Type – 1
1. If 4 men can complete a work in 6 days than 3 men can complete the same work in?
1) 9 days 2) 8 days 3) 10 days 4) 12 days 5) None of these
2. If 7 women can complete a work in 4 days than 2 women will do the same work in ?
1) 8 days 2) 12 days 3) 14 days 4) 16 days 5) None of these
3. If 8 boys can complete a work in 3 days the 2 boys can do the same work in ?
1) 8 days 2) 6 days 3) 14 days 4) 12 days 5) None of these
4. A can complete a work in 9 days and B in 12 days. They work for a day alternately. In how many
days the work would be finished if A begins the work?
1) days 2) days 3) 12 days 4) 15 days 5) None of these
5. A, B and C can do a piece of work in 20, 30 and 60 days respectively. In how many days can A
do the work, if he is assisted by B and C on every third day?
1) 15 days 2) 12 days 3) 18 days 4) 16 days 5) None of these
6. A and B can do a work in 12 days, B and C do it in 15 days, A and C can do it in 20 days. In
how many days A, B and C finished it working together?
1) 5 days 2) 10 days 3) 12 days 4) 15 days 5) None of these
7. A and B can do a work in 8 days, B and C can do the same work in 12 days. A, B and C together
can finished it in 6 days then A and C together will do it in?
1) 8 days 2) 7 days 3) 12 days 4) can’t be determined 5) None of these
8. A can do a work in 4 hours. B and C together can do it in 3 hours while A and C together can do
it in 2 hours. How long will B alone take do it ?
1) 1 hr 2) 10 hr 3) 12 hr 4) 24 hr 5) None of these
9. A can finish a work in 24 days, B in 9 days and C in 12 days. B and C starts the work togther but
are forced to leave after 3 days, the remaining work done by A in how many days?
1) 10 days 2) 13 days 3) 15 days 4) 9 days 5) None of these
BS EDUCATION
10. Ravi completes a work in 36 days. Vijay completes the same work in 24 days. Ravi starts a work
alone and after 6 days Vijay join him. In how many days they will complete the remaining work?
1) 8 days 2) 12 days 3) 18 days 4) 9 days 5) None of these
11. A can do a piece of work in 14 days which B can do it in 21 days. They begin together but 3 day
before completion of work A leaves off. The total number of days required to complete a work?
1) days 2) days 3) 8 days 4) days 5) None of these
12. A can complete a work in 10 days, B in 12 days and C in 15 days. All of them began work
together but A had to leaves the work after 2 days of start and B 3 days before the completion of
work. How long did the work last?
1) 6 days 2) 8 days 3) 7 days 4) 9 days 5) None of these
13. A, B and C complete a work in 10 days, 12 days and 15 days respectively. They start the work
together but A left the work before 5 days of its completion. B also left the work 2 days after A
left. In how many days the work was completed?
1) 4 days 2) 7 days 3) 8 days 4) 9 days 5) None of these
14. If A can complete a work in 10 days and B can complete a same work in 15 days. Then in how
many days A and B together complete the same work?
1) 5 days 2) 6 days 3) 8 days 4) 10 days 5) 12 days
15. A can complete a work in 12 days and that of B in 15 days and C in 20 days. If all 3 persons
work together then work will finish in?
1) 5 days 2) 7 days 3) 8 days 4) 10 days 5) None of these
16. If A and B together complete a work in 10 days and A alone can complete the same work in 5
days then in how many days B alone can complete a work?
17. A can do a work in 8 days and that of B in 12 days. B starts the work alone but after 3 days he
left a work and A join the work. In how many days the total work be finished?
1) 6 days 2) 3 days 3) 9 days 4) 12 days 5) 8 days
18. Dipak can do a piece of work in 25 days and Ashok do the same work in 40 days. They work
together for 5 days and Dipak goes Ashok finishes the remaining work?
1) 32 days 2) 30 days 3) 27 days 4) 22 days 5) None of these
*************