Download
Download
Bill Period
Book No / Connection No. Account No. Supply Type Load(KW/KVA/BHP) Bill No.
Bill Grp
From To Months
KES06497 225208 / 238650 225596 / 239048 1.00 388 / 398 0/0 0.90 0.00 Normal 18/03/2023 25/03/2023
3. Rebate upto Payable Date (-) 0.00 i) Previous Arrears / Arrear Count 26420.00 + 0.00 / 1
5. Due for Minimum Charges / Regulatory Surcharge :/ TCS 0.00/0.00/0.00 13. Previous Delay Surcharge 264.2
A) Assesment (+) 0.00 16. Total Payable Amount Before Due Date 33924.00
11. Credit 18. Total Payable Amt. After Due Dt. 33924.00
B) Temporary (-) (ISD Interest ) of (-) 0.00 20. Bill Date 18/03/2023
Assistant Engineer
PLEASE NOTE THAT EVERY BILL MUST BE PAID ON DUE DATE OR BEFORE DUE DATE OTHERWISE YOUR ELECTRICITY SUPPLY WILL BE DISCONNECTED WITHOUT ANY
WARNING INFORMATION UNDER THE 24(1) ACT OF INDIAN ELECTRICITY RULE 1910.
Book No. Sc No. Account No. Meter No. Meter Reading Date
Consumer Signature
1. Please mention connection no., book no., account no, name and address on the back of cheque/draft.