0% found this document useful (0 votes)
19 views

Air-Handling-Unit

commissioning check list
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
19 views

Air-Handling-Unit

commissioning check list
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Date: _____________________

Inspector: _____________________

Response
Item Description Comments
(√ / ×)

1 Visual Inspection

Check the exterior of the AHU for any signs of damage, corrosion,
or leaks

Inspect access panels and doors for proper closure and sealing

Ensure that dampers, louvers, and filters are clean and in good
condition

2 Filter Inspection

Inspect and replace air filters if necessary, ensuring they are the
correct size and type for the AHU

Record the filter type, size, and condition (clean, dirty, replaced)

3 Fan and Motor Inspection

Check fan blades for balance, wear, or damage

Inspect motor belts and pulleys for proper tension and alignment

Lubricate bearings if required and record any maintenance


performed

4 Coil Inspection

Inspect heating and cooling coils for dirt buildup or damage

Clean coils if necessary to maintain efficiency

Check for any signs of leaks in the coil tubing or connections

5 Drain Pan Inspection

Adapt this checklist template as necessary to meet your particular project requirements and site conditions.
1
Inspect drain pans for standing water, algae growth, or debris

Clean and disinfect drain pans as needed to prevent microbial


growth

6 Ductwork Inspection

Inspect ductwork for signs of leaks, damage, or obstructions

Seal any leaks found and remove any obstructions to maintain


airflow

7 Temperature and Humidity Control

Check temperature and humidity sensors for accuracy

Verify that control settings are appropriate for the desired


conditions

Adjust settings if necessary and record changes made

8 Electrical Components Inspection

Inspect electrical wiring, connections, and components for signs of


wear or damage

Test safety controls and shutdown mechanisms for proper operation

Ensure that all electrical panels are properly secured and labeled

9 Vibration and Noise Check

Monitor vibration levels of moving parts such as fans and motors

Listen for unusual noises that could indicate mechanical problems

Investigate and address any excessive vibration or noise issues

10 Documentation and Recording

Record all inspection findings, including any maintenance tasks


performed and any issues identified

Document any corrective actions taken and any parts replaced

Keep a log of AHU performance data, including temperature,


humidity, and airflow measurements

11 Final Inspection

Review the checklist to ensure all inspection points have been


addressed

Adapt this checklist template as necessary to meet your particular project requirements and site conditions.
2
Sign off on the checklist indicating completion and approval

Non-Conformances
Item Date Reason for Non-Conformance

Checked by: __________________________ _____________________________

Name Signature

Date: _________________________

Adapt this checklist template as necessary to meet your particular project requirements and site conditions.