Air-Handling-Unit
Air-Handling-Unit
Inspector: _____________________
Response
Item Description Comments
(√ / ×)
1 Visual Inspection
Check the exterior of the AHU for any signs of damage, corrosion,
or leaks
Inspect access panels and doors for proper closure and sealing
Ensure that dampers, louvers, and filters are clean and in good
condition
2 Filter Inspection
Inspect and replace air filters if necessary, ensuring they are the
correct size and type for the AHU
Record the filter type, size, and condition (clean, dirty, replaced)
Inspect motor belts and pulleys for proper tension and alignment
4 Coil Inspection
Adapt this checklist template as necessary to meet your particular project requirements and site conditions.
1
Inspect drain pans for standing water, algae growth, or debris
6 Ductwork Inspection
Ensure that all electrical panels are properly secured and labeled
11 Final Inspection
Adapt this checklist template as necessary to meet your particular project requirements and site conditions.
2
Sign off on the checklist indicating completion and approval
Non-Conformances
Item Date Reason for Non-Conformance
Name Signature
Date: _________________________
Adapt this checklist template as necessary to meet your particular project requirements and site conditions.
3