M4
M4-M5
M5-M6 10 8.43 13.00 1 109.59
M6-M7 10 9.05 18.00 1 162.90
10 6.90 13.00 1 89.70
M7-M8 10 7.90 30.00 1 237.00

H M1-M2 10 8.23 4.00 1 32.92


M2-M3
M3-M4
M4-M5
M5-M6 10 6.43 41.00 1 263.63
M6-M7 10 9.85 33.00 1 325.05
M7-M8 10 9.85 24.00 1 236.40

negative bar
SY12/M1-M8

M2/SY10-SY11
M3/SY10-SY11
M4/SY10-SY11
M5/SY10-SY11 10 3.42 15.00 1 51.30
M6S/SY10-SY11 10 4.70 15.00 1 70.50
M7/SY10-SY11 10 3.84 39.00 1 149.76

Staircase
Staircase -1

Staircase -1
1 12 7.50 13.00 34 3,315.00
2 12 3.50 13.00 34 1,547.00
3 12 2.20 13.00 34 972.40
4 12 2.40 13.00 34 1,060.80
5 12 3.50 13.00 34 1,547.00
8 1.50 8.00 340 4,080.00
8 1.50 15.00 34 765.00

Staircase -2
1 14 7.00 8.00 17 952.00
2 14 2.55 8.00 17 346.80
3 14 1.80 8.00 17 244.80
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
4 8 1.00 8.00 17 136.00
5 8 1.20 8.00 17 163.20
3.4 8 1.20 23.00 17 469.20

1 14 7.00 8.00 51 2,856.00


2 14 2.55 8.00 51 1,040.40
3 14 1.80 8.00 51 734.40
4 8 1.00 8.00 51 408.00
5 8 1.20 8.00 51 489.60
3.4 8 1.20 23.00 51 1,407.60

Staircase -2
1 14 7.00 8.00 21 1,176.00
2 14 2.55 8.00 21 428.40
3 14 1.80 8.00 21 302.40
4 8 1.00 10.00 21 210.00
5 8 1.20 10.00 21 252.00
8 1.20 23.00 21 579.60
6 16 1.70 8.00 21 285.60
7 14 4.60 8.00 21 772.80

4 8 1.00 10.00 21 210.00


5 8 1.20 10.00 21 252.00
8 1.20 23.00 21 579.60
8 14 6.00 8.00 21 1,008.00
9 14 2.60 8.00 21 436.80
10 14 1.70 8.00 21 285.60
11 14 3.20 8.00 21 537.60
14 14 4.50 8.00 21 756.00

Staircase -3

1 12 7.30 9.00 1 65.70


2 12 2.40 9.00 1 21.60
3 12 1.80 9.00 1 16.20
4 8 1.00 10.00 1 10.00
5 8 1.40 10.00 1 14.00
8 1.40 23.00 1 32.20
6 16 1.70 9.00 1 15.30
7 14 4.60 9.00 1 41.40

4 8 1.10 10.00 1 11.00


5 8 1.40 10.00 1 14.00
8 1.40 23.00 1 32.20
8 14 6.00 9.00 1 54.00
9 14 2.60 9.00 1 23.40
10 14 1.70 9.00 1 15.30
11 14 3.20 9.00 1 28.80
12 14 2.80 9.00 1 25.20

Staircase -3

1 12 7.30 9.00 1 65.70


2 12 2.40 9.00 1 21.60
3 12 1.80 9.00 1 16.20
4 8 1.00 10.00 1 10.00
5 8 1.20 10.00 1 12.00
8 1.20 23.00 1 27.60
6 16 1.70 9.00 1 15.30
7 14 4.60 9.00 1 41.40

4 8 1.15 10.00 1 11.50


5 8 1.40 10.00 1 14.00
8 1.40 23.00 1 32.20
8 14 6.30 9.00 1 56.70
9 14 2.60 9.00 1 23.40
10 14 1.70 9.00 1 15.30
11 14 3.40 9.00 1 30.60
12 14 4.90 9.00 1 44.10
0.00 #REF! 721,939.27 #REF! 12,277.60 173,444.29 #REF! 1,709.92 0.00 0.00
0.22 0.395 0.617 0.888 1.208 1.578 2.468 3.551 4.831 5.571
Weight per M 0.00 #REF! 445,436.528 #REF! 14,831.341 273,695.098 #REF! 6,071.926 0.000 0.000
Add 5% wastage 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05
Total weight (kg) 0.00 #REF! 467,708.35 #REF! 15,572.91 287,379.85 #REF! 6,375.52 0.00 0.00
the depth of the foundation 3. something or
1 2.4 ??

fill Shall be prepared when we get enough


2 information

Ramp gare yalew beam doublle new weys


Retaining Wall Section

Retaining Wall missed


Basment beam

Ar ground floor
strong room need special treatment

30.9 9
19.8 6
19.8 6
20.25 6
90.75 27 3.36111111111111

6,700,000.00
6,700,000.00 6 1,116,666.67
2550

795813.356521739 748905.36
5.4 0.941056535257513
3.3
45.24
1.8
2.6
Wall 1.89
living 38.95 17 662.15
kit 20.06 17 341.02
bed 27.04 17 459.68
bed 2 5.72 17 97.24
TAKE-OFF SHEET
PROJECT:- B+G+8 Mixed Use building PAGE
CLIENT:- DATE
TIM DIM SQ DESCRIPTION TIM
DIVISION -4 MASONARY
3.01, 20 cm block
Basement Floor -4
1 28.3 L=5.2+4.20+3.5+5.20+5.20+5
2.75
77.825 -6
deduct door
-2 0.9 D2
2.1 -2
-3.78
block under the slab
1 7.35 L=5.8+1.55 -6
3.02
22.197
Ground floor -2
block under beam
L=4.20+3.44+5.20+5.4+5.4+5+5.20+5.20+5+
1 54.77 5.4+3.53+1.80
3.39
185.67 2
deduct Openings
-1 0.6 W1
1.5
-0.9

-1 2 W2 1
0.6
-1.2
-1 0.99 W3
0.6 1
-0.594
-2 0.9 D2
2.1
-3.78 1
block under the slab
1 15.25 L=3.84+2.26+9.15
3.66 -2
55.815
-1 0.9 D2
2.1 -5
-1.89
-1 0.7 D1
2.1 -3
-1.47
-2 0.6 W1
1.5 -1
-1.8

-1
First Floor & Second floor
block under beam
L=5.4+4.2+5.2+5.2+5.4+5.4+5.2+5+5+5.2+5.
2 82.78 2+5+5.4+3.53+3.53+3.53+5.39 -1
2.75
455.29
TAKE-OFF SHEET
PROJECT:- B+G+8 Mixed Use building PAGE
CLIENT:- DATE
TIM DIM SQ DESCRIPTION TIM
Fourth, fifth , six -3
L=5.4+4.2+7+5.4+5.2+5.4+5+5.175+2.4+2+5
3 77.71 +5+5.2+5+5.4+3.53+1.4
2.75
641.06625 -1
deduct Openings
-15 2 W2
0.6
-18 1
-3 0.99 W3
0.6
-1.782 -12
-9 1.5 W13
1.2
-16.2
-3 2.82 W38 1
0.6
-5.076

seventh Floor
L=5.4+4.2+7+5.4+2.7+5.2+0.4+0.4+5+10+5.
1 66.23 2+5+5.4+3.53+1.4 1
2.75
182.1325
deduct Openings -5
-5 2 W2
0.6
-6 -1
-1 0.99 W3
0.6
-0.594
-3 1.5 W13 1
1.2
-5.4
-1 2.82 W38
0.6
-1.692
Eight Floor 1
L=5.4+4.2+7+5.4+2.7+5.2+0.4+0.4+5+10+5.
1 61.23 2+5.4+3.53+1.4
2.75
168.3825
deduct Openings -1
-5 2 W2
0.6
-6

-1 0.99 W3 1
0.6
-0.594
TAKE-OFF SHEET

PROJECT:- B+G+8 Mixed Use building PAGE


CLIENT:- DATE
TIM DIM SQ DESCRIPTION TIM
-1 0.7 D1 -2
2.1
-1.47
-3 0.9 D2 -1
2.1
-5.67
-1 2 D5 -2
2.1
-4.2
-2 0.6 W1 -1
1.5
-1.8
First Floor

L=5.8+7.51+4+5.2+3.4+5.4+5.2+3.4+5.4+2.5
+5.4+12.2+5.4+1.53+1.53+2.7+1.25+1.25+1
.25+1.832+5.2+5.2+7.89+5.2+5.4+2.884+3.
1 116.992 066 3
2.86
334.59712
deduct door -18
-1 1 D3
2.1
-2.1 -3
-5 0.9 D2
2.1
-9.45

-1 2 D5 1
2.1
-4.2
Second Floor -6

L=5.8+3.2+1.611+3.74+2.7+15+7.8+7.8+7+7
+8+11.2+5.6+5+5.2+5+5.6+6+12+10.4+3.8+
1 146.10 1.25+1.25+1.25+2.9
2.86
417.85 -1
-8 0.9 D2
2.1
-15.12
-1 2 D5 1
2.1
-4.2
Third floor

L=5.8+7.51+1.6+3.74+3.25+7.99+3.65+8.2+
+0.95+0.95+1.85+1.85+5.2+5.2+5.4+1.81+1
.25+1.25+1.25+5.2+2.9+6.2+6.3+5.6+5+5+5
1 132.79 .85+1.5+2.7+5.4+5.4+3.52+3.52 1
2.86
379.78
deduct Openings
-7 0.9 D2 -4
2.1
-13.23
-1 1.2 D4 -1
2.1
-2.52
-1 2 D5 -1
2.1
-4.2
W1
-1 1.5 1
0.6
-0.9

TAKE-OFF SHEET
PROJECT:- B+G+8 Mixed Use building PAGE
CLIENT:- DATE
TIM DIM SQ DESCRIPTION TIM
c, 10cm thick
Basement floor 1
1 0.45 L=0.45
3.02
1.4 ml
Ground Floor -8
L=3.075+2.8+3.5+3.16+1.420+2.01+2.01+0.
1 18.425 45
3.66
67.4355
Deduct 1
-6 0.7 D1
2.1
-8.82
First Floor -1
L=2.9+3.210+1.528+1.528+1.61+0.45+3.16+
1 19.386 1.5+3.5
3.02
58.55
Deduct
-7 0.7 D1

2.1 1
-10.29
Second floor
1 17.99 L=6.25+1.52+1.52+2.975+2.724+1.5+1.5 1
3.02
54.32678
Deduct 17
-8 0.7 D1

2.1
-11.76
Third floor 1
1 19.66 L=2.9+2.76+4.7+0.45+5.850+1.5+1.5
3.02
59.3732 1
Deduct
-11 0.7 D1
2.1

-16.17 1
Fourth, Fifth , sixth & Seventh floor
4 20.1 L=6+5.8+1.5+1.5+1.5+1.5+2.3
3.02 1
242.808
Deduct
-32 0.7 D1 1
2.1
-47.04

TAKE-OFF SHEET
PROJECT:- B+G+8 Mixed Use building PAGE
CLIENT:- DATE
TIM DIM SQ DESCRIPTION TIM
5.05 roof cover -3
1 350 A=350
350
7. Division 9-Finishing -2
7.1 Plastering
a,internal plastering
Internal wall platering -1
5,180.27 2*20 cm Block
5,451.15 2*15 cm Block
954.96 2*10 cm Block

7,754.75 sum(2*block area)-(external Plastering) -1


External plastering
Ground floor
L=3.44+4.2+5.2+0.7585+5+5.2+5.2+4.96+5.
1 52.98 4+3.525+4.9+5.2

3.39 1
179.61
Deduct opening
-1 1.5 W1
0.6 -3
-0.90
-1 2 W2
0.6 -1
-1.20
-1 0.99 W3
0.6 -1
-0.59
-2 0.9 D2
2.1 -1
-3.78
First floor
L=10.6+5.4+4.2+5.2+1.808+5.2+5+5+5.2+5.
1 78.983 2+5+5.4+3.525+3.525+3.525+5.2 -1
2.75
217.20
-3 2 W2

0.6 3
-3.60
-1 0.99 W3
0.6
-0.59 -15
-1 2.82 W38
0.6
-1.69 -3
Second Floor
L=5.2+5.4+4.2+5.2+1.808+5.2+5+5+5.4+5.2
1 75.47 +3.53+3.53+5.4+5+5.2+5.2
3.05 -9
230.18
Deduct opening
-3 2 W2
0.6
-3.60

TAKE-OFF SHEET
PROJECT:- B+G+8 Mixed Use building PAGE
CLIENT:- DATE
TIM DIM SQ DESCRIPTION TIM
-3 2.82 W38 -3
0.6
-5.08
Seventh Floor -1
L=5.2+4.2+5.4+5.2+1.808+5+5+5.2+5+5.4+3
1 63.233 .525+3+7.2+2.1
2.75
173.89
deduct opening 1
-5 2 W2
0.6
-6.00
-1 0.99 W3
0.6 4
-0.59
-3 1.5 W13
1.2
-5.40
-1 2.82 W38 2
0.6
-1.69
Eighth floor
L=14+5.4+4.2+5.2+1.81+5+5+5.2+5+5.4+3.5
1 103.7 3+43.96 2
2.75
285.18
-10 1.5 W55
2
-30.00 2
-1 2.82 W38
0.6
-1.69
-5 2 W2
0.6 2
-6.00
-1 0.99 W3
0.6
-0.59
-3 1.5 W13
1.2 1
-5.40
-2 1.5
0.6 1
-1.80
Terrace
Under Beam 1
1 62.2 L=5.4+4.2+5.2+5.2+7+33.4+1.8
2.75
171.05

TIM DIM SQ DESCRIPTION TIM


7.2 Tiling

7.2.1, Cement Screed 1


basement
1 882.34 A=56.46+65.78+760.10

882.34 3
882.34 m2
7.2.2 patterned trowel

1 19.71 1
19.71
19.71 m2

7.2.3 40 cm screed 1
a, to receive ceramic
Ground Floor

1 47 A=12.75+12.75+21.5 1
47
First floor
1 43 A=16.02+11.95+15.45
43.42
Second Floor
A=16.02+11.95+5.62+13.11+10.11+15.25+3
1 107 4.92
106.98
Third Floor 1
A=16.02+11.95+5.62+11.74+13.68+10.58+2
1 99.66 .22+2.49+15.25+10.11
99.66
Fourth & fifth Floor 1
2 58.95 A=16.02+11.95+5.62+10.11+15.25
117.9
Sixth & Seventhfloor 3
2 60.14 A=16.02+11.95+5.62+1.191+10.11+15.25
120.28
Eighth floor 2
1 65.15 A=5.62+31.35+28.18
65.15
600.39 m2
b, To receive Porceiline
Ground Floor

A=7.33+12.72+35.04+34.95+37.55+48.39+6
8.91+172.11+14.6+213.38+35.95+30.62+11
1 727.46 .40+4.51
727.46

First floor 1

A=18.97+49.99+46.57+11.29+21.28+33.38+
350.38+23.61+10.07+15.80+163.68+13.18+
1 836.91 22.76+9.99+13.21+22.76+9.99
836.91

Second Floor 1

A=25.12+40.82+24.75+25+13.90+13.90+9.2
7+11.45+10.93+10.10+9.27+11.45+10.93+1
1 726.71 0.10+251.71+24.50+24.26+164.33+34.92
726.71

TAKE-OFF SHEET
PROJECT:- B+G+8 Mixed Use building PAGE
CLIENT:- DATE
TIM DIM SQ DESCRIPTION TIM
Second floor

L=98.4+6.5-0.8-
0.8+3.18+44.8+35.6+18.706+60-0.8-0.8-
1 348.486 0.8+5.6+5.6+74.1 1
348.5
Third floor
L=27+0.805+52.1+115.2-0.8-0.8-
1 292.505 0.8+28.3+28.3+5.4+40.2-0.8-0.8-0.8

292.5 1
Fourth , Fifth & six Floor
L=27+7.8+30.3+5.9+0.8+5+4.4+33.8+4.98+1
3 219.88 2.1+4.4+85-0.8-0.8
659.6
Seventh Floor 1
L=27+7.8+30.3+5.9+0.8+5+4.4+33.8+4.98+1
1 240.18 2.1+4.4+85-0.8-0.8+20.3
240.2
Eighth Floor

L=4.842+42.205-1.2-0.8-
0.8+3.18+2.35+14.2+8.9+58.6-0.8-0.8-
1 166.50 0.8+1.22+23.099+13.1 1
166.5
Terrace
1 134.69 L=120+14.687
134.7 1
2315.46
7.2.8 PVc Tile
Eight Floor
1 271.81 A=271.81 1
271.8
271.8
7.2.9 Pvc Skirting
1 58.66 L=61.8-1.4-1.74 4
58.7
58.7
7.2.10 Granite for stair casae
Tread 1

L=((10+10)*1.291)+((10+10)*1.3)+
((9+9)*1.3*8)+((9+9)*1.41*9)+
1 529.74 ((10+10)*1.4)+((10+10)*1.715)
529.7
Riser
L=((11+11)*1.291)+((11+11)*1.3)+
((10+10)*1.3*8)+((10+10)*1.4*9)+
((11+11)*1.41)+((11+11)*1.715)+
1 615.752 ((10+10)*1.5)
615.8 1
Landing
1 51.4 A=2.3+2.4+(2.6*8)+(2.4*10)+1.9
51.4 -30
Skirting
L=((3.525)+(5.2*9)+(11.725*11)+(2.64*11)+
1 228.36 9.148)*1.05
228.4

7.2.11 Enterance Stair Case 1


Tread
5 7.64
38.2
Riser 1
6 7.64
45.84

TAKE-OFF SHEET
PROJECT:- B+G+8 Mixed Use building PAGE
CLIENT:- DATE
TIM DIM SQ DESCRIPTION TIM
marble coping
first & Second Floor
2 35.9 L=(28.7-(0.6*4)+(10.2-0.6))
71.8
Third

1 25.3 L=4.4+20.9
25.3
eighth
1 10.8 L=10.8
10.8
terrace
half wall
1 18.6 L=18.6
18.6
seventh

1 14 L=14
14
140.50
EET

DIM SQ DESCRIPTION
deduct Openings
W1
1.5
0.6
-3.6
2 W2
0.6
-7.2
0.99 W3
0.6
-1.188
1.5 W13
1.2
-10.8
2.82 W38
0.6

-3.384
half wall
35.9 L=(28.7-(0.6*4)+(10.2-0.6))
1
71.8
Third Floor
block under beam
L=5.4+4.2+10.6+5.2+5.4+5.2+5.4+3+10+5.8+5.
80.73 2+5+5.4+3.53+1.4
2.75
222.0
half wall
25.3 L=4.4+20.9
1
25.3
block under the slab
4 L=4
3.02
12.08
0.6 W1
1.5
-1.8
2 W2
0.6
-6
1.5 W13
1.2
-5.4
2.82 W38
0.6
-1.692
2.7 W39
0.6
-1.62

2.5 W40
0.6
-1.5

DIM SQ DESCRIPTION
1.5 W13

1.2
-5.4
2.82 W38
0.6
-1.692
Block under slab
48.6 L=42.2+6.4
3.02
146.772
1.5 W55
2
-36
half wall
10.8 L=10.8
1
10.8

Terrace

129 L=95.6-(3*0.6)+30.6-(10*0.6)+29.2-18.6
3.02
389.58
2 W2
0.6
-6
0.99 W3
0.6
-0.594
half wall
18.6 L=18.6
1
18.6
2,590
3.02 15 Cm block work
Basment Floor
13.3 L=2.9+(5.2*2)

2.75
36.575
deduct Door
2 D5
2.1
-4.2
Ground Floor

L=5.4+9.15+5.2+3.815+4.215+5.4+5.4+5.4+2.9
74.3 +3.065+7.514+7.891+5.2+1.25+1.25+1.25
3.53
261.9075

DIM SQ DESCRIPTION
1.05 W41
0.6
-1.26
5.65 W42
0.6
-3.39
2.7 sW1
2
-10.8
3.62 SW2
2
-10.8
Fourth , Fifth & six Floor

L=5.6+7.4+1.635+3.74+2.7+1.81+1.25+1.25+1.
25+5.2+2.9+6.2+6.3+5.6+5+5.85+5+2.6+2.6+5
94.01 .4+3.525+1.4+1.5+5.4+1.4+1.5
2.86
806.61
0.9 D2
2.1
-34.02
2 D5
2.1
-12.6
Seven

L=5.6+7.4+1.635+3.74+2.7+1.81+1.25+1.25+1.
25+5.2+2.9+6.2+6.3+5.6+5+5.85+5+2.6+2.6+5
94.02 .4+3.525+1.4+1.5+5.4+1.4+1.51
2.86
268.90
0.9 D2

2.1
-11.34
2 D5
2.1
-4.2
half wall
14 L=14
1.5
21.00
Eighth floor

L=5.65+1.61+3.74+9.2+1.6+1.6+2.3+8.625+6.3
+5+6.8+5+5.2+6.9+5.2+2.9+1.81+1.25+1.25+1
83.185 .25
2.86
237.91
deduct opening
0.9 D2
2.1
-7.56
1.2 D4
2.1
-2.52
2 D5
2.1
-4.2
Terrace
20.22 L=7.81+1.81+1.25+1.25+2.9+5.2
2.82
57.0
2725.5760914

DIM SQ DESCRIPTION
Eighth floor
20.95 L=0.45+11.5+(1.5*6)
3.02
63.269
Deduct
0.7 D1

2.1
-11.76
Terrace
5.85 L=5.4+0.45
3.02
17.667
Deduct
2 D5

2.1
-4.2
477.5
4 . Metal Work
4.01 hand rail for stair case

L=(5.813+6.4+5.813+5.82+5.82+5.82+5.82+5.8
2+5.82+5.82+5.82+2.825+2.775+6.825+6.3+6.
289.03 2+4.3+6.2+4.3+6.2+4.3+(9*5.7))*1.74
289.03 ml
4.02 hand rail for balcony
128.1 L=7.7+10.5+5+2.6+37.7+20.9+4.4+28+11.3
128.10 ml
4.03 sun breaker
12.8
217.60 ml

5. Division -7 Thermal & moisture protection


5.01 light weight concrete
207.29 L=72.9+80.22+54.17
207.29 m2
5.02 Cement Screed
207.29 L=72.9+80.22+54.17
207.29 m2
5.03 Wet , Terrace & Balcony
wet area

A=25.65+8.9+33.93+8.9+29.4+25.55+29.31+1
1.74+25.71+29.30+26.7+29.3+26.7+29.3+26.7
484.67 +29.3+26.7+61.58
484.67
Terrace
333.53 A=205+128.53+70.66
333.53
balcony
39.31 A=16.37+22.94
39.31
857.51

DIM SQ DESCRIPTION
1.5 W13
1.2
-5.40
1.5 W1
0.6
-1.80
0.99 W3
0.6
-0.59

2.82 W38
0.6
-1.69

Third floor
L=10.6+3.4+2+5.2+1.808+5.8+5.2+5+5.4+3.52
64.728 +3+3.4+5.2+5.2
3.05
197.42
deduct
2 W2
0.6
-3.60
0.99 W3
0.6
-0.59
2.82 W38
0.6
-1.69
2.82 W39
0.6
-1.69

2.5 W40
1.2
-3.00
Fourth Floor , Fifth & Six
L=7+4.2+5.4+5.2+1.808+5+5+5.2+5+5.4+3.53+
66.038 3+2.4+2.4+5.5
2.75
544.81
deduct opening
2 W2
0.6
-18.00
0.99 W3
0.6

-1.78
1.5 W13
1.2
-16.20
DIM SQ DESCRIPTION
2 W2
0.6
-3.60
0.99 W3

0.6
-0.59
Under Slab
59 L=59
3.02
178.18
Half Wall
first & Second Floor
35.9 L=(28.7-(0.6*4)+(10.2-0.6))
1
143.6
Third

25.3 L=4.4+20.9
1
50.6
eighth

10.8 L=10.8
1
21.6
terrace
half wall
18.6 L=18.6
1
37.2
seventh

14 L=14
1.5
42.00
2402.04
d, Rc Ceiling & Stair case
Two Coat of Plastered Surface
141.95 A=56.46+19.71+65.78
141.95
Plasterd & Painted
A=7.33+12.75+12.75+12.75+35.04+34.95+37.
55+48.39+172.11+14.6+30.62+35.95+11.4+21
.5+213.38+16.02+11.95+18.97+49.99+46.57+
11.29+15.45+21.28+33.38+350.38+23.61+163
.68+10.07+15.80+13.18+22.76+9.99+13.21+2
2.76+4.99+16.02+11.95+5.62+25.12+40.82+1
3.11+10.11+15.25+31.03+34.92+24.75+25+13
.90+13.90+251.71+9.27+11.45+10.93+10.10+
9.27+11.45+10.93+10.10+24.5+24.26+164.33
+34.26+15.25+10.11+42.3+121.79+10.58+13.
68+11.74+(2.22*2)+70.66+16.02+11.95+5.62+
(4*(16.02+11.95+5.62+104.84+42.3+10.11+15
.25+34.26))
+5.62+65.17+28.18+31.35+10.44+28.61+199.
4189.41 11+28.18+12.15+13.47+31.13
4189.41
Stair case
250.94 A=(10.63+9.6+(9.6*8)+(9.6*10))*1.3
250.939
4582.299

DIM SQ DESCRIPTION
Third Floor
A=65.11+121.79+134.87+190.53+73.23+96.39
852.52 +23.38+34.26+70.66+42.3
852.52
Fourth , fifth floor& Sixth floor
A=107.29+44.24+182.66+29.82+31.82+182.66
794.15 +34.26+104.84+42.3+34.26
2382.45
Seventh Floor
A=107.29+44.24+182.66+29.82+31.82+182.66
810.52 +34.26+104.84+42.3+34.26+16.37
810.52
Eighth floor
A=34.11+65.17+22.94+199.11+271.81+28.61+
691.72 10.44+31.35+28.18
691.72
Terrace

428.67 A=39.56+12.15+203.83+13.47+31.13+128.53
428.67
7456.96
7.2.4 ceramic tile
similar with cement screed form ceramic
600.39

7.2.5 Ceramic Skirting


Second
46.29 L=9.587+13.7+23

46.287
Third Floor
45.991 L=12.3+14.031+4.9+5.05+9.71
46.0
Fourth &,fifth floor & Eight floor
9.56 L=9.56
28.7
Sixth &Seventh Floor
11.16 L=9.56+1.6
22.3
143.278 ml
7.2.6 Porcelian tile
similar with cement screed for Porcelian
7456.96 m2

7.2.7 Porcelian Skirting


Ground Floor

L=10.7+7.715+(6*7.028)+21.58+13.031+30.63
4+24.955+1.2+1.8+2.4+2.4+2.4+7.99+14.4+1.
191.14 218+6.55

191.1
First Floor

L=16.5+38.5+21.8+13.5+6.6+18.1+7.4+7.4+14.
3+14+17.5+12.83+5.4+13.5+8.5+22.3+44.2+3.
282.33 2+12.6

282.3

EET
DIM SQ DESCRIPTION
Window Sill

L=((1.5*9)+(32*2)+(10*0.99)+(10*2.890)+(1.5
*24)+(8*2.820)+(2.7*1)+(2.5)+(2*1.05)+(5.65*
235.0 1)+(1.5*12)+(5*3)+(2*1.5))*1.05
235.0
treshold

200

L=(2*5.2)+(5*2)+(5.4*3)+(3*3.53)+4.2+4.42+(
2.7*1)+(24*1.5)+(8*3.99)+(2*3.4)+(19*5.4)+(2
*5.85)+(2*2.2)+(2.72)+(3.850)+(6+2.5)+(5.2*6
)+(2*5.65)+(5.83*2)+(2*2.690)+(2*5.88)+(2*2.
4)+(2*2.65)+(2.490)+(5*5.6)+(5*5.45)+(2.56)+
(6*3.35)+(9*5.2)+(3)+(4.42*2)+(3.22)+(24*5)+
(5.4*2)+(9*3.53)+(3.160)+(4.250)+(5.8)+(4.2)+
757.04 (4.2*8)+(6.05*4)+(4.65*4)+(2*5)
757.0

7.2.14 Ceramic Wall


Ground Floor
58.7 L=21.2+20.1+17.4

2.1
123.27
First Floor

68.72 L=22.12+29.2+17.4
2.1
144.31
Second Floor
80.294 L=21.966+19.3+21.3+17.728
2.1
168.62
Third Floor
100.127 L=12.86+9.102+19.3+19.5+17.94+21.425
2.1
210.27
Fourth , Fifth , six & seventh Floor
84 L=22.3+19.1+42.6
2.1
705.60
Eighth floor
72.75 L=36.75+25.5+10.5

2.1
152.78
1504.8411

7.2.15 Granite Clading


594.4 A=(168.7*2)+(128.5)*2
594.4
deduct door
2.67
-80.1

514.3
7.2.16 Gysum ceiling

A=760.10+65.11+134.87+190.53+96.39+23.38
+(4*(107.29+44.24+182.66+29.82+31.82+182.
4002.81 60))+34.11+271.81+39.56+73.23
4002.81
4002.81
7.2.16 HPL
34.18 L=0.58+(0.8*42)
34.18

EET

DIM SQ DESCRIPTION
c-25 9,500.00
c-30 10,500.00
68
10,000.00
11,000.00
TAKE-OFF SHEET
PROJECT:- B+G+8 Mixed Use building PAGE
CLIENT:- DATE
TIM DIM SQ DESCRIPTION TIM DIM SQ
1. Earth Work
1.1 Site Clearance 3 3.5
1 35.6 L1=33.6+2 3.5
36.9 L2=34.925+2 1.5
1314.53 m2 55.13
1.2 Excavation Gate out
1.2.1 Bulk Excavation depth<1.5 m 6 3
1 1090 A=1090 3
1.5 1.5
1635.00 m3 81
1.2.2 Bulk Excavation depth 1.5-3m
1 1090 A=1090 1 8.8
1.3 4
1417.00 m3 1.5
1.2.3 Pit Excavation depth <1.5m 52.8
F1
1 5.6 L1&L2=(4.6+0.5+0.5) 1 5
5.6 8.125
1.5 1.5
47.04 m3 60.94
F2
3 5.2 L1&L2=(4.2+0.5+0.5) 1 5.26
5.2 10.8
1.5 1.5
121.68 m3 85.18

F3 1 42.28
6 5 L1&L2=(4+0.5+0.5) 2.25
5 1.5
1.5 142.68
225 m 3
1385.05
F4
5 4.8 L1&L2=(3.8+0.5+0.5)
4.8 1 5.6
1.5 5.6
172.8 m3 1.05
F5 32.93
5 4.8 L1&L2=(3.8+0.5+0.5)
4.8 3 5.2
1.5 5.2
172.8 m3 1.05
F6 85.18
7 4 L1&L2=(3+0.5+0.5)
4 6 5
1.5 5
168 m3 1.05
157.5

TAKE-OFF SHEET
PROJECT:- PAGE
CLIENT:- DATE
TIM DIM SQ DESCRIPTION TIM DIM SQ
F4
5 4.8 L1&L2=(3.8+0.5+0.5)
4.8
1.05 1 5.3
120.96 m3
0.8
F5 0.45
5 4.8 L1&L2=(3.8+0.5+0.5) 2
4.8
1.05 1 5.1
120.96 m3 0.8
F6 0.45
7 4 L1&L2=(3+0.5+0.5) 2
4
1.05 1 5.15
117.6 m3 0.8
F7 0.45
3 3.5 L1&L2=(2.5+0.5+0.5) 2
3.5
1.05 1 7.6
38.59 m3
0.8
F8&F8' 0.45
6 3 L1&L2=(2+0.5+0.5) 3
3
1.05 1 4.2
56.7 m3
0.8
SWF1 0.45
1 8.8 L1=7.8+0.5+0.5 2
4 L2=3+0.5+0.5
1.05 1 3.1
36.96 m3 0.8
SWF2 0.45
1 5 L1=4+0.5+0.5 1
8.125 L2=7.125+0.5+0.5
1.05 1 2.05
42.66 m3 0.8
LSWF1 0.45

1 5.26 L1=4.258+0.5+0.5 1
10.8 L2=9.8+0.5+0.5
1.05 1 4.15
59.63 m3 0.8
Retaining wall footing 0.45

L=1.125+3+2.35+2.3+2.55+2+1.3+2+1.55+
1.05+2.05+2.35+2.35+2.3+1.55+1.1+1.75+
1 42.28 1.1+1.6+1.6+0.8+2+2.5 1
2.25 W=1.25+0.5+0.5
1.05 1 3.1
99.87 0.8
969.54 0.45
1

TAKE-OFF SHEET
PROJECT:- PAGE
CLIENT:- DATE
TIM DIM SQ DESCRIPTION TIM DIM SQ
15 m3
1.09 Back fill from quarry waste
2354.59 Pit excavation
15 Trench excavation
-510.61 Footing pad 1 4.7
-28.43 Foundation column 4.7
-48.04 Basment beam 22.09
-33.398 Lean Concrete
1749.112 Total Volume of Back fill 3 4.3
1.10 Cart away 4.3
262.906 Site Clerance 55.47
3052.00 Bulk excavation
2354.59 Pit excavation 6 4.1
15 Trench excavation 4.1
5684.496 Total Volume of cart away 100.86
1.11 Hard Core
axis b/n ED-76 5 3.9
1 4.5 L1=4.8-0.3 3.9
5.5 L2=5.8-0.3 76.05
24.75
axis B/n FF'-65 5 3.9
1 5.7 L1=6-0.3 3.9
5.5 L2=5.8-0.3 76.05
31.35
axis B/n ED-65 7 3.1
1 4.5 L1=4.8-0.3 3.1
5.5 L2=5.8-0.3 67.27
24.75
axis B/n CB-65 3 2.6
1 5.3 L1=5.6-0.3 2.6
5.5 L2=5.8-0.3 20.28
29.15
axis B/n BA-65 6 2.1
1 5.3 L1=5.6-0.3 2.1
5.5 L2=5.8-0.3 26.46
29.15
axis b/n AF'-15 1 7.9
1 33.6 L1=33.6 3.1
21.53 L2=21.53 24.49
723.41
Deduct 1 4.1
shear wall area 7.225
-1 28.65 A=28.65 29.62
-28.65
Beam 1 4.36
-5 33.6 L=33.6 9.9
0.3 43.14

-50.4 1 64.28
-5 21.53 L=21.53 1.35
0.3 86.77
-32.295 628.55
751.21

TAKE-OFF SHEET
PROJECT:- PAGE
CLIENT:- DATE
TIM DIM SQ DESCRIPTION TIM DIM SQ
b. Basement Beam
along axis 6
1 5.3 L=1.7+0.75+2.85 1 0.8
0.4 w=0.3+0.1 0.9
2.12 1.60
along axis 5 1.15

1 10.89 L=2.65+1.8+1.7+0.592+1.95+2.2
0.4 w=0.3+0.1 13 0.70
4.36 0.70
along axis 4 1.60
1 10.59 L=2.65+2.1+1.9+0.592+1.6+1.75 10.18
0.4 w=0.3+0.1
4.24 1 0.60
along axis 3 0.30
1 11.05 L=3+2+0.9+1.7+1.6+1.85 1.60
0.4 w=0.3+0.1 0.29
4.42
along axis 2 20 0.60
1 12.8 L=3.1+2.35+1.3+2.1+2.1+1.85 0.60
0.4 w=0.3+0.1 1.60
5.12 11.51
along axis F
1 7.82 L=1.7+1.7+1.6+2.1+0.725 1 0.70
0.4 w=0.3+0.1 0.80
3.13 1.60
along axis E 0.9
1 10.03 L=2+1.4+1.8+1.7+2.25+0.875
0.4 w=0.3+0.1 9 0.50
4.01 0.50
along axis D 1.60
1 4.93 L=1.7+2.35+0.875 3.6
0.4 w=0.3+0.1
1.97 2 0.50
along axis C 0.50
1 6.98 L=2.15+1.7+2.25+0.875 1.60
0.4 w=0.3+0.1 0.8
2.79 28.43
along axis B
1 9.08 L=2.65+1.8+1.5+2.25+0.875
0.4 w=0.3+0.1 1 0.8
3.63 0.9
along axis A 3.20
1 9.08 L=2.65+1.8+1.5+2.25+0.875 2.3
0.4 w=0.3+0.1
3.63 13 0.70
39.41 0.70
3.20
20.38

TAKE-OFF SHEET
PROJECT:- PAGE
CLIENT:- DATE
TIM DIM SQ DESCRIPTION TIM DIM SQ
C5
1 0.60
0.30
3.20 1 4.6
0.58 4.6
C6,C6',C6'',C8&C10 1.3
20 0.60 27.51
0.60
3.20 3 4.2
23.04 4.2
C7 1.2
1 0.70 63.5
0.80
3.20 6 4
1.79 4
C12 1.1
3 0.50 105.6
0.50
3.20 5 3.8
2.4 3.8
C12',C13&C13' 1.1
6 0.50 79.42
0.50
2.20 5 3.5
3.3 3.5
53.79 0.95
c, in lift shaft shear wall 58.19
SW1
1 3 L=3 7 3
0.3 D=2.5+3.2-1.2 3
4.5 0.75
4.05 47.25
SW2
1 4.125 L=4.125 3 2.5
0.3 D=2.5+3.2-1 2.5
4.7 0.65
5.82 12.19
Lift Shaft
2 4.55 L1=4.55 6 2
0.3 D=2.5+3.2-1.3 2
4.4 0.45
12.01 10.8
deduct door
-2 1.275 1 7.8
2.1 3
0.3 1
-1.61 23.4
3 1.93 L1=1.93
0.3 D=2.5+3.2-1.3
4.4
7.64
27.91
d, In retaining wall
1 145.95
0.3
3.45
151.06

TAKE-OFF SHEET
PROJECT:- PAGE
CLIENT:- DATE
TIM DIM SQ DESCRIPTION TIM DIM SQ
SWF2
1 4 L1=4 1 5.4
7.125 L2=7.125 0.3
1 0.45
28.5 m3 0.73
LSWF1
1 4.26 L1=4.258 1 29.53
9.8 L2=9.8 0.3
1.3 0.45
54.25 m3 3.99
510.61
b, in Basement Beam 1 24.33
along axis 1,2,3,4&5 0.3
5 33.9 L=33.9 0.45
0.3 3.28
0.4
20.34 m3
along axis 6 1 5
1 22.9 L=6.3+11.500+5.1 0.3
0.3 0.45
0.4 0.68
2.75 m 3

along axis 7 3 24.6


1 11.1 L=11.1 0.3
0.3 0.45
0.4 9.96
1.33 m 3

along axis A,B,C&F' 1 22.67


4 25.72 L=27.525-(6*0.3) 0.3
0.3 0.45
0.4 3.06
12.35 m3
along axis D,E&F 1 24.3
3 31.30 L=33.4-(7*0.3) 0.3
0.3 0.45
0.4 3.28
11.27 m3
48.04 1 20.5
c, Ground Floor Beam 0.3
at level 1,2,3,4.5&6 0.45
6 5.4 L=5.4 2.77
0.3
0.45 1 6.9
4.37 0.3
0.45
0.93

TAKE-OFF SHEET
PROJECT:- PAGE
CLIENT:- DATE
TIM DIM SQ DESCRIPTION TIM DIM SQ
along axis A
1 22.6 L=22.6-(0.6*3)+1.8
0.3 -1 28.65
0.45 -28.65
3.05
along axis B&C -5 33.6
2 27.7 L=29.2-(5*0.3) 0.3
0.3 -50.4
0.45 -5 21.53
7.48 0.3
along axis D -32.295
1 31.4 L=34.4-(5*0.6) 751.21
0.3
0.45
4.24
along axis E&F 1 5.7
2 29.53 L=32.53-(5*0.6) 25.83
0.3 147.23
0.45
7.97
55.79 1 15.9
d, 100mm Basement Floor Slab 1.5
axis b/n ED-76 23.85
1 4.5 L1=4.8-0.3
5.5 L2=5.8-0.3 1 26.1
24.75 11.00
axis B/n FF'-65 287.10
1 5.7 L1=6-0.3
5.5 L2=5.8-0.3 1 23.5
31.35 3.83
axis B/n ED-65 89.89
1 4.5 L1=4.8-0.3
5.5 L2=5.8-0.3 1 23.5
24.75 3.83
axis B/n CB-65 89.89
1 5.3 L1=5.6-0.3
5.5 L2=5.8-0.3 1 2.7
29.15 2.7
axis B/n BA-65
1 5.3 L1=5.6-0.3 1 17.96
5.5 L2=5.8-0.3 17.96
29.15
axis b/n AF'-15 1 7.40
1 33.6 L1=33.6 7.4
21.53 L2=21.53 667.02
723.408

TAKE-OFF SHEET
PROJECT:- PAGE
CLIENT:- DATE
TIM DIM SQ DESCRIPTION TIM DIM SQ
Soffit
2 2.99 L=((0.16*10)^2+(0.28*9)^2)^0.5 5 15.2
1.40 1.1
0.24 83.6
2.01
Steps 5 14
20 1.40 0.95
0.28 66.5
0.16
0.63 7 12
Landing 0.75
1 2.88 L1=2.888 63
0.80 L2=0.797
0.24 3 10
0.55 0.65
3.18 19.5
g, in Ramp Beam
3 5.4 along axis 5,6& 7 6 8
0.45 0.45
0.3 21.6
2.19
along axis E&F 1 21.6
2 11.3 1
0.45 21.6
0.3
3.05 1 22.25
5.24 1
h) Ramp Slab 22.25
b/n axis FE-75
2 5.7 L1=6-0.3 1 28.12
5.5 L2=5.8-0.3 1.3
0.18 36.55
11.29 524.6
2.2 Concrete Form Work
a, Footing pad
1 3.4
F1 1.20
1 18.4 L=4.6*4 4.08
1.3
23.92 m2 13 2.80
F2 1.20
3 16.8 L=4.2*4 43.63
1.2
60.48 m2 1 1.80
F3 1.20
6 16 L=4*4 2.16
1.1
105.6 m2

TAKE-OFF SHEET
PROJECT:- PAGE
CLIENT:- DATE
TIM DIM SQ DESCRIPTION TIM DIM SQ
C6,C6',C6'',C8&C10
20 2.40
1.20 1 14.16
57.54 4.4
C7 62.3
1 3.00
1.20 1 15.02
3.6 4.4
C12,C12',C13&C13' 66.09
9 2.00
1.20 -4 1.28
21.58 2.1
C14 -10.71
1 2.00 188.98
1.20
2.4 2 145.95
134.99 3.45
C, To Basement Column 1007.06
C1
1 3.4
2.75 10 33.9
9.35 0.4
C2,C2',C3,C3',C4,C7',C9,C9',C11& C11' 135.6
13 2.80
2.75 2 22.9
100.1 0.4
C5 18.32
1 1.80
2.75 2 11.1
4.95 0.4
C6,C6',C6'',C8&C10 8.88
20 2.40
2.75 8 25.72
132 0.4
C7 82.32
1 3.00
2.75 6 31.30
8.25 0.4
C12 75.12
3 2.00 320.24
2.75
16.5
C12',C13&C13' 2 5.4
6 2.00 1.02
1.75 11.02
21
292.15
d, Lift Shaft Shear wall
SW1
2 3.3 L=3+0.3
4.5 D=2.5+3.2-1.2
29.7
SW2
2 4.43 L=4.125+0.3
4.7 D=2.5+3.2-1
41.6

TAKE-OFF SHEET
PROJECT:- PAGE
CLIENT:- DATE
TIM DIM SQ DESCRIPTION TIM DIM SQ
at level 2,3,4&5
4 5.4 L=5.4 1 5.4
0.84 1.2
18.14 m2 6.48
along axis 7 1 1.5
1 5.4 L=5.4 1.02
1.2 1.53
6.48 m 2

along axis F 1 22.6


1 24.33 L=32.53-(5*0.6)-5.2 1.2
1.02 27.12
24.82
1 5.2 L=5.2 2 27.7
1.2 1.2
6.24 66.48
along axis F'
1 24.33 L=26.73-(4*0.6) 1 30.16
1.02 0.84
24.82 25.33
at level 0.00 1 1.24
along axis 1' 1.02
1 5 L=5.6-0.6 1.27
1.2
6.24 1 29.53
along axis 1 0.84
1 9.6 L=10.2-0.6 24.81
1.02
9.79 1 24.33
1 15 L=16.2-0.6*2 0.84
0.84 20.44
12.60 1 5.2
along axis 2&3 1.2
2 24.6 L=27-(4*0.6) 6.24
0.84 386.83
41.33 m2
along axis 4
1 22.67 L=27-(3*0.6)-2.53 1 5.7
0.84 25.83
19.04 m2 147.23
along axis 5
1 24.3 L=27-(4*0.6)-0.3
0.84 1 15.9
20.41 m 2
1.5
along axis 6 23.85
1 20.5 L=12.3-(0.6*2)+(10-0.6)
0.84 1 26.1
17.22 m 2
11.00
287.10

TAKE-OFF SHEET
PROJECT:- PAGE
CLIENT:- DATE
TIM DIM SQ DESCRIPTION TIM DIM SQ
b/n axis AF-24
1 23.5 L1=24.7-(4*0.3)
3.83 L2=4.125-0.3 2 5.7
89.89 5.5
b/n axis AC-45 62.70
1 23.5 L1=24.7-(4*0.3)
3.83 L2=4.125-0.3
89.89
b/n axis DD'-45
1 2.7 A=2.7
2.7 1 0.7
b/n axis DE-67 0.9
1 17.96 A=14.4+3.56 3.50
17.96 2.21
Enterance slab
1 7.40 A=7.4 11 0.70
7.4 0.70
Side Form Work 3.50
1 136.00 L=136 18.87
0.18
24.48 1 0.60
690.50 0.30
J) To Stair Case And Landing 3.50
Soffit 0.63
2 2.99 L=((0.16*10)^2+(0.28*9)^2)^0.5
1.40 22 0.60
8.36 0.60
Side Form Work 3.50
4 2.99 27.72
0.40
1 0.70
0.70
2.39 3.50
riser 1.72
20 1.40
0.16 3 0.50
2.24 0.50
Landing 3.50
1 2.88 L1=2.888 2.63
0.80 L2=0.797
2.30 6 0.50
15.29 0.50
k, in Ramp Beam 4.50
2 5.4 along axis 5& 7 6.75
1.02
11.02 2 0.20
1 5.4 along axis 6 6.2
0.84 2.43
4.54
along axis E&F
2 11.3 1 0.7
0.84 0.8
18.98 3.20
34.54 1.79

TAKE-OFF SHEET
PROJECT:- PAGE
CLIENT:- DATE
TIM DIM SQ DESCRIPTION TIM DIM SQ
C2,C2',C9,C9'
5 0.70 3 0.50
0.70 0.50
3.20 3.20
7.84 2.4
C5
1 0.60 6 0.50
0.30 0.50
3.20 3.20
0.58 4.8
C3,C3',C4 ,C6,C6',C6'',C7',C8,C10,C11&C11
28 0.60 2 0.20
0.60 3.2
3.20 1.26
32.26
C7
1 0.70 1 0.7
0.70 0.7
3.20 3.20
1.57 1.57
C12
3 0.50 1 0.60
0.50 0.30
3.20 3.20
2.4 0.58

C12',C13&C13'
6 0.50 19 0.60
0.50 0.60
3.20 3.20
4.8 21.89
Second Floor
C1&C7 18 0.50
2 0.7 0.50
0.7 3.20
3.20 14.4
3.14
C5 2 0.20
1 0.60 3.2
0.30 1.26
3.20
0.58 2 0.40

C2,C2',C3,C3',C4 ,C6,C6',C6'',C7',C8,C9,C9',
C10,C11&C11 0.40
33 0.60 3.20
0.60 1.02
3.20
38.02

TAKE-OFF SHEET
PROJECT:- PAGE
CLIENT:- DATE
TIM DIM SQ DESCRIPTION TIM DIM SQ
Fourth
C1&C7
2 0.6 1 0.60
0.6 0.30
3.20 3.20
2.3 0.58

C5
1 0.60 32 0.40
0.30 0.40
3.20 3.20
0.58 16.38
C2,C2',C3,C3',C4,
C6,C6',C6''C7',C8,C9,C9',C10,C11&C11
34 0.50
0.50 1 0.60
3.20 0.30
27.2 2.60
Fifth 0.47
C1
1 0.6 21 0.40
0.6 0.40
3.20 2.60
1.15 8.74
C5 339.49
1 0.60
0.30
3.20 1 3
0.58 0.3
C2,C2',C3,C3',C4, C6,C6',C6'',
C7,C7',C8,C9,C9',C10,C11&C11 31.7
35 0.50 28.53
0.50
3.20 1 4.125
28 0.3
siixth 31.7
C5 39.23
1 0.60
0.30 2 4.55
3.20 0.3
0.58 31.7
C1,C2,C2',C3,C3',C4, C6,C6',C6'',
C7,C7',C8,C9,C9',C10,C11&C11 86.54
36 0.50
0.50 -20 1.275
3.20 2.1
28.8 0.3
Seventh -16.07
C5 3 1.93
1 0.60 0.3
0.30 31.7
3.20 55.06
0.58 193.29
C1,C2,C2',C3,C3',C4, C6,C6',C6'',
C7,C7',C8,C9,C9',C10,C11&C11
36 0.40
0.40
3.20
18.43

TAKE-OFF SHEET
PROJECT:- PAGE
CLIENT:- DATE
TIM DIM SQ DESCRIPTION TIM DIM SQ
along axis 1- First floor
1 25 L=17.4-(4*0.6)+11.8-(3*0.6) 3 26.13
0.3 0.3
0.45 0.45
3.38 10.58
along axis 1-2nd & 3rd Floor
2 30 L=34.2-(7*0.6) 3 1.25
0.3 0.3
0.45 0.45
8.1 0.51
along axis 2,3 &5
30 L=34.2-(7*0.6) 3 26.98
0.3 0.3
0.45 0.45
4.05 10.93
along axis 4
3 27.8 L=34.2-(7*0.6)-2.2 3 30.00
0.3 0.3
0.45 0.45
11.26 12.15
along axis 6
3 25 L=17.4-(4*0.6)+11.8-(3*0.6) 3 30.46
0.3 0.3
22.5 27.42
along axis 7
3 6.9 L=7.5-0.6 2 24.33
0.3 0.3
0.45 0.45
2.79 6.57
along axis A
3 21.27 L=23.20-(4*0.6)+1.4/3 1 5.20
0.3 0.3
0.45 0.45
8.61 0.7
along axis B-1st floor
1 21.4 L=23.8-(4*0.6)
0.3 12 26.4
0.45 0.3
2.89 0.45
along axis B-2nd 42.77
1 24.33 L=27.93-(6*0.6)
0.3 4 30
0.45 0.3
3.28 0.45
along axis B-third floor 16.2
1 25.73 L=29.33-(6*0.6)
0.3 4 27.8
0.45 0.3
3.47 0.45
15.01

TAKE-OFF SHEET
PROJECT:- PAGE
CLIENT:- DATE
TIM DIM SQ DESCRIPTION TIM DIM SQ
along axis 6
4 15 L=17.4-(4*0.6) 1 11.7
0.3 0.3
0.45 0.45
8.1 1.58
along axis 7
4 6.9 L=7.5-0.6 1 7
0.3 0.3
0.45 0.45
3.73 0.95
along axis A
4 17.00 L=17.40-(3*0.6)+1.4 1 15.90
0.3 0.3
0.45 0.45
9.18 2.15
along axis B&C
8 20.53 L=23.53-(5*0.6) 2 21.03
0.3 0.3
0.45 0.45
22.17 5.68
along axis D'
4 1.25 L=1.250 1 1.25
0.3 0.3
0.45 0.45
0.68 0.17
along axis D
4 26.98 L=13.451-(3*0.6)+17.13-(3*0.6) 1 27.58
0.3 0.3
0.45 0.45
14.57 3.72
along axis E&F
8 30.93 L=33.73-(7*0.6)+1.4 2 31.63
0.3 0.3
0.45 0.45
33.4 8.54
along axis F'
4 10.40 L=12.2-(3*0.6)
0.3 1 32.1
0.45 0.3
5.62 0.45
Eighth Floor 4.33
along axis 1,2,3& 5
4 30.7 L=34.2-(7*0.5) 3 31.4
0.3 0.3
0.45 0.45
16.58 12.72
along axis 4
1 28.5 L=34.2-(7*0.5)-2.2 1 29.2
0.3 0.3
0.45 0.45
3.85 3.94

TAKE-OFF SHEET
PROJECT:- PAGE
CLIENT:- DATE
TIM DIM SQ DESCRIPTION TIM DIM SQ
along axis 6
1 12 L=13.2-(3*0.4) 1 7.1
0.3 0.3
0.45 0.45
1.62 0.96
along axis 7
1 6.9 L=7.5-0.6 1 5.4
0.3 0.3
0.45 0.45
0.93 0.73
along axis A
1 17.60 L=17.40-(3*0.4)+1.4 1 1.4
0.3 0.3
0.45 0.45
2.38 0.19
along axis B & C
2 11.8 L=10.8-0.4+1.4 1 12.2
0.3 0.3
0.45 0.45
3.19 1.65
along axis D
1 18.45 L=12.85-(2*0.4)+5+1.4 1 17.8
0.3 0.3
0.45 0.45
2.49 2.4
along axis E
1 23 L=23.6-(5*0.4)+1.4 2 7
0.3 0.3
0.45 0.45
3.11 1.89
along axis F 18.06
1 32.33 L=33.73-(7*0.4)+1.4
0.3
0.45
4.36 1 10.53
392.91 10.53
b, Top Tie Beam
along axis 1&3 1 16.1
2 27.40 L=29.802-(6*0.4) 9.53
0.3 153.43
0.45
7.4 1 10.75
along axis 4&5 5.7
2 5.4 L=6.2-0.4-0.4 61.28
0.3
0.45 1 32.1
1.46 5.7
along axis 6 182.97
1 10.2 L=11.4-(0.4*3)
0.3 1 16.08
0.45 11
1.38 176.88

TAKE-OFF SHEET
PROJECT:- PAGE
CLIENT:- DATE
TIM DIM SQ DESCRIPTION TIM DIM SQ
B/n axis 46-AC
1 16.08 L1=16.98-(3*0.3) 1 16.08
10.9 L2=11.8-(3*0.3) 11
175.27 176.88
B/n axis 4'5-DD'
1 2.72 A=2.72 1 16.08
2.72 10.9
B/n axis 67-FD 175.27
1 5.65 L1=5.95-0.3
7.86 L2=8.46-(2*0.3) 1 11.32
44.41 11.32
Second Floor
b/n axis 12-AC 1 5.65
1 10.75 L1=11.65-(3*0.3) 7.86
4.28 L2=4.28 44.41
46.01
b/n axis 12-DF
1 14.75 L1=15.35-(2*0.3) 4 15.4
4.28 L2=4.28 1.55
63.13 95.48
b/n axis 24-AF
1 30.8 L1=32.60-(6*0.3) 4 2.4
11 L2=11.3-0.3 1.55
338.8 14.88
B/n axis 46-AC
1 16.08 L1=16.98-(3*0.3) 4 28.20
10.9 L2=11.8-(3*0.3) 14.93
175.27 1684.1
b/n axis 45-DF
1 14.75 L1=15.35-(2*0.3) 4 16.08
5.5 L2=5.5 11
81.13 707.52
b/n axis 45-DF'
1 16.2 L1=17.4-(0.3*4) 4 16.08
5.8 L2=6.4-0.3*2 5.65
93.96 363.41
B/n axis 4'5-DD'
1 2.72 A=2.72 4 2.72
2.72 10.88
B/n axis 67-FD
1 5.65 L1=5.95-0.3 4 5.65
7.86 L2=8.46-(2*0.3) 7.86
44.41 177.64
Third Floor
B/n Axis 11'-FF'
1 28.1 L1=29.9-(6*0.3) 1 22.8
1.55 L2=1.55 1.55
43.56 35.34
B/n Axis 14-AF
1 32.01 L1=34.107-(7*0.3) 1 28.20
14.93 L2=15.53-(2*0.3) 14.93
477.86 421.03

TAKE-OFF SHEET
PROJECT:- PAGE
CLIENT:- DATE
TIM DIM SQ DESCRIPTION TIM DIM SQ
B/n axis 46-DF
1 12.15 L1=12.75-(2*0.3) 22 0.28
11 L2=11.3-0.3 0.16
133.65 1.3
B/n axis 45-AC 0.64
1 16.08 L1=16.98-(3*0.3)
5.65 L2=5.95-0.3 1 2.35
90.85 0.18
B/n axis 4'5-DD' 0.42
1 2.72 A=2.72
2.72 2 3.31
B/n axis 67-FD 1.3
1 5.65 L1=5.95-0.3 0.18
7.86 L2=8.46-(2*0.3) 1.55
44.41
Terrace 22 0.28
B/n Axis 34-AF 0.16
1 28.20 L1=30-(6*0.3) 1.3
5.3 L2=5.3 0.64
149.46
B/n axis 46-DF 1 2.59
1 12.15 L1=12.75-(2*0.3) 0.18
11 L2=11.3-0.3 0.47
133.65
B/n axis 45-AC 18 2.99
1 16.08 L1=16.98-(3*0.3) 1.3
5.65 L2=5.95-0.3 0.18
90.85 12.57
B/n axis 4'5-DD'
1 2.72 A=2.72 180 0.28
2.72 0.16
B/n axis 67-FD 1.3
1 5.65 L1=5.95-0.3 5.24
7.86 L2=8.46-(2*0.3)
44.41 9 2.59
6785.22 0.18
Roof Slab 4.2
B/n axis 34-DC
1 5.6 L1=6.2-0.3*2 2 3.31
11.1 L2=12-0.3*3 1.41
62.16 0.18
B/n Axis FD-67 1.68
1 10.5 L1=11.4-0.3*3
5.8 L2=6.4-0.3*2 22 0.28
60.9 0.16
123.06 1.41
e) In staircase and Landing 0.69
Stair Case 1-(Ground-First Floor)
2 3.31 L=((11*0.16)^2+(10*0.28)^2)^0.5 1 2.3
1.3 0.18
0.18 0.41
1.55

TAKE-OFF SHEET
PROJECT:- PAGE
CLIENT:- DATE
TIM DIM SQ DESCRIPTION TIM DIM SQ
Stair Case 3-(1st -Terrace)
18 2.99 L=((10*0.16)^2+(9*0.28)^2)^0.5 1 2.80
1.41 3.05
0.18 8.54
13.64
Steps 3 2.00
180 0.28 3.05
0.16 18.3
1.41
5.69 6 2.00
Landing 4.05
9 2.3 A=2.3 48.6
0.18
3.73 2 1.57
Staircase -4 (Ground -1st floor) 5.75
Soffit 18.06
1 6.53 L=((22*0.16)^2+(20*0.275)^2)^0.5
1.715
0.23 1 3
2.58 2.75
Steps 8.25
22 0.275
0.16 5 2.80
1.715 2.75
0.83 38.5
Landing
1 1.715 1 1.80
1.25 2.75
0.23 4.95

0.49
Stair beam 28 2.40
1 6.2 2.75
0.3 184.8
0.45
0.84 1 2.80
57.86 2.75
2.2 Concrete Form Work 7.7
a, Elevation Coulumn
Ground Floor 3 2.00
C1 2.75
1 3.2 16.5
3.05
9.76 6 2.00
C2,C2',C3,C3',C9,C9',C11, C11' 2.75
11 2.80 33
3.05
93.94
C5 2 2.8
1 1.80 2.75
3.05 15.4
5.49
C4 ,C6,C6',C6'',C7',C8&C10
22 2.40
3.05

161.04

TAKE-OFF SHEET
PROJECT:- PAGE
CLIENT:- DATE
TIM DIM SQ DESCRIPTION TIM DIM SQ

C5
1 1.80 34 2.00
2.75 2.75
4.95 187

C2,C2',C3,C3',C4 ,C6,C6',C6'',C7',C8,C9,C9',
C10,C11&C11
33 2.40
2.75 1 2.4
217.8 2.75
C12 6.6
3 2.00
2.75 1 1.80
16.5 2.75
C12',C13&C13' 4.95

6 2.00
2.75 35 2.00
33 2.75
C14 192.5
2 1.57
2.75
8.64 1 1.80
Third 2.75
C1 4.95

1 2.8
2.75 36 2.00
7.7 2.75
C5 198
1 1.80
2.75
4.95 1 1.80
C2,C2',C3,C3',C7,C7',C8,C9,C9',C10,C11&C
11 2.75
19 2.40 4.95

2.75
125.4 36 1.60
C4, C13,C13',C6,C6',C6'' 2.75
18 2.00 158.4
2.75
99
C14 1 1.80
2 1.57 2.75
2.75 4.95

8.64
C15 32 1.60
2 1.60 2.75
2.75 140.8
8.8
Fourth
C1&C7 1 1.80
2 2.4 2.15
2.75 3.87
13.2
C5
1 1.80
2.75
4.95

TAKE-OFF SHEET
PROJECT:- PAGE
CLIENT:- DATE
TIM DIM SQ DESCRIPTION TIM DIM SQ
C1,C2,C2',C3,C3',C4, C6,C6',C6''
21 1.60 1 5.00
2.15 1.02
72.24 5.1
2205.57 4 1
b, Shear Wall 1.2
SW1 4.8
2 3.3 L=3+0.3
31.7 3 24.58
209.22 0.84
SW2 61.93
2 4.43 L=4.125+0.3
31.7 3 2.89
280.55 1.02
Lift Shaft 8.84
external
1 14.16 3 25
31.7 0.84
448.87 63
internal
1 15.02 L=7.51*2 3 6.9
31.7 0.84
476.13 17.39
deduct door
-40 1.28 3 21.27
2.1 0.84
-107.1 53.59
1307.67
c, Floor Beam 1 21.4
First Floor 0.84
along axis 1- First floor 17.98
1 25 L=17.4-(4*0.6)+11.8-(3*0.6)
0.84 1 24.33
21 0.84
along axis 1-2nd 20.44
1 24 L=34.2-(7*0.6)-6
0.84 1 25.73
20.16 0.84
ditto 21.61
1 6 L=6
1.2 3 26.13
7.2 0.84
along axis 1- 3rd Floor 65.85
1 30 L=34.2-(7*0.6)
0.84 3 1.25
25.2 1.2
along axis 2,3 &5 4.5
9 29.11 L=34.2-(7*0.6)-5/9-1/3
0.84 3 26.98
220.08 0.84
67.99

TAKE-OFF SHEET
PROJECT:- PAGE
CLIENT:- DATE
TIM DIM SQ DESCRIPTION TIM DIM SQ
along axis E
3 30.00 L=33.73-(7*0.6)+1.4/3 4 26.98
0.84 0.84
75.59 90.66
along axis F
3 30.46 L=33.73-(7*0.6)+(1.4*2/3) 8 30.93
0.84 0.84
76.77 207.85
along axis F' - 1st & 3rd
2 24.33 L=27.925-(6*0.6) 4 10.40
0.84 0.84
40.87 34.94
along axis F' - 2nd
1 5.20 L=6.4-(2*0.6)
0.84 4 30.7
4.37 0.84
Fourth -Seventh 103.15
along axis 1,2,&3
12 26.4 L=30-(6*0.6) 1 25.61
0.84 0.84
266.11 21.51
along axis 5 1 2.89
4 30 L=34.2-(7*0.6) 1.02
0.84 2.95
100.8
along axis 4 1 11.7
4 24.91 L=34.2-(7*0.6)-2.2-2.89 1.02
0.84 11.93
83.7
Ditto 1 7
4 2.89 L=2.89 0.84
1.02 5.88
11.79
along axis 6 1 15.90
4 15 L=17.4-(4*0.6) 0.84
0.84 13.36
50.4
along axis 7 2 21.03
4 6.9 L=7.5-0.6 0.84
0.84 35.33
23.18
along axis A 1 1.25
4 17.00 L=17.40-(3*0.6)+1.4 1.2
0.84 1.5
57.12
along axis B&C 1 27.58
8 20.53 L=23.53-(5*0.6) 0.84
0.84 23.17
137.96
along axis D' 2 31.63
4 1.25 L=1.250 0.84
1.2 53.14
6

TAKE-OFF SHEET
PROJECT:- PAGE
CLIENT:- DATE
TIM DIM SQ DESCRIPTION TIM DIM SQ
Terrace
along axis 1' 1 17.05
1 32.1 L=34.2-(7*0.3) 0.84
1.2 14.32
38.52
along axis 1 1 21.6
1 31.4 L=34.2-(7*0.4) 0.84
1.2 18.14
37.68
along axis 3 1 21.20
1 31.4 L=34.2-(7*0.4) 0.84
1.02 17.81
32.03 1 11.33
along axis 5 1.2
1 31.4 L=34.2-(7*0.4) 13.6
0.84 2526.32
26.38
along axis 4
1 26.31 L=34.2-(7*0.4)-2.2-2.89
0.84 2 24.90
22.1 1.2
1 2.89 L=2.89 59.76
1.02 1 5.00
2.95 0.84
4.2
along axis 6
1 10.2 L=13.2-(3*0.4)-1.8 2 5.4
0.84 0.84
8.57 9.07
1 1.8 L=1.8
1.02 1 10.2
1.84 0.84
along axis 7 8.57
1 6.9 L=7.5-0.6
0.84 1 7.1
5.8 0.84
along axis A,B&C 5.96
3 10.40 L=10.8-0.4
0.84 1 5.4
26.21 1.2
along axis A 6.48
1 6.60 L=5.4+1.2
1.2 5 1.4
7.92 1.2
along axis B , C,D&E 8.4
4 1.2 L=1.2
1.2 1 10.8
5.76 0.84
9.07

TAKE-OFF SHEET
PROJECT:- PAGE
CLIENT:- DATE
TIM DIM SQ DESCRIPTION TIM DIM SQ
along axis D
1 16.4 L=6.4-(2*0.4)+12-(0.4*3) 1 30.8
0.84 11
13.78 338.8
along axis E&F
2 5.6 L=6.4-(2*0.4) 1 16.08
0.84 10.9
9.41 175.27
134.7
e, floor slab 1 14.75
First Floor 5.5
B/n Axis 11'-FF' 81.13
1 10.53 A=10.53
10.53 1 16.2
B/n axis 13-DF' 5.8
1 16.1 L1=17.3-(4*0.3) 93.96
9.53 L2=9.83-0.3
153.43 1 2.72
B/n axis 23-AC 2.72
1 10.75 L1=11.35-(2*0.3)
5.7 L2=6-0.3 1 5.65
61.28 7.86
B/n axis 34-AF 44.41
1 32.1 L1=34.2-(7*0.3)
5.7 L2=5.3 1 142.25
182.97 0.18
B/n axis 46-DF 25.61
1 16.08 L1=16.98-(3*0.3)
11 L2=11.3-0.3
176.88 1 28.1
B/n axis 46-AC 1.55
1 16.08 L1=16.98-(3*0.3) 43.56
10.9 L2=11.8-(3*0.3)
175.27 1 32.01
B/n axis 4'5-DD' 14.93
1 2.72 A=2.72 477.86
2.72
B/n axis 67-FD 1 16.08
1 5.65 L1=5.95-0.3 11
7.86 L2=8.46-(2*0.3) 176.88
44.41
Side Form Work 1 16.08
1 159.3 L=159.3 10.9
0.18 175.27
28.67
Second Floor 1 11.32
b/n axis 12-AC 11.32
1 10.75 L1=11.65-(3*0.3)
4.28 L2=4.28 1 5.65
46.01 7.86
b/n axis 12-DF 44.41
1 14.75 L1=15.35-(2*0.3)
4.28 L2=4.28 1 147.15
63.13 0.18
26.49

TAKE-OFF SHEET
PROJECT:- PAGE
CLIENT:- DATE
TIM DIM SQ DESCRIPTION TIM DIM SQ
Fourth - seventh floor
axis B/n 11'-BE 1 5.65
4 15.4 L1=16.60-(4*0.3) 7.86
1.55 L2=1.55 44.41
95.48
axis B/n 11'-BE 1 130.25
4 2.4 L1=2.40 0.18
1.55 L2=1.55 23.45
14.88
B/n Axis 14-AF
4 28.20 L1=30-(6*0.3) 1 28.20
14.93 L2=15.53-(2*0.3) 5.3
1684.1 149.46
B/n axis 46-DF
4 16.08 L1=16.98-(3*0.3) 1 12.15
11 L2=11.3-0.3 11
707.52 133.65
B/n axis 45-AC
4 16.08 L1=16.98-(3*0.3) 1 16.08
5.65 L2=5.95-0.3 5.65
363.41 90.85
B/n axis 4'5-DD'
4 2.72 A=2.72 1 2.72
10.88 2.72
B/n axis 67-FD
4 5.65 L1=5.95-0.3 1 5.65
7.86 L2=8.46-(2*0.3) 7.86
177.64 44.41
side Form Work
4 141.4 L=141.4 1 107
0.18 0.18
101.81 19.26
Eighth Floor 7010.51
B/n Axis 11'-FF'
1 22.8 L1=24.3-(5*0.3)
1.55 L2=1.55 1 5.6
35.34 11.1
B/n Axis 14-AF 62.16
1 28.20 L1=30-(6*0.3)
14.93 L2=15.53-(2*0.3) 1 10.5
421.03 5.8
B/n axis 46-DF 60.9
1 12.15 L1=12.75-(2*0.3)
11 L2=11.3-0.3 1 72
133.65 0.18
B/n axis 45-AC 12.96
1 16.08 L1=16.98-(3*0.3) 136.02
5.65 L2=5.95-0.3
90.85
B/n axis 4'5-DD'
1 2.72 A=2.72
2.72

TAKE-OFF SHEET
PROJECT:- PAGE
CLIENT:- DATE
TIM DIM SQ DESCRIPTION TIM DIM SQ
g) To Staircase and landing
Stair Case 1-(Ground-First Floor)
Soffit 2 3.31
2 3.31 L=((11*0.16)^2+(10*0.28)^2)^0.5 1.41
1.3 9.33
8.6
Side Form Work 22 0.16
4 3.31 L=((11*0.16)^2+(10*0.28)^2)^0.5 1.41
0.34 4.96
4.5
riser 4 3.31
22 0.16 0.44
1.3 5.82
4.58
Landing 1 2.3
1 2.35 A=2.35 2.3
2.35
Stair Case 2-(Ground-First Floor)
Soffit 18 2.99
2 3.31 L=((11*0.16)^2+(10*0.28)^2)^0.5 1.41
1.3 75.76
8.6
Side Form Work 180 0.16
4 3.31 1.41
0.34 40.61
2.25
riser 32 2.99
22 0.16 0.44
1.3 42.03
4.58
Landing 9 2.3
1 2.59 A=2.59 20.7
2.59
Stair Case 2-(1st -Terrace)
soffit 1 6.53
18 2.99 L=((10*0.16)^2+(9*0.28)^2)^0.5 1.715
1.3 11.2
69.85
riser 22 0.16
180 0.16 1.715
1.3 6.04
37.44
Side Form Work 1 6.53
36 2.99 0.39
0.34 2.55
36.54
Landing 1 1.715
9 2.59 A=2.59 1.25
23.31 2.14

TAKE-OFF SHEET
PROJECT:- PAGE
CLIENT:- DATE
TIM DIM SQ DESCRIPTION TIM DIM SQ
Stair Beam
1 6.2 L=6.2
0.97
6.01
434.64
Structure
Truss
a, 0.06
60x60x3mm
6 155.6561 L=27.54*0.06*4*7850*0.003
933.9365
b,
40x40x3mm
6 137.856 L=36.586*0.04*4*7850*0.003
827.1363
Purlin
25x25x2mm

L=6.7+6.694+1.197+0.928+0.927+0.928+0
10 22.05 .9268+0.92795+0.92669+0.92664+0.9656
1.57 w=0.025*4*0.002*7850
346.1486

L=6.633+6.315+1.158+0.89+0.91+0.885+0
.892+0.882+0.892+0.891+0.89096+0.8903
30 22.13 5
1.57 w=0.025*4*0.002*7850
1042.291
L=5.5+5.536+1.197+0.927+0.927+0.928+0
10 18.72 .927+0.927+0.9279+0.92795
1.57 w=0.025*4*0.002*7850
293.9801
1682.419
DESCRIPTION
F7
L1&L2=(2.5+0.5+0.5)

m3
F8&F8'
L1&L2=(2+0.5+0.5)

m3
SWF1
L1=7.8+0.5+0.5
L2=3+0.5+0.5

m3
SWF2
L1=4+0.5+0.5
L2=7.125+0.5+0.5

m3
LSWF1
L1=4.258+0.5+0.5
L2=9.8+0.5+0.5

m3

L=1.125+3+2.35+2.3+2.55+2+1.3+2+1.5
5+1.05+2.05+2.35+2.35+2.3+1.55+1.1+
1.75+1.1+1.6+1.6+0.8+2+2.5
W=1.25+0.5+0.5

1.2.4 pit excavation b/n 1.5-3m


F1
L1&L2=(4.6+0.5+0.5)
H=2.5-1.5+0.05

m3
F2
L1&L2=(4.2+0.5+0.5)

m3
F3
L1&L2=(4+0.5+0.5)

m3

DESCRIPTION
1.07 Trench excavation
for Basement Beam
along axis 5
L=1.65+0.8+0.7+0.95+1.2
w=0.3+0.25+0.25
D=0.4+0.05

along axis 4
L=1.75+1.1+0.9+0.6+0.75

along axis 3
L=2+1+0.7+0.6+0.85

along axis 2
L=2.1+1.35+1.1+1.1+1.1+0.85

along axis B
L=1.65+0.8+0.5+1.25

along axis C
L=1.15+0.7+1.25
along axis D
L=0.7+1.35

along axis E
L=1+0.4+0.8+0.7+1.25

along axis F
L=0.7+0.7+0.6+1.1

DESCRIPTION
B, Sub structure
2.1.1 Lean Concrete work
a, Under Footing Pad
F1
L1&L2=(4.6+0.1)

F2
L1&L2=(4.2+0.1)

F3
L1&L2=(4+0.1)

F4
L1&L2=(3.8+0.1)
F5
L1&L2=(3.8+0.1)

F6
L1&L2=(3+0.1)

F7
L1&L2=(2.5+0.1)

F8&F8'
L1&L2=(2+0.1)

SWF1
L1=7.8+0.1
L2=3+0.1

SWF2
L1=4+0.1
L2=7.125+0.1

LSWF1
L1=4.258+0.1
L2=9.8+0.1

L1=2.125+4+3.35+3.3+3.55+3+2.3+2+2.
55+2.05+3.05+3.35+3.35+3.3+2.55+2.1
+2.75+2.1+2.6+2.6+1.8+3+3.5
W=1.25+0.1

DESCRIPTION
2.1.2 In Foundation Column
C1
avg. d. f=0.9013
H=2.5-0.9013

C2,C2',C3,C3',C4,C7',C9,C9',C11,&C11'

C5

C6,C6',C6'',C8&C10

C7

C12,C12',C13&C13'

C14

C, In Basement Column
C1

C2,C2',C3,C3',C4,C7',C9,C9',C11, C11'
DESCRIPTION
2.1.3 C-25
a, In Footing Pad
F1
L1&L2=4.6

m3
F2
L1&L2=4.2

m3
F3
L1&L2=4

m3
F4
L1&L2=3.8

m3
F5
L1&L2=3.5

m3
F6
L1&L2=3

m3
F7
L1&L2=2.5

m3
F8&F8'
L1&L2=2

m3
SWF1
L1=7.8
L2=3

m3

DESCRIPTION
along axis 7
L=5.4

along axis F
L=32.53-(5*0.6)

along axis F'


L=26.73-(4*0.6)

at level 0.00
along axis 1'
L=5.6-0.6
along axis 1,2&3
L=27-(4*0.6)

along axis 4
L=27-(3*0.6)-2.53

along axis 5
L=27-(4*0.6)-0.3

along axis 6
L=12.3-(0.6*2)+(10-0.6)

along axis 7
L=7.5-0.6

DESCRIPTION
Deduct
shear wall area
A=28.65

Beam
L=33.6

L=21.53
e) 180mm Ground floor Slab
at level -1.00
b/n axis F'F-16
L1=5.7
L2=27.03-(4*0.3)

at level +0.0
b/n axis AD-11'
L1=16.5-(2*0.3)
L2=1.5

b/n axis AF-12


L1=27.3-(4*0.3)
L2=11.3-(0.3)

b/n axis AF-24


L1=24.7-(4*0.3)
L2=4.125-0.3

b/n axis AC-45


L1=24.7-(4*0.3)
L2=4.125-0.3

b/n axis DD'-45


A=2.7

b/n axis DE-67


A=14.4+3.56

Enterance slab
A=7.4

F, Stair case & landing


Basement To Ground Floor

DESCRIPTION
F4
L=3.8*4
m2
F5
L=3.5*4

m2
F6
L=3*4

m2
F7
L=2.5*4

m2
F8&F8'
L=2*4

m2
SWF1
L=(7.8*2)+(3*2)

m2
SWF2
L=(4*2)+(7.125*2)

m2
LSWF1
L=(4.258*2)+(9.8*2)

m2
m2
2.1.2 In Foundation Column
C1
H=2.5-0.9013-0.4

C2,C2',C3,C3',C4,C7',C9,C9',C11, C11'

C5
DESCRIPTION
Lift Shaft
external

internal
L=7.51*2

deduct door

e, In retaining wall

f, in Basement Beam
along axis 1,2,3,4&5
L=33.9

m2
along axis 6
L=6.3+11.500+5.1

m2
along axis 7
L=11.1

m2
along axis A,B,C&F'
L=27.525-(6*0.3)

m2
along axis D,E&F
L=33.4-(7*0.3)
m2
m2
g, Ground floor Beam
at level 1&6
L=5.4

m2

DESCRIPTION
along axis 7
L=5.4 1

m2
L=1.5
-4

along axis A
L=22.6-(0.6*3)+1.8

m2
along axis B&C
L=29.2-(5*0.3)

m2
along axis D
L=34.4-(5*0.6)-1.242

m2
L=1.242

m2
along axis E
L=32.53-(5*0.6)

m2
along axis F
L=32.53-(5*0.6)-5.2

m2
L=5.2

m2

at level -1.00
b/n axis F'F-16
L1=5.7
L2=27.03-(4*0.3)

at level +0.0
b/n axis AD-11'
L1=16.5-(2*0.3)
L2=1.5

b/n axis AF-12


L1=27.3-(4*0.3)
L2=11.3-(0.3)

DESCRIPTION
h) Ramp Slab
b/n axis FE-75
L1=6-0.3
L2=5.8-0.3

B, Super Structure
C-30
a, Elevation Coulumn
Ground Floor
C1

C2,C2',C3,C3',C9,C9',C11, C11'

C5

C4 ,C6,C6',C6'',C7',C8&C10

C7

C12

C12',C13&C13'

C14

First Floor
C1
DESCRIPTION
C12

C12',C13&C13'

C14

Third
C1

C5

C2,C2',C3,C3',C7,C7',C8,C9,C9',C10,C11
&C11

C4, C13,C13',C6,C6',C6''

C14
C15

DESCRIPTION
Eighth
C5

C1,C2,C2',C3,C3',C4, C6,C6',C6'',
C7,C7',C8,C9,C9',C11&C11

Terrace
C5

C1,C2,C2',C3,C3',C4, C6,C6',C6''

b, Shear Wall
SW1
L=3
SW2
L=4.125

Lift Shaft
L1=4.55

deduct door

L1=1.93

C-25
a, Floor Beam
Firsrt Floor -3rd Floor

DESCRIPTION
along axis C
L=29.13-(5*0.6)

along axis D'


L=1.250
along axis D
L=13.451-(3*0.6)+17.13-(3*0.6)

along axis E
L=33.73-(7*0.6)+1.4/3

along axis F
L=33.73-(7*0.6)+(1.4*2/3)

along axis F' - 1st & 3rd


L=27.925-(6*0.6)

along axis F' - 2nd


L=6.4-(2*0.6)

Fourth -Seventh
along axis 1,2,&3
L=30-(6*0.6)

along axis 5
L=34.2-(7*0.6)

along axis 4
L=34.2-(7*0.6)-2.2

DESCRIPTION
along axis 6
L=13.2-(3*0.5)

along axis 7
L=7.5-0.5

along axis A
L=17.40-(3*0.5)

along axis B&C


L=23.53-(5*0.5)

along axis D'


L=1.250

along axis D
L=13.451-(3*0.5)+17.13-(3*0.5)

along axis E&F


L=33.73-(7*0.5)+1.4

Terrace
along axis 1'
L=34.2-(7*0.3)

along axis 1,3&5


L=34.2-(7*0.4)
along axis 4
L=34.2-(7*0.4)-2.2

DESCRIPTION
along axis 7
L=7.5-0.4

along axis A
L=5.4

along axis B
L=1.4

along axis C
L=12-(0.4*3)+1.4

along axis D
L=6.4-(2*0.4)+12-(0.4*3)+1.4

along axis E&F


L=6.4-(2*0.4)+1.4

c) In 180mm thick Floor slab


First Floor
B/n Axis 11'-FF'
A=10.53

B/n axis 13-DF'


L1=17.3-(4*0.3)
L2=9.83-0.3

B/n axis 23-AC


L1=11.35-(2*0.3)
L2=6-0.3

B/n axis 34-AF


L1=34.2-(7*0.3)
L2=5.3

B/n axis 46-DF


L1=16.98-(3*0.3)
L2=11.3-0.3

DESCRIPTION
B/n axis 46-DF
L1=16.98-(3*0.3)
L2=11.3-0.3

B/n axis 46-AC


L1=16.98-(3*0.3)
L2=11.8-(3*0.3)

B/n axis 4'5-DD' & 56'-DC


A=2.72+8.6

B/n axis 67-FD


L1=5.95-0.3
L2=8.46-(2*0.3)

Fourth - seventh floor


axis B/n 11'-BE
L1=16.60-(4*0.3)
L2=1.55

axis B/n 11'-BE


L1=2.40
L2=1.55

B/n Axis 14-AF


L1=30-(6*0.3)
L2=15.53-(2*0.3)

B/n axis 46-DF


L1=16.98-(3*0.3)
L2=11.3-0.3

B/n axis 45-AC


L1=16.98-(3*0.3)
L2=5.95-0.3

B/n axis 4'5-DD'


A=2.72

B/n axis 67-FD


L1=5.95-0.3
L2=8.46-(2*0.3)

Eighth Floor
B/n Axis 11'-FF'
L1=24.3-(5*0.3)
L2=1.55

B/n Axis 14-AF


L1=30-(6*0.3)
L2=15.53-(2*0.3)

DESCRIPTION
Steps

Landing
A=2.35

Stair Case 2-(Ground-First Floor)


L=((11*0.16)^2+(10*0.28)^2)^0.5

Steps

Landing
A=2.59

Stair Case 2-(1st -Terrace)


L=((10*0.16)^2+(9*0.28)^2)^0.5

Steps

Landing
A=2.59

Stair Case 3-(Ground-First Floor)


L=((11*0.16)^2+(10*0.28)^2)^0.5

Steps

Landing
A=2.35
DESCRIPTION
C7

C12

C12',C13&C13'

C14

First Floor
C1

C2,C2',C9,C9'

C5

C3,C3',C4 ,C6,C6',C6'',C7',C8,C10,C11&C
11

C7

C12
C12',C13&C13'

Second Floor
C1&C7

DESCRIPTION

C2,C2',C3,C3',C4,
C6,C6',C6''C7',C8,C9,C9',C10,C11&C11

Fifth
C1

C5

C2,C2',C3,C3',C4, C6,C6',C6'',
C7,C7',C8,C9,C9',C10,C11&C11

siixth
C5
C1,C2,C2',C3,C3',C4, C6,C6',C6'',
C7,C7',C8,C9,C9',C10,C11&C11

Seventh
C5

C1,C2,C2',C3,C3',C4, C6,C6',C6'',
C7,C7',C8,C9,C9',C10,C11&C11

Eighth
C5

C1,C2,C2',C3,C3',C4, C6,C6',C6'',
C7,C7',C8,C9,C9',C11&C11

Terrace
C5

DESCRIPTION
along axis 2-second floor
L=5

along axis 2,3 ,4&5-second floor

along axis 4
L=34.2-(7*0.6)-2.2-1/3-2.89

ditto
L=2.89

along axis 6
L=17.4-(4*0.6)+11.8-(3*0.6)

along axis 7
L=7.5-0.6

along axis A
L=23.20-(4*0.6)+1.4/3

along axis B-1st floor


L=23.8-(4*0.6)

along axis B-2nd


L=27.93-(6*0.6)

along axis B-third floor


L=29.33-(6*0.6)

along axis C
L=29.13-(5*0.6)

along axis D'


L=1.250
along axis D
L=13.451-(3*0.6)+17.13-(3*0.6)

DESCRIPTION
along axis D
L=13.451-(3*0.6)+17.13-(3*0.6)

along axis E&F


L=33.73-(7*0.6)+1.4

along axis F'


L=12.2-(3*0.6)

Eighth Floor
along axis 1,2,3& 5
L=34.2-(7*0.5)

along axis 4
L=34.2-(7*0.5)-2.2-2.89

L=2.89

along axis 6
L=13.2-(3*0.5)

along axis 7
L=7.5-0.5

along axis A
L=17.40-(3*0.5)
along axis B&C
L=23.53-(5*0.5)

along axis D'


L=1.250

along axis D
L=13.451-(3*0.5)+17.13-(3*0.5)

along axis E&F


L=33.73-(7*0.5)+1.4

DESCRIPTION
along axis D
L=12.85-(2*0.4)+5

along axis E
L=23.6-(5*0.4)

along axis F
L=22.4-(3*0.4)

L=11.33

along axis 1&3


L=29.802-(6*0.4)-5/2
L=5

along axis 4&5


L=6.2-0.4-0.4

along axis 6
L=11.4-(0.4*3)

along axis 7
L=7.5-0.4

along axis A
L=5.4

along axis B,C,D,E&F


L=1.4

along axis C
L=12-(0.4*3)

DESCRIPTION
b/n axis 24-AF
L1=32.60-(6*0.3)
L2=11.3-0.3

B/n axis 46-AC


L1=16.98-(3*0.3)
L2=11.8-(3*0.3)

b/n axis 45-DF


L1=15.35-(2*0.3)
L2=5.5

b/n axis 45-DF'


L1=17.4-(0.3*4)
L2=6.4-0.3*2

B/n axis 4'5-DD'


A=2.72

B/n axis 67-FD


L1=5.95-0.3
L2=8.46-(2*0.3)

side Form Work


L=142.25

Third Floor
B/n Axis 11'-FF'
L1=29.9-(6*0.3)
L2=1.55

B/n Axis 14-AF


L1=34.107-(7*0.3)
L2=15.53-(2*0.3)

B/n axis 46-DF


L1=16.98-(3*0.3)
L2=11.3-0.3

B/n axis 46-AC


L1=16.98-(3*0.3)
L2=11.8-(3*0.3)

B/n axis 4'5-DD' & 56'-DC


A=2.72+8.6

B/n axis 67-FD


L1=5.95-0.3
L2=8.46-(2*0.3)

side Form Work


L=147.15
DESCRIPTION
B/n axis 67-FD
L1=5.95-0.3
L2=8.46-(2*0.3)

side Form Work


L=130.25

Terrace
B/n Axis 34-AF
L1=30-(6*0.3)
L2=5.3

B/n axis 46-DF


L1=12.75-(2*0.3)
L2=11.3-0.3

B/n axis 45-AC


L1=16.98-(3*0.3)
L2=5.95-0.3

B/n axis 4'5-DD'


A=2.72

B/n axis 67-FD


L1=5.95-0.3
L2=8.46-(2*0.3)

side Form Work


L=107

f,Roof Slab
B/n axis 34-DC
L1=6.2-0.3*2
L2=12-0.3*3

B/n Axis FD-67


L1=11.4-0.3*3
L2=6.4-0.3*2

side Form Work


L=35.6+36.4

DESCRIPTION
Stair Case 3-(Ground-First Floor)
soffit
L=((11*0.16)^2+(10*0.28)^2)^0.5

riser

Side Form Work

Landing
A=2.35

Stair Case 3-(1st -Terrace)


soffit
L=((10*0.16)^2+(9*0.28)^2)^0.5

riser

Side Form Work


Landing
A=2.3

Staircase -4 (Ground -1st floor)


Soffit
L=((22*0.16)^2+(20*0.275)^2)^0.5

riser

Side Form Work

Landing

DESCRIPTION
Sub structure

Length of No. of No. of Total No.


No. Location Dia (mm) bar(mm) Bars Memb of Bars Dia 6 Dia 8
Ground floor Beam
GB1
Top 14 9.40 2 2 4
intermidiate 0
Bottom 14 8.70 2 2 4
st 6 1.16 50 2 100 116
GB2
Top 14 8.00 2 1 2
intermidiate 0
Bottom 14 7.30 2 1 2
st 6 1.16 42 1 42 48.72
GB3
Top 14 11.45 2 1 2
intermidiate 0
Bottom 14 10.75 2 1 2
st 6 1.16 61 1 61 70.76
GB4
Top 14 10.44 2 1 2
intermidiate 0
Bottom 14 9.74 2 1 2
st 6 1.16 56 1 56 64.96
GB5
Top 14 12.00 2 1 2
Bottom 14 11.30 2 1 2
st 6 1.16 65 1 65 75.4
First floor
FB1
along axis F 0
Top 14 6.70 2 1 2
16 3.44 2 1 2
14 3.44 1 1 1
0
Bottom 14 6.00 2 1 2
16 6.00 1 1 1
0
st 6 1.16 34 1 34 39.44
FB2
Top 14 9.40 2 2 4
14 1.85 1 2 2
16 2.86 2 2 4
intermediate 14 1.85 1 2 2
0
Bottom 16 8.70 2 2 4
14 8.70 1 2 2
st 6 1.16 50 2 100 116
FB 3
Top 14 9.80 2 1 2
14 2.13 1 1 1
14 2.99 2 1 2
14 1.72 1 1 1
Bottom 14 9.10 3 1 3
st 6 1.16 52 1 52 60.32
FB4 1
Top 14 9.80 2 1 2
16 2.13 1 1 1
20 2.99 2 1 2
14 1.72 1 1 1
Bottom 14 9.10 3 1 3
14 5.26 2 1 2

st 6 1.16 52 1 52 60.32
FB5
Top 14 8.86 2 2 4
14 4.36 2 2 4
14 3.02 2 2 4
14 2.99 2 2 4
16 3.37 1 2 2
Bottom 3 2 6
3 2 6
st 71 1 71
second floor
1700 SFB1
Top 14 6.70 2 1 2
16 3.44 1 1 1
Bottom 14 6.00 3 1 3
st 6 1.16 35 1 35 40.6
SFB2
Top 14 9.40 2 2 4
14 1.85 1 2 2
20 2.86 1 2 2
14 2.86 1 2 2
14 1.85 1 2 2
Bottom 16 8.70 2 2 4
14 8.70 1 2 2
st 6 1.16 50 2 100 116
SFB3
Top 14 9.80 2 1 2
14 2.13 1 1 1
14 2.99 2 1 2
14 1.72 1 1 1
Bottom 14 9.10 3 1 3
st 6 1.16 52 1 52 60.32
SFB4
Top 14 9.48 2 1 2
20 3.82 1 1 1
14 3.82 1 1 1
20 2.99 1 1 1
16 2.99 1 1 1
14 2.71 2 1 2
14 1.72 1 1 1
Bottom 16 10.79 2 1 2
20 10.79 1 1 1
0
st 6 1.16 61 1 61 70.76
SFB5
Top 14 9.48 2 1 2
16 3.82 1 1 1
16 2.99 1 1 1
14 4.36 2 1 2
16 3.37 1 1 1
Bottom 14 7.20 3 1 3
5 14 5.94 3 1 3
0
st 6 1.16 71 1 71 82.36
Top tie beam
RB1
Top 14 9.40 2 2 4
14 1.85 1 2 2
16 2.86 1 2 2
14 1.85 1 2 2
Bottom 14 8.70 3 2 6
st 6 1.16 50 2 100 116
RB2
Top 14 9.40 2 1 2
14 1.85 2 1 2
14 2.86 1 1 1
Bottom 14 8.70 2 1 2
st 6 1.16 50 1 50 58
RB3
Top 14 11.45 2 1 2
14 2.13 1 1 1
14 2.99 1 1 1
14 3.37 1 1 1
Bottom 14 10.75 3 1 3
st 6 1.36 61 1 61 82.96
RB4
Top 14 9.80 2 1 2
14 2.13 1 1 1
16 2.99 1 1 1
14 1.72 1 1 1
Bottom
intermediate 14 9.10 3 1 3
0
st 6 1.16 52 1 52 60.32

Dia 6 Dia 8
Total Length (M) 1339.24 0
Weight (Kg/M) 2.22 0.39
Total Weight (Kg) 2974.72 0
1.02 3034.214 0

Super structure

Length of No. of No. of Total No.


No. Location Dia (mm) bar(mm) Bars Memb of Bars Dia 6 Dia 8
1 Elevation Column
C1 Ground floor- 2nd floor 14 3.84 10 8 80
14 3.84 8 8 64
14 3.53 8 8 64
st1-1 8 1.36 3 8 24 32.64
8 1.14 3 8 24 27.36
st2-2 8 1.26 6 16 96 120.96
8 1.26 10 8 80 100.8
8 1.04 10 16 160 166.4
8 1.04 10 8 80 83.2
8 1.26 3 1 3 3.78
8 1.04 3 1 3 3.12
st 3-3 8 1.06 6 32 192 203.52
8 0.90 6 32 192 172.8
8 1.06 10 16 160 169.6
8 0.90 10 16 160 144
8 1.06 3 2 6 6.36
8 0.90 3 2 6 5.4
C2 0
14 3.84 8 1 8
14 3.84 8 1 8
14 3.53 8 1 8
st4-4 8 1.36 3 2 6 8.16
8 1.14 3 2 6 6.84
8 1.36 6 2 2 2.72
8 1.14 6 2 12 13.68
8 1.36 10 1 10 13.6
8 1.14 10 1 10 11.4
st 5-5 8 1.31 6 4 24 31.44
8 0.94 6 4 24 22.56
8 1.31 10 2 20 26.2
8 0.94 10 2 20 18.8
8 1.31 3 2 6 7.86
8 0.94 3 2 6 5.64
C3 14 4.57 8 2 16
14 3.53 8 2 16
st5-5 8 0.95 3 6 18 17.01
8 0.95 6 8 48 45.792
8 0.95 10 4 40 38.16
3 Ground floor Slab
Main Bar
y-direction 8 8.55 37 1 37 316.35
8 1.74 8 2
x - direction 8 8.35 36 1 36 300.6
8 2.70 12 1
8 3.15 14 1 14 44.1
First floor 0
y-direction 8 8.52 9 1 9 76.68
8 7.50 12 1 12 90
8 6.42 14 1 14 89.88
10 2.96 19 1 19
positive bar 10 2.98 26 1 26
10 2.99 18 1 18
x - direction 8 2.72 9 1 9 24.48
10 2.86 41 1 41
8 6.17 41 1 41 252.97
y-direction 8 5.63 13 1 13 73.19
x-direction 10 3.20 38 1 38
y-direction 8 5.80 30 1 30 174
10 3.12 30 1 30
x - direction 8 6.17 9 1 9 55.53
8 4.70 10 1 10 47
8 7.60 18 1 18 136.8
y- direction 8 6.42 34 1 34 218.28
10 2.96 25 1 25
10 2.99 41 1 41
x-direction 8 6.17 41 1 41 252.97
8 5.47 6 1 6 32.82
0
second floor
y-direction 8 8.32 9 1 9 74.88
8 8.12 12 1 12 97.44
8 7.04 14 1 14 98.56
10 3.58 31 1 31
positive bar 10 2.98 26 1 26
10 2.99 18 1
x - direction 8 2.86 12 1 12 34.32
10 2.86 41 1 41
8 6.17 41 1 41 252.97
y-direction 8 5.63 13 1 13 73.19
x-direction 10 3.20 38 1 38
y-direction 8 5.80 30 1 30 174
10 3.12 30 1 30
x - direction 8 7.60 9 1 9 68.4
8 4.70 10 1 10 47
8 7.60 18 1 18 136.8
y- direction 8 7.04 34 1 34 239.36
10 3.58 41 1 41
10 2.99 41 1 41
x-direction 0
8 9.20 10 1 10 92
8 6.10 45 1 45 274.5
0
Roof slab
y-direction 8 7.45 34 1 34 253.3
10 2.99 34 1 34
x-direction 8 7.65 41 1 41 313.65
y-direction 8 5.80 18 1 18 104.4
8 5.63 12 1 12 67.56
10 3.12 18 1 18
x-direction 8 6.17 27 1 27 166.59
10 2.86 27 1 27
8 3.71 10 1 10 37.1
y-direction 8 7.15 41 1 41 293.15
10 3.12 29 1 29
x-direction 8 6.17 27 1 27 166.59
8 4.70 10 1 10 47
5 stair case -1
Ground -first floor
flight 1
1 12 4.85 10 1 10
2 12 4.27 10 1 10
3 12 3.70 10 1 10
4 12 1.43 10 1 10
5 8 0.96 7 10 70 67.2
6 14 1.67 13 1 13
distribution bar 8 1.23 62 1 62 76.322
riser 8 1.23 10 1 10 12.3
flight 2
1 12 4.54 10 1 10
2 12 1.78 10 1 10
4 12 3.98 10 1 10
5 8 0.96 8 10 80 76.8
6 14 4.41 13 1 13
distribution bar 8 1.23 34 1 34 41.854
riser 8 1.23 10 1 10 12.3
stair case -2
Ground -first floor
flight 1
1 14 5.16 13 1 13
2 14 2.76 13 1 13
3 14 1.99 13 1 13
4 14 2.89 13 1 13
5 8 1.15 8 10 80 92
6 14 1.67 13 1 13
distribution bar 8 1.24 47 1 47 58.28
riser 8 1.24 10 1 10 12.4
flight 2
1 14 5.16 13 1 13
2 14 3.34 13 1 13
3 14 2.57 13 1 13
4 14 2.31 13 1 13
5 8 1.15 8 10 80 92
6 14 2.73 13 1 13
distribution bar 8 1.24 42 1 42 52.08
8 1.24 10 1 10 12.4
stair case -2
1st-Terrace
flight 1
1 14 4.45 13 9 117
2 14 2.65 13 9 117
3 14 1.99 13 9 117
4 14 3.06 13 9 117
5 8 1.15 8 90 720 828
6 14 3.59 13 9 117
distribution bar 8 1.24 39 9 351 435.24
riser 8 1.24 10 1 10 12.4
flight 2
1 14 4.55 13 9 117
2 14 3.51 13 9 117
3 14 2.85 13 9 117
4 14 2.20 13 9 117
5 8 1.15 8 90 720 828
6 14 2.38 13 9 117
distribution bar 8 1.24 39 9 351 435.24
riser 8 1.24 10 1 10 12.4
Stair case -3
Ground -first floor
sec 7-7
1 14 4.86 14 1 14
2 14 2.51 14 1 14
3 14 1.74 14 1 14
4 14 3.14 14 1 14
5 8 1.15 9 10 90 103.5
6 14 3.57 14 1 14
distribution bar 8 1.36 47 1 47 63.92
riser 8 1.36 10 1 10 13.6
Sec 8-8
1 14 5.16 14 1 14
2 14 3.59 14 1 14
3 14 2.83 14 1 14
4 14 2.06 14 1 14
5 8 1.15 9 10 90 103.5
6 14 2.48 14 1 14
distribution bar 8 1.36 47 1 47 63.92
riser 8 1.36 10 1 10 13.6
First -Terrace
sec 7-7
1 14 4.25 14 9 126
2 14 2.31 14 9 126
3 14 1.74 14 9 126
4 14 3.47 14 9 126
5 8 1.15 9 90 810 931.5
6 14 3.80 14 9 126
distribution bar 8 1.36 47 9 423 575.28
riser 8 1.36 10 9 90 122.4
Sec 8-8
1 14 4.55 14 9 126
2 14 3.79 14 9 126
3 14 3.11 14 9 126
4 14 1.95 14 9 126
5 8 1.15 9 90 810 931.5
6 14 2.13 14 9 126
distribution bar 8 1.36 47 9 423 575.28
riser 8 1.36 10 9 90 122.4
Gutter
2 10 2.40 166 1 166
1 10 4.10 166 1 166
8 12.00 9 4 36 432
8 6.50 9 2 18 117

Dia 6 Dia 8
Total Length (M) 0 14134.83
Weight (Kg/M) 2.22 0.39
Total Weight (Kg) 0 5581.561
1.02 0 5693.192
48.33333

Dia 10 Dia 12 Dia 14 Dia 16 Dia 20 Dia 24

37.6

34.8

16

14.6 48.33333

22.9

21.5

20.88

19.48

24
22.6

Dia 8 300.44 0.39 118.6377


Dia 14 234.36 1.21 283.4162
13.4
6.88
3.44
12
6

37.6
3.7
11.44
3.7
34.8
17.4
19.6
2.13
5.98
1.72
27.3

19.6
2.13
5.98
1.72
27.3
10.52

35.44
17.44
12.08
11.96
6.74

13.4
3.44
18

37.6
3.7
5.72
5.72
3.7
34.8
17.4

19.6
2.13
5.98
1.72
27.3

18.96
3.82
3.82
2.99
2.99
5.42
1.72
21.58
10.79

18.96
3.82
2.99
8.72
3.37
21.6
17.82

37.6
3.7
5.72
3.7
52.2

18.8
3.7
2.86
17.4

22.9
2.13
2.99
3.37
32.25
19.6
2.13
2.99
1.72
27.3

Dia 10 Dia 12 Dia 14 Dia 16 Dia 20 Dia 24


0 0 1026.01 149.69 29.3 0
0.62 0.89 1.21 1.58 2.47 3.55
0 0 1240.774 236.4383 72.3124 0
0 0 1265.59 241.1671 73.75865 0

Dia 10 Dia 12 Dia 14 Dia 16 Dia 20 Dia 24

307.2 11.6
245.76
225.92

30.72
30.72
28.24
73.12
56.48

56.24
77.48
53.82

117.26

121.6

93.6

74
122.59
110.98
77.48
0

117.26

121.6

93.6

146.78
122.59

101.66

56.16

77.22

90.48

48.5
42.7
37
14.3

21.645
45.35
17.75
39.75

57.33

67.015
35.88
25.87
37.57

21.645

67.015
43.42
33.41
30.03

35.49

520.65
310.05
232.83
358.02

420.03

532.35
410.67
333.45
257.4

278.46

67.97
35.07
24.36
43.96

49.91

72.17
50.26
39.55
28.77

34.72

535.5
290.43
219.24
436.59

478.17

573.3
477.54
391.23
245.7

268.38
398.4
681.264

Dia 10 Dia 12 Dia 14 Dia 16 Dia 20 Dia 24


2912.064 245.35 9491.21 0 11.6 0
0.62 0.89 1.21 1.58 2.47 3.55
1796.743 217.9886 11477.91 0 28.6288 0
1832.678 222.3483 11707.47 0 29.20138 0
TAKE-OFF SHEET
PROJECT:- PAGE
CLIENT:- DATE
TIM DIM SQ DESCRIPTION TIM DIM SQ
Concrete
Gutter
1 29.7
1.5
0.1
4.455
Form work
1 29.7
1.5
44.55
1 29.7
0.68
20.196
2 1.5
0.1
0.3
65.046
DESCRIPTION
TAKE-OFF SHEET
PROJECT:- PAGE
CLIENT:- DATE
TIM DIM SQ DESCRIPTION TIM DIM SQ
c-25
Enterance Stair
1 3.9 soffit
2.1
0.15
1.23
Steps
6 3.9
0.3
0.15
0.53
1.76
Enterance Ramp
2 6.05 A=6.05
0.18
2.18
Form Work
Enterance Stair
soffit
1 2.1
3.9
8.19
2 1.86 side Form work
0.16
0.6
6 3.9
0.16
3.74
12.53
Enterance Ramp
soffit
2 6.05 A=6.05
12.1
side Form work
3 7.6
0.18
4.1
16.2
DESCRIPTION
133.36