Octave - Synchronoise
Octave - Synchronoise
Date: 08/January/2025
• It should be ensured that all MoUs / Agreements with vendors should be on the CSA letterhead.
• The letterhead should not have ‘BITS Pilani’ emblem and the draft MoU / Agreement should be vetted by the
Administration (Dy. Registrar).
• All student representatives signing or communicating on behalf of CSA should distinctly mention their name
and Student ID in such documents.
• It should be ensured that designations of CSA representatives are not perceived as that of the employees of
BITS Pilani.
Page 1|6
(E) Details of Expected expenditure
# Particulars Amt (Rs.) Remarks (if any)
1 Vendor charges for equipment and
10000/-
engineer
2 Marketing Cost 500/-
3
4
5
6
7
8
9
10
Expected Total Expenditure (E) 10500/-
It should be ensured that expected revenue (D) should be at least 10 to 20 % more than the expected expenditure (E)
to accommodate any unforeseen expenditure related to the event.
Page 2|6
Permission for Infrastructure
Open Space & Required for / Purpose of Date & Timing Yes/No Remarks by Estate
Residential Quarters use Manager & Signature
16th January 2025
Lawns between LT3 05:00 PM
Event
and LT4 to
11:00 PM
Hostel Rooms / Required for / Purpose of Date & Timing Yes/No Remarks by Chief
Hostel Common use Warden/ AD-SWD
Rooms & Signature
N/A N/A N/A N/A N/A
Visitors’ Guest Required for / Purpose of Date & Timing Yes/No Remarks by PRO
House use & Signature
Classrooms/Lecture Required for / Purpose of Date & Timing Yes/No Remarks by AD - AUGSD
Theatres use & Signature
N/A N/A N/A N/A N/A
It should be ensured that the tables, chairs and other furniture & fixture in the permitted classrooms as well as
other spaces remain in required order to start the classes and/ or regular usage after event.
Responsible Student (Name and ID):
Library & its Required for / Purpose of Date & Timing Yes/No Remarks by Librarian
surrounding area use & Signature
N/A N/A N/A N/A N/A
Page 3|6
Audio-Visual & Required for Date & Timing Yes/No Remarks by Sr. Manager -
Auditorium CC & Signature
N/A N/A N/A N/A N/A
Director’s Required for / Purpose of Date & Timing Yes/No Remarks by PS to Director
Conference Room use & Signature
N/A N/A N/A N/A N/A
It should be ensured that the AV infrastructure in the permitted classrooms, lecture theatres, conference rooms
and auditorium remain intact and in required order to start the classes and/ or regular usage after event.
Any expenditure pertaining to damage during the event to be taken care of from respective festival / event
budget.
Responsible Student (Name and ID):
Statutory Required for / Purpose of Date & Timing Yes/No Remarks by Sr. Manager
Permissions use – PR & Signature
N/A N/A N/A N/A N/A
Necessary permissions from appropriate Govt. offices to be submitted to PR Unit prior to the events. Any
expenditure to be taken care of from respective festival / event budget.
Responsible Student (Name and ID):
Security Required for / Purpose of Date & Timing Yes/No Remarks by CSO
Requirements use & Signature
Security requirements details to be discussed with the CSO at least one week prior to the event to assess and
provide additional manpower for the respective festival / event. Expenditure to be taken care of from respective
festival / event budget.
Housekeeping Required for / Purpose of Date & Timing Yes/No Remarks by Sr. GM -
Requirements use Estate & Signature
N/A N/A N/A N/A N/A
Housekeeping requirements details to be discussed with the Sr. GM – Estate at least one week prior to the event
to assess and provide additional manpower for respective festival / event.
Expenditure to be taken care of from respective festival / event budget. It should be ensured that the permitted
spaces, classrooms are clean and in required order to start classes after event.
Page 4|6
Committees (aside from CSA Executive Committee)
Note: Timings and dates mentioned in this form are tentative. This form may be updated depending on
the need in future.
CSA (Executive Committee)
# Name Post ID # Mobile
1 Sanmay Angaitkar President 2022AAPS0766G 9663151827
2 Krishna Veerwani Vice President 2022B2A41534G 7771896000
3 Aryaman Karoliwal General Secretary 2023A1PS0109G 7020893840
_________________________________________ _________________________________________
Shiv Patel Sanmay Angaitkar
Chief Coordinator, Synchronoise President, CSA
Page 5|6
Page 6|6