Comparis i On
Comparis i On
3 Strip curtain thickness shall be min. 3mm in place of 2mm. Supplier to confirm Supplier to confirm Considered Considered
We had considered 40 RFT copper piping per unit in our scope. If you want us to consider
4 Piping length shall be as per site conditions. Vendor to visit the site to understand the actual requirement. Supplier to confirm Supplier to confirm entire quantity in this quote, then please provide final location of ODUs and if it gets Considered
changed, then extra quantity may be charged extra.
Room shifting only 3 nos in place of 4 nos. (SS incubator 3300x1500x2100 is removed as per customer requirement. in place of Okay. We will submit separate offer for Incubation Heater – 3 KW x 2 No. including
5 that 3KW heater X2 NOS with control panel, cables and instruments to be consider). Submit price separately considering of its Supplier to confirm Supplier to confirm Considered
installation in our scope.
installation.
6 All tools, tackles, tables, ladders, nitrogen and oxygen gas cylinders, LPG cylinder and other consumables are in vendor scope. Supplier to confirm Supplier to confirm Okay Considered
7 Transportation facility, erection and commissioning charge and all other expense need to be included in vendor offer Supplier to confirm Supplier to confirm Okay Considered
8 Electrical point availability shall be as per site condition Supplier to confirm Supplier to confirm okay Considered
9 Cables with water proofing, piping and duct opening and other works to be consider in vendor scope Supplier to confirm Supplier to confirm Need to elaborate this poiny Considered
Okay. We will consider drain up to nearby 4-5 Mtr in our scope. Please let us know if it is Considered
10 Defrost drain piping will be in supplier scope up to nearest drain point. Supplier to confirm Supplier to confirm beyond mentioned distance.
Shifting job includes dismantling, shifting, re-installation, pressure testing, insulation, gas filling, vacuum, and complete Shifting and safe storage will be scope of IDMC Limited. Rest mentioned work will be in
11 Supplier to confirm Supplier to confirm Considered
commissioning of cold and incubation rooms. scope of Ice Make.
12 Panel supply and installation is in scope of vendor Supplier to confirm Supplier to confirm okay Considered
-
Ice make has not considered shifting work in
their scope.
- Vendor to consider drain pipe and refrigerant
copper piping length as per site requirement.
- Puf panel cladding thickness shall be 0.5mm in
place of 0.4mm considered by vendor.
- Receiver and suction line accumulator sizes to
be rechecked and confirmed by vendor as per
system requirement.
Shill Enterprise