MoM 210824
MoM 210824
, Satara
IT Dept. Head Office, Satara
-------------------------------------------------------------------------------------------------------------
August 21, 2024
Bank has presented project status report. Various points were discussed in length. Point wise
discussions and actionable there to are summarized here under -
1. Assets : In case of Agri. Crop loan, interest receivable stands in Partition account and there
is no control of out standing interest with original loan account.
At the time of credit in Original loan account, it should recover interest from Partition A/c,
if any, automatically.
Actionable : For Crop loan account the applied interest is debited in Operative or Parking
account.The amount of interest stands in partition account should be recovered first. For
that, while taking recovery in crop loan account the exception should be set up. Agri
Department will giving the work class to override the exception.
For the the option Operative or Parking account there is a 1 concern that marking
of NPA and after marking as NPA the interest pending in Parking account reversal.
2. NPA accounts : Calculation of interest at compounding rate after marking NPA till recovery
of outstanding. However, no entries needs to be passed in account at the time of periodical
calculation of interest.
Actionable : By considering the RBI guidelines and the functionality available in Finacle
software, Bank accept the functionality and accounting entries held in Finacle software.
3. Interest Subvention : Two separate placeholders are required for Interest Subvention for
Central & State Govt. Credit. Auto entries needs to be passed separately at branch & HO
level..
Actionable : Calculation is done on Outstanding balance. For the accounts open in legacy,
for the interest calculation separate utility will provide by company. For accounting entries,
2 Separate placeholder should be created i.e. 1 for State Govt. and 1 for central Govt. Also
the accounting entries should be pass centrally.
4. Penal charges : Calculation of penal charges as per repayment frequency of respective loan
account. And needs to be accounted on the basis of realisation of penal charges.
Actionable : The accounting entries will be on actual basis.
5. PMSBY premium collection : In auto entry credit needs to be passed directly to Current
account of Insurance Company.
Actionable : New registration - First premium will be credited to Office A/c and through
Cron job it will be transferred to Insurance Co Current A/c at defined interval
1 Gen Hardware set up We are facing the issue of Modus has pointed out towards
& sizing slowness of server (production). low space availability on server
GIPL has logged ticket with IBM. which may be a cause of
It is also suggeted to log a ticket slowness. Bank has agreed the
point and increased the size as
with Oracle. Modus with the
communicated by Umesh vide
help of EdgeVerve log a ticket
mail dtd. 08/08/2024.
with Oracle. This is required to
be done before go live. This GIPL pointed out that 2 DB
issue was faced and resolved servers have been created in
immediately after our meeting production environment. Modus
dtd. 17/07/2024 agreed to arrange a call with
Umesh and matter will be
Hardware sizing - As discussed discussed and closed by
and decided in the meeting dtd.
04/06/2024, Modus to furnish 22/08/2024.
final hardware sizing
Bank has also asked Modus to
(production) after Mock 2
communicate final hardware
migration. sizing requirement for
production since Mock 2
migration is completed.
2 Gen Migration data Values are not appeared It is decided to test one sample
correctly. SI - a/c numbers are SI and then Modus will fix the
not properly migrated issue and will communicate to
Bank.
3 Gen EOD batch jobs - During the process of EOD some Modus suggested to raise the
failed jobs of the jobs are not successful. issue in Mantis and will resolve.
We require to have exact reason Also suggested to set failed
of failure for rectification batch jobs at SOL EOD.
5 Gen Local level support Not available. We are facing Modus assured to post another
issues to generate and get even PM on site from 28/08/2024.
Balance sheet & Prof. & Loss
Reports.
6 Gen Points resolved in Mantis points raised at the time Modus assured to implement
Mock1 are not of Mock 1 are shown closed. changes in UAT2 environment.
appearing in
Mock 2
7 Gen HBR figures are not tallying with Modus assured to have separate
Balance sheet figures call on this issue. Modus will
arrange call by 23/08/2024.
11 Assets Asset code/ Crop Asset code/ Crop code needs to It is informed by Bank that
code needs to be be displayed at A/c opening, Assets codes are appearing,
displayed transaction on account, A/c however, Crop codes are not
enquiry screen-Pending with appearing. This is customisation
point.
modus Printing of Asset code on
statement of a/c - pending. Modus assured to resolve the
Same is needed for crop also point.
Assets LOS Response from OEM awaited. Bank pointed out that CBS data
Not sync with CBS data. is not sinc with LOS data. Modus
assured to revert on the points
by 24/08/2024.
Assets LR Response from OEM awaited. Bank pointed out that data is not
Data not available for testing. in LR and could not be tested.
13 DC Mapper response Mapper response upload in Bank pointed out that Mapper
upload in Finacle Finacle not provided response file to upload in Finacle
not provided not provided. Modus to log a
ticket in TOL.
DC Inward NACH, Inward NACH, RTGS, NEFT,H2H Modus assured to deliver the
RTGS, NEFT,H2H files are not processed same by 31/08/2024
files are not automatically.
processed
automatically.
16 HRMS Sign off for UAT Separate call will be set with GM
Shares Share Certificate Number to be generated only Modus assured to deliver in Post
after Board Approval go live scenario.
Shares Shares Certificate and Reports (To be printed in Pending with Modus
Marathi)
19 User management - change in roll/rights of users Modus has sent a mail. Bank to
process needs to be provided revert on the mail. It is especially
only view rights and CRM access.
20 Inventory with accounting entries – Pending with Modus assured to deliver the
Modus same by 31/08/2024
21 Reports- Reports are not generated as per the It is decided that Mr. Vikrant will
requirement of the bank e.g. Excel format data share the list of completed
only, As per bank requirement Selection of fields reports. Bank will verify the
not available , Solwise/Setwise-Sum of Total not same and will communicate to
Nitish sir.
available, Solwise/Setwise - All reports not
available etc.
Done / Closed 43 16 24
Pending Modus 11 5 7
Under testing with Bank 1 3 3
After Go live accepted 1 2
Total Count 56 24 36
Meeting is concluded with vote of thanks by General Manager, Admin & Finance.
*************