0% found this document useful (0 votes)
24 views2 pages

GENERAL-COMBINED

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
24 views2 pages

GENERAL-COMBINED

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

1 2 3 4 5 6 7 8 9 10

OWNER:

8. CONTRACTOR MUST SUBMIT COMPLETE LABELING SYSTEM - APPROVED FROM PROJECT OPERATOR- FOR BOTH
CABLING AND CONDUITS SYSTEMS AND ALL ACCESSORIES INCLUDING CONNECTIONS WITH TGBs (TELECOMMUNICATION
GROUNDING BUSBARS) ...ETC.
IMPORTANT NOTE :
STRUCTURED CABLING AND NETWORK SOLUTION WILL BE ISSUED IN A SEPARATE ADDENDUM. 9. CALCULATIONS : THE FOLLOWING CALCULATIONS AND ITEMS MUST BE INCLUDED IN THE TECHNICAL MATERIAL
SUBMITTAL AND REFLECTED ON THE SHOPDRAWINGS

ABBREVIATION: - FIELD OF VIEW FOR EACH CAMERA INDICATED ON PLANS ACCORDING TO CCTV SYSTEM MANUFACTURER GENERATED
SOFTWARE . CONSULTANT:

DI DIGITAL INPUT
- ALL PLANS MUST BE SUBMITTED WITH FIELD OF VIEW FOR ALL CAMERAS .
AI ANALOG INPUT
DO DIGITAL OUTPUT
- CCTV SYSTEM STORAGE CALCULATIONS, USING SYSTEM MANUFACTURER SOFTWARE.
AO ANALOG OUTPUT
- CONTRACTOR SHALL COORDINATE TO MAKE ALL NECESSARY ADJUSTMEMTS NECESSARY TO ACHIEVE THE REQUIRED
GENERAL DETAILS FIELD OF VIEWS AND COORDINATE THE POWER AND RACKING REQUIREMENTS FOR SYSTEM STORGAGE BASED ON THE www.ecgsa. com
H APPROVED CALCULATIONS. H
NOTES (SECURITY SYSTEMS "CCTV ,ACCESS CONTROL) :
- FOR THE ACCESS CONTROL SYSTEM DC CALCULATIONS , VERIFYING THE VOLAGE DROP AGAINST THE OPERATING
1 .CONTRACTOR IS FULLY RESPONSIBLE FOR SUPPLYING , INSTALLING , TESTING , COMMISSIONING , PUT INTO OPERATION THE CONDITIONS FOR VARIOUS SYSTEM DEVICES TAKING INTO CONSIDERATION CABLES TYPES , LENGTHES AND
SYSTEMS INDICATED IN THE DRAWINGS TO ACHIEVE SYSTEMS REQUIREMENTS INDICATED IN RELATED PLANS , RISERS ,BOQs, MANUFACTURER OFFICIAL REQUIRED OPERATING VOLTAGES .
SPECIFICATIONS AND ALL RELATED CONTRACT DOCUMENTS INCLUDING ALL NECESSARY ACCESSORIES TO CONSTRUCT FULLY
FUNCTIONAL END-TO-END INTEGRATED SYSTEMS INCLUDING-BUT NOT LIMITED TO-THE FOLLOWING: - ALL ACCESS CONTROL PANELS BATTERY CALCULATIONS SIZED TO OPERATE THE SYSTEM FOR AT LEAST 15 MINUTES FIRE ALARM SYSTEM
-CCTV (CLOSED CIRCUIT TELEVISION) SYSTEM 10. CONTRACTOR SHALL COORDINATE WITH ALL OTHER DESIGN PACKAGES TO CONSTRUCT A COMPLETE INTEGRATED
COMPLETE WITH CABLES, CONDUITS, BOXES, PULL BOXES,FACP(S) ,CAMERAS , STORAGE,VIDEO MANAGEMENT 1. CONTRACTOR IS FULLY RESPONSIBLE FOR SUPPLYING , INSTALLING , TESTING , COMMISSIONING , PUT INTO OPERATION THE
FULLY FUNCTIONAL SYSTEMS DURING VARIOUS CONSTRUCTION STAGES . SYSTEMS INDICATED IN THE DRAWINGS TO ACHIEVE SYSTEMS REQUIREMENTS INDICATED IN RELATED PLANS , RISERS ,BOQs,
SOFTWARE,VIDEO ANALYTICS , SYSTEM SERVER,MONITORING STATIONS,SCREENS, WORKSTATIONS COMPLETE WITH
OPERATING SYSTEM AND ALL NECESSARY LICENSES ,PRINTER ,INTERFACES WITH ALL OTHER RELATED MEP SYSTEMS ON BOTH SPECIFICATIONS AND ALL RELATED CONTRACT DOCUMENTS INCLUDING ALL NECESSARY ACCESSORIES TO CONSTRUCT FULL SYSTEMS
HARWARE AND SOFTWARE LEVELS AS REQUIRED ...ETC. - FUNCTIONS INCLUDING-BUT NOT LIMITED TO-THE FOLLOWING:
- FA (FIRE ALARM ) ADDRESSABLE SYSTEM COMPLETE WITH CABLES , CONDUITS, BOXES, PULL BOXES, FACP(S) ,AUTO
-ACS (ACCESS CONTROL ) SYSTEM DIALER , GUI WITH WORKSTATION COMPLETE WITH OPERATING SYSTEM AND ALL NECESSARY LICENSES , PRINTER
COMPLETE WITH CABLES, CONDUITS, BOXES, PULL BOXES,READERS,CONTROLLERS,CARDS, BATTERIES,REQUEST TO EXIT ADDRESSABLE DETECTORS, MODULES,SIRENS,STROBE LIGHTS ,MANUAL STATIONS, ,INTERFACES WITH ALL OTHER RELATED MEP
BUTTONS,BREAK GLASS UNITS, SYSTEM SERVER,MONITORING STATIONS,SCREENS, WORKSTATIONS COMPLETE WITH OPERATING SYSTEMS ON BOTH HARDWARE AND SOFTWARE LEVELS AS REQUIRED ...ETC.
SYSTEM AND ALL NECESSARY LICENSES ,PRINTER ,INTERFACES WITH ALL OTHER RELATED MEP SYSTEMS ON BOTH HARWARE - INTERFACE WITH OTHER SYSTEMS .
AND SOFTWARE LEVELS AS REQUIRED ...ETC. - ALL THE FIRE ALARM SYSTEM COMPONENTS MUST BE MONITORED FOR PROPER OPERATION .USING ALL NECESSARY ACCESSORIES
SUCH AS EOL RESISTANCE ...ETC.
2 .SYSTEM INTEGRATOR : CONTRACTOR IS RESPONSIBLE FOR ASSIGNING - AT NO EXTRA COST - A SYSTEM - THE FIRE ALARM SYSTEM BATTERY MUST BE CONTINUOUSLY MENTORED AND PROVIDE ALARM TO RECHARGE THE BATTERIES
INTEGRATOR APPROVED BY THE ENGINEER TO INTEGRATE ALL ELV /ICT , LIGHT CURRENT ,LOWCURRENT,MEP 2. SYSTEM INTEGRATOR : CONTRACTOR IS RESPONSIBLE FOR ASSIGNING - AT NO EXTRA COST - A SYSTEM INTEGRATOR APPROVED BY
SYSTEMS IN THE PROJECT AS RREQUIRED IN THE PROJECT RELATED DOCUMENTS INCLUDING SPECIFICATIONS THE ENGINEER TO INTEGRATE ALL ELV/ICT , LIGHT CURRENT ,LOWCURRENT,MEP SYSTEMS IN THE PROJECT AS REQUIRED IN THE
G AND DRAWINGS ..ETC. PROJECT RELATED DOCUMENTS INCLUDING SPECIFICATIONS AND DRAWINGS ...ETC.
G
3. POWER & UPS : - THE FIRE ALARM SYSTEM MUST BE SUPPLIED FROM EMERGENCY SOURCE ALONG WITH BATTERY SYSTEM SIZED TO
3. POWER & UPS : OPERATE THE FIRE ALARM SYSTEM IN FULL ALARM STATUS FOR 30 MINUTES AND IN NORMAL OPERATING CONDITIONS FOR 24 HOUR.
- THE CCTV SYSTEM MUST BE SUPPLIED FROM UPS SOURCE . INCLUDING ALL CAMERAS 4. GROUNDING: THE SYSTEMS SHALL BE GROUNDED AND BONDED ACCORDING TO ANSI -J-STD-607-B FOR ALL INSTALLATIONS USING
,SERVERS,WORKSTATIONS AND STORAGE SYSTEM. TGBs, TMGB AND AS PER SYSTEMS MANUFACTURER OFFICIAL GROUNDING AND BONDING REQUIREMENTS .
5. CABLES : THE FIRE ALARM SYSTEM CABLES MUST CWZ 950 C. THE LOOP CABLES MUST BE AT LEAST BE 2X1.5mm & DC
- THE CCTV AND THE ACESS CONTROL SYSTEMS MUST BE SUPPLIED FROM UPS SOURCE .BATTERY BACKUP SHALL BE 2X2.5mm . ALL CABLES SIZES MUST BE VALIDATED BY THE CONTRACTOR AT THE TECHNICAL MATERIAL SUBMITTAL
TIME SHALL BE 15 MINUTES. CALCULATIONS ACCORDING TO SYSTEM MANUFACTURER REQUIREMENTS
6. ALL INSTALLATIONS MUST BE PERFORMED ACCORDING TO SYSTEMS MANUFACTURERS OFFICIAL INSTALLATION MANUALS
4. GROUNDING: THE SYSTEMS SHALL BE GROUNDED AND BONDED ACCORDING TO ANSI -J-STD-607-A FOR ALL 7. SUBMITTALS: THE CONTRACTOR MUST SUBMIT FOR THE ENGINEER APPROVAL A COMPLETE TECHNICAL MATERIAL SUBMITTAL
INSTALLATIONS USING TGBs, TMGB AND AS PER SYSTEMS MANUFACTURER OFFICIAL GROUNDING AND STAMPED AND APPROVED FROM THE SYSTEM INTEGRATOR , INCLUDING ALL REQUIRED INTEGRATION DOCUMENTS , SHOP-DRAWINGS,
BONDING REQUIREMENTS. AND COMPOSITE DRAWINGS COORDINATED WITH ALL OTHER DISCIPLINES .
) -
5. CABLES : ALL SYSTEMS CABLES MUST BE LOW SMOKE ZERO HALOGEN (LSZH) 8. CALCULATIONS : THE FOLLOWING CALCULATIONS AND ITEMS MUST BE INCLUDED IN THE TECHNICAL MATERIAL SUBMITTAL AND
REFLECTED ON THE SHOP DRAWINGS
6. ALL INSTALLATIONS MUST BE PERFORMED ACCORDING TO SYSTEMS MANUFACTURERS OFFICIAL - FIRE ALARM SYSTEM DC CALCULATIONS, VERIFYING THE VOLTAGE DROP AGAINST THE OPERATING CONDITIONS FOR VARIOUS SYSTEM
INSTALLATION MANUALS DEVICES TAKING INTO CONSIDERATION CABLES TYPES , LENGTHENS AND MANUFACTURER OFFICIAL REQUIRED OPERATING VOLTAGES .
- FIRE ALARM SYSTEM BATTERY CALCULATIONS . THE BATTERY SYSTEM MUST BE SIZED TO OPERATE THE FIRE ALARM
7. SUBMITTALS: THE CONTRACTOR MUST SUBMIT FOR THE ENGINEER APPROVAL A COMPLETE TECHNICAL SYSTEM IN FULL ALARM STATUS FOR 30 MINUTES AND NORMAL OPERATING CONDITIONS FOR 24 HOUR.
MATERIAL SUBMITTAL STAMPED AND APPROVED FROM THE SYSTEM INTEGRATOR , INCLUDING ALL REQUIRED 9 . CONTRACTOR SHALL COORDINATE WITH ALL OTHER DESIGN PACKAGES TO CONSTRUCT A COMPLETE INTEGRATED FUNCTION
INTEGRATION DOCUMENTS, SHOP-DRAWINGS, AND COMPOSITE DRAWINGS COORDINATED WITH ALL OTHER REQUIRED DURING VARIOUS CONSTRUCTION STAGES .
DISCIPLINES.
F F

E E

D D

KEY PLAN

C C
Sheet size -ISO A 1189 *841( 0mm)

0 JUN-2017 CONSTRUCTION Y.HTFA T.HMHH T.KMFE A.MARM


B REV DATE ISSUED FOR DRW CHK TL PM
B
PROJECT TITLE:

BUILDING NAME

DISCIPLINE

TELECOMMUNICATIONS
SHEET TYPE

SHEET TITLE

LEGEND AND NOTES

SCALE PROJECT NO BUILDING NO SHEET NO REV MARK

NTS 2416 G00 0 A


A
1 2 3 4 5 6 7 8 9 10 ECG Copyright -Produced Using BIM Technology
THIS DRAWING AND THE DESIGN IT COVERS ARE THE PROPERTY OF THE ENGINEERING CONSULTANTS GROUP .THEY ARE MERELY LOANED ON THE BORROWER 'S EXPRESSED AGREEMENT THAT THEY WILL NOT BE REPRODUCED ,COPIED ,LOANED ,EXHIBITED NOR USED EXCEPT FOR LIMITED AND PRIVATE USE PERMITTED BY WRITTEN CONSENT GIVEN BY THE LENDER TO THE BORROWER .
1 2 3 4 5 6 7 8 9 10
OWNER:

CONSULTANT:

www.ecgsa.com
H H

G G

F F

UHF BAND

VHF BAND

AMPLIFIRE
E E
RG11 COAXIAL MOUNTING POLE MOUNTING POLE
CABLE
STEEL C-CHANNEL SUPPORT STEEL C-CHANNEL SUPPORT STEEL C-CHANNEL SUPPORT

ANTENAA PAD RG11 COAXIAL ANTENAA PAD RG11 COAXIAL ANTENAA PAD
CONCRETE CABLE CONCRETE CABLE CONCRETE

30 cm

30 cm

30 cm
ROOF FLOOR ROOF FLOOR ROOF FLOOR
(EXPOSED) (EXPOSED) (EXPOSED)

60 cm 60 cm 60 cm

D D

KEY PLAN

C C
Sheet size -ISO A 1189 *841( 0mm)

0 JUN-2017 CONSTRUCTION Y.HTFA T.HMHH T.KMFE A.MARM


B REV DATE ISSUED FOR DRW CHK TL PM
B
PROJECT TITLE :

BUILDING NAME

DISCIPLINE

TELECOMMUNICATIONS
SHEET TYPE

9-TELECOMMUNICATION TYPICAL
DETAILS
SHEET TITLE

INSTALLATION
DETAILS
SCALE PROJECT NO BUILDING NO SHEET NO REV MARK

NTS 2416 G00 0 A


A
1 2 3 4 5 6 7 8 9 10 ECG Copyright -Produced Using BIM Technology
THIS DRAWING AND THE DESIGN IT COVERS ARE THE PROPERTY OF THE ENGINEERING CONSULTANTS GROUP .THEY ARE MERELY LOANED ON THE BORROWER'S EXPRESSED AGREEMENT THAT THEY WILL NOT BE REPRODUCED ,COPIED ,LOANED ,EXHIBITED NOR USED EXCEPT FOR LIMITED AND PRIVATE USE PERMITTED BY WRITTEN CONSENT GIVEN BY THE LENDER TO THE BORROWER .

You might also like