Abstract. In the emergency repair of electric power caused by sudden natural disasters, the reliability and
stability of emergency power supply vehicles largely determine the speed and efficiency of restoring power
supply. Based on the performance test and reliability study of 18 diesel-powered vehicles in Guangzhou
Power Supply Company Limited, the typical defects of emergency power supply equipment and the causes
of the faults are analyzed. It provides technical support for the technical standards and the maintenance
guidance of emergency power supply equipment, and greatly improves the emergency capability of rapid
power recovery under extreme natural disasters. It has improved the emergency response capability of rapid
re-powering under extreme natural disasters, shortened the repair time, and significantly reduced the loss
and impact of extreme natural disasters on the power system and the entire national economy.
© The Authors, published by EDP Sciences. This is an open access article distributed under the terms of the Creative Commons Attribution License 4.0
(http://creativecommons.org/licenses/by/4.0/).
E3S Web of Conferences 256, 01008 (2021) https://doi.org/10.1051/e3sconf/202125601008
PoSEI2021
YD/T 502-2007 "Diesel Generator Set for 25 %, 50 %, 75 %, 100 % of rated load, then reduce the
Communication" and relevant technical agreements of a load from 100 % to no-load step by step according to this
power supply bureau. The performance judgment is grade, and run for a period of time under each grade of
based on the technical agreement. When the technical load; Test the three-phase voltage, frequency and output
agreement is lower than the national standard, industry power under various load levels. According to relevant
standard or enterprise commitment, the higher technical requirements, the deviation between steady-
requirements in the national/industry standard or state voltage and rated voltage shall be ≤±0.5%, and the
enterprise commitment shall be taken as the performance deviation between steady-state frequency and rated
judgment basis. frequency shall be ≤±0.5%.
The performance and parameters studied include Figure 1 & Figure 2 show the time variation
steady-state voltage deviation and steady-state frequency characteristics (steady-state) of three-phase voltage,
deviation, transient voltage deviation and transient frequency and output power under different load rates for
frequency deviation, voltage and frequency recovery a 500kW diesel generator under inspection. In order to
time, three-phase voltage imbalance, frequency drop, visually judge whether the steady-state voltage and
phase voltage sine wave distortion rate, insulation steady-state frequency meet the requirements (the steady-
resistance and other non-electrical performance and state voltage deviation should be less than or equal to
parameters, as well as operation state parameter 0.5%, and the steady-state frequency deviation should be
monitoring function, overload protection function, less than or equal to 0.5%), the upper and lower
emergency stop function, continuous operation function, boundary lines of the steady-state voltage and steady-
generator appearance and phase sequence arrangement. state frequency are respectively made in the figure and
the upper and lower limit values are marked. It can be
seen from Figure 1 & Figure 2 that under no-load
4TEST ITEMS condition, the three-phase voltage basically changes
within the allowable deviation range of steady-state
4.1Steady-state voltage and frequency deviation voltage; the larger the load rate is, the more the three-
phase voltage decreases compared with the rated phase
The research steps of this performance parameter are as voltage, and the more it deviates from the lower limit of
follows: start and set the generator to operate stably steady-state voltage, among which the decrease of A-
under rated conditions, and reduce the load to no load phase voltage is the most obvious.
after a period of time; Gradually load from no-load to
Upper boundary 230*(1+0.5%) V
232 (a) 600
226 400
75%
224 75%
300
222
50% 50%
220 200
Figure 2. Time variation characteristics of output frequency and power of 500kW power generator (steady-state)
2
E3S Web of Conferences 256, 01008 (2021) https://doi.org/10.1051/e3sconf/202125601008
PoSEI2021
228 400
Phase A
216 Phase B 100
Phase C Voltage recovery time
212 0
0 20 40 60 80 100
Time t/s
Fig. 3 Time varying characteristics of three phase voltage and output power during sudden load reduction (transient)
51.0 500
(b)
50.0
Frequency f/Hz
Frequency 300
49.5
f 200
49.0
100
48.5
Frequency recovery time
48.0 0
0 20 40 60 80 100
Time t/s
Fig. 4 Time varying characteristics of three phase frequency and output power during sudden load reduction (transient)
3
E3S Web of Conferences 256, 01008 (2021) https://doi.org/10.1051/e3sconf/202125601008
PoSEI2021
232
230
226
Phase A
Phase B
224 Phase C
222
0 40 80 120 160 200 240
Time t/s
Fig.5 Time variation characteristics of three-phase voltage for 500 kW diesel generator under no-load stable operation.
voltage shall be≤3% when no load is applied and ≤10%
4.4Phase voltage sine wave distortion rate when full load is applied.
Figure 6 shows the time variation characteristics of
The research steps of this performance parameter are as
the three-phase voltage and its sine wave distortion rate
follows: the generator is in a cold state or a hot state, and
when a 500kW diesel generator under inspection is
the generator is started and adjusted to operate stably
unloaded. It can be seen from the figure that the sine
under the rated working condition; After a period of time,
wave distortion rate of the three-phase voltage fluctuates
reduce the load to no load and adjust the frequency to the
up and down at 1.3 when no load is applied, and the
rated value to test the three-phase voltage and its sine
distortion rate of phase B is the smallest and that of
wave distortion rate. According to relevant technical
phase C is the largest, but all meet the requirement that
requirements, the sine wave distortion rate of three-phase
the sine wave distortion rate of the voltage is ≤3% when
no load is applied.
232 5 Voltage Sine Wave Distortion Rate Uthd
4
230
Phase Voltage U/V
3
228
Voltage sine wave distortion rate of Phase C 2
Voltage sine wave distortion rate of Phase A
226
Phase A 1
Voltage sine wave distortion rate of Phase B Phase B
Phase C
224 0
0 20 40 60 80 100
Time t/s
Fig.6 Time variation characteristics of three-phase voltage and sine wave distortion rate of 500 kW diesel generator under no-load
condition
continuous operation time of most unqualified diesel
5Continuous operation generators is between 20min and 30min, except that the
continuous operation time of 2 generators is less than
The research steps of this performance parameter are as 15min. In addition, the detection found that the reason
follows: start and set the generator to run stably under the why most power generators stop is that the unit cooling
rated working condition, making it run continuously for water temperature is too high, which leads to alarm
60min under full load; During the operation, the shutdown. It can be seen that after a period of service,
generator will not stop without warning. After the the continuous operation capability of some power
operation, the generator unit will be checked for oil generators cannot meet the technical requirements, and
leakage, water leakage and other abnormal phenomena. the most likely reason is the reduction of heat dissipation
The diesel generator is considered to have normal capability.
continuous operation capability.
Of the 56 diesel generators tested, 10 failed in
continuous operation; One of them can run continuously 6Conclusions
for 60min, but after the operation, the unit was found to
have oil leakage; The other 9 power generators will stop According to China's national standard GB/T 20136-
when they are running for less than 60min.The 2006 "General Test Methods for Internal Combustion
4
E3S Web of Conferences 256, 01008 (2021) https://doi.org/10.1051/e3sconf/202125601008
PoSEI2021
Engine Power Stations", industry standard YD/T 502- 5. YD/T 502-2007. (2007) Diesel Generator Set for
2007 "Diesel Generator Set for Communication" and Communication [S].
relevant technical regulations, this article systematically 6. Analysis of common problems in customer electrical
studies various performance parameters of 56 electric equipment power quality[M]. China Electric Power
emergency diesel generators after serving for a certain Press, 2013.
period of time.
7. Wang, Y. (2015) Research on Management System
a) After a certain period of service, the steady-state
and Capability Evaluation of Power System Sudden
frequency deviation, voltage imbalance, frequency drop,
Disaster Emergency Project [D]. North China
insulation resistance, overload protection, emergency
Electric Power University.
stop function and monitoring function have not occurred
or only a small number of power generators have failed, 8. Wang, Z.K., Sun, L., Lin, Z.Z. (2018) Optimal
which indicates that the above performance and function Allocation of Emergency Power Sources
are stable. Considering Uncertainties of Loads and Dispatching
b) After a certain period of service, nearly 40% of the Time Periods[J]. Automation of Electric Power
power generators have excessive steady-state or transient Systems. 42(2): 34-41.
voltage deviation, and nearly 70% of the power
generators have excessive transient frequency deviation.
The deterioration of output voltage and frequency of
power generators is obvious, which seriously affects the
quality of emergency power supply. The maintenance of
diesel power generators should attach great importance
to these quality indicators and shorten the test cycle
appropriately.
c) After a certain period of service, 25% of the power
generators are not qualified for continuous operation, and
the operation time with rated load is less than 60min.
This seriously affects the reliability of emergency power
supply and brings hidden dangers to emergency power
supply. The maintenance of diesel power generators
should pay more attention to full load operation
capability to ensure normal continuous operation
capability.
Acknowledgments
The project was funded by the Key Laboratory of
Medium-voltage and Low-voltage Electric Equipment
Inspection and Testing of China Southern Power Grid,
China.
References
1. Zhang, Z.C., Qin, Y., Gu, C.H. and Xu, Z.B., (2018)
Research on operating performances of 500 kVA
flywheel energy storage UPS power supply vehicle.
Movable Power Station&Vehicle, vol. 3, pp. 25–29.
2. Zhang, Z.C., Qin, Y., Gu, C.H. and Xu, Z.B. (2019)
Research on operating performances of 300 kVA
zero switching time of UPS emergency power
supply vehicle. Electrical Technology, vol. 1, pp. 7–
10.
3. Qin, Y., Gu, C.H., Zhang, Z.C. and Xu, Z.B. (2019)
Research on performance state of 500 kW diesel
electric emergency generator vehicle,”Electrical Age,
vol. 4, pp. 55–58.
4. GB/T 20136-2006. General Test Methods for
Internal Combustion Engine Power Stations [S].
Lanzhou Power Vehicle Research Institute, China
Electrical Equipment Industry Association. 2006.