Comparis i On

Uploaded by

dzmtn8fs5k
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
17 views

Comparis i On

Uploaded by

dzmtn8fs5k
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Technical Data Sheet

As per IDMC specification ICE MAKE MECH AIR


Sr. No Description Cold room Blast room Cold room Blast room Cold room Blast room
1 Dimensions Size:- 6900L X 4977W X 3500H Size:- 6900L X 4977W X 3500H Size:- 6900L X 4977W X 3500H Size:- 6900L X 4977W X 3500H Size:- 6900L X 4977W X 3500H Size:- 6900L X 4977W X 3500H
2 Qty 1 1 1 1 1 1
3 Compressor Make & Model Supplier to confirm Supplier to confirm Bitzer - 4HE25Y Bitzer - 6FE44Y FRASCOLD FRASCOLD
4 Compressor Type Supplier to confirm Supplier to confirm Semi Harmetic Semi Harmetic SEMI- HERMETIC SEMI- HERMETIC
5 CDU Make & Model Supplier to confirm Supplier to confirm Ice Make / Model - ICH145 Ice Make / Model - ICL105 LBT-V2571-3Y-4T LBT-Z50-154-3Y-6T
6 Design Ambient Temperature in Deg.C 45 45 45 45 45 45
7 Evaporation Temperature in Deg.C -5 -15 -5 -15 -5 -15
8 Condensing Temperature in Deg.C 50 50 50 50 50 50
9 Min. Compressor Capacity in TR 10 TR 15 TR 10 TR 15 TR 10 TR 15 TR
10 Sub Cooling in Deg.C Supplier to confirm Supplier to confirm DDE DDE 3K 3K
11 Super Heating in Deg.C ```````````` Supplier to confirm DDE DDE 10K 10K
12 Refrigerant R-404A R-404A R-404A R-404A R-404A R-404A
13 Compressor COP Supplier to confirm Supplier to confirm
14 Compressor Motor Power Supply 415 ± 10% V, 50 ± 5% Hz, 3 Phase 415 ± 10% V, 50 ± 5% Hz, 3 Phase 415 ± 10% V, 50 ± 5% Hz, 3 Phase 415 ± 10% V, 50 ± 5% Hz, 3 Phase 415 ± 10% V, 50 ± 5% Hz, 3 Phase 415 ± 10% V, 50 ± 5% Hz, 3 Phase
15 Compressor Motor Insulation & Protection Class F & IP55 F & IP55 F & IP55 F & IP55 F & IP65 F & IP55
16 Oil Separator
17 Make of Oil Separator Supplier to confirm Supplier to confirm Dry All - Size - 1 1/8” Emerson/Dry All Size:-1 3/8” GVN GVN
18 Design Pressure of Oil Separator in Bar(A) Supplier to confirm Supplier to confirm 30 BAR 30 BAR
19 Pneumatic/ Hydro Test Pressure in Bar(A) Supplier to confirm Supplier to confirm 48 BAR 48 BAR
20 Air Cooled Condenser Ice Make Ice Make
21 Size & Thk. of Condenser Copper Tube Supplier to confirm Supplier to confirm DDE DDE 3/8"x0.43 MM 3/8"x0.43 MM
22 Thk. of Aluminum Fin Supplier to confirm Supplier to confirm DDE DDE 0.115MM 0.115MM
23 Fin Spacing Supplier to confirm Supplier to confirm DDE DDE 10 FPI 10 FPI
24 No. of Condenser Fan Supplier to confirm Supplier to confirm DDE DDE 4 6
25 Each & Total Fan Power Consumption in kW Supplier to confirm Supplier to confirm DDE DDE 0.6x4=2.6KW 0.65x6=3.9kw
26 Design Pressure of Condenser in Bar(A) Supplier to confirm Supplier to confirm DDE DDE 33 33
27 Pneumatic/ Hydro Test Pressure in Bar(A) Supplier to confirm Supplier to confirm DDE DDE 37.9 37.9
28 Receiver Dry All Make Dry All Make
29 Refrigerant Receiver Capacity Supplier to confirm Supplier to confirm 10 Ltr 15 Ltr 18/35 50/70
30 Design Pressure of Receiver in Bar(A) Supplier to confirm Supplier to confirm DDE DDE 3MM/4MM 4.5 & 4 / 4.5 & 7
31 Pneumatic/ Hydro Test Pressure in Bar(A) Supplier to confirm Supplier to confirm DDE DDE 43/48 48
32 Suction Line Accumulator Dry All Make - Size:- 1 3/8” Dry All Make - Size:- 2 1/8”
33 Suction Line Accumulator Capacity Supplier to confirm Supplier to confirm 13LIT 25 LIT
34 Design Pressure of Accumulator in Bar(A) Supplier to confirm Supplier to confirm DDE DDE 33 33
35 Pneumatic/ Hydro Test Pressure in Bar(A) Supplier to confirm Supplier to confirm DDE DDE 48 48
36 Liquid Line Size from Condenser to Receiver Supplier to confirm Supplier to confirm DDE DDE 7/8" 1-3/8"
37 Liquid Line Size from Receiver to Evaporator Supplier to confirm Supplier to confirm DDE DDE 7/8" 1-3/8"
38 Suction Gas Line Size Supplier to confirm Supplier to confirm DDE DDE 2-1/8" 2-5/8"
39 Make & Model/ Size of Liquid Line Solenoid Valve Supplier to confirm Supplier to confirm DDE DDE DANFOSS EVR15,7/8 " DANFOSS EVR25, 1-3/8"
40 Make & Model/ Size of Filter/ Drier Supplier to confirm Supplier to confirm DDE DDE DANFOSS 4175,DML DANFOSS DRYALL, DRC4811
41 Make & Model of Liquid Line Sight Glass Supplier to confirm Supplier to confirm DDE DDE DANFOSS OLAB
42 Thermostatic Expansion Valve Make & Model/ Size Supplier to confirm Supplier to confirm DDE DDE
43 Orifice Size and No. Supplier to confirm Supplier to confirm
44 Controls Make (Electrical Control Panel) Ice Make Ice Make
1 Door cladding thickness shall be min. 0.5mm in place of 0.4mm Supplier to confirm Supplier to confirm PUF Panel sheet thickness will be 0.4 mm Considered
2 All the CDUs shall be suitable for outdoor installation. We will not provide any shed. CDUs will be installed in open to sky area. Supplier to confirm Supplier to confirm Okay. In this case, control panel will be nearby cold room only. Considered

3 Strip curtain thickness shall be min. 3mm in place of 2mm. Supplier to confirm Supplier to confirm Considered Considered

We had considered 40 RFT copper piping per unit in our scope. If you want us to consider
4 Piping length shall be as per site conditions. Vendor to visit the site to understand the actual requirement. Supplier to confirm Supplier to confirm entire quantity in this quote, then please provide final location of ODUs and if it gets Considered
changed, then extra quantity may be charged extra.

Room shifting only 3 nos in place of 4 nos. (SS incubator 3300x1500x2100 is removed as per customer requirement. in place of Okay. We will submit separate offer for Incubation Heater – 3 KW x 2 No. including
5 that 3KW heater X2 NOS with control panel, cables and instruments to be consider). Submit price separately considering of its Supplier to confirm Supplier to confirm Considered
installation in our scope.
installation.
6 All tools, tackles, tables, ladders, nitrogen and oxygen gas cylinders, LPG cylinder and other consumables are in vendor scope. Supplier to confirm Supplier to confirm Okay Considered

7 Transportation facility, erection and commissioning charge and all other expense need to be included in vendor offer Supplier to confirm Supplier to confirm Okay Considered

8 Electrical point availability shall be as per site condition Supplier to confirm Supplier to confirm okay Considered
9 Cables with water proofing, piping and duct opening and other works to be consider in vendor scope Supplier to confirm Supplier to confirm Need to elaborate this poiny Considered
Okay. We will consider drain up to nearby 4-5 Mtr in our scope. Please let us know if it is Considered
10 Defrost drain piping will be in supplier scope up to nearest drain point. Supplier to confirm Supplier to confirm beyond mentioned distance.
Shifting job includes dismantling, shifting, re-installation, pressure testing, insulation, gas filling, vacuum, and complete Shifting and safe storage will be scope of IDMC Limited. Rest mentioned work will be in
11 Supplier to confirm Supplier to confirm Considered
commissioning of cold and incubation rooms. scope of Ice Make.
12 Panel supply and installation is in scope of vendor Supplier to confirm Supplier to confirm okay Considered

Mech air offer is found technically ok.

Ice make offer found technically ok subject to below


mentioned points

-
Ice make has not considered shifting work in
their scope.
- Vendor to consider drain pipe and refrigerant
copper piping length as per site requirement.
- Puf panel cladding thickness shall be 0.5mm in
place of 0.4mm considered by vendor.
- Receiver and suction line accumulator sizes to
be rechecked and confirmed by vendor as per
system requirement.

Shill Enterprise

- Technical details asked in our technical


specification is not provided by vendor.
- Vendor has not visited the site to understand
actual scope of work.