Sinqee Boq Final
Sinqee Boq Final
FOR
BAANKII
BAANKII SIINQEE
SIINQEE
FOR
PRICED
MARCH, 2023
Addis Ababa
Ethiopia
B+G+8 Mixed Use Building
Fill around foundation and around imported selected material from site
1.3.6 waste well rolled and compacted in layers not exceeding 200 mm thick. M3 0.00
Client :Bankii Sinqee Page 2 of 242 ETG Designers and consultants Sh.Co
B+G+8 Mixed Use Building
Fill under hard core with imported selected material from quarry waste
1.3.7 well rolled and compacted in layers not exceeding 200 mm thick. M3 1749.11 1,331.00 2,328,068.07
2 DIVISION -3 CONCRETE
B-SUB STRUCTURE
2.1 CAST-IN-PLACE CONCRETE
50 mm thick lean concrete quality C-5, with minimum cement content
2.1.1 of 150 kg /m3, of concrete:
Client :Bankii Sinqee Page 3 of 242 ETG Designers and consultants Sh.Co
B+G+8 Mixed Use Building
B-SUPER STRUCTURE
2.1 CAST-IN-PLACE CONCRETE
Provide, cut and fix in position sawn structural wood or steel formwork
2.2.1 which ever is appropriate;
Client :Bankii Sinqee Page 4 of 242 ETG Designers and consultants Sh.Co
B+G+8 Mixed Use Building
Class B, 200mm thick HCB wall with the designed compressive strength
3.1.1 , bedded in cement mortar (1:3).Price shall include mortar bed. M2 2590.14 1,061.00 2,748,135.28
3.1.2 Ditto as Item 3.1.1 but 150mm thick M2 2725.58 944.00 2,572,943.83
3.1.3 Ditto as Item 3.1.1 but 100mm thick M2 477.48 745.00 355,723.65
3.1.5 Ditto but for exposed part above natural ground level. M3 0.00
4 DIVISION -5 METALS
Supply and fix 90cm hand rail to the stair case made from 5mm thick
laminated clear glass and Ø40mm vertical aluminum rail placed c/c
1000mm. Price shall include metal plates and all other necessary works
and materialsneeded for anchorage. Price shall also include one coat of
antirust & syntheticenamel spray paint to metal parts & all other
4.10 necessary accessories needed to complete the work. Ml 289.03 11,000.00 3,179,364.54
Ditto as item no 4.01 but 900mm heigh gurd rail for balcony , open
4.20 down and disable ramp Ml 128.10 11,000.00 1,409,100.00
Supply and fix 20x70 cm aluminum sun shade for the Window as per
the given design with aluminum vertical mullions and horizontal
4.3 transoms , price shall include all the necessary works there to complete. Ml 217.60 3,700.00 805,120.00
Client :Bankii Sinqee Page 5 of 242 ETG Designers and consultants Sh.Co
B+G+8 Mixed Use Building
b) Dia 12mm purlin to truss connection bolt. Pcs 60.00 50.00 3,000.00
30mm thick smooth finished cement sand screed laid on top of light
weight concrete and gutter in mortar mix (1:3) with proper slope
5.02 towards down pipe. M2 207.29 604.00 125,203.16
Client :Bankii Sinqee Page 6 of 242 ETG Designers and consultants Sh.Co
B+G+8 Mixed Use Building
Apply APP modified & thickness not less than 4mm slated finish Water
Proofing Membrane or compatible equivalent material for concrete
roof slab including surrounding Parapet wall system to a height of the
copping cover as per the manufacturer's instructions and
recommendations. The cost shall include cleaning of all dirt and dust
materials and all incidental works and details of manufacturer. The
work shall be done on sub contractual base with the supplier of the
material which will give material and construction guarantee to the
client .The work shall include all incidential civil works & tasting of
5.04 roof leakage after completion of the work.
a) Flat Roofs & Gutters M2 207.29 650.00 134,738.50
6 DIVISION -8 OPENINING
6.1 GLAZED ALUMINIUM CURTAIN WALLS
All doors and window are manufactured from 1.8mm thick anodized
aluminum profile frames. All works should be cut and assembled to
sizes and shaps of the window and door schedule up on submitting work
shop drawing by the contractor. Unit price includes supply and
installation 5mm thick Clear glass, anchor bolts, 3mm thick aluminum
cover plates, cylindrical locks, door stoppers and all other necessary
accessories as per ES 3139 quality requirment to completing the work.
6.1.1 Window
a) Type W1 size: 1500x600mm Pcs 9.00 13,500.00 121,500.00
b) Type W2 size: 2000x600mm Pcs 32.00 18,000.00 576,000.00
c) Type W3 size: 990x600mm Pcs 10.00 8,910.00 89,100.00
d) Type W4 size: 2890x1200mm Pcs 10.00 52,020.00 520,200.00
e) Type W5size: 5200x3600mm Pcs 2.00 280,800.00 561,600.00
f) Type W6 size: 5000x3600mm Pcs 1.00 270,000.00 270,000.00
g) Type W7 size: 5400x3600mm Pcs 2.00 291,600.00 583,200.00
h) Type W9 size: 4200x3600mm Pcs 1.00 226,800.00 226,800.00
i)Type W10 size 5000x10000mm Pcs 2.00 750,000.00 1,500,000.00
j) Type W11 size: 4420x3600mm Pcs 1.00 238,680.00 238,680.00
k) Type W13 size: 1500x1200mm Pcs 24.00 27,000.00 648,000.00
l) Type W14 size: 3990x2800mm Pcs 8.00 167,580.00 1,340,640.00
m) Type W16 size: 5400x2800mm Pcs 19.00 226,800.00 4,309,200.00
n) Type W19 size: 2720x2800mm Pcs 1.00 114,240.00 114,240.00
o) Type W21 size: 6000x2800mm Pcs 1.00 252,000.00 252,000.00
p) Type W 27size: 5880x2800mm Pcs 2.00 246,960.00 493,920.00
q) Type W30 size: 2490x2800mm Pcs 1.00 104,580.00 104,580.00
r) Type W 33 size: 2560x2800mm Pcs 1.00 107,520.00 107,520.00
s) Type W 37 size: 3220x2800mm Pcs 1.00 135,240.00 135,240.00
t) Type W 38 size: 2820x600mm Pcs 8.00 25,380.00 203,040.00
w) Type W 39 size: 2700x1200mm Pcs 1.00 48,600.00 48,600.00
x) Type W 40 size: 2500x1200mm Pcs 1.00 45,000.00 45,000.00
y) Type W 41 size: 1050x600mm Pcs 2.00 9,450.00 18,900.00
z) Type W 42size: 5650x600mm Pcs 1.00 50,850.00 50,850.00
a'') Type W 44 size: 5400x2800mm Pcs 2.00 226,800.00 453,600.00
b'') Type W 45 size: 3530x2800mm Pcs 9.00 148,260.00 1,334,340.00
c'') Type W46 size: 3160x2800mm Pcs 1.00 132,720.00 132,720.00
d'') Type W 49 size: 4200x2800mm Pcs 8.00 176,400.00 1,411,200.00
e'' Type W 50 size: 6050x2800mm Pcs 4.00 254,100.00 1,016,400.00
f'') Type W 55 size: 1500x2000mm Pcs 12.00 45,000.00 540,000.00
g'') Type W 56 size: 3000x650mm Pcs 5.00 29,250.00 146,250.00
h'') Type W 57 size: 1500x650mm Pcs 2.00 14,625.00 29,250.00
Client :Bankii Sinqee Page 7 of 242 ETG Designers and consultants Sh.Co
B+G+8 Mixed Use Building
6.1.2 Door
a) Type D1 = size:700x2100mm Pcs 74.00 22,050.00 1,631,700.00
b) Type D2 = size: 900x2100mm Pcs 57.00 28,350.00 1,615,950.00
c) Type D3 = size: 1000x2100mm Pcs 1.00 31,500.00 31,500.00
d) Type D4 = size: 1200x2100mm Pcs 2.00 37,800.00 75,600.00
Supply and fix Fire resistance Bristol door of rating of 120 minute as
per the architectural schedule,FLS and NFPA , made of frame 45mm
thick metal door – frame sheet 2.0 mm thick GI sheet visible seam-leaf
sheet material 1.5 mm thick G.I steel – door silencer 2 No’s rubber
bumpers supplied – frame jamb depth up to 150 mm, single rebated
frame-finish polyster powder coated at factory finish match leaf. price
shall include all the necessary fixing accessories and approved quality
fire resistant 6.5mm vision panel, inturnescent strip/cold smoke seal,
kick plate, door closer, lock, (product data, shop drawings, material type,
color, size, pattern and BS/UL10Cshall be reviewed/approved by
6.2 architect prior to any purchase.
a) Type D5 size: 2000x2100 mm PCs 12.00 720,000.00 8,640,000.00
Curtain walls
Client :Bankii Sinqee Page 8 of 242 ETG Designers and consultants Sh.Co
B+G+8 Mixed Use Building
Supply and fix semi- structural of appropriate section to safely bear the
expected load and curtain wall made of double glazed continuous
horizontal panel or glass bearing units with profile dimensions 1.8mm.
The units are composed of a frame with horizontal perimetral profiles
able to mechanically restrain the glass panel by inserting an external
glass beading profile and vertical profiles that enable the glass to cover
the profiles. The materials to be used are high quality, anodized
aluminum profile frames with 5mm thick black tinted glass openable
window and sealant, as per the engineers approval. Price shall include
glass, anchorage, sealant and all the necessary accessories needed to
6.30 finish the workin comply to BS5516
7 DIVISION -9 FINISHES
7.1 PLASTERING
Apply two coats of plastering in cement mortar (1.3) for internal wall
Surface to comply with the requirements of ES 1487. All wall concrete
7.1.1 structure joints shall be well treated to avoid hairline cracks.
10mm thick first grade RAK Dubai or equivalent Mat ceramic tile
flooring stuck down with approved type adhesive on cement sand screed
floor finish and joints grouted in appropriate color setting coat mortar.
Type, color, size and pattern of tile shall comply with technical
7.2.4 specification requirement,Architects preference and approval. M2 600.39 5,000.00 3,001,960.00
Client :Bankii Sinqee Page 9 of 242 ETG Designers and consultants Sh.Co
B+G+8 Mixed Use Building
Supply and fix 3mm thick Rolled PVC flooring glued with approved
type adhesive to cement screed. Price shall include adhesive. Color and
quality to be approved by the Engineer and material shall be in
7.2.8 compliance with BS 3260 quality standard.. M2 271.81 1,300.00 353,353.00
Supply and fix 100 mm high PVC Rolled tile skirting glued with
7.2.9 approved type adhesive backing Ml 58.66 150.00 8,799.00
a) Width 250mm Ml
b) Width 200mm Ml 757.04 1,500.00 1,135,560.00
Client :Bankii Sinqee Page 10 of 242 ETG Designers and consultants Sh.Co
B+G+8 Mixed Use Building
Supply and fix 15mm thick granite wall cladding to lift shaft shear wall
in accordance with the Architectural detail drawing stuck to wall with
approved type of adhesive on plastered wall surface and joints to be
grouted in appropriate color setting coat mortar. Color, Size and Pattern
of the tile shall be in accordance with the Architect's preference and
7.2.15 Technical Specification Requirement. M2 514.30 10,000.00 5,143,000.00
Supply & fix 15mm thick Gypsum Fiber ceiling With Suspender & all
7.2.16 accessories M2 4002.81 1,500.00 6,004,215.00
Marble coping bedded in cement sand mortar mix (1:2) and joints
7.2.18 grouted in white water proof joint filler
Size 300 x 30mm Ml 140.50 2,700.00 379,350.00
Supply and apply by roller 2 coats of approved type quartz paint as per
7.3.2 manufacturere instruction over finish plaster surface to:-
a ) To External Wall M2 3821.61 550.00 2,101,883.11
Supply, fix, test and commission soap holder made of white vitreous
china near the shower and bath tub units complete with its all
8.1
acsessories, best quality and approved standards.
Size - 185 x 95mm No 41 1,128.00 46,248.00
Supply, fix, test and commission towel hanger, 600mm long, made of
8.2 chrome plated tubular metal rollers including fastening screws. No 2 653.00 1,306.00
Supply, fix, test and commission toilet paper holder made of white
vitreous china complete with chrome plated metal roller & fastening
8.3
screws; all of best quality and approved standards.
Size - 170 x 185mm No 70 650.00 45,500.00
Supply, fix, test and commission crystal glass mirror with copper back
protection, including chrome plated brass clips and fixing screws of best
8.4 quality & approved standards.
Size - a) 500x600mm No 73 1,105.00 80,665.00
Client :Bankii Sinqee Page 11 of 242 ETG Designers and consultants Sh.Co
B+G+8 Mixed Use Building
Ditto item No/1.17 above but Automatic Hand dryer, complies with the
8.6 EN 60335-2-23/1997 Standards. " 35 16,000.00 560,000.00
Supply, fix, test and commission low flush water closet , made of
white glazed vitreous china, of Europian standards with close coupled
cistern complete with universal mechanism & float ball valve, plastic
seat & cover, heavy duty flexible pipe and all required accessories of
9.1.2 approved standards & best quality. " 70 20,529.00 1,437,030.00
Supply, fix, test and commission Wall hung Urinal, made of white
glazed vitreous china, of Europian standards, including Push button
chrome plated faucet, S-Trap and all required accessories of approved
9.1.3 standards & best quality. No 42 6,450.00 270,900.00
Supply and install kitchen sink in stainless steel, double bowl, with
chrome plated mixing faucet, chain, plug, Smell trap and complete with
9.1.5 all required accessories.
Size -1500x500mm, Single Bowl No 5 8,500.00 42,500.00
Supply, fix, test and commission water heater Complete with all water
proofing, mounting and fastening materials, heat insulation, safety and
non-return valve, & all accessories; all of approved standards & quality.
Unit price shall include all assisstance works there to.
9.1.6
Size - a) 50 lit.capacity No 2 18,008.00 36,016.00
Size - b) 100 lit.capacity No 1 26,384.00 26,384.00
Client :Bankii Sinqee Page 12 of 242 ETG Designers and consultants Sh.Co
B+G+8 Mixed Use Building
Supply, install, disinfect, test and commission potable water supply PP-
R Pipes, PN 20, of aproved standards & qualities, for cold & Hot water
distribution to all sanitary fixtures or equipments as where shown on the
drawings. Complete with connecting fittings such as bends, unions,
tees, reducers, supporting clamps, anchors, painting as where required,...
etc. The scope of works includes all incidential civil works, such as
chiselling of walls, floors and closing them with cement mortar or
concrete to normal conditions. All as spacified in the techinical
spesification of the material and the manufacturer's instructions &
recomendation. The installation of the system shall be tested at the
expence of the copntractor with a pressure of 10kg/cm² or twice the
working pressure, which ever is greater. All pipe sizes mentioned here
9.2.1 are commercial external diametrers.
a) ¯25mm ML 325 245.00 79,625.00
b) ¯50mm " 24 380.00 9,120.00
c) ¯75mm " 28 510.00 14,280.00
Supply, fix, test and commission PP-R gate valves, of approved
Standards & quality, and the same brand of the pipe, for Cold and Hot
water distribution systems as where shown on the drawings. Complete
9.2.2 with all required fittings and accesseries there to.
a) CHROME PLATED ANGLE VALVE No 263 480.00 126,240.00
b) ¯25mm NORMAL " 26 630.00 16,380.00
9.3) WASTE, VENT & STORM WATER DRAIN PIPES:
All soil & waste, vent and storm water pipe lines shall be UPVC pipe
to BS 4514 and the slope towards the outlet shall be provided in the
drawings. All UPVC pipes and necessary fittings shall be standard
quality and be free from damage during srorage & constraction. Unit
price shall include all assisstance civil works and fixing or/& hanging to
walls, beams or slabs etc...
Supply, install, test and commission soil & waste water drainage
pipes in horizontal branches and vertical stacks made of UPVC
Pipes(PN6) of approved standards & quality including all necessary
fittings such as elbow. Y,Tee ...etc. with tight joints. All horizontall
branches shall be laid in a slope of 2% at normal conditions. Unit price
shall include provision of MARMOX OR equivalent angle board for
cladding the vertical stacks of the waste drain pipes, all necessary
assistance works such as chiseling of walls, beams, floors,... etc and
closing them with concrete or cement mortar to normal conditions.
9.3.1
a) ¯50mm ML 67 395.00 26,465.00
b) ¯75mm " 83 510.00 42,330.00
c) ¯110mm " 104 725.00 75,400.00
c) ¯160mm " 45 725.00 32,625.00
Supply and install vent caps made of rigid UPVC to be connected to
the roof terminal of vent pipes as shown on the riser diagram complete
9.3.2 with all necessary sealing gaskets and accessories there to.
a) ¯110 No 5 230.00 1,150.00
Supply, install, test and commission floor drains as where shown on
drawings, made of polished stainless steel or equivalent, with suficient
water seal not less than 2.5cm, or accompanied with P-Smell Trap, on
waste water drainage pipes, including accessories for the proper
installation and operation of the fixture. All as specified on the technical
specification.
9.3.3
a) ¯80mm " 33 1,037.00 34,221.00
Ditto item No/3.3 above but for Stainless Steel Floor Gulley, purpose
9.3.4 made.
a) 20 x 60cm " ….
Client :Bankii Sinqee Page 13 of 242 ETG Designers and consultants Sh.Co
B+G+8 Mixed Use Building
Ditto item NO/ 3.1 above but for storm water drain Down Pipes.
Exposed UPVC Down Pipes to sun light shall be painted with UV
resistant paint and withstand the external temprature and the quality
9.3.6 shall meet the purpose.
a) ¯50mm, for spouts ML 12 250.00 3,000.00
b) ¯110mm " 341 500.00 170,500.00
Supply, install and commission storm water flat roof drain Strainer
made of dura coated cast iron body or equivalent, incobination flashing
clamp/gravel guard and other required fittings and accessories such as
adaptors to UPVC down pipe riser. All as where shown on drawings and
as specified on the technical specification.
9.3.7 No 11 737.00 8,107.00
Client :Bankii Sinqee Page 14 of 242 ETG Designers and consultants Sh.Co
B+G+8 Mixed Use Building
Supply, fix, test and commission Wall mounted, Fire Hose Cabinate as
per BS EN671-1, complete with Ф40mm, 30m long non percoleting
canvas hose, Bronzze spray jet nozzle, hose reel and angle valve with
built-in pressure reducer, swinging guide arm and all other necessary
connecting and fixing fittings and accessories for the proper installation
and function of the system and quick connection to Fire Hydrant. The
Cabinet shall provide space for the chemical fire extingusher & be
factory made 1.2mm thick ... etc. Unit price shall include all accessories
9.3 & incidential works there to.
Size: - 80 X 90 X 20cm No 9 32,000.00 288,000.00
Supply and fix Chemical fire extinguisher, with described size & class
of fire, all of approved standards & quality and complete with required
9.4 fittings. It will placed in the fire hose cabinate.
a) 6kg, class of fire A, B, C, & E No 9 3,550.00 31,950.00
Client :Bankii Sinqee Page 15 of 242 ETG Designers and consultants Sh.Co
B+G+8 Mixed Use Building
Suction Dia.
9.3 = 2" Discharge Dia. = 2" No 1 219,289.00 219,289.00
Client :Bankii Sinqee Page 16 of 242 ETG Designers and consultants Sh.Co
B+G+8 Mixed Use Building
9.2.2
i) Pump set for water tanks
· Q = 3.5l/s
· H = 50m
· P = 3kw No 2 1,381,325.50 2,762,651.00
Supply,install,test and commission FACTORY ASSEMBLED
Centrifugal pumps, equiped with Diesel pump,Electrical pump,Jocky
pump for FIRE FIGHTING, as where shown on the drawings, complete
with required fittings such as automatic float switch including respective
cable at G/Reservoir, non return (check) valve, gate valves, foot valve
with Strainer at suction tip , etc…. Both pumps, the on duty and the
stand by one will have common suction as well as delivery lines. Unit
price shall include provision of all necessary devices and fittings such as
electrical control panel, construction of pump house and Pump Seat Rc-
Pad all of approved standards & Quality, and incidential works there to.
The work shall be done on sub contractual bases with the supplier of the
material which will give material & installation guarantee to the client.
Client :Bankii Sinqee Page 17 of 242 ETG Designers and consultants Sh.Co
B+G+8 Mixed Use Building
9.2) Manholes
Construct rectangular manholes out of mortar 15cm thick RC-Concrete
wall, internally plastered, on a base of 150mm thick RC-Concrete slab
cast over 15cm thick hard core, and covered withPurpose made Cast
Iron Cover of aproved quality; all as shown on the Detail drawings .
Price shall also include excavation of pit , backfilling and cartaway .
9.2.1
Size: - a) 1000 x 1000mm (avg. depth 1200mm) No 6 15,300.00 91,800.00
9.2.2 SPETIK TANK
construct effective volume of 100 m3 septic tank out of 200mm
thick RC wall &on the base of 200mm thick R.C
concrete bottom slab , top slab and reinforced manhole
cover .the work shal be carried out in accordance with the given sanitary
detail drawing & instruction .
price shall include excavation to the
required depth ,backfilling ,cart away and all the necessary assitance
work No 1 1,105,000.00 1,105,000.00
Client :Bankii Sinqee Page 18 of 242 ETG Designers and consultants Sh.Co
B+G+8 Mixed Use Building
Client :Bankii Sinqee Page 19 of 242 ETG Designers and consultants Sh.Co
B+G+8 Mixed Use Building
Client :Bankii Sinqee Page 20 of 242 ETG Designers and consultants Sh.Co
B+G+8 Mixed Use Building
Client :Bankii Sinqee Page 21 of 242 ETG Designers and consultants Sh.Co
B+G+8 Mixed Use Building
Client :Bankii Sinqee Page 22 of 242 ETG Designers and consultants Sh.Co
B+G+8 Mixed Use Building
10.5.3 Flush mounting socket outlet of 16A/1P, with switch for water heater. No 3 400.00 1,200.00
10.5.4 Flush mounting socket outlet of 25A/1P No 11 600.00 6,600.00
10.5.5 Flush mounting socket outlet of25A/3P No 5 800.00 4,000.00
10.5.6 Flush mounting socket outlet of32A/3P No 3 800.00 2,400.00
Floor Box. -
-Floor box shall be fixed neatly in contact with the horizontal surface of
the Floor with the necessary fixers or connectors with IP 54 enclousures
and maximum depth of 5-7cm -
-Floor box ,data,socket and telephone out lets shall be the product of the
same manfacture. -
EAE , DB MX-1-S1 360X360 in screed floor service outlet box +DK
MX1 250x250 Modular socket Box, Grey or approved equivallent and
consisting of :- -
4pcs 8 contact RJ 45 data/tele outlet and 4pcs socket out let
10.5.7 .(4US,2D/T). No 76 12,000.00 912,000.00
Client :Bankii Sinqee Page 23 of 242 ETG Designers and consultants Sh.Co
B+G+8 Mixed Use Building
10.8 Manholes
Manhole in brick or masonry, internally of 600x600x600mm including
No 3,800.00 15,200.00
10.8.1 reinforced concrete cover with lifting lug. 4
10.10 Grounding
50 x 50 x 50 cm single brick inspection pit with the cover top inscribed
10.10.1 "Earthing" as per the detail drawing No 1 2,800.00 2,800.00
10.10.2 4 x 150 sq.mm bare copper wire m 15 556.25 8,343.75
10.10.3 Diameter 16mm and 1500mm long copper rod
Note:If the earth resistence is more than 5 ohms 'add additional electrode
spaced at length of the electrode No 1 650.00 650.00
TOTAL CARRIED TO SUMMARY ................................................... 17,462,706.65
Client :Bankii Sinqee Page 24 of 242 ETG Designers and consultants Sh.Co
B+G+8 Mixed Use Building
Supply, install, leble, test and commission of 22U, 19" wall Mounted
steel enclosure for IDF-GF with transparent and lockable door ,knock-
out holes for cable entrance and conduit connection, ventilation
fan,screen lable holder and including reserve space for hubs and
switches,complete connection and all the necessary accessories
consisting:-
11.1.6
2 pcs cat 6, 48port patch panel, RJ 45 8 contacts for horizontal cabling
(Both Data and telephone) (96ports) (4U)
1pc voice patch panel, 24port contacts for 20 pair telephone cable
(1U)
6 pcs cable organizer, (6U)
1pc PDU with 8 shuko socket outlets (1U)
2 pcs 48Ports Cisco or equivalent Switch (4U)
fiber optic drawer and fiber optic unit to accommodate 6 multimode
fiber back bone cables. Standard (2m) patch cords , fiber optic LC-LC
patch cords And all necessary accessories to make the system complete. No 1 580,000.00 580,000.00
Supply, install, leble, test and commission of 16U, 19" wall Mounted
steel enclosure for IDF-1F with transparent and lockable door ,knock-
out holes for cable entrance and conduit connection, ventilation
fan,screen lable holder and including reserve space for hubs and
switches,complete connection and all the necessary accessories
consisting:-
11.1.7
Client :Bankii Sinqee Page 25 of 242 ETG Designers and consultants Sh.Co
B+G+8 Mixed Use Building
Supply, install, leble, test and commission of 22U, 19" wall Mounted
steel enclosure for IDF-3F with transparent and lockable door ,knock-
out holes for cable entrance and conduit connection, ventilation
fan,screen lable holder and including reserve space for hubs and
switches,complete connection and all the necessary accessories
consisting:-
11.1.8
2 pcs cat 6, 48port patch panel, RJ 45 8 contacts for horizontal cabling
(Both Data and telephone) (96ports) (4U)
1pc voice patch panel, 24port contacts for 20 pair telephone cable
(1U)
6 pcs cable organizer, (6U)
1pc PDU with 8 shuko socket outlets (1U)
2 pcs 248Ports Cisco or equivalent Switch (4U)
fiber optic drawer and fiber optic unit to accommodate 6 multimode
fiber back bone cables. Standard (2m) patch cords , fiber optic LC-LC
patch cords And all necessary accessories to make the system complete. No 1 580,000.00 580,000.00
Supply, install, leble, test and commission of 32U, 19" wall Mounted
steel enclosure for IDF-TF(4-7F) with transparent and lockable
door ,knock-out holes for cable entrance and conduit connection,
ventilation fan,screen lable holder and including reserve space for hubs
and switches,complete connection and all the necessary accessories
consisting:-
11.1.9
3 pcs cat 6, 48port patch panel, RJ 45 8 contacts for horizontal cabling
(Both Data and telephone) (144ports) (6U)
2pc voice patch panel, 24port contacts for 40 pair telephone cable
(2U)
6 pcs cable organizer, (6U)
1pc PDU with 8 shuko socket outlets (1U)
3 pcs 48Ports Cisco or equivalent Switch (6U)
fiber optic drawer and fiber optic unit to accommodate 6 multimode
fiber back bone cables. Standard (2m) patch cords , fiber optic LC-LC
patch cords And all necessary accessories to make the system complete. No 4 580,000.00 2,320,000.00
Client :Bankii Sinqee Page 26 of 242 ETG Designers and consultants Sh.Co
B+G+8 Mixed Use Building
Dish antenna for for sattelite signal reception complete with C-band
11.2.1 LNB, cabling, mounting accessories on roof top concrete base. No 1.00 132,000.00 132,000.00
TV points fed through RG6 Coaxial Cable and Power supply wires
through inside PVC conduits of 32mm diameter including MS box,
junction boxes with covers, insulating screw cap connectors, and flush
mounted terminal loop through TV sockets with all required materials
11.2.4 with necessary distributor terminal in between the TV Terminals. Nº 10 1,800.00 18,000.00
Loop through Double moudule FM+AM TV out let for flush mounting
11.2.5 Nº 10 1100 11,000.00
11.2.6 Flush mountedTV Box Nº 2 650 1,300.00
Client :Bankii Sinqee Page 27 of 242 ETG Designers and consultants Sh.Co
B+G+8 Mixed Use Building
Client :Bankii Sinqee Page 28 of 242 ETG Designers and consultants Sh.Co
B+G+8 Mixed Use Building
Client :Bankii Sinqee Page 29 of 242 ETG Designers and consultants Sh.Co
B+G+8 Mixed Use Building
MV/LV Transformer
13.5 (Supplied by EEPCo or Nominated Sub Contractor)
Client :Bankii Sinqee Page 30 of 242 ETG Designers and consultants Sh.Co
B+G+8 Mixed Use Building
Client :Bankii Sinqee Page 31 of 242 ETG Designers and consultants Sh.Co
B+G+8 Mixed Use Building
Client :Bankii Sinqee Page 32 of 242 ETG Designers and consultants Sh.Co
Project Residence
Location ADDIS ABABA
SUB - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
Left wings
F1 16 7.00 32.00 #REF! #REF!
16 6.30 38.00 #REF! #REF!
F2 16 5.90 39.00 #REF! #REF!
16 6.60 33.00 #REF! #REF!
F3 16 5.60 62.00 #REF! #REF!
F4 16 5.40 52.00 #REF! #REF!
F5 16 4.70 46.00 #REF! #REF!
F6 14 4.10 46.00 #REF! #REF!
F7 14 3.50 44.00 #REF! #REF!
F8 12 2.80 32.00 #REF! #REF!
F9 10 6.60 18.00 #REF! #REF!
Compundfooting
CF1 16 4.70 84.00 #REF! #REF!
CF2 16 5.40 84.00 #REF! #REF!
RWF1 20 4.30 81.00 2 696.60
20 4.30 81.00 2 696.60
16 6.05 13.00 2 157.30
16 6.05 13.00 2 157.30
Stripped footing
3.013 20 9.30 16.00 1 148.80
20 7.20 16.00 1 115.20
20 6.20 16.00 1 99.20
20 6.60 27.00 6 1,069.20
20 7.80 16.00 1 124.80
Right wings
F3 16 5.60 62.00 #REF! #REF!
F10 16 5.40 50.00 #REF! #REF!
F11 16 4.60 50.00 #REF! #REF!
F12 14 3.70 50.00 #REF! #REF!
F13 14 3.20 28.00 #REF! #REF!
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
MX5 & Mx6 20 7.05 8.00 2 112.80
20 7.05 8.00 2 112.80
20 5.05 12.00 2 121.20
20 11.05 14.00 2 309.40
16 12.00 4.00 2 96.00
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
C11 24 4.37 14.00 #REF! #REF!
St1 10 2.26 18.00 #REF! #REF!
St2 10 1.76 18.00 #REF! #REF!
St3 10 1.58 18.00 #REF! #REF!
St4 10 0.61 18.00 #REF! #REF!
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
At Basment floor
left wings
C-1 20 4.80 16.00 #REF! #REF!
St1 10 2.26 18.00 #REF! #REF!
St2 10 1.76 18.00 #REF! #REF!
St5 10 0.61 18.00 #REF! #REF!
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
C3' Sec-6 24 5.20 18.00 #REF! #REF!
St1 10 3.06 18.00 #REF! #REF!
St2 10 2.52 18.00 #REF! #REF!
St3 10 2.36 18.00 #REF! #REF!
St4 10 1.92 18.00 #REF! #REF!
St4 10 0.80 18.00 #REF! #REF!
C5
Sec-8' 24 5.20 16.00 #REF! #REF!
St1 10 2.66 18.00 #REF! #REF!
St2 10 2.12 18.00 #REF! #REF!
St3 10 1.98 18.00 #REF! #REF!
St4 10 1.52 18.00 #REF! #REF!
right wing
C-1 Section 1 20 4.90 18.00 #REF! #REF!
St1 10 3.06 18.00 #REF! #REF!
St2 10 2.26 18.00 #REF! #REF!
St3 10 2.16 18.00 #REF! #REF!
St4 10 1.52 18.00 #REF! #REF!
Project Residence
Location ADDIS ABABA
SUB - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
St5 10 0.80 18.00 #REF! #REF!
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
St2 10 2.12 18.00 #REF! #REF!
St3 10 2.16 18.00 #REF! #REF!
St4 10 1.52 18.00 #REF! #REF!
St4 10 0.80 18.00 #REF! #REF!
Shear Wall
SW-1 20 6.10 88.00 1 536.80
12 7.42 62.00 1 460.04
RC Retaining Wall
Foundation level
Along Ax-A 12 3.50 706.00 1 2,471.00
12 12.00 36.00 5 2,160.00
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
Along Ax-1 12 3.57 788.00 1 2,813.16
12 12.00 42.00 5 2,520.00
Project Residence
Location ADDIS ABABA
SUB - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
Beams
Basment Beam
Right wings
MX1 & MX2 20 9.96 4.00 2 79.68
20 7.00 24.00 2 336.00
20 11.31 4.00 2 90.48
24 2.70 3.00 2 16.17
24 3.76 3.00 2 22.53
24 3.87 3.00 2 23.22
24 4.00 15.00 2 120.00
24 4.34 3.00 2 26.04
24 3.15 3.00 2 18.90
20 6.42 6.00 2 77.04
20 7.00 34.00 2 476.00
20 7.87 5.00 2 78.70
10 1.80 473.00 2 1,702.80
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
20 5.65 4.00 4 90.40
20 7.10 5.00 4 142.00
20 5.52 4.00 4 88.32
10 1.80 324.00 4 2,332.80
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
20 7.10 3.00 3 63.90
20 5.52 3.00 3 49.68
10 1.80 363.00 3 1,960.20
left wings
MX1 16 9.01 4.00 1 36.04
16 6.90 4.00 1 27.60
16 6.60 4.00 1 26.40
16 6.80 8.00 1 54.40
16 11.55 4.00 1 46.20
16 8.05 4.00 1 32.20
16 9.68 4.00 1 38.72
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
16 5.45 4.00 1 21.80
16 11.52 4.00 1 46.08
2.2 10 1.80 324.00 1 583.20
2.05
SY3 & SY4 16 10.16 4.00 2 81.28
20 8.05 3.00 2 48.30
16 8.40 4.00 2 67.20
16 6.88 4.00 2 55.00
16 6.18 4.00 2 49.40
16 8.91 4.00 2 71.28
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
16 6.87 4.00 3 82.44
16 6.17 4.00 3 74.04
16 8.91 4.00 3 106.92
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
20 11.91 6.00 2 142.92
16 6.06 4.00 2 48.48
16 8.06 5.00 2 80.60
10 1.80 197.00 2 709.20
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
20 3.59 6.00 2 43.08
20 2.36 3.00 2 14.16
20 8.07 5.00 2 80.70
20 5.65 3.00 2 33.90
20 7.10 3.00 2 42.60
20 5.52 3.00 2 33.12
10 1.80 196.00 2 705.60
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
16 3.24 2.00 1 6.48
16 3.87 4.00 1 15.48
16 4.00 10.00 1 40.00
16 2.70 2.00 1 5.39
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
20 4.05 3.00 2 24.30
16 3.59 3.00 2 21.54
20 3.59 4.00 2 28.72
16 2.36 2.00 2 9.44
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
negative bar
MX2 10 3.59 677.00 1 2,430.43
MX3 10 3.59 640.00 1 2,297.60
MX4 10 4.05 569.00 1 2,304.45
MX5 10 5.00 536.00 1 2,680.00
MX6 10 4.92 21.00 1 103.32
10 3.82 586.00 1 2,238.52
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
Basment Slab
8 1.05 #REF! 1 #REF!
Ramp Slab
10 1.05 #REF! 1 #REF!
Staircase
Staircase -1
1 16 4.75 12.00 2 114.00
2 16 2.72 12.00 1 32.64
16 3.81 12.00 1 45.66
3 16 2.35 12.00 1 28.20
16 3.43 12.00 1 41.16
4 16 3.68 12.00 1 44.10
16 2.61 12.00 1 31.26
6 16 3.99 12.00 1 47.88
16 2.87 12.00 1 34.44
8 1.03 8.00 20 164.00
8 1.45 10.00 2 29.00
8 1.45 15.00 2 43.50
Section 2-2
St1 10 1.86 144.00 4 1,071.36
St2 10 1.32 144.00 8 1,518.34
Section 3-3
St6 10 2.86 48.00 4 549.12
St7 10 2.32 48.00 4 445.44
St8 10 2.05 48.00 4 393.60
St9 10 1.72 48.00 4 330.24
Sec-7-7
St6 10 2.86 48.00 2 274.56
St7 10 2.32 48.00 2 222.72
St9 10 1.72 48.00 2 165.12
St20 10 2.26 48.00 2 217.34
St19 10 0.80 48.00 2 77.28
Sec-8-8
St21 10 2.66 48.00 2 255.36
St22 10 2.12 48.00 2 203.52
St23 10 2.16 48.00 2 207.74
St24 10 1.52 48.00 2 145.92
St19 10 0.80 48.00 2 77.28
Section 4-4
St10 10 2.46 48.00 2 236.16
St11 10 1.99 48.00 2 191.23
St12 10 1.48 48.00 2 142.08
St13 10 1.78 48.00 2 171.26
Section 1-1
St1 10 2.26 96.00 2 433.92
St2 10 1.76 96.00 4 677.38
St3 10 0.61 96.00 4 232.32
Sec-7-7
St6 10 2.86 48.00 2 274.56
St7 10 2.32 48.00 2 222.72
St9 10 1.72 48.00 2 165.12
St20 10 2.26 48.00 2 217.34
St19 10 0.80 48.00 2 77.28
Sec-8-8
St21 10 2.66 48.00 2 255.36
St22 10 2.12 48.00 2 203.52
St23 10 2.16 48.00 2 207.74
St24 10 1.52 48.00 2 145.92
St19 10 0.80 48.00 2 77.28
Section 4-4
St10 10 2.46 48.00 2 236.16
St11 10 1.99 48.00 2 191.23
St12 10 1.48 48.00 2 142.08
St13 10 1.78 48.00 2 171.26
Section 1-1
St1 10 2.26 96.00 2 433.92
St2 10 1.76 96.00 4 677.38
St3 10 0.61 96.00 4 232.32
Sec-8'-8'
St1 10 2.66 47.00 1 125.02
St2 10 2.12 47.00 1 99.64
St3 10 1.98 47.00 1 93.25
St4 10 1.52 47.00 1 71.44
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
Section 4-4
St10 10 2.46 48.00 1 118.08
St11 10 1.99 48.00 1 95.62
St12 10 1.48 48.00 1 71.04
St13 10 1.78 48.00 1 85.63
Section 5-5
St1 10 2.26 72.00 1 162.72
St12 10 1.76 72.00 1 127.01
St3 10 0.60 72.00 1 43.20
St14 10 1.58 72.00 1 114.05
Section 9-9
St4 10 1.86 96.00 1 178.56
St5 10 1.32 96.00 1 126.53
St25 10 1.46 96.00 1 140.54
St26 10 0.51 96.00 1 48.48
Section 4-4
St10 10 2.46 24.00 3 177.12
St11 10 1.99 24.00 3 143.42
St12 10 1.48 24.00 3 106.56
St13 10 1.78 24.00 3 128.45
Section 5-5
St1 10 2.26 120.00 3 813.60
St12 10 1.76 120.00 3 635.04
St3 10 0.60 120.00 3 216.00
St14 10 1.58 120.00 3 570.24
Section 5'-5'
St4 10 2.26 24.00 3 162.72
St5 10 1.58 24.00 6 228.10
Section 5-5
St1 10 2.26 96.00 5 1,084.80
St12 10 1.76 96.00 5 846.72
St3 10 0.60 96.00 5 288.00
St14 10 1.58 96.00 5 760.32
Section 9-9
St4 10 1.86 96.00 5 892.80
St5 10 1.32 96.00 5 632.64
St25 10 1.46 96.00 5 702.72
St26 10 0.51 96.00 5 242.40
Section 5-5
St1 10 2.26 96.00 33 7,159.68
St12 10 1.76 96.00 33 5,588.35
St3 10 0.60 96.00 33 1,900.80
St14 10 1.58 96.00 33 5,018.11
Section 9-9
St4 10 1.86 96.00 33 5,892.48
St5 10 1.32 96.00 33 4,175.42
St25 10 1.46 96.00 33 4,637.95
St26 10 0.51 96.00 33 1,599.84
Section 5-5
St1 10 2.26 96.00 1 216.96
St12 10 1.76 96.00 1 169.34
St3 10 0.60 96.00 1 57.60
St14 10 1.58 96.00 1 152.06
Section 2-2
St1 10 1.86 72.00 1 133.92
St2 10 1.32 72.00 2 189.79
Section 2'-2'
St1 10 1.86 24.00 1 44.64
St2 10 1.32 24.00 2 63.26
Section 5-5
St1 10 2.26 96.00 4 867.84
St12 10 1.76 96.00 4 677.38
St3 10 0.60 96.00 4 230.40
St14 10 1.58 96.00 4 608.26
Section 2-2
St1 10 1.86 72.00 4 535.68
St2 10 1.32 72.00 8 759.17
Section 2'-2'
St1 10 1.86 24.00 4 178.56
St2 10 1.32 24.00 8 253.06
Section 5-5
St1 10 2.26 192.00 3 1,301.76
St12 10 1.76 192.00 3 1,016.06
St3 10 0.60 192.00 3 345.60
St14 10 1.58 192.00 3 912.38
right wing
C-1 20 4.84 102.00 5 2,468.40
20 4.74 30.00 5 711.00
24 5.04 12.00 5 302.40
24 3.75 12.00 5 225.00
Sec9-9
St33 10 0.71 108.00 2 152.28
St34 10 3.06 108.00 2 660.96
St35 10 2.59 108.00 2 559.87
St36 10 2.08 108.00 2 449.28
St37 10 2.54 108.00 2 549.50
St38 10 1.98 108.00 2 428.54
Sec10-10'
No detail Section for t St1 10 2.66 26.00 2 138.32
St39 10 1.98 26.00 2 103.17
St40 10 2.12 26.00 2 110.24
St41 10 1.52 26.00 2 79.04
Sec10-10
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
St1 10 2.66 78.00 2 414.96
St39 10 1.98 78.00 2 309.50
St40 10 2.12 78.00 2 330.72
St41 10 1.52 78.00 2 237.12
Sec1-1
St1 10 2.66 48.00 1 127.68
St2 10 2.12 48.00 1 101.76
St3 10 2.16 48.00 1 103.87
St4 10 1.52 48.00 1 72.96
St5 10 0.80 48.00 1 38.64
Sec2-2
St6 10 2.46 75.00 1 184.50
St7 10 1.99 75.00 1 149.40
St8 10 1.48 75.00 1 111.00
St9 10 1.78 75.00 1 133.80
Sec3-3
St9 10 2.26 75.00 1 169.50
St10 10 1.76 75.00 1 132.30
St11 10 1.58 75.00 1 118.80
St12 10 0.61 75.00 1 45.38
Sec6-6
St18 10 1.86 75.00 1 139.50
St19 10 1.32 75.00 2 197.70
Sec1-1
St1 10 2.66 55.00 3 438.90
St2 10 2.12 55.00 3 349.80
St3 10 2.16 55.00 3 357.06
St4 10 1.52 55.00 3 250.80
St5 10 0.80 55.00 3 132.83
Sec2-2
St6 10 2.46 75.00 3 553.50
St7 10 1.99 75.00 3 448.20
St8 10 1.48 75.00 3 333.00
St9 10 1.78 75.00 3 401.40
Sec3-3
St9 10 2.26 81.00 3 549.18
St10 10 1.76 81.00 3 428.65
St11 10 1.58 81.00 3 384.91
St12 10 0.61 81.00 3 147.02
Sec11-11
St9 10 2.26 81.00 3 549.18
St10 10 1.76 81.00 3 428.65
St11 10 1.58 81.00 3 384.91
St12 10 0.61 81.00 3 147.02
Sec-12-12
St1 10 2.46 50.00 7 861.00
St2 10 1.48 50.00 7 518.00
St3 10 1.99 50.00 7 697.20
St4 10 1.96 50.00 7 687.40
St5 10 0.71 50.00 7 246.75
Sec-13-13
St1 10 2.26 150.00 7 2,373.00
St2 10 1.76 150.00 14 3,704.40
St3 10 0.61 150.00 14 1,270.50
Sec-4-4
St9 10 2.26 150.00 7 2,373.00
St11 10 1.58 150.00 14 3,326.40
Sec3-3
St9 10 2.26 135.00 4 1,220.40
St10 10 1.76 135.00 4 952.56
St11 10 1.58 135.00 4 855.36
St12 10 0.61 135.00 4 326.70
Sec14-14
St4 10 1.86 54.00 4 401.76
St5 10 1.32 54.00 4 284.69
St25 10 1.46 54.00 4 316.22
St26 10 0.51 54.00 4 109.08
Sec2-2
St6 10 2.46 75.00 3 553.50
St7 10 1.99 75.00 3 448.20
St8 10 1.48 75.00 3 333.00
St9 10 1.78 75.00 3 401.40
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
Sec3-3
St9 10 2.26 81.00 3 549.18
St10 10 1.76 81.00 3 428.65
St11 10 1.58 81.00 3 384.91
St12 10 0.61 81.00 3 147.02
Sec15-15
St4 10 1.86 54.00 3 301.32
St5 10 1.32 54.00 6 427.03
Sec1-1
St1 10 2.66 50.00 7 931.00
St2 10 2.12 50.00 7 742.00
St3 10 2.16 50.00 7 757.40
St4 10 1.52 50.00 7 532.00
St5 10 0.80 50.00 7 281.75
Sec2-2
St6 10 2.46 50.00 7 861.00
St7 10 1.99 50.00 7 697.20
St8 10 1.48 50.00 7 518.00
St9 10 1.78 50.00 7 624.40
Sec3-3
St9 10 2.26 54.00 7 854.28
St10 10 1.76 54.00 7 666.79
St11 10 1.58 54.00 7 598.75
St12 10 0.61 54.00 7 228.69
Sec11-11
St9 10 2.26 54.00 7 854.28
St10 10 1.76 54.00 7 666.79
St11 10 1.58 54.00 7 598.75
St12 10 0.61 54.00 7 228.69
Sec1-1
St1 10 2.66 50.00 3 399.00
St2 10 2.12 50.00 3 318.00
St3 10 2.16 50.00 3 324.60
St4 10 1.52 50.00 3 228.00
St5 10 0.80 50.00 3 120.75
Sec2-2
St6 10 2.46 75.00 3 553.50
St7 10 1.99 75.00 3 448.20
St8 10 1.48 75.00 3 333.00
St9 10 1.78 75.00 3 401.40
Sec3-3
St9 10 2.26 27.00 3 183.06
St10 10 1.76 27.00 3 142.88
St11 10 1.58 27.00 3 128.30
St12 10 0.61 27.00 3 49.01
Sec15-15
St4 10 1.86 54.00 3 301.32
St5 10 1.32 54.00 6 427.03
Sec3-3
St9 10 2.26 108.00 9 2,196.72
St10 10 1.76 108.00 9 1,714.61
St11 10 1.58 108.00 9 1,539.65
St12 10 0.61 108.00 9 588.06
Sec-4-4
St9 10 2.26 25.00 9 508.50
St11 10 1.58 25.00 18 712.80
Sec2-2
St6 10 2.46 75.00 3 553.50
St7 10 1.99 75.00 3 448.20
St8 10 1.48 75.00 3 333.00
St9 10 1.78 75.00 3 401.40
Sec3-3
St9 10 2.26 81.00 3 549.18
St10 10 1.76 81.00 3 428.65
St11 10 1.58 81.00 3 384.91
St12 10 0.61 81.00 3 147.02
Sec11-11
St9 10 2.26 54.00 3 366.12
St10 10 1.76 54.00 3 285.77
St11 10 1.58 54.00 3 256.61
St12 10 0.61 54.00 3 98.01
Sec-13-13
St1 10 2.26 200.00 3 1,356.00
St2 10 1.76 200.00 6 2,116.80
St3 10 0.61 200.00 6 726.00
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
Sec2-2
St6 10 2.46 158.00 2 777.36
St7 10 1.99 158.00 2 629.47
St8 10 1.48 158.00 2 467.68
0.8785 St9 10 1.78 158.00 2 563.74
1.757
C13' 20 4.84 80.00 2 774.40
24 4.13 16.00 2 132.03
Sec2-2
St6 10 2.46 150.00 2 738.00
St7 10 1.99 150.00 2 597.60
St8 10 1.48 150.00 2 444.00
St9 10 1.78 150.00 2 535.20
Sec1-1
St1 10 2.66 50.00 2 266.00
St2 10 2.12 50.00 2 212.00
St3 10 2.16 50.00 2 216.40
St4 10 1.52 50.00 2 152.00
St5 10 0.80 50.00 2 80.50
Sec2-2
St6 10 2.46 75.00 2 369.00
St7 10 1.99 75.00 2 298.80
St8 10 1.48 75.00 2 222.00
St9 10 1.78 75.00 2 267.60
Sec3-3
St9 10 2.26 27.00 2 122.04
St10 10 1.76 27.00 2 95.26
St11 10 1.58 27.00 2 85.54
St12 10 0.61 27.00 2 32.67
Sec1-1
St1 10 2.66 50.00 2 266.00
St2 10 2.12 50.00 2 212.00
St3 10 2.16 50.00 2 216.40
St4 10 1.52 50.00 2 152.00
St5 10 0.80 50.00 2 80.50
Sec2-2
St6 10 2.46 100.00 2 492.00
St7 10 1.99 100.00 2 398.40
St8 10 1.48 100.00 2 296.00
St9 10 1.78 100.00 2 356.80
Sec1-1
St1 10 2.66 50.00 2 266.00
St2 10 2.12 50.00 2 212.00
St3 10 2.16 50.00 2 216.40
St4 10 1.52 50.00 2 152.00
St5 10 0.80 50.00 2 80.50
Sec1-1
St1 10 2.66 50.00 2 266.00
St2 10 2.12 50.00 2 212.00
St3 10 2.16 50.00 2 216.40
St4 10 1.52 50.00 2 152.00
St5 10 0.80 50.00 2 80.50
Shear Wall
At Basment Floor
SW-1 20 6.10 88.00 1 536.80
12 7.42 62.00 1 460.04
Mezzanine floor
left wing
MX1 20 9.11 4.00 1 36.44
20 7.10 3.00 1 21.30
20 6.80 3.00 1 20.40
20 8.84 3.00 1 26.52
20 2.31 4.00 1 9.24
20 3.70 3.00 1 11.10
20 4.07 4.00 1 16.28
20 3.87 4.00 1 15.48
20 4.27 3.00 1 12.79
20 2.70 5.00 1 13.48
24 5.47 5.00 1 27.35
20 7.80 5.00 1 39.00
24 6.80 4.00 1 27.20
24 7.96 4.00 1 31.84
10 1.80 210.00 1 378.00
Right wing
MX1 16 9.01 4.00 1 36.04
16 6.90 4.00 1 27.60
16 6.60 4.00 1 26.40
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
16 6.80 8.00 1 54.40
16 11.55 4.00 1 46.20
16 8.05 4.00 1 32.20
16 9.68 4.00 1 38.72
3rd-15th
TB-1 16 7.50 7.00 26 1,365.00
20 2.40 4.00 26 249.60
8 1.60 144.00 26 5,990.40
Comunical
TB-1 16 7.50 7.00 2 105.00
20 2.40 4.00 2 19.20
8 1.60 144.00 2 460.80
Roof
TB-1 16 7.50 7.00 2 105.00
20 2.40 4.00 2 19.20
8 1.60 144.00 2 460.80
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
Upper roof
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
RB-1 16 4.00 6.00 2 48.00
16 12.00 3.00 2 72.00
20 3.00 4.00 2 24.00
20 4.00 4.00 2 32.00
16 7.00 12.00 2 168.00
8 1.60 159.00 2 508.80
Slab
First floor
SY1-SY2
MX1-MX2 (V) 10 7.85 23.00 1 180.55
Mx-2-3 10 6.40 23.00 1 147.20
Mx-3-4 10 4.95 23.00 1 113.85
Mx-4-5 10 7.80 25.00 1 195.00
Mx-5-6 10 5.19 25.00 1 129.75
SY1-SY2 1
Mx-1-2 (H) 10 8.11 24.00 1 194.64
Mx-2-3 10 8.11 31.00 1 251.41
Mx-3-4 10 6.05 42.00 1 254.10
Mx-4-5 10 8.75 37.00 1 323.75
negative bar
MX1 1
H 10 3.70 30.00 1 111.00
MX2 10 3.59 23.00 1 82.57
10 2.43 31.00 1 75.21
10 3.70 44.00 1 162.80
MX3 10 3.59 23.00 1 82.57
10 3.70 24.00 1 88.80
10 2.43 21.00 1 51.03
MX4 10 4.05 23.00 1 93.15
10 2.43 21.00 1 51.03
10 3.70 36.00 1 133.20
MX5 10 4.92 21.00 1 103.32
10 3.70 64.00 0.00
SY2-SY3
V M1-M2 10 7.85 33.00 1 259.05
M2-M3 10 6.40 33.00 1 211.20
M3-M4 10 4.95 33.00 1 163.35
M4-M5 10 7.80 37.00 1 288.60
M5-M6 10 7.80 33.00 1 257.40
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
M6-M7 10 6.80 27.00 1 183.60
SY3-SY4
V 10 7.85 30.00 1 235.50
10 6.40 30.00 1 192.00
10 4.95 28.00 1 138.60
10 7.80 28.00 1 218.40
10 7.80 28.00 1 218.40
10 6.90 28.00 1 193.20
10 7.79 28.00 1 218.12
negative bar
10 4.00 30.00 1 120.00
10 3.59 39.00 1 140.01
10 4.00 40.00 1 160.00
10 3.59 39.00 1 140.01
10 4.00 23.00 1 92.00
10 4.05 32.00 1 129.60
12 4.05 35.00 1 141.75
10 4.00 56.00 1 224.00
10 5.00 15.00 1 75.00
10 4.70 17.00 1 79.90
10 4.00 43.00 1 172.00
10 3.84 49.00 1 188.16
10 4.00 32.00 1 128.00
SY5-SY6
V 10 7.85 49.00 1 384.65
10 6.40 30.00 1 192.00
10 4.95 30.00 1 148.50
10 7.80 33.00 1 257.40
10 7.80 19.00 1 148.20
10 6.90 30.00 1 207.00
10 7.79 30.00 1 233.70
negative bar
10 2.48 23.00 1 57.04
10 3.59 39.00 1 140.01
10 2.53 30.00 1 75.90
10 3.59 39.00 1 140.01
10 4.00 23.00 1 92.00
10 4.05 32.00 1 129.60
12 4.00 56.00 1 224.00
10 5.00 20.00 1 100.00
10 5.00 15.00 1 75.00
10 4.70 20.00 1 94.00
10 4.00 43.00 1 172.00
10 3.84 39.00 1 149.76
10 4.00 32.00 1 128.00
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
negative bar
12 3.59 49.00 1 175.91
10 4.00 30.00 1 120.00
10 4.05 35.00 1 141.75
10 4.00 49.00 1 196.00
10 5.00 35.00 1 175.00
10 4.70 39.00 1 183.30
12 4.00 43.00 1 172.00
10 3.84 39.00 1 149.76
10 4.00 32.00 1 128.00
negative bar
10 4.00 32.00 1 128.00
10 3.84 39.00 1 149.76
10 4.00 43.00 1 172.00
10 4.00 56.00 1 224.00
10 4.05 35.00 1 141.75
10 4.00 23.00 1 92.00
12 3.59 49.00 1 175.91
10 3.27 49.00 1 160.23
10 2.75 37.00 1 101.75
SY8-SY9
V 10 7.85 30.00 1 235.50
10 6.40 30.00 1 192.00
10 4.90 30.00 1 147.00
10 10.55 33.00 1 348.15
10 9.65 30.00 1 289.50
10 7.79 30.00 1 233.70
negative bar
10 4.00 30.00 1 120.00
10 3.59 49.00 1 175.91
10 4.00 40.00 1 160.00
10 3.59 49.00 1 175.91
10 4.00 23.00 1 92.00
10 4.05 35.00 1 141.75
12 4.00 56.00 1 224.00
10 4.00 43.00 1 172.00
10 3.84 39.00 1 149.76
10 4.00 32.00 1 128.00
SY9-SY10
V 10 7.85 30.00 1 235.50
10 6.40 30.00 1 192.00
10 4.90 30.00 1 147.00
10 10.55 33.00 1 348.15
10 9.65 30.00 1 289.50
10 7.79 30.00 1 233.70
negative bar
10 3.88 37.00 1 143.56
10 3.59 49.00 1 175.91
10 3.88 49.00 1 190.12
10 3.59 49.00 1 175.91
10 3.88 23.00 1 89.24
10 4.05 35.00 1 141.75
12 3.88 56.00 1 217.28
10 3.88 43.00 1 166.84
10 3.84 39.00 1 149.76
10 3.88 32.00 1 124.16
SY10-SY11
V 10 7.85 34.00 1 266.90
10 6.40 34.00 1 217.60
10 4.95 34.00 1 168.30
10 10.55 46.00 1 485.30
10 9.65 46.00 1 443.90
10 7.79 46.00 1 358.34
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
negative bar
10 3.59 46.00 1 165.14
10 3.59 49.00 1 175.91
10 4.05 39.00 1 157.95
10 3.84 37.00 1 142.08
SY11'-SY12
V 10 7.85 28.00 1 219.80
10 6.40 28.00 1 179.20
10 4.95 31.00 1 153.45
10 7.80 31.00 1 241.80
10 7.80 34.00 1 265.20
10 9.35 39.00 1 364.65
negative bar
10 3.89 32.00 1 124.32
10 3.59 37.00 1 132.83
10 3.89 42.00 1 163.17
10 3.59 37.00 1 132.83
10 3.89 23.00 1 89.35
10 4.05 32.00 1 129.60
10 3.89 52.00 1 202.02
10 5.00 32.00 1 160.00
10 3.89 52.00 1 202.02
10 4.70 37.00 1 173.90
SY12-SY13
V 10 7.85 33.00 1 259.05
10 6.40 33.00 1 211.20
10 4.95 33.00 1 163.35
10 7.80 33.00 1 257.40
10 7.80 30.00 1 234.00
10 6.90 30.00 1 207.00
10 7.79 30.00 1 233.70
negative bar
10 4.00 32.00 1 128.00
10 3.59 39.00 1 140.01
10 4.00 42.00 1 168.00
10 3.59 39.00 1 140.01
10 4.05 35.00 1 141.75
10 4.00 56.00 1 224.00
10 5.00 35.00 1 175.00
10 4.00 49.00 1 196.00
10 4.70 39.00 1 183.30
10 4.00 43.00 1 172.00
10 3.84 39.00 1 149.76
SY13-SY14
V 10 7.85 30.00 1 235.50
10 8.69 30.00 1 260.70
10 10.55 33.00 1 348.15
10 7.80 33.00 1 257.40
10 6.90 30.00 1 207.00
10 9.18 30.00 1 275.25
negative bar
10 4.00 30.00 1 120.00
10 3.59 39.00 1 140.01
10 4.00 30.00 1 120.00
10 4.00 56.00 1 224.00
10 5.00 35.00 1 175.00
10 4.00 49.00 1 196.00
10 4.70 39.00 1 183.30
10 4.00 43.00 1 172.00
10 3.84 39.00 1 149.76
10 4.00 32.00 1 128.00
SY14-SY15
V 10 7.85 30.00 1 235.50
10 6.40 30.00 1 192.00
10 4.95 30.00 1 148.50
10 7.80 33.00 1 257.40
10 7.80 33.00 1 257.40
10 6.90 30.00 1 207.00
10 9.18 30.00 1 275.25
SY15-SY16
V 10 7.85 30.00 1 235.50
10 6.40 49.00 1 313.60
10 4.95 30.00 1 148.50
10 7.80 33.00 1 257.40
10 7.80 19.00 1 148.20
10 6.90 30.00 1 207.00
10 7.79 30.00 1 233.70
negative bar
10 4.00 30.00 1 120.00
10 3.59 49.00 1 175.91
10 4.00 40.00 1 160.00
10 3.59 53.00 1 190.27
10 4.00 30.00 1 120.00
10 4.05 35.00 1 141.75
10 4.00 49.00 1 196.00
10 5.00 20.00 1 100.00
10 4.70 22.00 1 103.40
10 4.00 43.00 1 172.00
10 3.84 39.00 1 149.76
10 4.00 32.00 1 128.00
SY16-SY17
V 10 7.85 49.00 1 384.65
10 6.40 49.00 1 313.60
10 4.95 33.00 1 163.35
10 7.80 33.00 1 257.40
10 7.80 17.00 1 132.60
10 6.90 23.00 1 158.70
10 7.79 30.00 1 233.70
negative bar
10 4.00 37.00 1 148.00
10 3.59 49.00 1 175.91
10 4.00 49.00 1 196.00
10 3.59 49.00 1 175.91
10 4.00 23.00 1 92.00
10 4.05 35.00 1 141.75
10 4.00 56.00 1 224.00
10 5.00 20.00 1 100.00
10 4.00 56.00 1 224.00
10 4.00 43.00 1 172.00
10 4.70 20.00 1 94.00
10 4.00 43.00 1 172.00
10 3.84 35.00 1 134.40
10 4.00 32.00 1 128.00
SY17-SY19
V 10 7.85 30.00 1 235.50
10 6.40 30.00 1 192.00
10 4.95 33.00 1 163.35
10 7.80 33.00 1 257.40
10 7.80 33.00 1 257.40
10 6.90 30.00 1 207.00
10 9.17 30.00 1 275.10
negative bar
10 4.00 30.00 1 120.00
10 3.59 35.00 1 125.65
10 4.00 40.00 1 160.00
10 3.59 35.00 1 125.65
10 4.00 23.00 1 92.00
10 4.05 35.00 1 141.75
10 4.00 49.00 1 196.00
10 5.00 35.00 1 175.00
10 4.00 56.00 1 224.00
10 4.00 43.00 1 172.00
10 4.70 35.00 1 164.50
10 4.00 43.00 1 172.00
10 3.84 35.00 1 134.40
10 4.00 32.00 1 128.00
SY19-SY20
V 10 7.85 30.00 1 235.50
10 6.40 30.00 1 192.00
10 4.95 33.00 1 163.35
10 7.80 33.00 1 257.40
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
10 7.80 33.00 1 257.40
10 6.90 30.00 1 207.00
10 7.79 30.00 1 233.70
negative bar
10 4.34 37.00 1 160.58
10 3.59 35.00 1 125.65
10 4.34 40.00 1 173.60
10 3.59 35.00 1 125.65
10 4.34 23.00 1 99.82
10 4.05 35.00 1 141.75
10 4.34 56.00 1 243.04
10 5.00 35.00 1 175.00
10 4.34 56.00 1 243.04
10 4.00 43.00 1 172.00
10 4.70 35.00 1 164.50
10 4.34 54.00 1 234.36
10 3.84 35.00 1 134.40
10 4.34 39.00 1 169.26
SY20-SY21
V 10 7.85 43.00 1 337.55
10 6.40 43.00 1 275.20
10 4.95 57.00 1 282.15
10 7.80 57.00 1 444.60
10 7.80 57.00 1 444.60
10 6.90 43.00 1 296.70
10 9.27 12.00 1 111.24
negative bar
10 4.46 37.00 1 165.02
10 3.59 49.00 1 175.91
10 4.46 52.00 1 231.92
10 3.59 49.00 1 175.91
10 4.05 49.00 1 198.45
10 5.00 49.00 1 245.00
10 4.46 61.00 1 272.06
10 4.70 49.00 1 230.30
10 4.46 54.00 1 240.84
10 3.84 49.00 1 188.16
10 4.46 39.00 1 173.94
SY21, MX1-MX2
10 7.85 12.00 1 94.20
SY21, MX2-MX3 10 9.30 12.00 1 111.60
SY21, MX5-MX6 10 10.85 15.00 1 162.75
SY21, MX6-MX7 10 6.90 6.00 1 41.40
SY21, MX7-MX8 10 7.79 6.00 1 46.74
Second Floor
SY1-SY2
MX1-MX2 (V) 10 7.85 22.00 1 172.70
Mx-2-3 10 6.40 22.00 1 140.80
Mx-3-4 10 4.95 22.00 1 108.90
Mx-4-5 10 7.80 24.00 1 187.20
Mx-5-6 10 5.19 27.00 1 140.13
SY1-SY2 1
Mx-1-2 (H) 10 8.11 26.00 1 210.86
Mx-2-3 10 8.11 30.00 1 243.30
Mx-3-4 10 7.85 25.00 1 196.13
Mx-4-5 10 5.68 37.00 1 210.01
Mx-5-6 10 4.66 37.00 1 172.26
negative bar
H 1
MX1
MX2 10 3.59 22.00 1 78.98
MX3 10 3.59 23.00 1 82.57
MX4 10 4.05 23.00 1 93.15
MX5 10 5.00 21.00 1 105.00
SY2-SY3
V M1-M2 10 7.85 33.00 1 259.05
M2-M3 10 6.40 33.00 1 211.20
M3-M4 10 4.95 33.00 1 163.35
M4-M5 10 7.80 36.00 1 280.80
M5-M6 10 7.80 33.00 1 257.40
M6-M8 10 11.70 26.00 1 304.20
negative bar
SY3/M1-M8 10 4.07 264.00 1 1,074.48
M2/Sy2-Sy3 10 3.59 43.00 1 154.37
M3 /Sy2-Sy3 10 3.59 43.00 1 154.37
M4 /Sy2-Sy3 10 4.05 38.00 1 153.90
M5 /Sy2-Sy3 10 5.00 38.00 1 190.00
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
M6/Sy2-Sy3 10 4.70 43.00 1 202.10
SY3-SY4
V M1-M2 10 7.85 30.00 1 235.50
M2-M3 10 6.40 30.00 1 192.00
M3-M4 10 4.95 28.00 1 138.60
M4-M5 10 7.80 28.00 1 218.40
M5-M6 10 7.80 28.00 1 218.40
M6-M7 10 6.90 28.00 1 193.20
M7-M8 10 7.79 28.00 1 218.12
negative bar
SY4/M1-M8 10 3.87 280.00 1 1,083.60
negative bar
SY5/M1-M8 10 4.00 228.00 1 912.00
SY5-SY6
V M1-M2 10 7.85 30.00 1 235.50
M2-M3 10 6.40 30.00 1 192.00
M3-M4 10 4.95 30.00 1 148.50
M4-M5 10 7.80 33.00 1 257.40
M5-M6 10 7.80 19.00 1 148.20
M6-M7 10 6.90 30.00 1 207.00
M7-M8 10 7.79 30.00 1 233.70
negative bar
SY6/M2-M3 10 2.50 28.00 1 70.00
10 4.30 28.00 1 120.40
SY6 SY7
V 10 7.85 19.00 1 149.15
10 6.40 26.00 1 166.40
10 4.95 30.00 1 148.50
10 7.80 33.00 1 257.40
10 7.80 33.00 1 257.40
10 6.90 30.00 1 207.00
10 9.30 30.00 1 279.00
negative bar
SY7/M1-M8 10 4.00 169.00 1 676.00
negative bar
SY8/M1-M8 10 4.00 245.00 1 980.00
SY8-SY9
V M1-M2 10 7.85 30.00 1 235.50
M2-M3 10 6.40 30.00 1 192.00
M2-M4 10 4.95 30.00 1 148.50
M2-M5 10 10.55 33.00 1 348.15
M2-M6 10 9.65 30.00 1 289.50
M2-M7 10 7.79 30.00 1 233.70
negative bar
SY9/M1-M8 10 4.00 245.00 1 980.00
SY9-SY10
5.35 V 10 7.85 30.00 1 235.50
10 6.40 30.00 1 192.00
10 4.95 30.00 1 148.50
10 10.55 33.00 1 348.15
10 9.65 30.00 1 289.50
10 7.79 30.00 1 233.70
negative bar
SY9/M1-M8 10 3.88 245.00 1 950.60
SY10-SY11
V 10 7.85 34.00 1 266.90
10 6.40 34.00 1 217.60
10 4.95 34.00 1 168.30
10 7.78 46.00 1 357.88
10 7.80 46.00 1 358.80
10 6.90 34.00 1 234.60
10 9.79 34.00 1 332.86
negative bar
12 3.59 46.00 1 165.14
12 3.59 39.00 1 140.01
10 4.05 39.00 1 157.95
10 5.00 39.00 1 195.00
10 4.70 39.00 1 183.30
10 3.84 37.00 1 142.08
SY11'-SY12
V 10 7.85 28.00 1 219.80
10 6.40 28.00 1 179.20
10 4.95 31.00 1 153.45
10 7.80 31.00 1 241.80
10 7.80 34.00 1 265.20
10 9.35 39.00 1 364.65
negative bar
10 3.89 32.00 1 124.32
10 3.59 37.00 1 132.83
10 3.89 42.00 1 163.17
10 3.59 37.00 1 132.83
10 3.89 23.00 1 89.35
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
10 4.05 32.00 1 129.60
10 3.89 52.00 1 202.02
10 5.00 32.00 1 160.00
10 3.89 52.00 1 202.02
10 4.70 37.00 1 173.90
SY12-SY13
V 10 7.85 33.00 1 259.05
10 6.40 33.00 1 211.20
10 4.95 33.00 1 163.35
10 7.80 33.00 1 257.40
10 7.80 30.00 1 234.00
10 6.90 30.00 1 207.00
10 7.79 30.00 1 233.70
negative bar
10 4.00 32.00 1 128.00
10 3.59 39.00 1 140.01
10 4.00 42.00 1 168.00
10 3.59 39.00 1 140.01
10 4.05 35.00 1 141.75
10 4.00 56.00 1 224.00
10 5.00 35.00 1 175.00
10 4.00 49.00 1 196.00
10 4.70 39.00 1 183.30
10 4.00 43.00 1 172.00
10 3.84 39.00 1 149.76
SY13-SY14
V 10 7.85 30.00 1 235.50
10 8.69 30.00 1 260.70
10 10.55 33.00 1 348.15
10 7.80 33.00 1 257.40
10 6.90 30.00 1 207.00
10 9.18 30.00 1 275.25
negative bar
SY14-SY15
V 10 7.85 30.00 1 235.50
10 6.40 30.00 1 192.00
10 4.95 30.00 1 148.50
10 7.80 33.00 1 257.40
10 7.80 33.00 1 257.40
10 6.90 30.00 1 207.00
10 9.18 30.00 1 275.25
negative bar
10 4.00 23.00 1 92.00
10 3.59 39.00 1 140.01
10 4.00 30.00 1 120.00
10 3.59 39.00 1 140.01
10 4.00 34.00 1 136.00
10 4.05 35.00 1 141.75
10 4.00 56.00 1 224.00
10 5.00 35.00 1 175.00
10 4.70 39.00 1 183.30
10 4.00 43.00 1 172.00
10 3.84 39.00 1 149.76
10 4.00 32.00 1 128.00
SY15-SY16
V 10 7.85 30.00 1 235.50
10 6.40 49.00 1 313.60
10 4.95 30.00 1 148.50
10 7.80 33.00 1 257.40
10 7.80 19.00 1 148.20
10 6.90 30.00 1 207.00
10 7.79 30.00 1 233.70
negative bar
10 4.00 30.00 1 120.00
10 3.59 49.00 1 175.91
10 4.00 40.00 1 160.00
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
10 3.59 53.00 1 190.27
10 4.00 30.00 1 120.00
10 4.05 35.00 1 141.75
10 4.00 49.00 1 196.00
10 5.00 20.00 1 100.00
10 4.70 22.00 1 103.40
10 4.00 43.00 1 172.00
10 3.84 39.00 1 149.76
10 4.00 32.00 1 128.00
SY16-SY17
V 10 7.85 49.00 1 384.65
10 6.40 49.00 1 313.60
10 4.95 33.00 1 163.35
10 7.80 33.00 1 257.40
10 7.80 17.00 1 132.60
10 6.90 23.00 1 158.70
10 7.79 30.00 1 233.70
negative bar
10 4.00 37.00 1 148.00
10 3.59 49.00 1 175.91
10 4.00 49.00 1 196.00
10 3.59 49.00 1 175.91
10 4.00 23.00 1 92.00
10 4.05 35.00 1 141.75
10 4.00 56.00 1 224.00
10 5.00 20.00 1 100.00
10 4.00 56.00 1 224.00
10 4.00 43.00 1 172.00
10 4.70 20.00 1 94.00
10 4.00 43.00 1 172.00
10 3.84 35.00 1 134.40
10 4.00 32.00 1 128.00
SY17-SY19
V 10 7.85 30.00 1 235.50
10 6.40 30.00 1 192.00
10 4.95 33.00 1 163.35
10 7.80 33.00 1 257.40
10 7.80 33.00 1 257.40
10 6.90 30.00 1 207.00
10 9.17 30.00 1 275.10
negative bar
10 4.00 30.00 1 120.00
10 3.59 35.00 1 125.65
10 4.00 40.00 1 160.00
10 3.59 35.00 1 125.65
10 4.00 23.00 1 92.00
10 4.05 35.00 1 141.75
10 4.00 49.00 1 196.00
10 5.00 35.00 1 175.00
10 4.00 56.00 1 224.00
10 4.00 43.00 1 172.00
10 4.70 35.00 1 164.50
10 4.00 43.00 1 172.00
10 3.84 35.00 1 134.40
10 4.00 32.00 1 128.00
SY19-SY20
V 10 7.85 30.00 1 235.50
10 6.40 30.00 1 192.00
10 4.95 33.00 1 163.35
10 7.80 33.00 1 257.40
10 7.80 33.00 1 257.40
10 6.90 30.00 1 207.00
10 7.79 30.00 1 233.70
negative bar
10 4.34 37.00 1 160.58
10 3.59 35.00 1 125.65
10 4.34 40.00 1 173.60
10 3.59 35.00 1 125.65
10 4.34 23.00 1 99.82
10 4.05 35.00 1 141.75
10 4.34 56.00 1 243.04
10 5.00 35.00 1 175.00
10 4.34 56.00 1 243.04
10 4.00 43.00 1 172.00
10 4.70 35.00 1 164.50
10 4.34 54.00 1 234.36
10 3.84 35.00 1 134.40
10 4.34 39.00 1 169.26
SY20-SY21
V 10 7.85 43.00 1 337.55
10 6.40 43.00 1 275.20
10 4.95 57.00 1 282.15
10 7.80 57.00 1 444.60
10 7.80 57.00 1 444.60
10 6.90 43.00 1 296.70
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
10 9.27 12.00 1 111.24
negative bar
10 4.46 37.00 1 165.02
10 3.59 49.00 1 175.91
10 4.46 52.00 1 231.92
10 3.59 49.00 1 175.91
10 4.05 49.00 1 198.45
10 5.00 49.00 1 245.00
10 4.46 61.00 1 272.06
10 4.70 49.00 1 230.30
10 4.46 54.00 1 240.84
10 3.84 49.00 1 188.16
10 4.46 39.00 1 173.94
SY21, MX1-MX2
10 7.85 12.00 1 94.20
SY21, MX2-MX3 10 9.30 12.00 1 111.60
SY21, MX5-MX6 10 10.85 15.00 1 162.75
SY21, MX6-MX7 10 6.90 6.00 1 41.40
SY21, MX7-MX8 10 7.79 6.00 1 46.74
Third Floor
SY1-SY2
MX1-MX2 (V) 10 7.45 22.00 1 163.90
Mx-2-3 10 6.40 22.00 1 140.80
Mx-3-4 10 4.95 22.00 1 108.90
Mx-4-5 10 7.80 24.00 1 187.20
Mx-5-6 10 7.80 27.00 1 210.60
SY1-SY2 1
Mx-1-2 (H) 10 8.11 26.00 1 210.86
Mx-2-3 10 8.11 30.00 1 243.30
Mx-3-4 10 7.85 25.00 1 196.13
Mx-4-5 10 5.68 37.00 1 210.01
Mx-5-6 10 4.66 37.00 1 172.26
negative bar
H 1
MX1
MX2 10 3.59 22.00 1 78.98
MX3 10 3.59 22.00 1 78.98
MX4 10 4.05 22.00 1 89.10
MX5 10 5.00 22.00 1 110.00
SY2-SY3
V M1-M2 10 7.45 33.00 1 245.85
M2-M3 10 6.40 33.00 1 211.20
M3-M4 10 4.95 33.00 1 163.35
M4-M5 10 7.80 36.00 1 280.80
M5-M6 10 7.80 33.00 1 257.40
M6-M8 10 11.70 26.00 1 304.20
negative bar
SY3/M1-M8 10 4.07 278.00 1 1,131.46
SY3-SY4
V M1-M2 10 7.45 30.00 1 223.50
M2-M3 10 6.40 30.00 1 192.00
M3-M4 10 4.95 28.00 1 138.60
M4-M5 10 7.80 28.00 1 218.40
M5-M6 10 7.80 28.00 1 218.40
M6-M7 10 6.90 28.00 1 193.20
M7-M8 10 7.79 28.00 1 218.12
negative bar
SY4/M1-M8 10 3.87 261.00 1 1,010.07
negative bar
SY5/M1-M8 10 4.00 205.00 1 820.00
SY5-SY6
V M1-M2
M2-M3 10 6.45 30.00 1 193.50
M3-M4 10 4.95 30.00 1 148.50
M4-M5 10 7.80 33.00 1 257.40
M5-M6 10 7.80 19.00 1 148.20
M6-M7 10 6.90 16.00 1 110.40
10 9.05 14.00 0.00
M7-M8 10 3.84 30.00 1 115.20
negative bar
SY6/M2-M3 10 2.50 24.00 1 60.00
SY6/M3-M8 10 4.00 154.00 1 616.00
SY6 SY7
V M1-M2 10 8.00 8.00 1 64.00
10 6.75 35.00 1 236.25
M2-M3 10 7.80 33.00 1 257.40
M3-M4 10 7.80 30.00 1 234.00
M4-M5 10 7.80 30.00 1 234.00
M5-M6 10 7.80 33.00 1 257.40
M6-M7 10 6.90 30.00 1 207.00
9.97 M7-M8 10 8.88 30.00 1 266.40
negative bar
SY7/M1-M8 10 4.00 178.00 1 712.00
negative bar
SY8/M1-M8 10 4.00 245.00 1 980.00
SY8-SY9
V M1-M2
M2-M3 10 6.42 30.00 1 192.60
M2-M4 10 4.95 30.00 1 148.50
M2-M5 10 10.55 33.00 1 348.15
M6-M7 10 9.65 30.00 1 289.50
M7-M8 10 7.79 30.00 1 233.70
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
negative bar
SY9/M1-M8 10 5.16 19.00 1 98.12
10 4.00 203.00 1 812.00
M2/SY8-SY9 12 3.34 27.00 1 90.18
M3/SY8-SY9 12 3.59 49.00 1 175.91
M4/SY8-SY9 10 4.05 35.00 1 141.75
M7/SY8-SY9 10 3.84 39.00 1 149.76
SY9-SY10
5.35 V M1-M2 10 7.45 30.00 1 223.50
M2-M3 10 6.40 30.00 1 192.00
M3-M4 10 4.95 30.00 1 148.50
M4-M5 10 10.55 33.00 1 348.15
M6-M7 10 9.65 30.00 1 289.50
M7-M8 10 7.79 30.00 1 233.70
negative bar
SY9/M1-M8 10 3.88 245.00 1 950.60
SY10-SY11
V M1-M2 10 7.45 34.00 1 253.30
M2-M3 10 6.40 34.00 1 217.60
M3-M4 10 4.95 34.00 1 168.30
M4-M5 10 10.55 46.00 1 485.30
M6-M7 10 9.65 46.00 1 443.90
M7-M8 10 6.90 34.00 1 234.60
negative bar
M2/SY10-SY11 12 3.59 46.00 1 165.14
M3/SY10-SY12 12 3.59 46.00 1 165.14
M4/SY10-SY13 10 4.05 39.00 1 157.95
M4/SY10-SY13 10 3.84 37.00 1 142.08
SY11'-SY12
V 10 7.85 28.00 1 219.80
10 6.40 28.00 1 179.20
10 4.95 31.00 1 153.45
10 7.80 31.00 1 241.80
10 7.80 34.00 1 265.20
10 9.35 39.00 1 364.65
negative bar
10 3.89 32.00 1 124.32
10 3.59 37.00 1 132.83
10 3.89 42.00 1 163.17
10 3.59 37.00 1 132.83
10 3.89 23.00 1 89.35
10 4.05 32.00 1 129.60
10 3.89 52.00 1 202.02
10 5.00 32.00 1 160.00
10 3.89 52.00 1 202.02
10 4.70 37.00 1 173.90
SY12-SY13
V 10 7.85 33.00 1 259.05
10 6.40 33.00 1 211.20
10 4.95 33.00 1 163.35
10 7.80 33.00 1 257.40
10 7.80 30.00 1 234.00
10 6.90 30.00 1 207.00
10 7.79 30.00 1 233.70
negative bar
10 4.00 32.00 1 128.00
10 3.59 39.00 1 140.01
10 4.00 42.00 1 168.00
10 3.59 39.00 1 140.01
10 4.05 35.00 1 141.75
10 4.00 56.00 1 224.00
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
10 5.00 35.00 1 175.00
10 4.00 49.00 1 196.00
10 4.70 39.00 1 183.30
10 4.00 43.00 1 172.00
10 3.84 39.00 1 149.76
SY13-SY14
V 10 7.85 30.00 1 235.50
10 8.69 30.00 1 260.70
10 10.55 33.00 1 348.15
10 7.80 33.00 1 257.40
10 6.90 30.00 1 207.00
10 9.18 30.00 1 275.25
negative bar
SY14-SY15
V 10 7.85 30.00 1 235.50
10 6.40 30.00 1 192.00
10 4.95 30.00 1 148.50
10 7.80 33.00 1 257.40
10 7.80 33.00 1 257.40
10 6.90 30.00 1 207.00
10 9.18 30.00 1 275.25
negative bar
10 4.00 23.00 1 92.00
10 3.59 39.00 1 140.01
10 4.00 30.00 1 120.00
10 3.59 39.00 1 140.01
10 4.00 34.00 1 136.00
10 4.05 35.00 1 141.75
10 4.00 56.00 1 224.00
10 5.00 35.00 1 175.00
10 4.70 39.00 1 183.30
10 4.00 43.00 1 172.00
10 3.84 39.00 1 149.76
10 4.00 32.00 1 128.00
SY15-SY16
V 10 7.85 30.00 1 235.50
10 6.40 49.00 1 313.60
10 4.95 30.00 1 148.50
10 7.80 33.00 1 257.40
10 7.80 19.00 1 148.20
10 6.90 30.00 1 207.00
10 7.79 30.00 1 233.70
negative bar
10 4.00 30.00 1 120.00
10 3.59 49.00 1 175.91
10 4.00 40.00 1 160.00
10 3.59 53.00 1 190.27
10 4.00 30.00 1 120.00
10 4.05 35.00 1 141.75
10 4.00 49.00 1 196.00
10 5.00 20.00 1 100.00
10 4.70 22.00 1 103.40
10 4.00 43.00 1 172.00
10 3.84 39.00 1 149.76
10 4.00 32.00 1 128.00
SY16-SY17
V 10 7.85 49.00 1 384.65
10 6.40 49.00 1 313.60
10 4.95 33.00 1 163.35
10 7.80 33.00 1 257.40
10 7.80 17.00 1 132.60
10 6.90 23.00 1 158.70
10 7.79 30.00 1 233.70
negative bar
10 4.00 37.00 1 148.00
10 3.59 49.00 1 175.91
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
10 4.00 49.00 1 196.00
10 3.59 49.00 1 175.91
10 4.00 23.00 1 92.00
10 4.05 35.00 1 141.75
10 4.00 56.00 1 224.00
10 5.00 20.00 1 100.00
10 4.00 56.00 1 224.00
10 4.00 43.00 1 172.00
10 4.70 20.00 1 94.00
10 4.00 43.00 1 172.00
10 3.84 35.00 1 134.40
10 4.00 32.00 1 128.00
SY17-SY19
V 10 7.85 30.00 1 235.50
10 6.40 30.00 1 192.00
10 4.95 33.00 1 163.35
10 7.80 33.00 1 257.40
10 7.80 33.00 1 257.40
10 6.90 30.00 1 207.00
10 9.17 30.00 1 275.10
negative bar
10 4.00 30.00 1 120.00
10 3.59 35.00 1 125.65
10 4.00 40.00 1 160.00
10 3.59 35.00 1 125.65
10 4.00 23.00 1 92.00
10 4.05 35.00 1 141.75
10 4.00 49.00 1 196.00
10 5.00 35.00 1 175.00
10 4.00 56.00 1 224.00
10 4.00 43.00 1 172.00
10 4.70 35.00 1 164.50
10 4.00 43.00 1 172.00
10 3.84 35.00 1 134.40
10 4.00 32.00 1 128.00
SY19-SY20
V 10 7.85 30.00 1 235.50
10 6.40 30.00 1 192.00
10 4.95 33.00 1 163.35
10 7.80 33.00 1 257.40
10 7.80 33.00 1 257.40
10 6.90 30.00 1 207.00
10 7.79 30.00 1 233.70
negative bar
10 4.34 37.00 1 160.58
10 3.59 35.00 1 125.65
10 4.34 40.00 1 173.60
10 3.59 35.00 1 125.65
10 4.34 23.00 1 99.82
10 4.05 35.00 1 141.75
10 4.34 56.00 1 243.04
10 5.00 35.00 1 175.00
10 4.34 56.00 1 243.04
10 4.00 43.00 1 172.00
10 4.70 35.00 1 164.50
10 4.34 54.00 1 234.36
10 3.84 35.00 1 134.40
10 4.34 39.00 1 169.26
SY20-SY21
V 10 7.85 43.00 1 337.55
10 6.40 43.00 1 275.20
10 4.95 57.00 1 282.15
10 7.80 57.00 1 444.60
10 7.80 57.00 1 444.60
10 6.90 43.00 1 296.70
10 9.27 12.00 1 111.24
negative bar
10 4.46 37.00 1 165.02
10 3.59 49.00 1 175.91
10 4.46 52.00 1 231.92
10 3.59 49.00 1 175.91
10 4.05 49.00 1 198.45
10 5.00 49.00 1 245.00
10 4.46 61.00 1 272.06
10 4.70 49.00 1 230.30
10 4.46 54.00 1 240.84
10 3.84 49.00 1 188.16
10 4.46 39.00 1 173.94
SY21, MX1-MX2
10 7.85 12.00 1 94.20
SY21, MX2-MX3 10 9.30 12.00 1 111.60
SY21, MX5-MX6 10 10.85 15.00 1 162.75
SY21, MX6-MX7 10 6.90 6.00 1 41.40
SY21, MX7-MX8 10 7.79 6.00 1 46.74
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
4th floor
SY1-SY2
MX1-MX2 (V) 10 7.45 24.00 1 178.80
Mx-2-3 10 6.40 24.00 1 153.60
Mx-3-4 10 4.95 24.00 1 118.80
Mx-4-5 10 7.80 24.00 1 187.20
Mx-5-6 10 7.80 24.00 1 187.20
negative bar
SY2/Mx1-Mx6 10 3.70 223.00 1 825.10
H 1
MX1
MX2 10 3.59 22.00 1 78.98
MX3 10 3.59 22.00 1 78.98
MX4 10 4.05 22.00 1 89.10
MX5 10 5.00 22.00 1 110.00
SY2-SY3
V M1-M2 10 7.45 33.00 1 245.85
M2-M3 10 6.40 33.00 1 211.20
M3-M4 10 4.95 33.00 1 163.35
M4-M5 10 7.80 36.00 1 280.80
M5-M6 10 7.80 33.00 1 257.40
M6-M8 10 6.18 26.00 1 160.58
negative bar
SY3/M1-M8 10 4.07 278.00 1 1,131.46
SY3-SY4
V M1-M2 10 7.45 30.00 1 223.50
M2-M3 10 6.40 30.00 1 192.00
M3-M4 10 4.95 28.00 1 138.60
M4-M5 10 7.80 28.00 1 218.40
M5-M6 10 7.80 28.00 1 218.40
M6-M7 10 6.90 28.00 1 193.20
M7-M8 10 7.79 28.00 1 218.12
negative bar
SY4/M1-M8 10 3.87 261.00 1 1,010.07
10 3.87 75.00 1 290.25
negative bar
SY5/M1-M8 10 4.00 188.00 1 752.00
SY5-SY6
V M1-M2
M2-M3 10 5.92 30.00 1 177.52
M3-M4 10 4.95 30.00 1 148.50
M4-M5 10 7.80 18.00 1 140.40
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
10 10.20 16.00 1 163.20
M5-M6 10 7.80 18.00 1 140.40
M6-M7 10 6.90 16.00 1 110.40
10 9.05 14.00 0.00
M7-M8 10 9.50 30.00 1 284.97
negative bar
SY6/M2-M3 10 2.50 24.00 1 60.00
SY6/M3-M8 10 4.00 131.00 1 524.00
SY6 SY7
V M1-M2
(H) M1-M2
M2-M3 10 6.30 23.00 1 144.90
M3-M4
M4-M5 10 6.30 41.00 1 258.30
M5-M6 10 8.55 41.00 1 350.55
M6-M7 10 6.30 33.00 1 207.90
M7-M8 10 6.30 24.00 1 151.20
negative bar
SY7/M1-M8 10 4.00 178.00 1 712.00
negative bar
SY8/M2-M8 10 4.00 194.00 1 776.00
M3/SY7-SY8
M4/SY7-SY8
M5/SY7-SY8 10 5.00 35.00 1 175.00
M6/SY7-SY8 10 4.70 39.00 1 183.30
M7/SY7-SY8 10 3.84 39.00 1 149.76
SY8-SY9
V M1-M2
M2-M3 10 6.19 30.00 1 185.72
M3-M4 10 4.95 30.00 1 148.50
M4-M5 10 7.80 33.00 1 257.40
M5-M6 10 7.80 33.00 1 257.40
M6-M7 10 6.90 30.00 1 207.00
M7-M8 10 8.50 30.00 1 255.00
negative bar
SY9/M1-M8 10 5.16 19.00 1 98.12
10 4.00 203.00 1 812.00
SY9-SY10
5.35 V M1-M2 10 7.45 30.00 1 223.50
M2-M3 10 6.40 30.00 1 192.00
M3-M4 10 4.95 30.00 1 148.50
M4-M5 10 10.55 33.00 1 348.15
M6-M7 10 9.65 30.00 1 289.50
M7-M8 10 7.79 30.00 1 233.70
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
H M1-M2 10 4.86 26.00 1 126.48
M2-M3 10 6.30 30.00 1 189.00
M3-M4 10 6.30 28.00 1 176.40
M4-M5 10 6.30 41.00 1 258.30
M6-M7 10 6.30 33.00 1 207.90
M7-M8 10 6.30 23.00 1 144.90
negative bar
SY9/M1-M8 10 3.88 189.00 1 733.32
12 3.88 56.00 1 217.28
SY10-SY11
V M1-M2 10 7.45 34.00 1 253.30
M2-M3 10 6.40 34.00 1 217.60
M3-M4 10 4.95 34.00 1 168.30
M4-M5 10 10.55 46.00 1 485.30
M6-M7 10 9.65 46.00 1 443.90
M7-M8 10 6.90 34.00 1 234.60
negative bar
M2/SY10-SY11 12 3.59 46.00 1 165.14
M3/SY10-SY12 12 3.59 46.00 1 165.14
M4/SY10-SY13 10 4.05 39.00 1 157.95
M4/SY10-SY13 10 3.84 37.00 1 142.08
SY11'-SY12
V M1-M2 10 7.45 28.00 1 208.60
M2-M3 10 6.40 28.00 1 179.20
M3-M4 10 4.95 31.00 1 153.45
M4-M5 10 10.83 31.00 1 335.73
M5-M6
M6-M7 10 9.60 39.00 1 374.40
M7-M8
negative bar
SY12/M1-M8 10 3.88 193.00 1 748.84
SY12-SY13
V M1-M2 10 7.45 33.00 1 245.85
M2-M3 10 6.40 33.00 1 211.20
M3-M4 10 4.95 33.00 1 163.35
M4-M5 10 7.80 33.00 1 257.40
M5-M6 10 7.80 30.00 1 234.00
M6-M7 10 6.90 30.00 1 207.00
M7-M8 10 7.79 30.00 1 233.70
negative bar
SY12/M1-M8 10 4.00 193.00 1 772.00
SY13-SY14
V M1-M2 10 7.45 30.00 1 223.50
M2-M3 10 8.69 30.00 1 260.70
M3-M4 10 10.55 33.00 1 348.15
M4-M5
M5-M6 10 7.80 33.00 1 257.40
M6-M7 10 6.90 30.00 1 207.00
M7-M8 10 9.18 30.00 1 275.25
negative bar
SY13/M1-M8 10 4.00 219.00 1 876.00
SY14-SY15
V M1-M2 10 7.45 30.00 1 223.50
M2-M3 10 6.40 30.00 1 192.00
M3-M4 10 4.95 30.00 1 148.50
M4-M5 10 7.80 33.00 1 257.40
M5-M6 10 7.80 33.00 1 257.40
M6-M7 10 6.90 30.00 1 207.00
M7-M8 10 9.18 30.00 1 275.25
negative bar
SY14/M1-M8 10 4.00 242.00 1 968.00
SY15-SY16
V M1-M2 10 7.45 30.00 1 223.50
M2-M3 10 6.40 49.00 1 313.60
M3-M4 10 4.95 30.00 1 148.50
M4-M5 10 7.80 33.00 1 257.40
M5-M6 10 7.80 19.00 1 148.20
M6-M7 10 6.90 13.00 1 89.70
10 6.91 18.00 1 124.29
M7-M8 10 7.79 30.00 1 233.70
negative bar
SY15/M1-M8 10 4.00 276.00 1 1,104.00
SY16-SY17
V M1-M2 10 7.45 49.00 1 365.05
M2-M3 10 6.40 49.00 1 313.60
M3-M4 10 4.95 33.00 1 163.35
M4-M5 10 7.80 33.00 1 257.40
M5-M6 10 7.80 17.00 1 132.60
M6-M7 10 6.90 13.00 1 89.70
10 6.91 18.00 1 124.29
M7-M8 10 7.79 30.00 1 233.70
negative bar
SY17/M1-M8 10 4.00 276.00 1 1,104.00
SY17-SY19
V M1-M2 10 7.45 30.00 1 223.50
M2-M3 10 6.40 30.00 1 192.00
M3-M4 10 4.95 33.00 1 163.35
M4-M5 10 7.80 33.00 1 257.40
M5-M6 10 7.80 33.00 1 257.40
M6-M7 10 6.90 30.00 1 207.00
M7-M8 10 7.79 30.00 1 233.70
negative bar
M1/SY17-SY19
M2/SY17-SY19 10 3.59 35.00 1 125.65
M3/SY17-SY19 10 3.59 35.00 1 125.65
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
M4/SY17-SY19 10 4.05 35.00 1 141.75
M5/SY17-SY19 10 5.00 35.00 1 175.00
M6S/SY17-SY19 10 4.70 35.00 1 164.50
M7SSY17-SY19 10 3.84 35.00 1 134.40
SY19-SY20
V M1-M2 10 7.85 30.00 1 235.50
M2-M3 10 6.40 30.00 1 192.00
M3-M4 10 4.95 33.00 1 163.35
M4-M5 10 7.80 33.00 1 257.40
M5-M6 10 7.80 33.00 1 257.40
M6-M7 10 6.90 30.00 1 207.00
M7-M8 10 7.79 30.00 1 233.70
H M1-M1'
M1-M2 10 6.30 24.00 1 151.20
M2-M3 10 6.30 33.00 1 207.90
M3-M4 10 6.30 41.00 1 258.30
M4-M5 10 6.30 41.00 1 258.30
M5-M6 10 6.30 25.00 1 157.50
M6-M7 10 6.30 30.00 1 189.00
M7-M8 10 6.30 23.00 1 144.90
negative bar
SY120/M1-M8 10 4.34 297.00 1 1,288.98
M1/SY19-SY20
M2/SSY19-SY20 10 3.59 35.00 1 125.65
M3/SY19-SY20 10 3.59 35.00 1 125.65
M4/SY19-SY20 10 4.05 35.00 1 141.75
M5/SY19-SY20 10 5.00 35.00 1 175.00
M6S/SY19-SY20 10 4.70 35.00 1 164.50
M7SSSY19-SY20 10 3.84 35.00 1 134.40
SY20-SY21
V M1-M2 10 7.85 43.00 1 337.55
M2-M3 10 6.40 43.00 1 275.20
M3-M4 10 4.95 57.00 1 282.15
M4-M5 10 7.80 57.00 1 444.60
M5-M6 10 7.80 57.00 1 444.60
M6-M7 10 6.90 43.00 1 296.70
M7-M8 10 9.27 12.00 1 111.24
H M1-M1'
M1-M2 10 9.13 30.00 1 273.90
M2-M3 10 9.13 40.00 1 365.20
M3-M4 10 9.13 61.00 1 556.93
M4-M5 10 10.19 61.00 1 621.59
M5-M6 10 10.19 37.00 1 377.03
M6-M7 10 9.13 37.00 1 337.81
M7-M8 10 9.13 28.00 1 255.64
negative bar
SY120/M1-M8 10 4.46 297.00 1 1,324.62
1
Mx-1-2 (H) 10 8.01 26.00 1 208.32
Mx-2-3 10 5.66 30.00 1 169.73
Mx-3-4 10 5.66 25.00 1 141.44
Mx-4-5 10 5.80 37.00 1 214.55
Mx-5-6 10 4.20 37.00 1 155.31
negative bar
H 1
MX1
MX2 10 3.59 22.00 1 78.98
MX3 10 3.59 22.00 1 78.98
MX4 10 4.05 22.00 1 89.10
MX5 10 5.00 22.00 1 110.00
SY2-SY3
V M1-M2 10 7.45 33.00 1 245.85
M2-M3 10 6.40 33.00 1 211.20
M3-M4 10 4.95 33.00 1 163.35
M4-M5 10 7.80 36.00 1 280.80
M5-M6 10 7.80 33.00 1 257.40
M6-M7 10 3.45 33.00 1 113.85
M7-M8 10 3.45 33.00 1 113.85
negative bar
SY3/M1-M8 10 4.07 278.00 1 1,131.46
SY3-SY4
V M1-M2 10 7.45 30.00 1 223.50
M2-M3 10 6.40 30.00 1 192.00
M3-M4 10 4.95 28.00 1 138.60
M4-M5 10 7.80 28.00 1 218.40
M5-M6 10 7.80 28.00 1 218.40
M6-M7 10 6.90 28.00 1 193.20
M7-M8 10 8.52 28.00 1 238.43
negative bar
SY4/M1-M8 10 3.87 288.00 1 1,114.56
negative bar
SY5/M1-M8 10 4.00 228.00 1 912.00
SY5-SY6
V M1-M2
M2-M3 10 6.45 30.00 1 193.50
M3-M4 10 4.95 30.00 1 148.50
M4-M5 10 7.80 18.00 1 140.40
10 10.20 16.00 1 163.20
M5-M6 10 7.80 18.00 1 140.40
M6-M7 10 6.90 16.00 1 110.40
10 9.05 14.00 1 126.70
M7-M8 10 7.79 30.00 1 233.70
negative bar
SY6/M2-M3 10 3.00 24.00 1 72.00
SY6/M3-M8 10 4.00 154.00 1 616.00
SY6 SY7
V M1-M2 10 0.00
M1-M3 10 0.00
M3-M4 10 6.13 33.00 1 202.29
M4-M5 10 7.80 30.00 1 234.00
M5-M6 10 7.80 33.00 1 257.40
M6-M7 10 6.90 30.00 1 207.00
9.97 M7-M8 10 8.88 30.00 1 266.40
(H) M1-M2
M2-M3 10 6.30 11.00 1 69.30
M3-M4 10 6.30 23.00 1 144.90
M4-M5 10 6.30 41.00 1 258.30
M5-M6 10 8.25 41.00 1 338.25
M6-M7 10 6.30 33.00 1 207.90
M7-M8 10 6.30 24.00 1 151.20
negative bar
SY7/M1-M8 10 4.00 219.00 1 876.00
negative bar
SY8/M1-M8 10 4.00 217.00 1 868.00
SY8-SY9
V M1-M2
M2-M3 10 5.78 30.00 1 173.28
M3-M4 10 4.95 30.00 1 148.50
M4-M5 10 10.55 33.00 1 348.15
M5-M6 10 7.80 33.00 0.00
M6-M7 10 6.90 30.00 1 207.00
M7-M8 10 7.79 30.00 1 233.70
negative bar
SY9/M1-M8 10 4.00 259.00 1 1,036.00
SY9-SY10
5.35 V M1-M2 10 7.45 30.00 1 223.50
M2-M3 10 6.40 30.00 1 192.00
M3-M4 10 4.95 30.00 1 148.50
M4-M5 10 10.55 33.00 1 348.15
M5-M6 10 7.80 33.00 1 257.40
M6-M7 10 6.90 30.00 1 207.00
M7-M8 10 7.78 30.00 1 233.40
negative bar
SY10/M1-M8 10 3.88 189.00 1 733.32
12 3.88 56.00 1 217.28
SY10-SY11
V M1-M2 10 7.45 34.00 1 253.30
M2-M3 10 6.40 34.00 1 217.60
M3-M4 10 4.95 34.00 1 168.30
M4-M5 10 10.55 46.00 1 485.30
M5-M6 10 46.00 1 0.00
M6-M7 10 9.65 34.00 1 328.10
M7-M8 10 9.79 34.00 1 332.86
negative bar
M2/SY10-SY11 12 3.59 46.00 1 165.14
M3/SY10-SY11 12 3.59 49.00 1 175.91
M4/SY10-SY11 10 4.05 39.00 1 157.95
M5/SY10-SY11
M6S/SY10-SY11
M7/SY10-SY11 10 3.84 37.00 1 142.08
SY11'-SY12
V M1-M2 10 7.45 28.00 1 208.60
M2-M3 10 6.40 28.00 1 179.20
M3-M4 10 4.95 31.00 1 153.45
M4-M5 10 10.83 31.00 1 335.73
M5-M6
M6-M7 10 9.60 39.00 1 374.40
M7-M8
negative bar
SY12/M1-M8 10 3.88 193.00 1 748.84
SY12-SY13
V M1-M2 10 7.45 33.00 1 245.85
M2-M3 10 6.40 33.00 1 211.20
M3-M4 10 4.95 33.00 1 163.35
M4-M5 10 7.80 33.00 1 257.40
M5-M6 10 7.80 30.00 1 234.00
M6-M7 10 6.90 30.00 1 207.00
M7-M8 10 7.79 30.00 1 233.70
negative bar
SY12/M1-M8 10 4.00 193.00 1 772.00
SY13-SY14
V M1-M2 10 7.45 30.00 1 223.50
M2-M3 10 8.69 30.00 1 260.70
M3-M4 10 10.55 33.00 1 348.15
M4-M5
M5-M6 10 7.80 33.00 1 257.40
M6-M7 10 6.90 30.00 1 207.00
M7-M8 10 9.18 30.00 1 275.25
negative bar
SY13/M1-M8 10 4.00 219.00 1 876.00
SY14-SY15
V M1-M2 10 7.45 30.00 1 223.50
M2-M3 10 6.40 30.00 1 192.00
M3-M4 10 4.95 30.00 1 148.50
M4-M5 10 7.80 33.00 1 257.40
M5-M6 10 7.80 33.00 1 257.40
M6-M7 10 6.90 30.00 1 207.00
M7-M8 10 9.18 30.00 1 275.25
negative bar
SY14/M1-M8 10 4.00 242.00 1 968.00
SY15-SY16
V M1-M2 10 7.45 30.00 1 223.50
M2-M3 10 6.40 49.00 1 313.60
M3-M4 10 4.95 30.00 1 148.50
M4-M5 10 7.80 33.00 1 257.40
M5-M6 10 7.80 19.00 1 148.20
M6-M7 10 6.90 13.00 1 89.70
10 6.91 18.00 1 124.29
M7-M8 10 7.79 30.00 1 233.70
negative bar
SY15/M1-M8 10 4.00 276.00 1 1,104.00
SY16-SY17
V M1-M2 10 7.45 49.00 1 365.05
M2-M3 10 6.40 49.00 1 313.60
M3-M4 10 4.95 33.00 1 163.35
M4-M5 10 7.80 33.00 1 257.40
M5-M6 10 7.80 17.00 1 132.60
M6-M7 10 6.90 13.00 1 89.70
10 6.91 18.00 1 124.29
M7-M8 10 7.79 30.00 1 233.70
negative bar
SY17/M1-M8 10 4.00 276.00 1 1,104.00
SY17-SY19
V M1-M2 10 7.45 30.00 1 223.50
M2-M3 10 6.40 30.00 1 192.00
M3-M4 10 4.95 33.00 1 163.35
M4-M5 10 7.80 33.00 1 257.40
M5-M6 10 7.80 33.00 1 257.40
M6-M7 10 6.90 30.00 1 207.00
M7-M8 10 7.79 30.00 1 233.70
negative bar
M1/SY17-SY19
M2/SY17-SY19 10 3.59 35.00 1 125.65
M3/SY17-SY19 10 3.59 35.00 1 125.65
M4/SY17-SY19 10 4.05 35.00 1 141.75
M5/SY17-SY19 10 5.00 35.00 1 175.00
M6S/SY17-SY19 10 4.70 35.00 1 164.50
M7SSY17-SY19 10 3.84 35.00 1 134.40
SY19-SY20
V M1-M2 10 7.85 30.00 1 235.50
M2-M3 10 6.40 30.00 1 192.00
M3-M4 10 4.95 33.00 1 163.35
M4-M5 10 7.80 33.00 1 257.40
M5-M6 10 7.80 33.00 1 257.40
M6-M7 10 6.90 30.00 1 207.00
M7-M8 10 7.79 30.00 1 233.70
H M1-M1'
M1-M2 10 6.30 24.00 1 151.20
M2-M3 10 6.30 33.00 1 207.90
M3-M4 10 6.30 41.00 1 258.30
M4-M5 10 6.30 41.00 1 258.30
M5-M6 10 6.30 25.00 1 157.50
M6-M7 10 6.30 30.00 1 189.00
M7-M8 10 6.30 23.00 1 144.90
negative bar
SY120/M1-M8 10 4.34 297.00 1 1,288.98
M1/SY19-SY20
M2/SSY19-SY20 10 3.59 35.00 1 125.65
M3/SY19-SY20 10 3.59 35.00 1 125.65
M4/SY19-SY20 10 4.05 35.00 1 141.75
M5/SY19-SY20 10 5.00 35.00 1 175.00
M6S/SY19-SY20 10 4.70 35.00 1 164.50
M7SSSY19-SY20 10 3.84 35.00 1 134.40
SY20-SY21
V M1-M2 10 7.85 43.00 1 337.55
M2-M3 10 6.40 43.00 1 275.20
M3-M4 10 4.95 57.00 1 282.15
M4-M5 10 7.80 57.00 1 444.60
M5-M6 10 7.80 57.00 1 444.60
M6-M7 10 6.90 43.00 1 296.70
M7-M8 10 9.27 12.00 1 111.24
H M1-M1'
M1-M2 10 9.13 30.00 1 273.90
M2-M3 10 9.13 40.00 1 365.20
M3-M4 10 9.13 61.00 1 556.93
M4-M5 10 10.19 61.00 1 621.59
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
M5-M6 10 10.19 37.00 1 377.03
M6-M7 10 9.13 37.00 1 337.81
M7-M8 10 9.13 28.00 1 255.64
negative bar
SY120/M1-M8 10 4.46 297.00 1 1,324.62
6th Floor
SY1-SY2
MX1-MX2 (V) 10 7.45 22.00 1 163.90
Mx-2-3 10 6.40 22.00 1 140.80
Mx-3-4 10 4.95 22.00 1 108.90
Mx-4-5 10 7.80 24.00 1 187.20
Mx-5-6 10 7.80 27.00 1 210.60
1
Mx-1-2 (H) 10 8.01 26.00 1 208.32
Mx-2-3 10 5.66 30.00 1 169.73
Mx-3-4 10 5.66 25.00 1 141.44
Mx-4-5 10 5.80 37.00 1 214.55
Mx-5-6 10 4.20 37.00 1 155.31
negative bar
H 1
MX1
MX2 10 3.59 22.00 1 78.98
MX3 10 3.59 22.00 1 78.98
MX4 10 4.05 22.00 1 89.10
MX5 10 5.00 22.00 1 110.00
SY2-SY3
V M1-M2 10 7.45 33.00 1 245.85
M2-M3 10 6.40 33.00 1 211.20
M3-M4 10 4.95 33.00 1 163.35
M4-M5 10 7.80 36.00 1 280.80
M5-M6 10 7.80 33.00 1 257.40
M6-M7 10 3.45 33.00 1 113.85
M7-M8 10 3.45 33.00 1 113.85
negative bar
SY3/M1-M8 10 4.07 278.00 1 1,131.46
SY3-SY4
V M1-M2 10 7.45 30.00 1 223.50
M2-M3 10 6.40 30.00 1 192.00
M3-M4 10 4.95 28.00 1 138.60
M4-M5 10 7.80 28.00 1 218.40
M5-M6 10 7.80 28.00 1 218.40
M6-M7 10 6.90 28.00 1 193.20
M7-M8 10 8.52 28.00 1 238.43
negative bar
SY4/M1-M8 10 3.87 288.00 1 1,114.56
negative bar
SY5/M1-M8 10 4.00 228.00 1 912.00
SY5-SY6
V M1-M2
M2-M3 10 6.45 30.00 1 193.50
M3-M4 10 4.95 30.00 1 148.50
M4-M5 10 7.80 18.00 1 140.40
10 10.20 16.00 1 163.20
M5-M6 10 7.80 18.00 1 140.40
M6-M7 10 6.90 16.00 1 110.40
10 9.05 14.00 1 126.70
M7-M8 10 7.79 30.00 1 233.70
negative bar
SY6/M2-M3 10 3.00 24.00 1 72.00
SY6/M3-M8 10 4.00 154.00 1 616.00
SY6 SY7
V M1-M2 10 0.00
M1-M3 10 0.00
M3-M4 10 6.13 33.00 1 202.29
M4-M5 10 7.80 30.00 1 234.00
M5-M6 10 7.80 33.00 1 257.40
M6-M7 10 6.90 30.00 1 207.00
9.97 M7-M8 10 8.88 30.00 1 266.40
(H) M1-M2
M2-M3 10 6.30 11.00 1 69.30
M3-M4 10 6.30 23.00 1 144.90
M4-M5 10 6.30 41.00 1 258.30
M5-M6 10 8.25 41.00 1 338.25
M6-M7 10 6.30 33.00 1 207.90
M7-M8 10 6.30 24.00 1 151.20
negative bar
SY7/M1-M8 10 4.00 219.00 1 876.00
negative bar
SY8/M1-M8 10 4.00 217.00 1 868.00
SY8-SY9
V M1-M2
M2-M3 10 5.78 30.00 1 173.28
M3-M4 10 4.95 30.00 1 148.50
M4-M5 10 10.55 33.00 1 348.15
M5-M6 10 7.80 33.00 0.00
M6-M7 10 6.90 30.00 1 207.00
M7-M8 10 7.79 30.00 1 233.70
negative bar
SY9/M1-M8 10 4.00 259.00 1 1,036.00
SY9-SY10
5.35 V M1-M2 10 7.45 30.00 1 223.50
M2-M3 10 6.40 30.00 1 192.00
M3-M4 10 4.95 30.00 1 148.50
M4-M5 10 10.55 33.00 1 348.15
M5-M6 10 7.80 33.00 1 257.40
M6-M7 10 6.90 30.00 1 207.00
M7-M8 10 7.78 30.00 1 233.40
negative bar
SY10/M1-M8 10 3.88 189.00 1 733.32
12 3.88 56.00 1 217.28
SY10-SY11
V M1-M2 10 7.45 34.00 1 253.30
M2-M3 10 6.40 34.00 1 217.60
M3-M4 10 4.95 34.00 1 168.30
M4-M5 10 7.80 46.00 1 358.80
M5-M6 10 7.80 46.00 1 358.80
M6-M7 10 9.65 34.00 1 328.10
M7-M8 10 9.79 34.00 1 332.86
negative bar
M2/SY10-SY11 12 3.59 46.00 1 165.14
M3/SY10-SY11 12 3.59 49.00 1 175.91
M4/SY10-SY11 10 4.05 39.00 1 157.95
M5/SY10-SY11 10 5.00 32.00 1 160.00
M6S/SY10-SY11 10 4.70 36.00 1 169.20
M7/SY10-SY11 10 3.84 37.00 1 142.08
SY11'-SY12
V M1-M2 10 7.45 28.00 1 208.60
M2-M3 10 6.40 28.00 1 179.20
M3-M4 10 4.95 31.00 1 153.45
M4-M5 10 10.83 31.00 1 335.73
M5-M6
M6-M7 10 9.60 39.00 1 374.40
M7-M8
negative bar
SY12/M1-M8 10 3.88 193.00 1 748.84
SY12-SY13
V M1-M2 10 7.45 33.00 1 245.85
M2-M3 10 6.40 33.00 1 211.20
M3-M4 10 4.95 33.00 1 163.35
M4-M5 10 7.80 33.00 1 257.40
M5-M6 10 7.80 30.00 1 234.00
M6-M7 10 6.90 30.00 1 207.00
M7-M8 10 7.79 30.00 1 233.70
negative bar
SY12/M1-M8 10 4.00 193.00 1 772.00
SY13-SY14
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
V M1-M2 10 7.45 30.00 1 223.50
M2-M3 10 8.69 30.00 1 260.70
M3-M4 10 10.55 33.00 1 348.15
M4-M5
M5-M6 10 7.80 33.00 1 257.40
M6-M7 10 6.90 30.00 1 207.00
M7-M8 10 9.18 30.00 1 275.25
negative bar
SY13/M1-M8 10 4.00 219.00 1 876.00
SY14-SY15
V M1-M2 10 7.45 30.00 1 223.50
M2-M3 10 6.40 30.00 1 192.00
M3-M4 10 4.95 30.00 1 148.50
M4-M5 10 7.80 33.00 1 257.40
M5-M6 10 7.80 33.00 1 257.40
M6-M7 10 6.90 30.00 1 207.00
M7-M8 10 9.18 30.00 1 275.25
negative bar
SY14/M1-M8 10 4.00 242.00 1 968.00
SY15-SY16
V M1-M2 10 7.45 30.00 1 223.50
M2-M3 10 6.40 49.00 1 313.60
M3-M4 10 4.95 30.00 1 148.50
M4-M5 10 7.80 33.00 1 257.40
M5-M6 10 7.80 19.00 1 148.20
M6-M7 10 6.90 13.00 1 89.70
10 6.91 18.00 1 124.29
M7-M8 10 7.79 30.00 1 233.70
negative bar
SY15/M1-M8 10 4.00 276.00 1 1,104.00
SY16-SY17
V M1-M2 10 7.45 49.00 1 365.05
M2-M3 10 6.40 49.00 1 313.60
M3-M4 10 4.95 33.00 1 163.35
M4-M5 10 7.80 33.00 1 257.40
M5-M6 10 7.80 17.00 1 132.60
M6-M7 10 6.90 13.00 1 89.70
10 6.91 18.00 1 124.29
M7-M8 10 7.79 30.00 1 233.70
negative bar
SY17/M1-M8 10 4.00 276.00 1 1,104.00
SY17-SY19
V M1-M2 10 7.45 30.00 1 223.50
M2-M3 10 6.40 30.00 1 192.00
M3-M4 10 4.95 33.00 1 163.35
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
M4-M5 10 7.80 33.00 1 257.40
M5-M6 10 7.80 33.00 1 257.40
M6-M7 10 6.90 30.00 1 207.00
M7-M8 10 7.79 30.00 1 233.70
negative bar
M1/SY17-SY19
M2/SY17-SY19 10 3.59 35.00 1 125.65
M3/SY17-SY19 10 3.59 35.00 1 125.65
M4/SY17-SY19 10 4.05 35.00 1 141.75
M5/SY17-SY19 10 5.00 35.00 1 175.00
M6S/SY17-SY19 10 4.70 35.00 1 164.50
M7SSY17-SY19 10 3.84 35.00 1 134.40
SY19-SY20
V M1-M2 10 3.24 30.00 1 97.20
M2-M3 1
M3-M4 1
M4-M5 1
M5-M6 1
M6-M7 1
M7-M8 10 4.50 30.00 1 135.00
H M1-M1'
M1-M2 10 6.30 10.00 1 63.00
M2-M3
M3-M4
M4-M5
M5-M6
M6-M7
M7-M8 10 6.30 23.00 1 144.90
negative bar
SY120/M1-M8 10 4.34 36.00 1 156.24
M1/SY19-SY20
M2/SSY19-SY20
M3/SY19-SY20
M4/SY19-SY20
M5/SY19-SY20
M6S/SY19-SY20
M7SSSY19-SY20
SY20-SY21
V M1-M2 10 3.24 43.00 1 139.32
10 7.45 12.00 1 89.40
M2-M3 10 6.40 12.00 1 76.80
M3-M4 10 4.95 12.00 1 59.40
M4-M5 10 7.80 12.00 1 93.60
M5-M6 10 7.80 12.00 1 93.60
M6-M7 10 6.90 12.00 1 82.80
M7-M8 10 9.27 12.00 1 111.24
H M1-M1'
M1-M2 10 9.13 13.00 1 118.69
3.84 23.00 1
M2-M3 10 3.84 23.00 1 88.32
M3-M4 10 3.84 23.00 1 88.32
M4-M5 10 3.84 23.00 1 88.32
M5-M6 10 3.84 23.00 1 88.32
M6-M7 10 3.84 23.00 1 88.32
M7-M8 10 3.84 23.00 1 88.32
negative bar
SY120/M1-M8 10 4.46 1 0.00
M1/SY19-SY20
M2/SSY19-SY20 10 3.59 13.00 1 46.67
M3/SY19-SY20 10 3.59 13.00 1 46.67
M4/SY19-SY20 10 4.05 13.00 1 52.65
M5/SY19-SY20 10 5.00 13.00 1 65.00
M6S/SY19-SY20 10 4.70 13.00 1 61.10
M7SSSY19-SY20 10 3.84 13.00 1 49.92
7th Floor
SY1-SY2
MX1-MX2 (V) 10 7.45 22.00 1 163.90
Mx-2-3 10 6.40 22.00 1 140.80
Mx-3-4 10 4.95 22.00 1 108.90
Mx-4-5 10 7.80 24.00 1 187.20
Mx-5-6 10 7.80 27.00 1 210.60
1
Mx-1-2 (H) 10 8.01 26.00 1 208.32
Mx-2-3 10 5.66 30.00 1 169.73
Mx-3-4 10 5.66 25.00 1 141.44
Mx-4-5 10 5.80 37.00 1 214.55
Mx-5-6 10 4.20 37.00 1 155.31
negative bar
H 1
MX1
MX2 10 3.59 22.00 1 78.98
MX3 10 3.59 22.00 1 78.98
MX4 10 4.05 22.00 1 89.10
MX5 10 5.00 22.00 1 110.00
SY2-SY3
V M1-M2 10 7.45 33.00 1 245.85
M2-M3 10 6.40 33.00 1 211.20
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
M3-M4 10 4.95 33.00 1 163.35
M4-M5 10 7.80 36.00 1 280.80
M5-M6 10 7.80 33.00 1 257.40
M6-M7 10 3.45 33.00 1 113.85
M7-M8 10 3.45 33.00 1 113.85
negative bar
SY3/M1-M8 10 4.07 278.00 1 1,131.46
SY3-SY4
V M1-M2 10 7.45 30.00 1 223.50
M2-M3 10 6.40 30.00 1 192.00
M3-M4 10 4.95 28.00 1 138.60
M4-M5 10 7.80 28.00 1 218.40
M5-M6 10 7.80 28.00 1 218.40
M6-M7 10 6.90 28.00 1 193.20
M7-M8 10 8.52 28.00 1 238.43
negative bar
SY4/M1-M8 10 3.87 288.00 1 1,114.56
negative bar
SY5/M1-M8 10 4.00 228.00 1 912.00
SY5-SY6
V M1-M2
M2-M3 10 6.45 30.00 1 193.50
M3-M4 10 4.95 30.00 1 148.50
M4-M5 10 7.80 18.00 1 140.40
10 10.20 16.00 1 163.20
M5-M6 10 7.80 18.00 1 140.40
M6-M7 10 6.90 16.00 1 110.40
10 9.05 14.00 1 126.70
M7-M8 10 7.79 30.00 1 233.70
negative bar
SY6/M2-M3 10 3.00 24.00 1 72.00
SY6/M3-M8 10 4.00 154.00 1 616.00
SY6 SY7
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
V M1-M2 10 0.00
M1-M3 10 0.00
M3-M4 10 6.13 33.00 1 202.29
M4-M5 10 7.80 30.00 1 234.00
M5-M6 10 7.80 33.00 1 257.40
M6-M7 10 6.90 30.00 1 207.00
9.97 M7-M8 10 8.88 30.00 1 266.40
(H) M1-M2
M2-M3 10 6.30 11.00 1 69.30
M3-M4 10 6.30 23.00 1 144.90
M4-M5 10 6.30 41.00 1 258.30
M5-M6 10 8.25 41.00 1 338.25
M6-M7 10 6.30 33.00 1 207.90
M7-M8 10 6.30 24.00 1 151.20
negative bar
SY7/M1-M8 10 4.00 219.00 1 876.00
negative bar
SY8/M1-M8 10 4.00 217.00 1 868.00
SY8-SY9
V M1-M2
M2-M3 10 5.78 30.00 1 173.28
M3-M4 10 4.95 30.00 1 148.50
M4-M5 10 10.55 33.00 1 348.15
M5-M6 10 7.80 33.00 0.00
M6-M7 10 6.90 30.00 1 207.00
M7-M8 10 7.79 30.00 1 233.70
negative bar
SY9/M1-M8 10 4.00 259.00 1 1,036.00
SY9-SY10
5.35 V M1-M2 10 7.45 30.00 1 223.50
M2-M3 10 6.40 30.00 1 192.00
M3-M4 10 4.95 30.00 1 148.50
M4-M5 10 10.55 33.00 1 348.15
M5-M6 10 7.80 33.00 1 257.40
M6-M7 10 6.90 30.00 1 207.00
M7-M8 10 7.78 30.00 1 233.40
negative bar
SY10/M1-M8 10 3.88 189.00 1 733.32
12 3.88 56.00 1 217.28
SY10-SY11
V M1-M2 10 7.45 34.00 1 253.30
M2-M3 10 6.40 34.00 1 217.60
M3-M4 10 4.95 34.00 1 168.30
M4-M5 10 7.80 46.00 1 358.80
M5-M6 10 7.80 46.00 1 358.80
M6-M7 10 9.65 34.00 1 328.10
M7-M8 10 9.79 34.00 1 332.86
negative bar
M2/SY10-SY11 12 3.59 46.00 1 165.14
M3/SY10-SY11 12 3.59 49.00 1 175.91
M4/SY10-SY11 10 4.05 39.00 1 157.95
M5/SY10-SY11 10 5.00 32.00 1 160.00
M6S/SY10-SY11 10 4.70 36.00 1 169.20
M7/SY10-SY11 10 3.84 37.00 1 142.08
SY11'-SY12
V M1-M2 10 7.45 28.00 1 208.60
M2-M3 10 6.40 28.00 1 179.20
M3-M4 10 4.95 31.00 1 153.45
M4-M5 10 10.83 31.00 1 335.73
M5-M6
M6-M7 10 9.60 39.00 1 374.40
M7-M8
negative bar
SY12/M1-M8 10 3.88 193.00 1 748.84
SY12-SY13
V M1-M2 10 7.45 33.00 1 245.85
M2-M3 10 6.40 33.00 1 211.20
M3-M4 10 4.95 33.00 1 163.35
M4-M5 10 7.80 33.00 1 257.40
M5-M6 10 7.80 30.00 1 234.00
M6-M7 10 6.90 30.00 1 207.00
M7-M8 10 7.79 30.00 1 233.70
negative bar
SY12/M1-M8 10 4.00 193.00 1 772.00
SY13-SY14
V M1-M2 10 7.45 30.00 1 223.50
M2-M3 10 8.69 30.00 1 260.70
M3-M4 10 10.55 33.00 1 348.15
M4-M5
M5-M6 10 7.80 33.00 1 257.40
M6-M7 10 6.90 30.00 1 207.00
M7-M8 10 9.18 30.00 1 275.25
negative bar
SY13/M1-M8 10 4.00 219.00 1 876.00
SY14-SY15
V M1-M2 10 7.45 30.00 1 223.50
M2-M3 10 6.40 30.00 1 192.00
M3-M4 10 4.95 30.00 1 148.50
M4-M5 10 7.80 33.00 1 257.40
M5-M6 10 7.80 33.00 1 257.40
M6-M7 10 6.90 30.00 1 207.00
M7-M8 10 9.18 30.00 1 275.25
negative bar
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
SY14/M1-M8 10 4.00 242.00 1 968.00
SY15-SY16
V M1-M2 10 7.45 30.00 1 223.50
M2-M3 10 6.40 49.00 1 313.60
M3-M4 10 4.95 30.00 1 148.50
M4-M5 10 7.80 33.00 1 257.40
M5-M6 10 7.80 19.00 1 148.20
M6-M7 10 6.90 13.00 1 89.70
10 6.91 18.00 1 124.29
M7-M8 10 7.79 30.00 1 233.70
negative bar
SY15/M1-M8 10 4.00 276.00 1 1,104.00
SY16-SY17
V M1-M2 10 7.45 49.00 1 365.05
M2-M3 10 6.40 49.00 1 313.60
M3-M4 10 4.95 33.00 1 163.35
M4-M5 10 7.80 33.00 1 257.40
M5-M6 10 7.80 17.00 1 132.60
M6-M7 10 6.90 13.00 1 89.70
10 6.91 18.00 1 124.29
M7-M8 10 7.79 30.00 1 233.70
negative bar
SY17/M1-M8 10 4.00 276.00 1 1,104.00
SY20-SY21
V M1-M2
10 7.45 12.00 1 89.40
M2-M3 10 6.40 12.00 1 76.80
M3-M4 10 4.95 12.00 1 59.40
M4-M5 10 7.80 12.00 1 93.60
M5-M6 10 7.80 12.00 1 93.60
M6-M7 10 6.90 12.00 1 82.80
M7-M8 10 9.27 12.00 1 111.24
H M1-M1'
M1-M2
10 3.84 23.00 1 88.32
M2-M3 10 3.84 23.00 1 88.32
M3-M4 10 3.84 23.00 1 88.32
M4-M5 10 3.84 23.00 1 88.32
M5-M6 10 3.84 23.00 1 88.32
M6-M7 10 3.84 23.00 1 88.32
M7-M8 10 3.84 23.00 1 88.32
negative bar
SY120/M1-M8
M1/SY19-SY20
M2/SSY19-SY20 10 3.59 13.00 1 46.67
M3/SY19-SY20 10 3.59 13.00 1 46.67
M4/SY19-SY20 10 4.05 13.00 1 52.65
M5/SY19-SY20 10 5.00 13.00 1 65.00
M6S/SY19-SY20 10 4.70 13.00 1 61.10
M7SSSY19-SY20 10 3.84 13.00 1 49.92
8th Floor
SY1-SY2
MX1-MX2 (V) 10 7.45 22.00 1 163.90
Mx-2-3 10 6.40 22.00 1 140.80
Mx-3-4 10 4.95 22.00 1 108.90
Mx-4-5 10 7.80 24.00 1 187.20
Mx-5-6 10 7.80 27.00 1 210.60
1
Mx-1-2 (H) 10 8.01 26.00 1 208.32
Mx-2-3 10 5.66 30.00 1 169.73
Mx-3-4 10 5.66 25.00 1 141.44
Mx-4-5 10 5.80 37.00 1 214.55
Mx-5-6 10 4.20 37.00 1 155.31
negative bar
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
H 1
MX1
MX2 10 3.59 22.00 1 78.98
MX3 10 3.59 22.00 1 78.98
MX4 10 4.05 22.00 1 89.10
MX5 10 5.00 22.00 1 110.00
SY2-SY3
V M1-M2 10 7.45 33.00 1 245.85
M2-M3 10 6.40 33.00 1 211.20
M3-M4 10 4.95 33.00 1 163.35
M4-M5 10 7.80 36.00 1 280.80
M5-M6 10 7.80 33.00 1 257.40
M6-M7 10 3.45 33.00 1 113.85
M7-M8 10 3.45 33.00 1 113.85
negative bar
SY3/M1-M8 10 4.07 278.00 1 1,131.46
SY3-SY4
V M1-M2 10 7.45 30.00 1 223.50
M2-M3 10 6.40 30.00 1 192.00
M3-M4 10 4.95 28.00 1 138.60
M4-M5 10 7.80 28.00 1 218.40
M5-M6 10 7.80 28.00 1 218.40
M6-M7 10 6.90 28.00 1 193.20
M7-M8 10 8.52 28.00 1 238.43
negative bar
SY4/M1-M8 10 3.87 288.00 1 1,114.56
negative bar
SY5/M1-M8 10 4.00 228.00 1 912.00
SY5-SY6
V M1-M2
M2-M3 10 6.45 30.00 1 193.50
M3-M4 10 4.95 30.00 1 148.50
M4-M5 10 7.80 18.00 1 140.40
10 10.20 16.00 1 163.20
M5-M6 10 7.80 18.00 1 140.40
M6-M7 10 6.90 16.00 1 110.40
10 9.05 14.00 1 126.70
M7-M8 10 7.79 30.00 1 233.70
SY6 SY7
V M1-M2 10 0.00
M1-M3 10 0.00
M3-M4 10 6.13 33.00 1 202.29
M4-M5 10 7.80 30.00 1 234.00
M5-M6 10 7.80 33.00 1 257.40
M6-M7 10 6.90 30.00 1 207.00
9.97 M7-M8 10 8.88 30.00 1 266.40
(H) M1-M2
M2-M3 10 6.30 11.00 1 69.30
M3-M4 10 6.30 23.00 1 144.90
M4-M5 10 6.30 41.00 1 258.30
M5-M6 10 8.25 41.00 1 338.25
M6-M7 10 6.30 33.00 1 207.90
M7-M8 10 6.30 24.00 1 151.20
negative bar
SY7/M1-M8 10 4.00 219.00 1 876.00
negative bar
SY8/M1-M8 10 4.00 217.00 1 868.00
SY8-SY9
V M1-M2
M2-M3 10 5.78 30.00 1 173.28
M3-M4 10 4.95 30.00 1 148.50
M4-M5 10 10.55 33.00 1 348.15
M5-M6 10 7.80 33.00 0.00
M6-M7 10 6.90 30.00 1 207.00
M7-M8 10 7.79 30.00 1 233.70
negative bar
SY9/M1-M8 10 4.00 259.00 1 1,036.00
SY9-SY10
5.35 V M1-M2 10 7.45 30.00 1 223.50
M2-M3 10 6.40 30.00 1 192.00
M3-M4 10 4.95 30.00 1 148.50
M4-M5 10 10.55 33.00 1 348.15
M5-M6 10 7.80 33.00 1 257.40
M6-M7 10 6.90 30.00 1 207.00
M7-M8 10 7.78 30.00 1 233.40
negative bar
SY10/M1-M8 10 3.88 189.00 1 733.32
12 3.88 56.00 1 217.28
negative bar
M2/SY10-SY11
M3/SY10-SY11
M4/SY10-SY11 10 4.12 15.00 1 61.80
M5/SY10-SY11 10 1 0.00
M6S/SY10-SY11 10 4.70 15.00 1 70.50
M7/SY10-SY11 10 3.76 37.00 1 139.12
SY11'-SY12
V M1-M2 10 3.10 28.00 1 86.80
M2-M3
M3-M4
M4-M5 10 3.15 20.00 1 63.00
10 9.13 17.00 1 155.21
M5-M6 1
M6-M7 10 6.90 39.00 1 269.10
10 3.80 17.00 1 64.60
M7-M8 10 9.79 37.00 1 362.23
negative bar
SY12/M1-M8 10 3.88 193.00 1 748.84
SY12-SY13
V M1-M2 10 5.22 33.00 1 172.26
M2-M3
M3-M4
M4-M5 10 3.35 33.00 1 110.55
M5-M6
M6-M7 10 3.35 42.00 1 140.70
M7-M8
negative bar
SY12/M1-M8 10 3.89 46.00 1 178.71
SY13-SY14
V M1-M2 10 5.22 33.00 1 172.26
M2-M3
M3-M4
M4-M5 10 3.35 33.00 1 110.55
M5-M6
M6-M7 10 3.35 42.00 1 140.70
M7-M8
negative bar
SY12/M1-M8 10 4.00 78.00 1 312.00
M2/SY10-SY11
M3/SY10-SY11
M4/SY10-SY11
M5/SY10-SY11
M6S/SY10-SY11
M7/SY10-SY11 10 3.76 39.00 1 146.64
SY14-SY15
V M1-M2 10 5.22 33.00 1 172.26
M2-M3
M3-M4
M4-M5 10 3.35 33.00 1 110.55
M5-M6
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
M6-M7 10 3.35 42.00 1 140.70
M7-M8
negative bar
SY12/M1-M8 10 4.00 78.00 1 312.00
M2/SY10-SY11
M3/SY10-SY11
M4/SY10-SY11
M5/SY10-SY11
M6S/SY10-SY11
M7/SY10-SY11 10 3.76 39.00 1 146.64
SY15-SY16
V M1-M2 10 5.22 33.00 1 172.26
M2-M3
M3-M4
M4-M5 10 3.35 33.00 1 110.55
M5-M6 10 9.11 33.00 1 300.63
M6-M7 10 6.90 18.00 1 124.20
10 9.05 13.00 1 117.65
M7-M8 10 7.80 33.00 1 257.40
negative bar
SY12/M1-M8 10 4.00 99.00 1 396.00
M2/SY10-SY11
M3/SY10-SY11
M4/SY10-SY11 10 4.10 21.00 1 86.10
10 2.68 15.00 1 40.20
M5/SY10-SY11
M6S/SY10-SY11 10 4.70 20.00 1 94.00
M7/SY10-SY11 10 3.84 39.00 1 149.76
SY16-SY17
V M1-M2 10 3.55 33.00 1 117.15
M2-M3
M3-M4
M4-M5 10 2.68 20.00 1 53.60
10 9.11 16.00 1 145.76
M5-M6
M6-M7 10 9.05 18.00 1 162.90
10 6.90 13.00 1 89.70
M7-M8 10 7.90 30.00 1 237.00
negative bar
SY12/M1-M8
M2/SY10-SY11
M3/SY10-SY11
M4/SY10-SY11
M5/SY10-SY11 10 4.10 15.00 1 61.50
M6S/SY10-SY11 10 4.70 15.00 1 70.50
M7/SY10-SY11 10 3.76 39.00 1 146.64
9th Floor
SY1-SY2
MX1-MX2 (V) 10 7.45 22.00 1 163.90
Mx-2-3 10 6.40 22.00 1 140.80
Mx-3-4 10 4.95 22.00 1 108.90
Mx-4-5 10 7.80 24.00 1 187.20
Mx-5-6 10 7.80 27.00 1 210.60
1
Mx-1-2 (H) 10 8.01 26.00 1 208.32
Mx-2-3 10 5.66 30.00 1 169.73
Mx-3-4 10 5.66 25.00 1 141.44
Mx-4-5 10 5.80 37.00 1 214.55
Mx-5-6 10 4.20 37.00 1 155.31
negative bar
H 1
MX1
MX2 10 3.59 22.00 1 78.98
MX3 10 3.59 22.00 1 78.98
MX4 10 4.05 22.00 1 89.10
MX5 10 5.00 22.00 1 110.00
SY2-SY3
V M1-M2 10 7.45 33.00 1 245.85
M2-M3 10 6.40 33.00 1 211.20
M3-M4 10 4.95 33.00 1 163.35
M4-M5 10 7.80 36.00 1 280.80
M5-M6 10 7.80 33.00 1 257.40
M6-M7 10 3.45 33.00 1 113.85
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
M7-M8 10 3.45 33.00 1 113.85
negative bar
SY3/M1-M8 10 4.07 278.00 1 1,131.46
SY3-SY4
V M1-M2 10 7.45 30.00 1 223.50
M2-M3 10 6.40 30.00 1 192.00
M3-M4 10 4.95 28.00 1 138.60
M4-M5 10 7.80 28.00 1 218.40
M5-M6 10 7.80 28.00 1 218.40
M6-M7 10 6.90 28.00 1 193.20
M7-M8 10 8.52 28.00 1 238.43
negative bar
SY4/M1-M8 10 3.87 288.00 1 1,114.56
negative bar
SY5/M1-M8 10 4.00 228.00 1 912.00
SY5-SY6
V M1-M2
M2-M3 10 6.45 30.00 1 193.50
M3-M4 10 4.95 30.00 1 148.50
M4-M5 10 7.80 18.00 1 140.40
10 10.20 16.00 1 163.20
M5-M6 10 7.80 18.00 1 140.40
M6-M7 10 6.90 16.00 1 110.40
10 9.05 14.00 1 126.70
M7-M8 10 7.79 30.00 1 233.70
negative bar
SY6/M2-M3 10 3.00 24.00 1 72.00
SY6/M3-M8 10 4.00 154.00 1 616.00
SY6 SY7
V M1-M2 10 0.00
M1-M3 10 0.00
M3-M4 10 6.13 33.00 1 202.29
M4-M5 10 7.80 30.00 1 234.00
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
M5-M6 10 7.80 33.00 1 257.40
M6-M7 10 6.90 30.00 1 207.00
9.97 M7-M8 10 8.88 30.00 1 266.40
(H) M1-M2
M2-M3 10 6.30 11.00 1 69.30
M3-M4 10 6.30 23.00 1 144.90
M4-M5 10 6.30 41.00 1 258.30
M5-M6 10 8.25 41.00 1 338.25
M6-M7 10 6.30 33.00 1 207.90
M7-M8 10 6.30 24.00 1 151.20
negative bar
SY7/M1-M8 10 4.00 219.00 1 876.00
negative bar
SY8/M1-M8 10 4.00 217.00 1 868.00
SY8-SY9
V M1-M2
M2-M3 10 5.78 30.00 1 173.28
M3-M4 10 4.95 30.00 1 148.50
M4-M5 10 10.55 33.00 1 348.15
M5-M6 10 7.80 33.00 0.00
M6-M7 10 6.90 30.00 1 207.00
M7-M8 10 7.79 30.00 1 233.70
negative bar
SY9/M1-M8 10 4.00 259.00 1 1,036.00
SY9-SY10
5.35 V M1-M2 10 7.45 30.00 1 223.50
M2-M3 10 6.40 30.00 1 192.00
M3-M4 10 4.95 30.00 1 148.50
M4-M5 10 10.55 33.00 1 348.15
M5-M6 10 7.80 33.00 1 257.40
M6-M7 10 6.90 30.00 1 207.00
M7-M8 10 7.78 30.00 1 233.40
negative bar
SY10/M1-M8 10 3.88 189.00 1 733.32
12 3.88 56.00 1 217.28
SY10-SY11
V M1-M2 10 3.45 34.00 1 117.30
M2-M3
M3-M4
M4-M5 10 3.35 29.00 1 97.15
M5-M6 10 7.80 46.00 1 358.80
10 9.13 21.00 1 191.73
M6-M7 10 6.90 21.00 1 144.90
10 3.35 29.00 1 97.15
M7-M8 10 9.79 34.00 1 332.86
negative bar
M2/SY10-SY11
M3/SY10-SY11
M4/SY10-SY11 10 4.12 15.00 1 61.80
M5/SY10-SY11 10 1 0.00
M6S/SY10-SY11 10 4.70 15.00 1 70.50
M7/SY10-SY11 10 3.76 37.00 1 139.12
SY11'-SY12
V M1-M2 10 3.10 28.00 1 86.80
M2-M3
M3-M4
M4-M5 10 3.15 20.00 1 63.00
negative bar
SY12/M1-M8 10 1 0.00
M2/SY10-SY11
M3/SY10-SY11
M4/SY10-SY11
M5/SY10-SY11
M6S/SY10-SY11
M7/SY10-SY11 10 3.76 32.00 1 120.32
SY11'-SY12
V M1-M2 10 4.05 28.00 1 113.40
M2-M3
M3-M4
M4-M5
M5-M6
M6-M7
negative bar
SY12/M1-M8 10 3.89 59.00 1 229.21
M2/SY10-SY11
M3/SY10-SY11
M4/SY10-SY11
M5/SY10-SY11
M6S/SY10-SY11
M7/SY10-SY11 10 3.76 37.00 1 139.12
SY12-SY13
V M1-M2 10 4.06 37.00 1 150.04
M2-M3
M3-M4
M4-M5
M5-M6
M6-M7
M7-M8 10 10.70 37.00 1 395.90
negative bar
SY12/M1-M8 10 4.00 46.00 1 184.00
SY13-SY14
V M1-M2 10 4.05 37.00 1 149.85
M2-M3
M3-M4
M4-M5 1
M5-M6
M6-M7 1
M7-M8 10 9.62 30.00 0.00
negative bar
SY14/M1-M8 10 4.00 59.00 1 236.00
M2/SY10-SY11
M3/SY10-SY11
M4/SY10-SY11
M5/SY10-SY11
M6S/SY10-SY11
M7/SY10-SY11 10 3.76 39.00 1 146.64
SY14-SY15
V M1-M2 10 4.05 33.00 1 133.65
M2-M3
M3-M4
M4-M5
M5-M6
M6-M7
M7-M8 10 9.63 42.00 1 404.25
negative bar
SY15/M1-M8 10 4.00 59.00 1 236.00
M2/SY10-SY11
M3/SY10-SY11
M4/SY10-SY11
M5/SY10-SY11
M6S/SY10-SY11
M7/SY10-SY11 10 3.76 39.00 1 146.64
SY15-SY16
V M1-M2 10 4.05 33.00 1 133.72
M2-M3
M3-M4
M4-M5
M5-M6 10 8.43 20.00 1 168.60
M6-M7 10 6.90 15.00 1 103.50
10 9.05 16.00 1 144.80
M7-M8 10 7.80 30.00 1 234.00
negative bar
SY12/M1-M8 10 4.00 80.00 1 320.00
M2/SY10-SY11
M3/SY10-SY11
M4/SY10-SY11
SY16-SY17
V M1-M2 10 3.55 33.00 1 117.15
M2-M3
M3-M4
M4-M5
M5-M6 10 8.43 13.00 1 109.59
M6-M7 10 9.05 18.00 1 162.90
10 6.90 13.00 1 89.70
M7-M8 10 7.90 30.00 1 237.00
negative bar
SY12/M1-M8
M2/SY10-SY11
M3/SY10-SY11
M4/SY10-SY11
M5/SY10-SY11 10 3.42 15.00 1 51.30
M6S/SY10-SY11 10 4.70 15.00 1 70.50
M7/SY10-SY11 10 3.84 39.00 1 149.76
Staircase
Staircase -1
Staircase -1
1 12 7.50 13.00 34 3,315.00
2 12 3.50 13.00 34 1,547.00
3 12 2.20 13.00 34 972.40
4 12 2.40 13.00 34 1,060.80
5 12 3.50 13.00 34 1,547.00
8 1.50 8.00 340 4,080.00
8 1.50 15.00 34 765.00
Staircase -2
1 14 7.00 8.00 17 952.00
2 14 2.55 8.00 17 346.80
3 14 1.80 8.00 17 244.80
Project RESIDENCE
Location ADDIS ABABA
SUPER - STRUCTURE
Drg.No Location Ref No Dia Length No of bar No of member Dia 6 Dia 8 Dia 10 Dia 12 Dia 14 Dia 16 Dia20 Dia24 Dia28 Dia32
4 8 1.00 8.00 17 136.00
5 8 1.20 8.00 17 163.20
3.4 8 1.20 23.00 17 469.20
Staircase -2
1 14 7.00 8.00 21 1,176.00
2 14 2.55 8.00 21 428.40
3 14 1.80 8.00 21 302.40
4 8 1.00 10.00 21 210.00
5 8 1.20 10.00 21 252.00
8 1.20 23.00 21 579.60
6 16 1.70 8.00 21 285.60
7 14 4.60 8.00 21 772.80
Staircase -3
Staircase -3
Ar ground floor
strong room need special treatment
30.9 9
19.8 6
19.8 6
20.25 6
90.75 27 3.36111111111111
6,700,000.00
6,700,000.00 6 1,116,666.67
2550
795813.356521739 748905.36
5.4 0.941056535257513
3.3
45.24
1.8
2.6
Wall 1.89
living 38.95 17 662.15
kit 20.06 17 341.02
bed 27.04 17 459.68
bed 2 5.72 17 97.24
TAKE-OFF SHEET
PROJECT:- B+G+8 Mixed Use building PAGE
CLIENT:- DATE
TIM DIM SQ DESCRIPTION TIM
DIVISION -4 MASONARY
3.01, 20 cm block
Basement Floor -4
1 28.3 L=5.2+4.20+3.5+5.20+5.20+5
2.75
77.825 -6
deduct door
-2 0.9 D2
2.1 -2
-3.78
block under the slab
1 7.35 L=5.8+1.55 -6
3.02
22.197
Ground floor -2
block under beam
L=4.20+3.44+5.20+5.4+5.4+5+5.20+5.20+5+
1 54.77 5.4+3.53+1.80
3.39
185.67 2
deduct Openings
-1 0.6 W1
1.5
-0.9
-1 2 W2 1
0.6
-1.2
-1 0.99 W3
0.6 1
-0.594
-2 0.9 D2
2.1
-3.78 1
block under the slab
1 15.25 L=3.84+2.26+9.15
3.66 -2
55.815
-1 0.9 D2
2.1 -5
-1.89
-1 0.7 D1
2.1 -3
-1.47
-2 0.6 W1
1.5 -1
-1.8
-1
First Floor & Second floor
block under beam
L=5.4+4.2+5.2+5.2+5.4+5.4+5.2+5+5+5.2+5.
2 82.78 2+5+5.4+3.53+3.53+3.53+5.39 -1
2.75
455.29
TAKE-OFF SHEET
PROJECT:- B+G+8 Mixed Use building PAGE
CLIENT:- DATE
TIM DIM SQ DESCRIPTION TIM
Fourth, fifth , six -3
L=5.4+4.2+7+5.4+5.2+5.4+5+5.175+2.4+2+5
3 77.71 +5+5.2+5+5.4+3.53+1.4
2.75
641.06625 -1
deduct Openings
-15 2 W2
0.6
-18 1
-3 0.99 W3
0.6
-1.782 -12
-9 1.5 W13
1.2
-16.2
-3 2.82 W38 1
0.6
-5.076
seventh Floor
L=5.4+4.2+7+5.4+2.7+5.2+0.4+0.4+5+10+5.
1 66.23 2+5+5.4+3.53+1.4 1
2.75
182.1325
deduct Openings -5
-5 2 W2
0.6
-6 -1
-1 0.99 W3
0.6
-0.594
-3 1.5 W13 1
1.2
-5.4
-1 2.82 W38
0.6
-1.692
Eight Floor 1
L=5.4+4.2+7+5.4+2.7+5.2+0.4+0.4+5+10+5.
1 61.23 2+5.4+3.53+1.4
2.75
168.3825
deduct Openings -1
-5 2 W2
0.6
-6
-1 0.99 W3 1
0.6
-0.594
TAKE-OFF SHEET
L=5.8+7.51+4+5.2+3.4+5.4+5.2+3.4+5.4+2.5
+5.4+12.2+5.4+1.53+1.53+2.7+1.25+1.25+1
.25+1.832+5.2+5.2+7.89+5.2+5.4+2.884+3.
1 116.992 066 3
2.86
334.59712
deduct door -18
-1 1 D3
2.1
-2.1 -3
-5 0.9 D2
2.1
-9.45
-1 2 D5 1
2.1
-4.2
Second Floor -6
L=5.8+3.2+1.611+3.74+2.7+15+7.8+7.8+7+7
+8+11.2+5.6+5+5.2+5+5.6+6+12+10.4+3.8+
1 146.10 1.25+1.25+1.25+2.9
2.86
417.85 -1
-8 0.9 D2
2.1
-15.12
-1 2 D5 1
2.1
-4.2
Third floor
L=5.8+7.51+1.6+3.74+3.25+7.99+3.65+8.2+
+0.95+0.95+1.85+1.85+5.2+5.2+5.4+1.81+1
.25+1.25+1.25+5.2+2.9+6.2+6.3+5.6+5+5+5
1 132.79 .85+1.5+2.7+5.4+5.4+3.52+3.52 1
2.86
379.78
deduct Openings
-7 0.9 D2 -4
2.1
-13.23
-1 1.2 D4 -1
2.1
-2.52
-1 2 D5 -1
2.1
-4.2
W1
-1 1.5 1
0.6
-0.9
TAKE-OFF SHEET
PROJECT:- B+G+8 Mixed Use building PAGE
CLIENT:- DATE
TIM DIM SQ DESCRIPTION TIM
c, 10cm thick
Basement floor 1
1 0.45 L=0.45
3.02
1.4 ml
Ground Floor -8
L=3.075+2.8+3.5+3.16+1.420+2.01+2.01+0.
1 18.425 45
3.66
67.4355
Deduct 1
-6 0.7 D1
2.1
-8.82
First Floor -1
L=2.9+3.210+1.528+1.528+1.61+0.45+3.16+
1 19.386 1.5+3.5
3.02
58.55
Deduct
-7 0.7 D1
2.1 1
-10.29
Second floor
1 17.99 L=6.25+1.52+1.52+2.975+2.724+1.5+1.5 1
3.02
54.32678
Deduct 17
-8 0.7 D1
2.1
-11.76
Third floor 1
1 19.66 L=2.9+2.76+4.7+0.45+5.850+1.5+1.5
3.02
59.3732 1
Deduct
-11 0.7 D1
2.1
-16.17 1
Fourth, Fifth , sixth & Seventh floor
4 20.1 L=6+5.8+1.5+1.5+1.5+1.5+2.3
3.02 1
242.808
Deduct
-32 0.7 D1 1
2.1
-47.04
TAKE-OFF SHEET
PROJECT:- B+G+8 Mixed Use building PAGE
CLIENT:- DATE
TIM DIM SQ DESCRIPTION TIM
5.05 roof cover -3
1 350 A=350
350
7. Division 9-Finishing -2
7.1 Plastering
a,internal plastering
Internal wall platering -1
5,180.27 2*20 cm Block
5,451.15 2*15 cm Block
954.96 2*10 cm Block
3.39 1
179.61
Deduct opening
-1 1.5 W1
0.6 -3
-0.90
-1 2 W2
0.6 -1
-1.20
-1 0.99 W3
0.6 -1
-0.59
-2 0.9 D2
2.1 -1
-3.78
First floor
L=10.6+5.4+4.2+5.2+1.808+5.2+5+5+5.2+5.
1 78.983 2+5+5.4+3.525+3.525+3.525+5.2 -1
2.75
217.20
-3 2 W2
0.6 3
-3.60
-1 0.99 W3
0.6
-0.59 -15
-1 2.82 W38
0.6
-1.69 -3
Second Floor
L=5.2+5.4+4.2+5.2+1.808+5.2+5+5+5.4+5.2
1 75.47 +3.53+3.53+5.4+5+5.2+5.2
3.05 -9
230.18
Deduct opening
-3 2 W2
0.6
-3.60
TAKE-OFF SHEET
PROJECT:- B+G+8 Mixed Use building PAGE
CLIENT:- DATE
TIM DIM SQ DESCRIPTION TIM
-3 2.82 W38 -3
0.6
-5.08
Seventh Floor -1
L=5.2+4.2+5.4+5.2+1.808+5+5+5.2+5+5.4+3
1 63.233 .525+3+7.2+2.1
2.75
173.89
deduct opening 1
-5 2 W2
0.6
-6.00
-1 0.99 W3
0.6 4
-0.59
-3 1.5 W13
1.2
-5.40
-1 2.82 W38 2
0.6
-1.69
Eighth floor
L=14+5.4+4.2+5.2+1.81+5+5+5.2+5+5.4+3.5
1 103.7 3+43.96 2
2.75
285.18
-10 1.5 W55
2
-30.00 2
-1 2.82 W38
0.6
-1.69
-5 2 W2
0.6 2
-6.00
-1 0.99 W3
0.6
-0.59
-3 1.5 W13
1.2 1
-5.40
-2 1.5
0.6 1
-1.80
Terrace
Under Beam 1
1 62.2 L=5.4+4.2+5.2+5.2+7+33.4+1.8
2.75
171.05
882.34 3
882.34 m2
7.2.2 patterned trowel
1 19.71 1
19.71
19.71 m2
7.2.3 40 cm screed 1
a, to receive ceramic
Ground Floor
1 47 A=12.75+12.75+21.5 1
47
First floor
1 43 A=16.02+11.95+15.45
43.42
Second Floor
A=16.02+11.95+5.62+13.11+10.11+15.25+3
1 107 4.92
106.98
Third Floor 1
A=16.02+11.95+5.62+11.74+13.68+10.58+2
1 99.66 .22+2.49+15.25+10.11
99.66
Fourth & fifth Floor 1
2 58.95 A=16.02+11.95+5.62+10.11+15.25
117.9
Sixth & Seventhfloor 3
2 60.14 A=16.02+11.95+5.62+1.191+10.11+15.25
120.28
Eighth floor 2
1 65.15 A=5.62+31.35+28.18
65.15
600.39 m2
b, To receive Porceiline
Ground Floor
A=7.33+12.72+35.04+34.95+37.55+48.39+6
8.91+172.11+14.6+213.38+35.95+30.62+11
1 727.46 .40+4.51
727.46
First floor 1
A=18.97+49.99+46.57+11.29+21.28+33.38+
350.38+23.61+10.07+15.80+163.68+13.18+
1 836.91 22.76+9.99+13.21+22.76+9.99
836.91
Second Floor 1
A=25.12+40.82+24.75+25+13.90+13.90+9.2
7+11.45+10.93+10.10+9.27+11.45+10.93+1
1 726.71 0.10+251.71+24.50+24.26+164.33+34.92
726.71
TAKE-OFF SHEET
PROJECT:- B+G+8 Mixed Use building PAGE
CLIENT:- DATE
TIM DIM SQ DESCRIPTION TIM
Second floor
L=98.4+6.5-0.8-
0.8+3.18+44.8+35.6+18.706+60-0.8-0.8-
1 348.486 0.8+5.6+5.6+74.1 1
348.5
Third floor
L=27+0.805+52.1+115.2-0.8-0.8-
1 292.505 0.8+28.3+28.3+5.4+40.2-0.8-0.8-0.8
292.5 1
Fourth , Fifth & six Floor
L=27+7.8+30.3+5.9+0.8+5+4.4+33.8+4.98+1
3 219.88 2.1+4.4+85-0.8-0.8
659.6
Seventh Floor 1
L=27+7.8+30.3+5.9+0.8+5+4.4+33.8+4.98+1
1 240.18 2.1+4.4+85-0.8-0.8+20.3
240.2
Eighth Floor
L=4.842+42.205-1.2-0.8-
0.8+3.18+2.35+14.2+8.9+58.6-0.8-0.8-
1 166.50 0.8+1.22+23.099+13.1 1
166.5
Terrace
1 134.69 L=120+14.687
134.7 1
2315.46
7.2.8 PVc Tile
Eight Floor
1 271.81 A=271.81 1
271.8
271.8
7.2.9 Pvc Skirting
1 58.66 L=61.8-1.4-1.74 4
58.7
58.7
7.2.10 Granite for stair casae
Tread 1
L=((10+10)*1.291)+((10+10)*1.3)+
((9+9)*1.3*8)+((9+9)*1.41*9)+
1 529.74 ((10+10)*1.4)+((10+10)*1.715)
529.7
Riser
L=((11+11)*1.291)+((11+11)*1.3)+
((10+10)*1.3*8)+((10+10)*1.4*9)+
((11+11)*1.41)+((11+11)*1.715)+
1 615.752 ((10+10)*1.5)
615.8 1
Landing
1 51.4 A=2.3+2.4+(2.6*8)+(2.4*10)+1.9
51.4 -30
Skirting
L=((3.525)+(5.2*9)+(11.725*11)+(2.64*11)+
1 228.36 9.148)*1.05
228.4
TAKE-OFF SHEET
PROJECT:- B+G+8 Mixed Use building PAGE
CLIENT:- DATE
TIM DIM SQ DESCRIPTION TIM
marble coping
first & Second Floor
2 35.9 L=(28.7-(0.6*4)+(10.2-0.6))
71.8
Third
1 25.3 L=4.4+20.9
25.3
eighth
1 10.8 L=10.8
10.8
terrace
half wall
1 18.6 L=18.6
18.6
seventh
1 14 L=14
14
140.50
EET
DIM SQ DESCRIPTION
deduct Openings
W1
1.5
0.6
-3.6
2 W2
0.6
-7.2
0.99 W3
0.6
-1.188
1.5 W13
1.2
-10.8
2.82 W38
0.6
-3.384
half wall
35.9 L=(28.7-(0.6*4)+(10.2-0.6))
1
71.8
Third Floor
block under beam
L=5.4+4.2+10.6+5.2+5.4+5.2+5.4+3+10+5.8+5.
80.73 2+5+5.4+3.53+1.4
2.75
222.0
half wall
25.3 L=4.4+20.9
1
25.3
block under the slab
4 L=4
3.02
12.08
0.6 W1
1.5
-1.8
2 W2
0.6
-6
1.5 W13
1.2
-5.4
2.82 W38
0.6
-1.692
2.7 W39
0.6
-1.62
2.5 W40
0.6
-1.5
DIM SQ DESCRIPTION
1.5 W13
1.2
-5.4
2.82 W38
0.6
-1.692
Block under slab
48.6 L=42.2+6.4
3.02
146.772
1.5 W55
2
-36
half wall
10.8 L=10.8
1
10.8
Terrace
129 L=95.6-(3*0.6)+30.6-(10*0.6)+29.2-18.6
3.02
389.58
2 W2
0.6
-6
0.99 W3
0.6
-0.594
half wall
18.6 L=18.6
1
18.6
2,590
3.02 15 Cm block work
Basment Floor
13.3 L=2.9+(5.2*2)
2.75
36.575
deduct Door
2 D5
2.1
-4.2
Ground Floor
L=5.4+9.15+5.2+3.815+4.215+5.4+5.4+5.4+2.9
74.3 +3.065+7.514+7.891+5.2+1.25+1.25+1.25
3.53
261.9075
DIM SQ DESCRIPTION
1.05 W41
0.6
-1.26
5.65 W42
0.6
-3.39
2.7 sW1
2
-10.8
3.62 SW2
2
-10.8
Fourth , Fifth & six Floor
L=5.6+7.4+1.635+3.74+2.7+1.81+1.25+1.25+1.
25+5.2+2.9+6.2+6.3+5.6+5+5.85+5+2.6+2.6+5
94.01 .4+3.525+1.4+1.5+5.4+1.4+1.5
2.86
806.61
0.9 D2
2.1
-34.02
2 D5
2.1
-12.6
Seven
L=5.6+7.4+1.635+3.74+2.7+1.81+1.25+1.25+1.
25+5.2+2.9+6.2+6.3+5.6+5+5.85+5+2.6+2.6+5
94.02 .4+3.525+1.4+1.5+5.4+1.4+1.51
2.86
268.90
0.9 D2
2.1
-11.34
2 D5
2.1
-4.2
half wall
14 L=14
1.5
21.00
Eighth floor
L=5.65+1.61+3.74+9.2+1.6+1.6+2.3+8.625+6.3
+5+6.8+5+5.2+6.9+5.2+2.9+1.81+1.25+1.25+1
83.185 .25
2.86
237.91
deduct opening
0.9 D2
2.1
-7.56
1.2 D4
2.1
-2.52
2 D5
2.1
-4.2
Terrace
20.22 L=7.81+1.81+1.25+1.25+2.9+5.2
2.82
57.0
2725.5760914
DIM SQ DESCRIPTION
Eighth floor
20.95 L=0.45+11.5+(1.5*6)
3.02
63.269
Deduct
0.7 D1
2.1
-11.76
Terrace
5.85 L=5.4+0.45
3.02
17.667
Deduct
2 D5
2.1
-4.2
477.5
4 . Metal Work
4.01 hand rail for stair case
L=(5.813+6.4+5.813+5.82+5.82+5.82+5.82+5.8
2+5.82+5.82+5.82+2.825+2.775+6.825+6.3+6.
289.03 2+4.3+6.2+4.3+6.2+4.3+(9*5.7))*1.74
289.03 ml
4.02 hand rail for balcony
128.1 L=7.7+10.5+5+2.6+37.7+20.9+4.4+28+11.3
128.10 ml
4.03 sun breaker
12.8
217.60 ml
A=25.65+8.9+33.93+8.9+29.4+25.55+29.31+1
1.74+25.71+29.30+26.7+29.3+26.7+29.3+26.7
484.67 +29.3+26.7+61.58
484.67
Terrace
333.53 A=205+128.53+70.66
333.53
balcony
39.31 A=16.37+22.94
39.31
857.51
DIM SQ DESCRIPTION
1.5 W13
1.2
-5.40
1.5 W1
0.6
-1.80
0.99 W3
0.6
-0.59
2.82 W38
0.6
-1.69
Third floor
L=10.6+3.4+2+5.2+1.808+5.8+5.2+5+5.4+3.52
64.728 +3+3.4+5.2+5.2
3.05
197.42
deduct
2 W2
0.6
-3.60
0.99 W3
0.6
-0.59
2.82 W38
0.6
-1.69
2.82 W39
0.6
-1.69
2.5 W40
1.2
-3.00
Fourth Floor , Fifth & Six
L=7+4.2+5.4+5.2+1.808+5+5+5.2+5+5.4+3.53+
66.038 3+2.4+2.4+5.5
2.75
544.81
deduct opening
2 W2
0.6
-18.00
0.99 W3
0.6
-1.78
1.5 W13
1.2
-16.20
DIM SQ DESCRIPTION
2 W2
0.6
-3.60
0.99 W3
0.6
-0.59
Under Slab
59 L=59
3.02
178.18
Half Wall
first & Second Floor
35.9 L=(28.7-(0.6*4)+(10.2-0.6))
1
143.6
Third
25.3 L=4.4+20.9
1
50.6
eighth
10.8 L=10.8
1
21.6
terrace
half wall
18.6 L=18.6
1
37.2
seventh
14 L=14
1.5
42.00
2402.04
d, Rc Ceiling & Stair case
Two Coat of Plastered Surface
141.95 A=56.46+19.71+65.78
141.95
Plasterd & Painted
A=7.33+12.75+12.75+12.75+35.04+34.95+37.
55+48.39+172.11+14.6+30.62+35.95+11.4+21
.5+213.38+16.02+11.95+18.97+49.99+46.57+
11.29+15.45+21.28+33.38+350.38+23.61+163
.68+10.07+15.80+13.18+22.76+9.99+13.21+2
2.76+4.99+16.02+11.95+5.62+25.12+40.82+1
3.11+10.11+15.25+31.03+34.92+24.75+25+13
.90+13.90+251.71+9.27+11.45+10.93+10.10+
9.27+11.45+10.93+10.10+24.5+24.26+164.33
+34.26+15.25+10.11+42.3+121.79+10.58+13.
68+11.74+(2.22*2)+70.66+16.02+11.95+5.62+
(4*(16.02+11.95+5.62+104.84+42.3+10.11+15
.25+34.26))
+5.62+65.17+28.18+31.35+10.44+28.61+199.
4189.41 11+28.18+12.15+13.47+31.13
4189.41
Stair case
250.94 A=(10.63+9.6+(9.6*8)+(9.6*10))*1.3
250.939
4582.299
DIM SQ DESCRIPTION
Third Floor
A=65.11+121.79+134.87+190.53+73.23+96.39
852.52 +23.38+34.26+70.66+42.3
852.52
Fourth , fifth floor& Sixth floor
A=107.29+44.24+182.66+29.82+31.82+182.66
794.15 +34.26+104.84+42.3+34.26
2382.45
Seventh Floor
A=107.29+44.24+182.66+29.82+31.82+182.66
810.52 +34.26+104.84+42.3+34.26+16.37
810.52
Eighth floor
A=34.11+65.17+22.94+199.11+271.81+28.61+
691.72 10.44+31.35+28.18
691.72
Terrace
428.67 A=39.56+12.15+203.83+13.47+31.13+128.53
428.67
7456.96
7.2.4 ceramic tile
similar with cement screed form ceramic
600.39
46.287
Third Floor
45.991 L=12.3+14.031+4.9+5.05+9.71
46.0
Fourth &,fifth floor & Eight floor
9.56 L=9.56
28.7
Sixth &Seventh Floor
11.16 L=9.56+1.6
22.3
143.278 ml
7.2.6 Porcelian tile
similar with cement screed for Porcelian
7456.96 m2
L=10.7+7.715+(6*7.028)+21.58+13.031+30.63
4+24.955+1.2+1.8+2.4+2.4+2.4+7.99+14.4+1.
191.14 218+6.55
191.1
First Floor
L=16.5+38.5+21.8+13.5+6.6+18.1+7.4+7.4+14.
3+14+17.5+12.83+5.4+13.5+8.5+22.3+44.2+3.
282.33 2+12.6
282.3
EET
DIM SQ DESCRIPTION
Window Sill
L=((1.5*9)+(32*2)+(10*0.99)+(10*2.890)+(1.5
*24)+(8*2.820)+(2.7*1)+(2.5)+(2*1.05)+(5.65*
235.0 1)+(1.5*12)+(5*3)+(2*1.5))*1.05
235.0
treshold
200
L=(2*5.2)+(5*2)+(5.4*3)+(3*3.53)+4.2+4.42+(
2.7*1)+(24*1.5)+(8*3.99)+(2*3.4)+(19*5.4)+(2
*5.85)+(2*2.2)+(2.72)+(3.850)+(6+2.5)+(5.2*6
)+(2*5.65)+(5.83*2)+(2*2.690)+(2*5.88)+(2*2.
4)+(2*2.65)+(2.490)+(5*5.6)+(5*5.45)+(2.56)+
(6*3.35)+(9*5.2)+(3)+(4.42*2)+(3.22)+(24*5)+
(5.4*2)+(9*3.53)+(3.160)+(4.250)+(5.8)+(4.2)+
757.04 (4.2*8)+(6.05*4)+(4.65*4)+(2*5)
757.0
2.1
123.27
First Floor
68.72 L=22.12+29.2+17.4
2.1
144.31
Second Floor
80.294 L=21.966+19.3+21.3+17.728
2.1
168.62
Third Floor
100.127 L=12.86+9.102+19.3+19.5+17.94+21.425
2.1
210.27
Fourth , Fifth , six & seventh Floor
84 L=22.3+19.1+42.6
2.1
705.60
Eighth floor
72.75 L=36.75+25.5+10.5
2.1
152.78
1504.8411
514.3
7.2.16 Gysum ceiling
A=760.10+65.11+134.87+190.53+96.39+23.38
+(4*(107.29+44.24+182.66+29.82+31.82+182.
4002.81 60))+34.11+271.81+39.56+73.23
4002.81
4002.81
7.2.16 HPL
34.18 L=0.58+(0.8*42)
34.18
EET
DIM SQ DESCRIPTION
c-25 9,500.00
c-30 10,500.00
68
10,000.00
11,000.00
TAKE-OFF SHEET
PROJECT:- B+G+8 Mixed Use building PAGE
CLIENT:- DATE
TIM DIM SQ DESCRIPTION TIM DIM SQ
1. Earth Work
1.1 Site Clearance 3 3.5
1 35.6 L1=33.6+2 3.5
36.9 L2=34.925+2 1.5
1314.53 m2 55.13
1.2 Excavation Gate out
1.2.1 Bulk Excavation depth<1.5 m 6 3
1 1090 A=1090 3
1.5 1.5
1635.00 m3 81
1.2.2 Bulk Excavation depth 1.5-3m
1 1090 A=1090 1 8.8
1.3 4
1417.00 m3 1.5
1.2.3 Pit Excavation depth <1.5m 52.8
F1
1 5.6 L1&L2=(4.6+0.5+0.5) 1 5
5.6 8.125
1.5 1.5
47.04 m3 60.94
F2
3 5.2 L1&L2=(4.2+0.5+0.5) 1 5.26
5.2 10.8
1.5 1.5
121.68 m3 85.18
F3 1 42.28
6 5 L1&L2=(4+0.5+0.5) 2.25
5 1.5
1.5 142.68
225 m 3
1385.05
F4
5 4.8 L1&L2=(3.8+0.5+0.5)
4.8 1 5.6
1.5 5.6
172.8 m3 1.05
F5 32.93
5 4.8 L1&L2=(3.8+0.5+0.5)
4.8 3 5.2
1.5 5.2
172.8 m3 1.05
F6 85.18
7 4 L1&L2=(3+0.5+0.5)
4 6 5
1.5 5
168 m3 1.05
157.5
TAKE-OFF SHEET
PROJECT:- PAGE
CLIENT:- DATE
TIM DIM SQ DESCRIPTION TIM DIM SQ
F4
5 4.8 L1&L2=(3.8+0.5+0.5)
4.8
1.05 1 5.3
120.96 m3
0.8
F5 0.45
5 4.8 L1&L2=(3.8+0.5+0.5) 2
4.8
1.05 1 5.1
120.96 m3 0.8
F6 0.45
7 4 L1&L2=(3+0.5+0.5) 2
4
1.05 1 5.15
117.6 m3 0.8
F7 0.45
3 3.5 L1&L2=(2.5+0.5+0.5) 2
3.5
1.05 1 7.6
38.59 m3
0.8
F8&F8' 0.45
6 3 L1&L2=(2+0.5+0.5) 3
3
1.05 1 4.2
56.7 m3
0.8
SWF1 0.45
1 8.8 L1=7.8+0.5+0.5 2
4 L2=3+0.5+0.5
1.05 1 3.1
36.96 m3 0.8
SWF2 0.45
1 5 L1=4+0.5+0.5 1
8.125 L2=7.125+0.5+0.5
1.05 1 2.05
42.66 m3 0.8
LSWF1 0.45
1 5.26 L1=4.258+0.5+0.5 1
10.8 L2=9.8+0.5+0.5
1.05 1 4.15
59.63 m3 0.8
Retaining wall footing 0.45
L=1.125+3+2.35+2.3+2.55+2+1.3+2+1.55+
1.05+2.05+2.35+2.35+2.3+1.55+1.1+1.75+
1 42.28 1.1+1.6+1.6+0.8+2+2.5 1
2.25 W=1.25+0.5+0.5
1.05 1 3.1
99.87 0.8
969.54 0.45
1
TAKE-OFF SHEET
PROJECT:- PAGE
CLIENT:- DATE
TIM DIM SQ DESCRIPTION TIM DIM SQ
15 m3
1.09 Back fill from quarry waste
2354.59 Pit excavation
15 Trench excavation
-510.61 Footing pad 1 4.7
-28.43 Foundation column 4.7
-48.04 Basment beam 22.09
-33.398 Lean Concrete
1749.112 Total Volume of Back fill 3 4.3
1.10 Cart away 4.3
262.906 Site Clerance 55.47
3052.00 Bulk excavation
2354.59 Pit excavation 6 4.1
15 Trench excavation 4.1
5684.496 Total Volume of cart away 100.86
1.11 Hard Core
axis b/n ED-76 5 3.9
1 4.5 L1=4.8-0.3 3.9
5.5 L2=5.8-0.3 76.05
24.75
axis B/n FF'-65 5 3.9
1 5.7 L1=6-0.3 3.9
5.5 L2=5.8-0.3 76.05
31.35
axis B/n ED-65 7 3.1
1 4.5 L1=4.8-0.3 3.1
5.5 L2=5.8-0.3 67.27
24.75
axis B/n CB-65 3 2.6
1 5.3 L1=5.6-0.3 2.6
5.5 L2=5.8-0.3 20.28
29.15
axis B/n BA-65 6 2.1
1 5.3 L1=5.6-0.3 2.1
5.5 L2=5.8-0.3 26.46
29.15
axis b/n AF'-15 1 7.9
1 33.6 L1=33.6 3.1
21.53 L2=21.53 24.49
723.41
Deduct 1 4.1
shear wall area 7.225
-1 28.65 A=28.65 29.62
-28.65
Beam 1 4.36
-5 33.6 L=33.6 9.9
0.3 43.14
-50.4 1 64.28
-5 21.53 L=21.53 1.35
0.3 86.77
-32.295 628.55
751.21
TAKE-OFF SHEET
PROJECT:- PAGE
CLIENT:- DATE
TIM DIM SQ DESCRIPTION TIM DIM SQ
b. Basement Beam
along axis 6
1 5.3 L=1.7+0.75+2.85 1 0.8
0.4 w=0.3+0.1 0.9
2.12 1.60
along axis 5 1.15
1 10.89 L=2.65+1.8+1.7+0.592+1.95+2.2
0.4 w=0.3+0.1 13 0.70
4.36 0.70
along axis 4 1.60
1 10.59 L=2.65+2.1+1.9+0.592+1.6+1.75 10.18
0.4 w=0.3+0.1
4.24 1 0.60
along axis 3 0.30
1 11.05 L=3+2+0.9+1.7+1.6+1.85 1.60
0.4 w=0.3+0.1 0.29
4.42
along axis 2 20 0.60
1 12.8 L=3.1+2.35+1.3+2.1+2.1+1.85 0.60
0.4 w=0.3+0.1 1.60
5.12 11.51
along axis F
1 7.82 L=1.7+1.7+1.6+2.1+0.725 1 0.70
0.4 w=0.3+0.1 0.80
3.13 1.60
along axis E 0.9
1 10.03 L=2+1.4+1.8+1.7+2.25+0.875
0.4 w=0.3+0.1 9 0.50
4.01 0.50
along axis D 1.60
1 4.93 L=1.7+2.35+0.875 3.6
0.4 w=0.3+0.1
1.97 2 0.50
along axis C 0.50
1 6.98 L=2.15+1.7+2.25+0.875 1.60
0.4 w=0.3+0.1 0.8
2.79 28.43
along axis B
1 9.08 L=2.65+1.8+1.5+2.25+0.875
0.4 w=0.3+0.1 1 0.8
3.63 0.9
along axis A 3.20
1 9.08 L=2.65+1.8+1.5+2.25+0.875 2.3
0.4 w=0.3+0.1
3.63 13 0.70
39.41 0.70
3.20
20.38
TAKE-OFF SHEET
PROJECT:- PAGE
CLIENT:- DATE
TIM DIM SQ DESCRIPTION TIM DIM SQ
C5
1 0.60
0.30
3.20 1 4.6
0.58 4.6
C6,C6',C6'',C8&C10 1.3
20 0.60 27.51
0.60
3.20 3 4.2
23.04 4.2
C7 1.2
1 0.70 63.5
0.80
3.20 6 4
1.79 4
C12 1.1
3 0.50 105.6
0.50
3.20 5 3.8
2.4 3.8
C12',C13&C13' 1.1
6 0.50 79.42
0.50
2.20 5 3.5
3.3 3.5
53.79 0.95
c, in lift shaft shear wall 58.19
SW1
1 3 L=3 7 3
0.3 D=2.5+3.2-1.2 3
4.5 0.75
4.05 47.25
SW2
1 4.125 L=4.125 3 2.5
0.3 D=2.5+3.2-1 2.5
4.7 0.65
5.82 12.19
Lift Shaft
2 4.55 L1=4.55 6 2
0.3 D=2.5+3.2-1.3 2
4.4 0.45
12.01 10.8
deduct door
-2 1.275 1 7.8
2.1 3
0.3 1
-1.61 23.4
3 1.93 L1=1.93
0.3 D=2.5+3.2-1.3
4.4
7.64
27.91
d, In retaining wall
1 145.95
0.3
3.45
151.06
TAKE-OFF SHEET
PROJECT:- PAGE
CLIENT:- DATE
TIM DIM SQ DESCRIPTION TIM DIM SQ
SWF2
1 4 L1=4 1 5.4
7.125 L2=7.125 0.3
1 0.45
28.5 m3 0.73
LSWF1
1 4.26 L1=4.258 1 29.53
9.8 L2=9.8 0.3
1.3 0.45
54.25 m3 3.99
510.61
b, in Basement Beam 1 24.33
along axis 1,2,3,4&5 0.3
5 33.9 L=33.9 0.45
0.3 3.28
0.4
20.34 m3
along axis 6 1 5
1 22.9 L=6.3+11.500+5.1 0.3
0.3 0.45
0.4 0.68
2.75 m 3
TAKE-OFF SHEET
PROJECT:- PAGE
CLIENT:- DATE
TIM DIM SQ DESCRIPTION TIM DIM SQ
along axis A
1 22.6 L=22.6-(0.6*3)+1.8
0.3 -1 28.65
0.45 -28.65
3.05
along axis B&C -5 33.6
2 27.7 L=29.2-(5*0.3) 0.3
0.3 -50.4
0.45 -5 21.53
7.48 0.3
along axis D -32.295
1 31.4 L=34.4-(5*0.6) 751.21
0.3
0.45
4.24
along axis E&F 1 5.7
2 29.53 L=32.53-(5*0.6) 25.83
0.3 147.23
0.45
7.97
55.79 1 15.9
d, 100mm Basement Floor Slab 1.5
axis b/n ED-76 23.85
1 4.5 L1=4.8-0.3
5.5 L2=5.8-0.3 1 26.1
24.75 11.00
axis B/n FF'-65 287.10
1 5.7 L1=6-0.3
5.5 L2=5.8-0.3 1 23.5
31.35 3.83
axis B/n ED-65 89.89
1 4.5 L1=4.8-0.3
5.5 L2=5.8-0.3 1 23.5
24.75 3.83
axis B/n CB-65 89.89
1 5.3 L1=5.6-0.3
5.5 L2=5.8-0.3 1 2.7
29.15 2.7
axis B/n BA-65
1 5.3 L1=5.6-0.3 1 17.96
5.5 L2=5.8-0.3 17.96
29.15
axis b/n AF'-15 1 7.40
1 33.6 L1=33.6 7.4
21.53 L2=21.53 667.02
723.408
TAKE-OFF SHEET
PROJECT:- PAGE
CLIENT:- DATE
TIM DIM SQ DESCRIPTION TIM DIM SQ
Soffit
2 2.99 L=((0.16*10)^2+(0.28*9)^2)^0.5 5 15.2
1.40 1.1
0.24 83.6
2.01
Steps 5 14
20 1.40 0.95
0.28 66.5
0.16
0.63 7 12
Landing 0.75
1 2.88 L1=2.888 63
0.80 L2=0.797
0.24 3 10
0.55 0.65
3.18 19.5
g, in Ramp Beam
3 5.4 along axis 5,6& 7 6 8
0.45 0.45
0.3 21.6
2.19
along axis E&F 1 21.6
2 11.3 1
0.45 21.6
0.3
3.05 1 22.25
5.24 1
h) Ramp Slab 22.25
b/n axis FE-75
2 5.7 L1=6-0.3 1 28.12
5.5 L2=5.8-0.3 1.3
0.18 36.55
11.29 524.6
2.2 Concrete Form Work
a, Footing pad
1 3.4
F1 1.20
1 18.4 L=4.6*4 4.08
1.3
23.92 m2 13 2.80
F2 1.20
3 16.8 L=4.2*4 43.63
1.2
60.48 m2 1 1.80
F3 1.20
6 16 L=4*4 2.16
1.1
105.6 m2
TAKE-OFF SHEET
PROJECT:- PAGE
CLIENT:- DATE
TIM DIM SQ DESCRIPTION TIM DIM SQ
C6,C6',C6'',C8&C10
20 2.40
1.20 1 14.16
57.54 4.4
C7 62.3
1 3.00
1.20 1 15.02
3.6 4.4
C12,C12',C13&C13' 66.09
9 2.00
1.20 -4 1.28
21.58 2.1
C14 -10.71
1 2.00 188.98
1.20
2.4 2 145.95
134.99 3.45
C, To Basement Column 1007.06
C1
1 3.4
2.75 10 33.9
9.35 0.4
C2,C2',C3,C3',C4,C7',C9,C9',C11& C11' 135.6
13 2.80
2.75 2 22.9
100.1 0.4
C5 18.32
1 1.80
2.75 2 11.1
4.95 0.4
C6,C6',C6'',C8&C10 8.88
20 2.40
2.75 8 25.72
132 0.4
C7 82.32
1 3.00
2.75 6 31.30
8.25 0.4
C12 75.12
3 2.00 320.24
2.75
16.5
C12',C13&C13' 2 5.4
6 2.00 1.02
1.75 11.02
21
292.15
d, Lift Shaft Shear wall
SW1
2 3.3 L=3+0.3
4.5 D=2.5+3.2-1.2
29.7
SW2
2 4.43 L=4.125+0.3
4.7 D=2.5+3.2-1
41.6
TAKE-OFF SHEET
PROJECT:- PAGE
CLIENT:- DATE
TIM DIM SQ DESCRIPTION TIM DIM SQ
at level 2,3,4&5
4 5.4 L=5.4 1 5.4
0.84 1.2
18.14 m2 6.48
along axis 7 1 1.5
1 5.4 L=5.4 1.02
1.2 1.53
6.48 m 2
TAKE-OFF SHEET
PROJECT:- PAGE
CLIENT:- DATE
TIM DIM SQ DESCRIPTION TIM DIM SQ
b/n axis AF-24
1 23.5 L1=24.7-(4*0.3)
3.83 L2=4.125-0.3 2 5.7
89.89 5.5
b/n axis AC-45 62.70
1 23.5 L1=24.7-(4*0.3)
3.83 L2=4.125-0.3
89.89
b/n axis DD'-45
1 2.7 A=2.7
2.7 1 0.7
b/n axis DE-67 0.9
1 17.96 A=14.4+3.56 3.50
17.96 2.21
Enterance slab
1 7.40 A=7.4 11 0.70
7.4 0.70
Side Form Work 3.50
1 136.00 L=136 18.87
0.18
24.48 1 0.60
690.50 0.30
J) To Stair Case And Landing 3.50
Soffit 0.63
2 2.99 L=((0.16*10)^2+(0.28*9)^2)^0.5
1.40 22 0.60
8.36 0.60
Side Form Work 3.50
4 2.99 27.72
0.40
1 0.70
0.70
2.39 3.50
riser 1.72
20 1.40
0.16 3 0.50
2.24 0.50
Landing 3.50
1 2.88 L1=2.888 2.63
0.80 L2=0.797
2.30 6 0.50
15.29 0.50
k, in Ramp Beam 4.50
2 5.4 along axis 5& 7 6.75
1.02
11.02 2 0.20
1 5.4 along axis 6 6.2
0.84 2.43
4.54
along axis E&F
2 11.3 1 0.7
0.84 0.8
18.98 3.20
34.54 1.79
TAKE-OFF SHEET
PROJECT:- PAGE
CLIENT:- DATE
TIM DIM SQ DESCRIPTION TIM DIM SQ
C2,C2',C9,C9'
5 0.70 3 0.50
0.70 0.50
3.20 3.20
7.84 2.4
C5
1 0.60 6 0.50
0.30 0.50
3.20 3.20
0.58 4.8
C3,C3',C4 ,C6,C6',C6'',C7',C8,C10,C11&C11
28 0.60 2 0.20
0.60 3.2
3.20 1.26
32.26
C7
1 0.70 1 0.7
0.70 0.7
3.20 3.20
1.57 1.57
C12
3 0.50 1 0.60
0.50 0.30
3.20 3.20
2.4 0.58
C12',C13&C13'
6 0.50 19 0.60
0.50 0.60
3.20 3.20
4.8 21.89
Second Floor
C1&C7 18 0.50
2 0.7 0.50
0.7 3.20
3.20 14.4
3.14
C5 2 0.20
1 0.60 3.2
0.30 1.26
3.20
0.58 2 0.40
C2,C2',C3,C3',C4 ,C6,C6',C6'',C7',C8,C9,C9',
C10,C11&C11 0.40
33 0.60 3.20
0.60 1.02
3.20
38.02
TAKE-OFF SHEET
PROJECT:- PAGE
CLIENT:- DATE
TIM DIM SQ DESCRIPTION TIM DIM SQ
Fourth
C1&C7
2 0.6 1 0.60
0.6 0.30
3.20 3.20
2.3 0.58
C5
1 0.60 32 0.40
0.30 0.40
3.20 3.20
0.58 16.38
C2,C2',C3,C3',C4,
C6,C6',C6''C7',C8,C9,C9',C10,C11&C11
34 0.50
0.50 1 0.60
3.20 0.30
27.2 2.60
Fifth 0.47
C1
1 0.6 21 0.40
0.6 0.40
3.20 2.60
1.15 8.74
C5 339.49
1 0.60
0.30
3.20 1 3
0.58 0.3
C2,C2',C3,C3',C4, C6,C6',C6'',
C7,C7',C8,C9,C9',C10,C11&C11 31.7
35 0.50 28.53
0.50
3.20 1 4.125
28 0.3
siixth 31.7
C5 39.23
1 0.60
0.30 2 4.55
3.20 0.3
0.58 31.7
C1,C2,C2',C3,C3',C4, C6,C6',C6'',
C7,C7',C8,C9,C9',C10,C11&C11 86.54
36 0.50
0.50 -20 1.275
3.20 2.1
28.8 0.3
Seventh -16.07
C5 3 1.93
1 0.60 0.3
0.30 31.7
3.20 55.06
0.58 193.29
C1,C2,C2',C3,C3',C4, C6,C6',C6'',
C7,C7',C8,C9,C9',C10,C11&C11
36 0.40
0.40
3.20
18.43
TAKE-OFF SHEET
PROJECT:- PAGE
CLIENT:- DATE
TIM DIM SQ DESCRIPTION TIM DIM SQ
along axis 1- First floor
1 25 L=17.4-(4*0.6)+11.8-(3*0.6) 3 26.13
0.3 0.3
0.45 0.45
3.38 10.58
along axis 1-2nd & 3rd Floor
2 30 L=34.2-(7*0.6) 3 1.25
0.3 0.3
0.45 0.45
8.1 0.51
along axis 2,3 &5
30 L=34.2-(7*0.6) 3 26.98
0.3 0.3
0.45 0.45
4.05 10.93
along axis 4
3 27.8 L=34.2-(7*0.6)-2.2 3 30.00
0.3 0.3
0.45 0.45
11.26 12.15
along axis 6
3 25 L=17.4-(4*0.6)+11.8-(3*0.6) 3 30.46
0.3 0.3
22.5 27.42
along axis 7
3 6.9 L=7.5-0.6 2 24.33
0.3 0.3
0.45 0.45
2.79 6.57
along axis A
3 21.27 L=23.20-(4*0.6)+1.4/3 1 5.20
0.3 0.3
0.45 0.45
8.61 0.7
along axis B-1st floor
1 21.4 L=23.8-(4*0.6)
0.3 12 26.4
0.45 0.3
2.89 0.45
along axis B-2nd 42.77
1 24.33 L=27.93-(6*0.6)
0.3 4 30
0.45 0.3
3.28 0.45
along axis B-third floor 16.2
1 25.73 L=29.33-(6*0.6)
0.3 4 27.8
0.45 0.3
3.47 0.45
15.01
TAKE-OFF SHEET
PROJECT:- PAGE
CLIENT:- DATE
TIM DIM SQ DESCRIPTION TIM DIM SQ
along axis 6
4 15 L=17.4-(4*0.6) 1 11.7
0.3 0.3
0.45 0.45
8.1 1.58
along axis 7
4 6.9 L=7.5-0.6 1 7
0.3 0.3
0.45 0.45
3.73 0.95
along axis A
4 17.00 L=17.40-(3*0.6)+1.4 1 15.90
0.3 0.3
0.45 0.45
9.18 2.15
along axis B&C
8 20.53 L=23.53-(5*0.6) 2 21.03
0.3 0.3
0.45 0.45
22.17 5.68
along axis D'
4 1.25 L=1.250 1 1.25
0.3 0.3
0.45 0.45
0.68 0.17
along axis D
4 26.98 L=13.451-(3*0.6)+17.13-(3*0.6) 1 27.58
0.3 0.3
0.45 0.45
14.57 3.72
along axis E&F
8 30.93 L=33.73-(7*0.6)+1.4 2 31.63
0.3 0.3
0.45 0.45
33.4 8.54
along axis F'
4 10.40 L=12.2-(3*0.6)
0.3 1 32.1
0.45 0.3
5.62 0.45
Eighth Floor 4.33
along axis 1,2,3& 5
4 30.7 L=34.2-(7*0.5) 3 31.4
0.3 0.3
0.45 0.45
16.58 12.72
along axis 4
1 28.5 L=34.2-(7*0.5)-2.2 1 29.2
0.3 0.3
0.45 0.45
3.85 3.94
TAKE-OFF SHEET
PROJECT:- PAGE
CLIENT:- DATE
TIM DIM SQ DESCRIPTION TIM DIM SQ
along axis 6
1 12 L=13.2-(3*0.4) 1 7.1
0.3 0.3
0.45 0.45
1.62 0.96
along axis 7
1 6.9 L=7.5-0.6 1 5.4
0.3 0.3
0.45 0.45
0.93 0.73
along axis A
1 17.60 L=17.40-(3*0.4)+1.4 1 1.4
0.3 0.3
0.45 0.45
2.38 0.19
along axis B & C
2 11.8 L=10.8-0.4+1.4 1 12.2
0.3 0.3
0.45 0.45
3.19 1.65
along axis D
1 18.45 L=12.85-(2*0.4)+5+1.4 1 17.8
0.3 0.3
0.45 0.45
2.49 2.4
along axis E
1 23 L=23.6-(5*0.4)+1.4 2 7
0.3 0.3
0.45 0.45
3.11 1.89
along axis F 18.06
1 32.33 L=33.73-(7*0.4)+1.4
0.3
0.45
4.36 1 10.53
392.91 10.53
b, Top Tie Beam
along axis 1&3 1 16.1
2 27.40 L=29.802-(6*0.4) 9.53
0.3 153.43
0.45
7.4 1 10.75
along axis 4&5 5.7
2 5.4 L=6.2-0.4-0.4 61.28
0.3
0.45 1 32.1
1.46 5.7
along axis 6 182.97
1 10.2 L=11.4-(0.4*3)
0.3 1 16.08
0.45 11
1.38 176.88
TAKE-OFF SHEET
PROJECT:- PAGE
CLIENT:- DATE
TIM DIM SQ DESCRIPTION TIM DIM SQ
B/n axis 46-AC
1 16.08 L1=16.98-(3*0.3) 1 16.08
10.9 L2=11.8-(3*0.3) 11
175.27 176.88
B/n axis 4'5-DD'
1 2.72 A=2.72 1 16.08
2.72 10.9
B/n axis 67-FD 175.27
1 5.65 L1=5.95-0.3
7.86 L2=8.46-(2*0.3) 1 11.32
44.41 11.32
Second Floor
b/n axis 12-AC 1 5.65
1 10.75 L1=11.65-(3*0.3) 7.86
4.28 L2=4.28 44.41
46.01
b/n axis 12-DF
1 14.75 L1=15.35-(2*0.3) 4 15.4
4.28 L2=4.28 1.55
63.13 95.48
b/n axis 24-AF
1 30.8 L1=32.60-(6*0.3) 4 2.4
11 L2=11.3-0.3 1.55
338.8 14.88
B/n axis 46-AC
1 16.08 L1=16.98-(3*0.3) 4 28.20
10.9 L2=11.8-(3*0.3) 14.93
175.27 1684.1
b/n axis 45-DF
1 14.75 L1=15.35-(2*0.3) 4 16.08
5.5 L2=5.5 11
81.13 707.52
b/n axis 45-DF'
1 16.2 L1=17.4-(0.3*4) 4 16.08
5.8 L2=6.4-0.3*2 5.65
93.96 363.41
B/n axis 4'5-DD'
1 2.72 A=2.72 4 2.72
2.72 10.88
B/n axis 67-FD
1 5.65 L1=5.95-0.3 4 5.65
7.86 L2=8.46-(2*0.3) 7.86
44.41 177.64
Third Floor
B/n Axis 11'-FF'
1 28.1 L1=29.9-(6*0.3) 1 22.8
1.55 L2=1.55 1.55
43.56 35.34
B/n Axis 14-AF
1 32.01 L1=34.107-(7*0.3) 1 28.20
14.93 L2=15.53-(2*0.3) 14.93
477.86 421.03
TAKE-OFF SHEET
PROJECT:- PAGE
CLIENT:- DATE
TIM DIM SQ DESCRIPTION TIM DIM SQ
B/n axis 46-DF
1 12.15 L1=12.75-(2*0.3) 22 0.28
11 L2=11.3-0.3 0.16
133.65 1.3
B/n axis 45-AC 0.64
1 16.08 L1=16.98-(3*0.3)
5.65 L2=5.95-0.3 1 2.35
90.85 0.18
B/n axis 4'5-DD' 0.42
1 2.72 A=2.72
2.72 2 3.31
B/n axis 67-FD 1.3
1 5.65 L1=5.95-0.3 0.18
7.86 L2=8.46-(2*0.3) 1.55
44.41
Terrace 22 0.28
B/n Axis 34-AF 0.16
1 28.20 L1=30-(6*0.3) 1.3
5.3 L2=5.3 0.64
149.46
B/n axis 46-DF 1 2.59
1 12.15 L1=12.75-(2*0.3) 0.18
11 L2=11.3-0.3 0.47
133.65
B/n axis 45-AC 18 2.99
1 16.08 L1=16.98-(3*0.3) 1.3
5.65 L2=5.95-0.3 0.18
90.85 12.57
B/n axis 4'5-DD'
1 2.72 A=2.72 180 0.28
2.72 0.16
B/n axis 67-FD 1.3
1 5.65 L1=5.95-0.3 5.24
7.86 L2=8.46-(2*0.3)
44.41 9 2.59
6785.22 0.18
Roof Slab 4.2
B/n axis 34-DC
1 5.6 L1=6.2-0.3*2 2 3.31
11.1 L2=12-0.3*3 1.41
62.16 0.18
B/n Axis FD-67 1.68
1 10.5 L1=11.4-0.3*3
5.8 L2=6.4-0.3*2 22 0.28
60.9 0.16
123.06 1.41
e) In staircase and Landing 0.69
Stair Case 1-(Ground-First Floor)
2 3.31 L=((11*0.16)^2+(10*0.28)^2)^0.5 1 2.3
1.3 0.18
0.18 0.41
1.55
TAKE-OFF SHEET
PROJECT:- PAGE
CLIENT:- DATE
TIM DIM SQ DESCRIPTION TIM DIM SQ
Stair Case 3-(1st -Terrace)
18 2.99 L=((10*0.16)^2+(9*0.28)^2)^0.5 1 2.80
1.41 3.05
0.18 8.54
13.64
Steps 3 2.00
180 0.28 3.05
0.16 18.3
1.41
5.69 6 2.00
Landing 4.05
9 2.3 A=2.3 48.6
0.18
3.73 2 1.57
Staircase -4 (Ground -1st floor) 5.75
Soffit 18.06
1 6.53 L=((22*0.16)^2+(20*0.275)^2)^0.5
1.715
0.23 1 3
2.58 2.75
Steps 8.25
22 0.275
0.16 5 2.80
1.715 2.75
0.83 38.5
Landing
1 1.715 1 1.80
1.25 2.75
0.23 4.95
0.49
Stair beam 28 2.40
1 6.2 2.75
0.3 184.8
0.45
0.84 1 2.80
57.86 2.75
2.2 Concrete Form Work 7.7
a, Elevation Coulumn
Ground Floor 3 2.00
C1 2.75
1 3.2 16.5
3.05
9.76 6 2.00
C2,C2',C3,C3',C9,C9',C11, C11' 2.75
11 2.80 33
3.05
93.94
C5 2 2.8
1 1.80 2.75
3.05 15.4
5.49
C4 ,C6,C6',C6'',C7',C8&C10
22 2.40
3.05
161.04
TAKE-OFF SHEET
PROJECT:- PAGE
CLIENT:- DATE
TIM DIM SQ DESCRIPTION TIM DIM SQ
C5
1 1.80 34 2.00
2.75 2.75
4.95 187
C2,C2',C3,C3',C4 ,C6,C6',C6'',C7',C8,C9,C9',
C10,C11&C11
33 2.40
2.75 1 2.4
217.8 2.75
C12 6.6
3 2.00
2.75 1 1.80
16.5 2.75
C12',C13&C13' 4.95
6 2.00
2.75 35 2.00
33 2.75
C14 192.5
2 1.57
2.75
8.64 1 1.80
Third 2.75
C1 4.95
1 2.8
2.75 36 2.00
7.7 2.75
C5 198
1 1.80
2.75
4.95 1 1.80
C2,C2',C3,C3',C7,C7',C8,C9,C9',C10,C11&C
11 2.75
19 2.40 4.95
2.75
125.4 36 1.60
C4, C13,C13',C6,C6',C6'' 2.75
18 2.00 158.4
2.75
99
C14 1 1.80
2 1.57 2.75
2.75 4.95
8.64
C15 32 1.60
2 1.60 2.75
2.75 140.8
8.8
Fourth
C1&C7 1 1.80
2 2.4 2.15
2.75 3.87
13.2
C5
1 1.80
2.75
4.95
TAKE-OFF SHEET
PROJECT:- PAGE
CLIENT:- DATE
TIM DIM SQ DESCRIPTION TIM DIM SQ
C1,C2,C2',C3,C3',C4, C6,C6',C6''
21 1.60 1 5.00
2.15 1.02
72.24 5.1
2205.57 4 1
b, Shear Wall 1.2
SW1 4.8
2 3.3 L=3+0.3
31.7 3 24.58
209.22 0.84
SW2 61.93
2 4.43 L=4.125+0.3
31.7 3 2.89
280.55 1.02
Lift Shaft 8.84
external
1 14.16 3 25
31.7 0.84
448.87 63
internal
1 15.02 L=7.51*2 3 6.9
31.7 0.84
476.13 17.39
deduct door
-40 1.28 3 21.27
2.1 0.84
-107.1 53.59
1307.67
c, Floor Beam 1 21.4
First Floor 0.84
along axis 1- First floor 17.98
1 25 L=17.4-(4*0.6)+11.8-(3*0.6)
0.84 1 24.33
21 0.84
along axis 1-2nd 20.44
1 24 L=34.2-(7*0.6)-6
0.84 1 25.73
20.16 0.84
ditto 21.61
1 6 L=6
1.2 3 26.13
7.2 0.84
along axis 1- 3rd Floor 65.85
1 30 L=34.2-(7*0.6)
0.84 3 1.25
25.2 1.2
along axis 2,3 &5 4.5
9 29.11 L=34.2-(7*0.6)-5/9-1/3
0.84 3 26.98
220.08 0.84
67.99
TAKE-OFF SHEET
PROJECT:- PAGE
CLIENT:- DATE
TIM DIM SQ DESCRIPTION TIM DIM SQ
along axis E
3 30.00 L=33.73-(7*0.6)+1.4/3 4 26.98
0.84 0.84
75.59 90.66
along axis F
3 30.46 L=33.73-(7*0.6)+(1.4*2/3) 8 30.93
0.84 0.84
76.77 207.85
along axis F' - 1st & 3rd
2 24.33 L=27.925-(6*0.6) 4 10.40
0.84 0.84
40.87 34.94
along axis F' - 2nd
1 5.20 L=6.4-(2*0.6)
0.84 4 30.7
4.37 0.84
Fourth -Seventh 103.15
along axis 1,2,&3
12 26.4 L=30-(6*0.6) 1 25.61
0.84 0.84
266.11 21.51
along axis 5 1 2.89
4 30 L=34.2-(7*0.6) 1.02
0.84 2.95
100.8
along axis 4 1 11.7
4 24.91 L=34.2-(7*0.6)-2.2-2.89 1.02
0.84 11.93
83.7
Ditto 1 7
4 2.89 L=2.89 0.84
1.02 5.88
11.79
along axis 6 1 15.90
4 15 L=17.4-(4*0.6) 0.84
0.84 13.36
50.4
along axis 7 2 21.03
4 6.9 L=7.5-0.6 0.84
0.84 35.33
23.18
along axis A 1 1.25
4 17.00 L=17.40-(3*0.6)+1.4 1.2
0.84 1.5
57.12
along axis B&C 1 27.58
8 20.53 L=23.53-(5*0.6) 0.84
0.84 23.17
137.96
along axis D' 2 31.63
4 1.25 L=1.250 0.84
1.2 53.14
6
TAKE-OFF SHEET
PROJECT:- PAGE
CLIENT:- DATE
TIM DIM SQ DESCRIPTION TIM DIM SQ
Terrace
along axis 1' 1 17.05
1 32.1 L=34.2-(7*0.3) 0.84
1.2 14.32
38.52
along axis 1 1 21.6
1 31.4 L=34.2-(7*0.4) 0.84
1.2 18.14
37.68
along axis 3 1 21.20
1 31.4 L=34.2-(7*0.4) 0.84
1.02 17.81
32.03 1 11.33
along axis 5 1.2
1 31.4 L=34.2-(7*0.4) 13.6
0.84 2526.32
26.38
along axis 4
1 26.31 L=34.2-(7*0.4)-2.2-2.89
0.84 2 24.90
22.1 1.2
1 2.89 L=2.89 59.76
1.02 1 5.00
2.95 0.84
4.2
along axis 6
1 10.2 L=13.2-(3*0.4)-1.8 2 5.4
0.84 0.84
8.57 9.07
1 1.8 L=1.8
1.02 1 10.2
1.84 0.84
along axis 7 8.57
1 6.9 L=7.5-0.6
0.84 1 7.1
5.8 0.84
along axis A,B&C 5.96
3 10.40 L=10.8-0.4
0.84 1 5.4
26.21 1.2
along axis A 6.48
1 6.60 L=5.4+1.2
1.2 5 1.4
7.92 1.2
along axis B , C,D&E 8.4
4 1.2 L=1.2
1.2 1 10.8
5.76 0.84
9.07
TAKE-OFF SHEET
PROJECT:- PAGE
CLIENT:- DATE
TIM DIM SQ DESCRIPTION TIM DIM SQ
along axis D
1 16.4 L=6.4-(2*0.4)+12-(0.4*3) 1 30.8
0.84 11
13.78 338.8
along axis E&F
2 5.6 L=6.4-(2*0.4) 1 16.08
0.84 10.9
9.41 175.27
134.7
e, floor slab 1 14.75
First Floor 5.5
B/n Axis 11'-FF' 81.13
1 10.53 A=10.53
10.53 1 16.2
B/n axis 13-DF' 5.8
1 16.1 L1=17.3-(4*0.3) 93.96
9.53 L2=9.83-0.3
153.43 1 2.72
B/n axis 23-AC 2.72
1 10.75 L1=11.35-(2*0.3)
5.7 L2=6-0.3 1 5.65
61.28 7.86
B/n axis 34-AF 44.41
1 32.1 L1=34.2-(7*0.3)
5.7 L2=5.3 1 142.25
182.97 0.18
B/n axis 46-DF 25.61
1 16.08 L1=16.98-(3*0.3)
11 L2=11.3-0.3
176.88 1 28.1
B/n axis 46-AC 1.55
1 16.08 L1=16.98-(3*0.3) 43.56
10.9 L2=11.8-(3*0.3)
175.27 1 32.01
B/n axis 4'5-DD' 14.93
1 2.72 A=2.72 477.86
2.72
B/n axis 67-FD 1 16.08
1 5.65 L1=5.95-0.3 11
7.86 L2=8.46-(2*0.3) 176.88
44.41
Side Form Work 1 16.08
1 159.3 L=159.3 10.9
0.18 175.27
28.67
Second Floor 1 11.32
b/n axis 12-AC 11.32
1 10.75 L1=11.65-(3*0.3)
4.28 L2=4.28 1 5.65
46.01 7.86
b/n axis 12-DF 44.41
1 14.75 L1=15.35-(2*0.3)
4.28 L2=4.28 1 147.15
63.13 0.18
26.49
TAKE-OFF SHEET
PROJECT:- PAGE
CLIENT:- DATE
TIM DIM SQ DESCRIPTION TIM DIM SQ
Fourth - seventh floor
axis B/n 11'-BE 1 5.65
4 15.4 L1=16.60-(4*0.3) 7.86
1.55 L2=1.55 44.41
95.48
axis B/n 11'-BE 1 130.25
4 2.4 L1=2.40 0.18
1.55 L2=1.55 23.45
14.88
B/n Axis 14-AF
4 28.20 L1=30-(6*0.3) 1 28.20
14.93 L2=15.53-(2*0.3) 5.3
1684.1 149.46
B/n axis 46-DF
4 16.08 L1=16.98-(3*0.3) 1 12.15
11 L2=11.3-0.3 11
707.52 133.65
B/n axis 45-AC
4 16.08 L1=16.98-(3*0.3) 1 16.08
5.65 L2=5.95-0.3 5.65
363.41 90.85
B/n axis 4'5-DD'
4 2.72 A=2.72 1 2.72
10.88 2.72
B/n axis 67-FD
4 5.65 L1=5.95-0.3 1 5.65
7.86 L2=8.46-(2*0.3) 7.86
177.64 44.41
side Form Work
4 141.4 L=141.4 1 107
0.18 0.18
101.81 19.26
Eighth Floor 7010.51
B/n Axis 11'-FF'
1 22.8 L1=24.3-(5*0.3)
1.55 L2=1.55 1 5.6
35.34 11.1
B/n Axis 14-AF 62.16
1 28.20 L1=30-(6*0.3)
14.93 L2=15.53-(2*0.3) 1 10.5
421.03 5.8
B/n axis 46-DF 60.9
1 12.15 L1=12.75-(2*0.3)
11 L2=11.3-0.3 1 72
133.65 0.18
B/n axis 45-AC 12.96
1 16.08 L1=16.98-(3*0.3) 136.02
5.65 L2=5.95-0.3
90.85
B/n axis 4'5-DD'
1 2.72 A=2.72
2.72
TAKE-OFF SHEET
PROJECT:- PAGE
CLIENT:- DATE
TIM DIM SQ DESCRIPTION TIM DIM SQ
g) To Staircase and landing
Stair Case 1-(Ground-First Floor)
Soffit 2 3.31
2 3.31 L=((11*0.16)^2+(10*0.28)^2)^0.5 1.41
1.3 9.33
8.6
Side Form Work 22 0.16
4 3.31 L=((11*0.16)^2+(10*0.28)^2)^0.5 1.41
0.34 4.96
4.5
riser 4 3.31
22 0.16 0.44
1.3 5.82
4.58
Landing 1 2.3
1 2.35 A=2.35 2.3
2.35
Stair Case 2-(Ground-First Floor)
Soffit 18 2.99
2 3.31 L=((11*0.16)^2+(10*0.28)^2)^0.5 1.41
1.3 75.76
8.6
Side Form Work 180 0.16
4 3.31 1.41
0.34 40.61
2.25
riser 32 2.99
22 0.16 0.44
1.3 42.03
4.58
Landing 9 2.3
1 2.59 A=2.59 20.7
2.59
Stair Case 2-(1st -Terrace)
soffit 1 6.53
18 2.99 L=((10*0.16)^2+(9*0.28)^2)^0.5 1.715
1.3 11.2
69.85
riser 22 0.16
180 0.16 1.715
1.3 6.04
37.44
Side Form Work 1 6.53
36 2.99 0.39
0.34 2.55
36.54
Landing 1 1.715
9 2.59 A=2.59 1.25
23.31 2.14
TAKE-OFF SHEET
PROJECT:- PAGE
CLIENT:- DATE
TIM DIM SQ DESCRIPTION TIM DIM SQ
Stair Beam
1 6.2 L=6.2
0.97
6.01
434.64
Structure
Truss
a, 0.06
60x60x3mm
6 155.6561 L=27.54*0.06*4*7850*0.003
933.9365
b,
40x40x3mm
6 137.856 L=36.586*0.04*4*7850*0.003
827.1363
Purlin
25x25x2mm
L=6.7+6.694+1.197+0.928+0.927+0.928+0
10 22.05 .9268+0.92795+0.92669+0.92664+0.9656
1.57 w=0.025*4*0.002*7850
346.1486
L=6.633+6.315+1.158+0.89+0.91+0.885+0
.892+0.882+0.892+0.891+0.89096+0.8903
30 22.13 5
1.57 w=0.025*4*0.002*7850
1042.291
L=5.5+5.536+1.197+0.927+0.927+0.928+0
10 18.72 .927+0.927+0.9279+0.92795
1.57 w=0.025*4*0.002*7850
293.9801
1682.419
DESCRIPTION
F7
L1&L2=(2.5+0.5+0.5)
m3
F8&F8'
L1&L2=(2+0.5+0.5)
m3
SWF1
L1=7.8+0.5+0.5
L2=3+0.5+0.5
m3
SWF2
L1=4+0.5+0.5
L2=7.125+0.5+0.5
m3
LSWF1
L1=4.258+0.5+0.5
L2=9.8+0.5+0.5
m3
L=1.125+3+2.35+2.3+2.55+2+1.3+2+1.5
5+1.05+2.05+2.35+2.35+2.3+1.55+1.1+
1.75+1.1+1.6+1.6+0.8+2+2.5
W=1.25+0.5+0.5
m3
F2
L1&L2=(4.2+0.5+0.5)
m3
F3
L1&L2=(4+0.5+0.5)
m3
DESCRIPTION
1.07 Trench excavation
for Basement Beam
along axis 5
L=1.65+0.8+0.7+0.95+1.2
w=0.3+0.25+0.25
D=0.4+0.05
along axis 4
L=1.75+1.1+0.9+0.6+0.75
along axis 3
L=2+1+0.7+0.6+0.85
along axis 2
L=2.1+1.35+1.1+1.1+1.1+0.85
along axis B
L=1.65+0.8+0.5+1.25
along axis C
L=1.15+0.7+1.25
along axis D
L=0.7+1.35
along axis E
L=1+0.4+0.8+0.7+1.25
along axis F
L=0.7+0.7+0.6+1.1
DESCRIPTION
B, Sub structure
2.1.1 Lean Concrete work
a, Under Footing Pad
F1
L1&L2=(4.6+0.1)
F2
L1&L2=(4.2+0.1)
F3
L1&L2=(4+0.1)
F4
L1&L2=(3.8+0.1)
F5
L1&L2=(3.8+0.1)
F6
L1&L2=(3+0.1)
F7
L1&L2=(2.5+0.1)
F8&F8'
L1&L2=(2+0.1)
SWF1
L1=7.8+0.1
L2=3+0.1
SWF2
L1=4+0.1
L2=7.125+0.1
LSWF1
L1=4.258+0.1
L2=9.8+0.1
L1=2.125+4+3.35+3.3+3.55+3+2.3+2+2.
55+2.05+3.05+3.35+3.35+3.3+2.55+2.1
+2.75+2.1+2.6+2.6+1.8+3+3.5
W=1.25+0.1
DESCRIPTION
2.1.2 In Foundation Column
C1
avg. d. f=0.9013
H=2.5-0.9013
C2,C2',C3,C3',C4,C7',C9,C9',C11,&C11'
C5
C6,C6',C6'',C8&C10
C7
C12,C12',C13&C13'
C14
C, In Basement Column
C1
C2,C2',C3,C3',C4,C7',C9,C9',C11, C11'
DESCRIPTION
2.1.3 C-25
a, In Footing Pad
F1
L1&L2=4.6
m3
F2
L1&L2=4.2
m3
F3
L1&L2=4
m3
F4
L1&L2=3.8
m3
F5
L1&L2=3.5
m3
F6
L1&L2=3
m3
F7
L1&L2=2.5
m3
F8&F8'
L1&L2=2
m3
SWF1
L1=7.8
L2=3
m3
DESCRIPTION
along axis 7
L=5.4
along axis F
L=32.53-(5*0.6)
at level 0.00
along axis 1'
L=5.6-0.6
along axis 1,2&3
L=27-(4*0.6)
along axis 4
L=27-(3*0.6)-2.53
along axis 5
L=27-(4*0.6)-0.3
along axis 6
L=12.3-(0.6*2)+(10-0.6)
along axis 7
L=7.5-0.6
DESCRIPTION
Deduct
shear wall area
A=28.65
Beam
L=33.6
L=21.53
e) 180mm Ground floor Slab
at level -1.00
b/n axis F'F-16
L1=5.7
L2=27.03-(4*0.3)
at level +0.0
b/n axis AD-11'
L1=16.5-(2*0.3)
L2=1.5
Enterance slab
A=7.4
DESCRIPTION
F4
L=3.8*4
m2
F5
L=3.5*4
m2
F6
L=3*4
m2
F7
L=2.5*4
m2
F8&F8'
L=2*4
m2
SWF1
L=(7.8*2)+(3*2)
m2
SWF2
L=(4*2)+(7.125*2)
m2
LSWF1
L=(4.258*2)+(9.8*2)
m2
m2
2.1.2 In Foundation Column
C1
H=2.5-0.9013-0.4
C2,C2',C3,C3',C4,C7',C9,C9',C11, C11'
C5
DESCRIPTION
Lift Shaft
external
internal
L=7.51*2
deduct door
e, In retaining wall
f, in Basement Beam
along axis 1,2,3,4&5
L=33.9
m2
along axis 6
L=6.3+11.500+5.1
m2
along axis 7
L=11.1
m2
along axis A,B,C&F'
L=27.525-(6*0.3)
m2
along axis D,E&F
L=33.4-(7*0.3)
m2
m2
g, Ground floor Beam
at level 1&6
L=5.4
m2
DESCRIPTION
along axis 7
L=5.4 1
m2
L=1.5
-4
along axis A
L=22.6-(0.6*3)+1.8
m2
along axis B&C
L=29.2-(5*0.3)
m2
along axis D
L=34.4-(5*0.6)-1.242
m2
L=1.242
m2
along axis E
L=32.53-(5*0.6)
m2
along axis F
L=32.53-(5*0.6)-5.2
m2
L=5.2
m2
at level -1.00
b/n axis F'F-16
L1=5.7
L2=27.03-(4*0.3)
at level +0.0
b/n axis AD-11'
L1=16.5-(2*0.3)
L2=1.5
DESCRIPTION
h) Ramp Slab
b/n axis FE-75
L1=6-0.3
L2=5.8-0.3
B, Super Structure
C-30
a, Elevation Coulumn
Ground Floor
C1
C2,C2',C3,C3',C9,C9',C11, C11'
C5
C4 ,C6,C6',C6'',C7',C8&C10
C7
C12
C12',C13&C13'
C14
First Floor
C1
DESCRIPTION
C12
C12',C13&C13'
C14
Third
C1
C5
C2,C2',C3,C3',C7,C7',C8,C9,C9',C10,C11
&C11
C4, C13,C13',C6,C6',C6''
C14
C15
DESCRIPTION
Eighth
C5
C1,C2,C2',C3,C3',C4, C6,C6',C6'',
C7,C7',C8,C9,C9',C11&C11
Terrace
C5
C1,C2,C2',C3,C3',C4, C6,C6',C6''
b, Shear Wall
SW1
L=3
SW2
L=4.125
Lift Shaft
L1=4.55
deduct door
L1=1.93
C-25
a, Floor Beam
Firsrt Floor -3rd Floor
DESCRIPTION
along axis C
L=29.13-(5*0.6)
along axis E
L=33.73-(7*0.6)+1.4/3
along axis F
L=33.73-(7*0.6)+(1.4*2/3)
Fourth -Seventh
along axis 1,2,&3
L=30-(6*0.6)
along axis 5
L=34.2-(7*0.6)
along axis 4
L=34.2-(7*0.6)-2.2
DESCRIPTION
along axis 6
L=13.2-(3*0.5)
along axis 7
L=7.5-0.5
along axis A
L=17.40-(3*0.5)
along axis D
L=13.451-(3*0.5)+17.13-(3*0.5)
Terrace
along axis 1'
L=34.2-(7*0.3)
DESCRIPTION
along axis 7
L=7.5-0.4
along axis A
L=5.4
along axis B
L=1.4
along axis C
L=12-(0.4*3)+1.4
along axis D
L=6.4-(2*0.4)+12-(0.4*3)+1.4
DESCRIPTION
B/n axis 46-DF
L1=16.98-(3*0.3)
L2=11.3-0.3
Eighth Floor
B/n Axis 11'-FF'
L1=24.3-(5*0.3)
L2=1.55
DESCRIPTION
Steps
Landing
A=2.35
Steps
Landing
A=2.59
Steps
Landing
A=2.59
Steps
Landing
A=2.35
DESCRIPTION
C7
C12
C12',C13&C13'
C14
First Floor
C1
C2,C2',C9,C9'
C5
C3,C3',C4 ,C6,C6',C6'',C7',C8,C10,C11&C
11
C7
C12
C12',C13&C13'
Second Floor
C1&C7
DESCRIPTION
C2,C2',C3,C3',C4,
C6,C6',C6''C7',C8,C9,C9',C10,C11&C11
Fifth
C1
C5
C2,C2',C3,C3',C4, C6,C6',C6'',
C7,C7',C8,C9,C9',C10,C11&C11
siixth
C5
C1,C2,C2',C3,C3',C4, C6,C6',C6'',
C7,C7',C8,C9,C9',C10,C11&C11
Seventh
C5
C1,C2,C2',C3,C3',C4, C6,C6',C6'',
C7,C7',C8,C9,C9',C10,C11&C11
Eighth
C5
C1,C2,C2',C3,C3',C4, C6,C6',C6'',
C7,C7',C8,C9,C9',C11&C11
Terrace
C5
DESCRIPTION
along axis 2-second floor
L=5
along axis 4
L=34.2-(7*0.6)-2.2-1/3-2.89
ditto
L=2.89
along axis 6
L=17.4-(4*0.6)+11.8-(3*0.6)
along axis 7
L=7.5-0.6
along axis A
L=23.20-(4*0.6)+1.4/3
along axis C
L=29.13-(5*0.6)
DESCRIPTION
along axis D
L=13.451-(3*0.6)+17.13-(3*0.6)
Eighth Floor
along axis 1,2,3& 5
L=34.2-(7*0.5)
along axis 4
L=34.2-(7*0.5)-2.2-2.89
L=2.89
along axis 6
L=13.2-(3*0.5)
along axis 7
L=7.5-0.5
along axis A
L=17.40-(3*0.5)
along axis B&C
L=23.53-(5*0.5)
along axis D
L=13.451-(3*0.5)+17.13-(3*0.5)
DESCRIPTION
along axis D
L=12.85-(2*0.4)+5
along axis E
L=23.6-(5*0.4)
along axis F
L=22.4-(3*0.4)
L=11.33
along axis 6
L=11.4-(0.4*3)
along axis 7
L=7.5-0.4
along axis A
L=5.4
along axis C
L=12-(0.4*3)
DESCRIPTION
b/n axis 24-AF
L1=32.60-(6*0.3)
L2=11.3-0.3
Third Floor
B/n Axis 11'-FF'
L1=29.9-(6*0.3)
L2=1.55
Terrace
B/n Axis 34-AF
L1=30-(6*0.3)
L2=5.3
f,Roof Slab
B/n axis 34-DC
L1=6.2-0.3*2
L2=12-0.3*3
DESCRIPTION
Stair Case 3-(Ground-First Floor)
soffit
L=((11*0.16)^2+(10*0.28)^2)^0.5
riser
Landing
A=2.35
riser
riser
Landing
DESCRIPTION
Sub structure
st 6 1.16 52 1 52 60.32
FB5
Top 14 8.86 2 2 4
14 4.36 2 2 4
14 3.02 2 2 4
14 2.99 2 2 4
16 3.37 1 2 2
Bottom 3 2 6
3 2 6
st 71 1 71
second floor
1700 SFB1
Top 14 6.70 2 1 2
16 3.44 1 1 1
Bottom 14 6.00 3 1 3
st 6 1.16 35 1 35 40.6
SFB2
Top 14 9.40 2 2 4
14 1.85 1 2 2
20 2.86 1 2 2
14 2.86 1 2 2
14 1.85 1 2 2
Bottom 16 8.70 2 2 4
14 8.70 1 2 2
st 6 1.16 50 2 100 116
SFB3
Top 14 9.80 2 1 2
14 2.13 1 1 1
14 2.99 2 1 2
14 1.72 1 1 1
Bottom 14 9.10 3 1 3
st 6 1.16 52 1 52 60.32
SFB4
Top 14 9.48 2 1 2
20 3.82 1 1 1
14 3.82 1 1 1
20 2.99 1 1 1
16 2.99 1 1 1
14 2.71 2 1 2
14 1.72 1 1 1
Bottom 16 10.79 2 1 2
20 10.79 1 1 1
0
st 6 1.16 61 1 61 70.76
SFB5
Top 14 9.48 2 1 2
16 3.82 1 1 1
16 2.99 1 1 1
14 4.36 2 1 2
16 3.37 1 1 1
Bottom 14 7.20 3 1 3
5 14 5.94 3 1 3
0
st 6 1.16 71 1 71 82.36
Top tie beam
RB1
Top 14 9.40 2 2 4
14 1.85 1 2 2
16 2.86 1 2 2
14 1.85 1 2 2
Bottom 14 8.70 3 2 6
st 6 1.16 50 2 100 116
RB2
Top 14 9.40 2 1 2
14 1.85 2 1 2
14 2.86 1 1 1
Bottom 14 8.70 2 1 2
st 6 1.16 50 1 50 58
RB3
Top 14 11.45 2 1 2
14 2.13 1 1 1
14 2.99 1 1 1
14 3.37 1 1 1
Bottom 14 10.75 3 1 3
st 6 1.36 61 1 61 82.96
RB4
Top 14 9.80 2 1 2
14 2.13 1 1 1
16 2.99 1 1 1
14 1.72 1 1 1
Bottom
intermediate 14 9.10 3 1 3
0
st 6 1.16 52 1 52 60.32
Dia 6 Dia 8
Total Length (M) 1339.24 0
Weight (Kg/M) 2.22 0.39
Total Weight (Kg) 2974.72 0
1.02 3034.214 0
Super structure
Dia 6 Dia 8
Total Length (M) 0 14134.83
Weight (Kg/M) 2.22 0.39
Total Weight (Kg) 0 5581.561
1.02 0 5693.192
48.33333
37.6
34.8
16
14.6 48.33333
22.9
21.5
20.88
19.48
24
22.6
37.6
3.7
11.44
3.7
34.8
17.4
19.6
2.13
5.98
1.72
27.3
19.6
2.13
5.98
1.72
27.3
10.52
35.44
17.44
12.08
11.96
6.74
13.4
3.44
18
37.6
3.7
5.72
5.72
3.7
34.8
17.4
19.6
2.13
5.98
1.72
27.3
18.96
3.82
3.82
2.99
2.99
5.42
1.72
21.58
10.79
18.96
3.82
2.99
8.72
3.37
21.6
17.82
37.6
3.7
5.72
3.7
52.2
18.8
3.7
2.86
17.4
22.9
2.13
2.99
3.37
32.25
19.6
2.13
2.99
1.72
27.3
307.2 11.6
245.76
225.92
30.72
30.72
28.24
73.12
56.48
56.24
77.48
53.82
117.26
121.6
93.6
74
122.59
110.98
77.48
0
117.26
121.6
93.6
146.78
122.59
101.66
56.16
77.22
90.48
48.5
42.7
37
14.3
21.645
45.35
17.75
39.75
57.33
67.015
35.88
25.87
37.57
21.645
67.015
43.42
33.41
30.03
35.49
520.65
310.05
232.83
358.02
420.03
532.35
410.67
333.45
257.4
278.46
67.97
35.07
24.36
43.96
49.91
72.17
50.26
39.55
28.77
34.72
535.5
290.43
219.24
436.59
478.17
573.3
477.54
391.23
245.7
268.38
398.4
681.264