17637 2017 Summer Model Answer Paper
17637 2017 Summer Model Answer Paper
(Autonomous)
(ISO/IEC-27001-2005 Certified)
State the types of maintenance to be undertaken for electrical machines. Explain in brief
b)
the purpose of any two types of maintenance.
Ans: Types of maintenance to be undertaken for electrical machines:-
(Any three types of maintenance names are expected ---2 Marks)
1. Preventive Maintenance
Routine Maintenance
MAHARASHTRA STATE BOARAD OF TECHNICAL EDUCATIOD
(Autonomous)
(ISO/IEC-27001-2005 Certified)
Periodic Maintenance
3. Overhaul
4. Productive maintenance
OR
1. Preventive Maintenance
2. Routine Maintenance
3. Periodic Maintenance
5. Overhaul
6. Productive maintenance
1.Routine Maintenance:-
Routine maintenance means checking/Cleaning/Repairing/Replacement of parts which carried
out daily.
Routine maintenance is carried out without dismantling the equipment, but it must always be
disconnected from supply before any repairs are undertaken.
The maintenance schedule of each equipment / machine is maintained in separate log sheet on
which maintenance history is recorded.
2.Periodic Maintenance:-
It should be carried out weekly, fortnightly, monthly, quarterly or half yearly depending upon
the equipments and condition of the machine.
It depends on condition of the machine/equipment and its working hours and its importance.
MAHARASHTRA STATE BOARAD OF TECHNICAL EDUCATIOD
(Autonomous)
(ISO/IEC-27001-2005 Certified)
Maintenance carried out when machine or equipment fails to run or not working satisfactory
4.Overhaul:-
Overhaul means dismantling of machine / equipment repair and reassemble.
It should be carried out half yearly or yearly, or it depends on its working hours & conditions.
5.Productive maintenance:-
Productive maintenance means the maintenance which carried out when a machine or equipment
fails to run without carrying out preventive maintenance.
Draw the dielectric absorption curve. How is it used for interpreting the condition of
c)
insulation?
Ans: Dielectric absorption curve:- ( 2 Mark)
1.6 Adequate
>1.6 Good
(iii) Dial test indicator:- It is used to check the run-out (Unbalance) of rotating parts and
indicators can also use to check the alignment of shaft in electrical machines.
(iv) Spirit level:- It is used to check the level of horizontal surface. OR It is used to check the
level of instrument.
b) Study the following incorrect figure No : 1 of phasing out test of three phase translOnner and
answer the following questions.
5. There should not be any loose connection in the electrical installation to avoid sparking.
8. Replace Wiring that becomes defective with the passage of time / Replace faulty electrical
installation and outdated appliances./ Replace Old electrical sockets and unsafe appliances
9. Do not store highly flammable liquids near (close to) electrical oven/furnace to avoid fire.
a) ii) State the type of fire extinguisher used on live electrical circuit.
Ans: Type of fire extinguisher used on Live electrical circuit :- (2 Marks)
a) iii) Why is CCI4 not recommended to be used as a tire extinguisher in less ventilated spaces''.
Ans: Reason CCI4 not recommended to be used as a tire extinguisher in less ventilated spaces''
(2 Marks)
Due to the heat of fires, CCI4 will be decomposed into heavy poisonous fumes. These fumes
are dangerous to persons and directly affect the lung function.
Hence CCI4 fire extinguishers are not used in less ventilated spaces.
Stand 6 to 8 feet away from the fire and follow the four-step
1. Hourly Maintenance
Check & measure Voltage & current.
It should be compared with rated figures given on name plate.
Check & measure ambient temperature.
2. Daily Maintenance
MAHARASHTRA STATE BOARAD OF TECHNICAL EDUCATIOD
(Autonomous)
(ISO/IEC-27001-2005 Certified)
After completing the activities during Hourly schedule following activities are necessary in
Daily schedule
Check Oil level in transformer.
Check the air passage of breather is clear see that there is no dirt , dust accumulated at air
passage.
Check the colour of Silica gel in breather.
3. Monthly Maintenance
After completing the activities during daily schedule following activities are necessary in
monthly schedule
Check the temperature indicators
Breathing holes in silica gel breather should also be checked monthly and properly cleaned if
required, for proper breathing action.
4. Quarterly Maintenance
After completing the activities during Monthly schedule following activities are necessary in
Quarterly schedule
Examine the Bushing for Dirt and dust deposit.
Check Oil strength (dielectric).
6. Yearly Maintenance
After completing the activities during Half yearly schedule following activities are necessary in
Yearly schedule
Check Oil in transformer against acidity, resistivity, sludge formation and tanδ.
Check Oil filled bushings.
OR
S.No Frequency of maintenance Inspection
c) State four possible causes for each of the following trouble of a 3 phase slip ring induction motor.
(i) Motor runs hot (ii) Motor runs slow (iii) Motor fails to start (iv) Excessive sparking between
brushes and slip rings.
Ans (Any Four causes are expected from following troubles, 1/2 Mark each, Total 8 Marks)
Loose contact.
Motor rotor, bearings or driven load is
locked.
Overloaded
Bearing is seized (Frozon).
Check the rotor resistance circuit and
control.
4 Excessive Sparking between Line current is more
brushes & slip ring in slipring Brushes are bedding or sticking in
I.M. holders-not properly
Dirt is accumulated on brushes
Improper pressure and spring tension.
Describe the procedure for conducting polarity test of a single phase transformer with the
b)
necessary circuit diagram.
Ans: Procedure :- (2 Marks)
Take a 1-phase transformer. There are two primary terminals, say P1 and P2 (can be marked
arbitrarily) and two secondary terminals S1 and S2.
Now, which one is S1 and which is S2? You cannot fix it arbitrarily just as you did for P1 and
P2. (If this transformer is not to be paralleled or is not to be a part of a 3-phase connected
transformer, you can fix S1 and S2 also arbitrarily.)
MAHARASHTRA STATE BOARAD OF TECHNICAL EDUCATIOD
(Autonomous)
(ISO/IEC-27001-2005 Certified)
It is important to mark that terminal as S1, which will have the same instantaneous polarity as
P1.
So a polarity test is done to identify and mark the terminals as below.
OR
For Additive polarity-
Temporly externally short the terminal P2 and S1.
Connect the voltmeter in terminal P1 and S2.
V3= V1 + V2
For subtactive polarity-
Temporly externally short the terminal P2 and S2.
Connect the voltmeter in terminal P1 and S1.
V3= V1 - V2
Polarity test of a single phase transformer circuit diagram:- (2 Marks)
The temperature at which all ( Total Volumetric oil) oil catches fire.
(iv) Purity:-
Whose breakdown strength is more than 70 KV & It should not contain impurities such as
sulphur and its compounds
OR
The transformer oil must be pure and transpernt in colour. It should not have any
contents of moisture and other suspended material.
e) FolloWing, test results were obtained in a single phase 2.75 kVA. 250/125 V transformer on a
short circuit test with S1 and S2, shorted conducted at test temperature of 30 "C. current = 8A:
Voltage applied = 36 volts. Power = 128 watts. Find (i) Percentage resistance (ii) Percentage
impedance both at 75 "C.
Ans: Given Data:
1-ph: 2.75 KVA Transformer 250/125 Volts Vsc = 36 V Isc = 8 A WsC = 128 W
Solution:
1. Resistance at 300C WSC = ISC2 R01
WSC 128
R01 at ( 30 0 C ) 2
I SC (8) 2
R01 at ( 30 0 C ) 2 --------------------------------------------------------------- (1/2 Mark)
VSC 36
2. Z 01 4.5 --------------------------------------------------------------- (1/2 Mark)
I SC 8
X 01 (4.5) 2 (2) 2
3. Resistance at 750C :
R2 t 2 234.5
R1 t1 234.5 -------------------------------------- (1/2 Mark)
234.5 75
R01 at (75 0 C ) R at (30 0 C )
234.5 30
There will be no effect on inductive reactance, The value of inductive reactance will be
remain the same
X 01 at ( 75 0 C ) X 01 (30 0 C ) 4.0311
4. Impedance at 750C :
Z 01 at (75 0 C ) R01 (750 C ) 2 X 01 (75 0 C ) 2 -------------------------------------- (1/2 Mark)
The only difference is the secondary of induction motor is rotating and short circuited
while transformer secondary is stationary and connected to load. The load on induction motor is
mechanical while load on transformer is electrical.
3. The foundation should be able to withstand against erecting weight, accessories weight,
operating weight etc.
8. The surface of foundation must be protected from machine oil by means of suitable chemical
coating or suitable chemical treatment.
9. Level of foundation should be above the maximum flood level of the site.
11. The foundation should be sufficiently rigid to maintain proper alignment between the motor
and the driven machine.
d) State and explain any four circumstances under which the competent authority should not issue
the 'permit to work' card ?
Ans: (Any four points are expected 1 Mark each total 4 Marks)
6. In Unfavorable atmospheric condition such as high wind pressure, high rain falls etc.
OR
OR (Any equivalent figure.)
In this kit, there are two electrodes separated by small gap of 2.5 mm or 4mm between them.
The cup is filled with sample of oil to be tested up to about 1 cm above the electrodes.
Now slowly raise the voltage between the electrodes till breakdown of oil occurs or sparking
starts between the electrodes. And note down voltage reading.
& Calculate average of all results to finalize the breakdown voltage of oil sample.
Result:-
For good transformer oil or dielectric strength of transformer oil is above 75Kv.
If dielectric strength of oil is lower than 30 KV than it indicates presence of impurities in oil & it
is not safe for use for Transformer.
b) Write the correct procedure of conducting (i) High voltage test (ii) Quiet running test on a single
phase induction motor.
Ans: (i) High voltage test:- ------------------------------ ( 3 Marks)
A high voltage is applied between windings and frame of the motor. The high voltage test
should be applied once and once only to a new and completed motor in normal working condition.
The high voltage test should not be applied when the insulation resistance is less than the required
value.
The high voltages are as under: For duration of 60 sec.
When running with the load the motor creates noise, which should be below the specified
noise level.
or equivalent figure
1. The surfaces of all coils windings are perfectly clean and it should be free from dirt & dust, oily
matters etc.
2. For the moisture removal heat the winding with the help of lamp (carbon filament) or in an oven
till all moisture get evaporated.
3. A pre dried winding is placed into a processing chamber (tank).
4. A vacuum is created in the process tank
To remove all air, including air within the small air gaps of the winding.
5. Then Varnish is transferred from varnish storage tank to the processing tank till the entire
winding is submerged.
MAHARASHTRA STATE BOARAD OF TECHNICAL EDUCATIOD
(Autonomous)
(ISO/IEC-27001-2005 Certified)
After that vacuum is released and desired pressure is applied into the processing tank
above the varnish level using compressed air or nitrogen.
Due to high pressure varnish is now forced in to the all air pockets inside the winding.
6. After desired amount of time, the pressure is released and the varnish is drained back into the
varnish storage tank.
7. Then coil is removed and applies finishing gel (varnishes) by brushing or spraying over winding
for better protection against moisture, chemical fumes and dust.
8. It is then kept in a baking oven till it gets set properly and become dry.
b) As per the procedure of installation of transformer (IS 1002K) discuss about the following aspects
: (i) Location (ii) Cabling (iii) Facilities for maintenance
Ans: Following is the procedure of installation of Transformer with respect to : (Any eight points are
expected aomongest (i) Location (ii) Cabling (iii) Facilities for maintenance 1 Mark each point ,
Total 8 Marks )
(i) Location (ii) Cabling (iii) Facilities for maintenance:-
1. Location-
It should be near load center.
Easy access for incoming and outgoing line.
Easy access towards Transformer
There should be sufficient place all around the transformer and also for future expansion.
Transformer area should be free earth quake.
The transformer area should have well ventialation available.
2. Cable-
The underground cable should be used.
The cable should be selected as per requirement of load and should have good
quality.
Shortcut rout not used in laying of cable.
The used cable should have high mechanical strength to prevent from mechanical
injury.
Easy access for transmission lines.
There should not be any complication of the interconnection between the cable
MAHARASHTRA STATE BOARAD OF TECHNICAL EDUCATIOD
(Autonomous)
(ISO/IEC-27001-2005 Certified)
terminal.
3. Facilities for maintenance-
Maintenance department should make proper maintenance schedule.
Availability of skilled technian.
Availability of tools and tackles.
Availability of raw material.
OR
1. Near load centre :
Transformer should be located near load center to reduce cost of Transmission and
distribution lines and to reduce losses in it.
2.Easy access for transmission Line :
There should be easy access for incoming and outgoing line.
3.Easy access towards Transformer:-
There should be easy access towards for Transformer for transportation of
equipment & manpower etc.
4.Space(Land ) available : Transformer
The land proposed for a Transformer should be normally level and open from all sides
5. Bearing capacity of land (Hard land) :
To reduce erection cost and for better foundation of Transformer land should be have
high bearing capacity (hard soil.)
6.Area free from earthquake :
To avoid damage to Transformer area should be free earth quake.
7. Transformer should be installed only on poles strong enough to carry their weight.
8. Transformer poles should be straight.
The following results were obtained from the tests on a 3.5 kW. 3 phase, 220 V. 50 Hz. 4 poles star
connected induction motor.
c) No load test: 220 V, 5A, 385 W Blocked rotor test : 110 V, 20A, 1870 W.
Assume stand still stator copper losses to be 55° of total copper losses. Draw the circle diagram
and find out. full load current. efficiency, power factor.
Ans: Given Data:
No load test:- 220 V; 5 Amp; W0 = 385 W;
Blocked rotor test:- 110 V; 20Amps; WSC = 1870 W;
Draw a circle diagram and determine:
i) Find Full load current, Efficiency, and power factor at rated output
----- (1Mark)
W0
0 Cos 1 ( ) ----------------------------------------------------------------- (1/2Mark)
3 V0 I 0
385
0 Cos 1 ( )
3 220 5
MAHARASHTRA STATE BOARAD OF TECHNICAL EDUCATIOD
(Autonomous)
(ISO/IEC-27001-2005 Certified)
ii) Blocked Rotor Test: - VSC = 110V, ISC = 20A & WSC = 1870 watt
V
I SN I SC ( ) ----------------------------------------------------------------- (1/2Mark)
VSC
220
I SN 20 ( )
110
I SN 40 A ------------------------------------------------------------------------ (1/2Mark)
WSC
SC Cos 1 ( )
3 VSC I SC
1870
SC Cos 1 ( )
3 110 20
WSN
iv) Power scale:-
Lenght at AG in cm
V 2
WSN WSC ( )
VSC
220 2
WSN 1870 ( )
110
WSN
Power scale :
Lenght at AG in cm
7480 watts
Power scale :
9.8 cm
MAHARASHTRA STATE BOARAD OF TECHNICAL EDUCATIOD
(Autonomous)
(ISO/IEC-27001-2005 Certified)
Output in watts
v) Length of output line, AX is output
power scale
3.5 103
763.27
4.6 cm ------------------------------------------------------ (1/2Mark)
From circle diagram : Point ‘L’ represent the full load condition of I.M :
1) full load current = Length of ‘OL’ in cm x Current scale
= 6.8 cm x 2 A/cm
= 13.6 Amp ------------------------------------------ (1 Mark)
length ( LM ) in cm 5.8
2) Power factor at full load =
length (OL) in cm 6.8
l ( LM )
3) Full load % efficiency = 100 ---------------------------------------------------- (1/2Mark)
l ( LK )
4.6 cm
= 100
5.8 cm
Discuss the procedure of levelling and aligning of direct coupled drives. Also draw the figure
b)
showing the position of packing materials.
Ans: Procedure:- (Procedure for 3 marks and Figure for 1mark )
Align the motor and the driven machine on bed-plate.
Firstly aligned center axis of both the shafts in the same line
Aligned both the shafts correctly in the horizontal plane.
Aligned both the shafts correctly in the vertical plane.
Aligned both the shafts correctly on the same center axis.
Any variation in levels is corrected by adding or removing shims
To check alignment there are three methods:-
1. By visual inspection, combined with straightedge or ruler:- This
method has less accuracy.
2. By use of Dial Indicator: - This method has high accuracy.
3. By use of Laser- guided tools: - This method has highest accuracy.
MAHARASHTRA STATE BOARAD OF TECHNICAL EDUCATIOD
(Autonomous)
(ISO/IEC-27001-2005 Certified)
OR
Describe the procedure of conducting high voltage test on a three phase induction motor as per IS
c)
4029-2010.
Ans: Objective:- (1 Mark)
The test voltages should be of power frequency and as far as possible should have a sine wave
shape.
This test consists in applying the specified test voltage between the various windings and earth.
MAHARASHTRA STATE BOARAD OF TECHNICAL EDUCATIOD
(Autonomous)
(ISO/IEC-27001-2005 Certified)
2 Rotor windings of slip ring 1000V + Twice open circuit standstill voltage as
induction motors (unidirectional) measured between slip rings with (unidirectional)
rated voltage applied to stator windings
3 For motors to be reversed or braked 1000 V+ Four times open circuit standstill voltage
while running , rotor winding
Conclusion :- (1 Mark)
During high voltage test if no failure of insulation occurs at full test voltage then test is
successful.
i.e. quality & level of insulation is good.
9. Aging of machine
11. Working environment of industry.(Presence of dust, dirt, chemical fumes, moisture in the air)
e) Draw the general line diagram of a centrifugal purifier for purifying transformer oil.
Ans: General line diagram of a centrifugal purifier for purifying transformer oil -----------------(4 Marks)
-------------------------------------------------------- END--------------------------------------------------------