0% found this document useful (0 votes)
17 views

Time and Work Type 1 - file

The document contains a series of time and work problems, each presenting a scenario involving different individuals or groups completing tasks in specified days. It provides multiple-choice answers for each problem, testing the reader's understanding of work efficiency and collaboration. The problems vary in complexity and require calculations to determine the time taken to complete the work under different conditions.

Uploaded by

kumarap
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
17 views

Time and Work Type 1 - file

The document contains a series of time and work problems, each presenting a scenario involving different individuals or groups completing tasks in specified days. It provides multiple-choice answers for each problem, testing the reader's understanding of work efficiency and collaboration. The problems vary in complexity and require calculations to determine the time taken to complete the work under different conditions.

Uploaded by

kumarap
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Time & Work

Type – 1
1. If 4 men can complete a work in 6 days than 3 men can complete the same work in?
1) 9 days 2) 8 days 3) 10 days 4) 12 days 5) None of these
2. If 7 women can complete a work in 4 days than 2 women will do the same work in ?
1) 8 days 2) 12 days 3) 14 days 4) 16 days 5) None of these
3. If 8 boys can complete a work in 3 days the 2 boys can do the same work in ?
1) 8 days 2) 6 days 3) 14 days 4) 12 days 5) None of these
4. A can complete a work in 9 days and B in 12 days. They work for a day alternately. In how many
days the work would be finished if A begins the work?
1) days 2) days 3) 12 days 4) 15 days 5) None of these

5. A, B and C can do a piece of work in 20, 30 and 60 days respectively. In how many days can A
do the work, if he is assisted by B and C on every third day?
1) 15 days 2) 12 days 3) 18 days 4) 16 days 5) None of these
6. A and B can do a work in 12 days, B and C do it in 15 days, A and C can do it in 20 days. In
how many days A, B and C finished it working together?
1) 5 days 2) 10 days 3) 12 days 4) 15 days 5) None of these
7. A and B can do a work in 8 days, B and C can do the same work in 12 days. A, B and C together
can finished it in 6 days then A and C together will do it in?
1) 8 days 2) 7 days 3) 12 days 4) can’t be determined 5) None of these
8. A can do a work in 4 hours. B and C together can do it in 3 hours while A and C together can do
it in 2 hours. How long will B alone take do it ?
1) 1 hr 2) 10 hr 3) 12 hr 4) 24 hr 5) None of these
9. A can finish a work in 24 days, B in 9 days and C in 12 days. B and C starts the work togther but
are forced to leave after 3 days, the remaining work done by A in how many days?
1) 10 days 2) 13 days 3) 15 days 4) 9 days 5) None of these
BS EDUCATION
10. Ravi completes a work in 36 days. Vijay completes the same work in 24 days. Ravi starts a work
alone and after 6 days Vijay join him. In how many days they will complete the remaining work?
1) 8 days 2) 12 days 3) 18 days 4) 9 days 5) None of these
11. A can do a piece of work in 14 days which B can do it in 21 days. They begin together but 3 day
before completion of work A leaves off. The total number of days required to complete a work?
1) days 2) days 3) 8 days 4) days 5) None of these

12. A can complete a work in 10 days, B in 12 days and C in 15 days. All of them began work
together but A had to leaves the work after 2 days of start and B 3 days before the completion of
work. How long did the work last?
1) 6 days 2) 8 days 3) 7 days 4) 9 days 5) None of these
13. A, B and C complete a work in 10 days, 12 days and 15 days respectively. They start the work
together but A left the work before 5 days of its completion. B also left the work 2 days after A
left. In how many days the work was completed?
1) 4 days 2) 7 days 3) 8 days 4) 9 days 5) None of these
14. If A can complete a work in 10 days and B can complete a same work in 15 days. Then in how
many days A and B together complete the same work?
1) 5 days 2) 6 days 3) 8 days 4) 10 days 5) 12 days
15. A can complete a work in 12 days and that of B in 15 days and C in 20 days. If all 3 persons
work together then work will finish in?
1) 5 days 2) 7 days 3) 8 days 4) 10 days 5) None of these
16. If A and B together complete a work in 10 days and A alone can complete the same work in 5
days then in how many days B alone can complete a work?

1) 15 days 2) 30 days 3) 25 days 4) days 5) None of these

17. A can do a work in 8 days and that of B in 12 days. B starts the work alone but after 3 days he
left a work and A join the work. In how many days the total work be finished?
1) 6 days 2) 3 days 3) 9 days 4) 12 days 5) 8 days
18. Dipak can do a piece of work in 25 days and Ashok do the same work in 40 days. They work
together for 5 days and Dipak goes Ashok finishes the remaining work?
1) 32 days 2) 30 days 3) 27 days 4) 22 days 5) None of these

*************