0% found this document useful (0 votes)
4 views

Daily Progress Report

Uploaded by

m4b82rtfpg
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
4 views

Daily Progress Report

Uploaded by

m4b82rtfpg
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 7

DAILY PROGRESS REPORT

JOB TITLE
Total Man Power Total Man Hours ─ Overall Progress % Date
Day Shift Day Shift ─ Cum. Planned
24-Jan-25
Night Shift Night Shift ─ Cum. Actual

WEEKLY SAFETY STATISTICS


• Near Miss 0 • Unsafe Condition 0 OVERALL PROGRESS
• Minor Incident 0 • Unsafe Act 0 100%

• Major Incident 0 • Safety Recognition 0


• Work Permit Violation 0
93.00%

TOTAL SAFETY STATISTICS 90%

• Near Miss 0 • Unsafe Condition 0 87.00%


• Minor Incident 0 • Unsafe Act 0
• Major Incident 0 • Safety Recognition 0
• Work Permit Violation 0 • Total Safety Issue 0 82.00%

80%

78.00%

MAJOR ACTIVITIES OF THE DAY


S. No Description
72.00%

1 70%

68.00%
2 67.00% 67.00%

3 64.00%

4 62.00%

60%
5 59.00%

% COMPLETE
6 56.00%

ONE DAY LOOK AHEAD PLAN 53.00%


52.00%
S. No Description
50%
49.00%
1
2 46.00%

3 43.00%
42.00%

4 40%

38.00%
5 37.00%

MILESTONES Allocated % Completed % ETC


33.50%

31.00%
30%
28.50%

26.00%

22.50%

20% 20.00%

17.50%

15.00%
13.50%

10%
9.00%
8.50%

Actual: % Planned: %
4.00%
3.50%

Days
0%
1-Oct 2-Oct 3-Oct 4-Oct 5-Oct 6-Oct 7-Oct 8-Oct 9-Oct 10-Oct 11-Oct 12-Oct 13-Oct 14-Oct 15-Oct 16-Oct 17-Oct 18-Oct 19-Oct 20-Oct 21-Oct 22-Oct 23-Oct 24-Oct 25-Oct

Total 100.00% 0.00%

Activities
Sl No: Activities Total No. of Tubes Completed Remaining Completed % Remaining % Remarks

1 1 1 0 100% 0%
Tube Cutting
2 1 0.75 0.25 75% 25%
Tube Pulling
3 1 0.5 0.5 50% 50%
Stub Pulling
4 1 0.25 0.75 25% 75%
Hole Cleaning
5 1 0.1 0.9 10% 90%
DPT on Holes
6 1 0.05 0.95 5% 95%
Tube Insertion
7 1 0.01 0.99 1% 99%
Tube to Tube Sheet Welding
8 1 0 1 0% 100%
Expanding
9 1 0 1 0% 100%
Excessive length trimming

Issues & Areas Of Concerns


Sl No: Description
1
2
3
4
5
6
7
8
9
10
11
12
HP Progress Report Prepared By : Rev.1
AREA "D"
Qty Blinded Opened Repaired Boxed Up Deblinded Actual % Planned %

VESSELS 1 0 0 0 0 0 0.00% 0.00%


HEATERS 1 1 1 0 0 0 0.71% 0.81%
Qty Blinded Pull Bund. Cleaned Inst. Bund. Tested Deblinded Actual % Planned %

HEAT EXCHANGERS 4 1 0 0 0 0 0 0.48% 0.34%

Qty Not Start In Progress Completed Actual% Planned %

IWS 3 2 1 0 0.10% 0.00%


EDC 1 1 0 0 0.00% 0.00%
PZV 24 24 0 0 0.00% 0.00%
PM 30 30 0 0 0.00% 0.00%
TAG JOB 9 8 0 1 14.29% 10.71%

AREA "E"
Qty Blinded Unload Opened Repaired Loaded Boxed Up Deblinded Actual% Planned %

REACTORS 3 0 0 0 0 0 0 0 0.00% 0.00%


Qty Blinded Opened Repaired Boxed Up Deblinded Actual % Planned %

VESSELS 2 1 1 0 0 0 5.44% 0.00%


COLUMNS 1 0 0 0 0 0 0.00% 0.00%
Qty Blinded Pull Bund. Cleaned Inst. Bund. Tested Deblinded Actual % Planned %

HEAT EXCHANGERS 2 0 0 0 0 0 0 0.00% 0.00%

Qty Not Start In Progress Completed Actual% Planned %

IWS 3 3 0 0 0.00% 0.00%


EDC 3 3 0 0 0.00% 0.00%
PZV 7 7 0 0 0.00% 0.00%
PM 29 29 0 0 0.00% 0.00%
TAG JOB 46 46 0 0 0.00% 0.00%
COMPRESSOR 2 2 0 0 0.00% 0.00%
AREA "G"
Qty Blinded Unload Opened Repaired Loaded Boxed Up Deblinded Actual% Planned %

REACTORS 8 0 0 0 0 0 0 0 0.00% 0.00%


Qty Blinded Opened Repaired Boxed Up Deblinded Actual % Planned %

VESSELS 2 0 0 0 0 0 0.00% 0.00%


COLUMNS 1 0 0 0 0 0 0.00% 0.00%
HEATERS 1 0 0 0 0 0 0.00% 0.00%
Qty Blinded Pull Bund. Cleaned Inst. Bund. Tested Deblinded Actual % Planned %

HEAT EXCHANGERS 5 0 0 0 0 0 0 0.00% 0.00%


Qty Blinded Opend Cleaned Inst. Plugs Tested Deblinded Actual % Planned %

FINFANS 4 1 1 0 0 0 0 2.70% 0.00%

Qty Not Start In Progress Completed Actual% Planned %

IWS 15 15 0 0 0.00% 0.00%


EDC 5 5 0 0 0.00% 0.00%
PZV 8 8 0 0 0.00% 0.00%
PM 20 20 0 0 0.00% 0.00%
TAG JOB 38 38 0 0 0.00% 0.00%
COMPRESSOR 1 1 0 0 0.00% 0.00%
AREA "H&I"
Qty Blinded Opened Repaired Boxed Up Deblinded Actual % Planned %

HEATERS 1 0 0 0 0 0 0.00% 0.00%

Qty Not Start In Progress Completed Actual% Planned %

IWS 3 3 0 0 0.00% 0.00%


EDC 4 4 0 0 0.00% 0.00%
PZV 6 6 0 0 0.00% 0.00%
PM 30 29 0 1 3.33% 0.00%
TAG JOB 12 12 0 0 0.00% 0.00%

AREA "CSF"
Qty Not Start In Progress Completed Actual% Planned %

IWS 5 4 1 0 1.36% 0.00%


EDC 1 1 0 0 0.00% 0.00%
PZV 1 1 0 0 0.00% 0.00%
PM 28 16 0 11 39.29% 0.00%
AREA "SRU"
Qty Blinded Unload Opened Repaired Loaded Boxed Up Deblinded Actual% Planned %

REACTORS 6 0 0 0 0 0 0 0 0.00% 0.00%


Qty Blinded Opened Repaired Boxed Up Deblinded Actual % Planned %

VESSELS 10 0 0 0 0 0 0.00% 0.00%


FURNACES 8 0 0 0 0 0 0.00% 0.00%
Qty Blinded Pull Bund. Cleaned Inst. Bund. Tested Deblinded Actual % Planned %

HEAT EXCHANGERS 13 0 0 0 0 0 0 0.00% 0.00%


FINFANS 2 0 0 0 0 0 0 0.00% 0.00%

Qty Not Start In Progress Completed Actual% Planned %

EDC 2 2 0 0 0.00% 0.00%


PZV 6 6 0 0 0.00% 0.00%
PM 4 4 0 0 0.00% 0.00%
TAG JOB 3 3 0 0 0.00% 0.00%

AREA "DHT"
Qty Blinded Unload Opened Repaired Loaded Boxed Up Deblinded Actual% Planned %

REACTORS 8 0 0 0 0 0 0 0 0.00% 0.00%


Qty Blinded Opened Repaired Boxed Up Deblinded Actual % Planned %

VESSELS 1 0 0 0 0 0 0.00% 0.00%


FURNACES 1 0 0 0 0 0 0.00% 0.00%
Qty Blinded Pull Bund. Cleaned Inst. Bund. Tested Deblinded Actual % Planned %

HEAT EXCHANGERS 3 0 0 0 0 0 0 0.00% 0.00%

Qty Not Start In Progress Completed Actual% Planned %

IWS 3 3 0 0 0.00% 0.00%


PM 12 12 0 0 0.00% 0.00%
TAG JOB 6 6 0 0 0.00% 0.00%
COMPRESSOR 1 1 0 0 0.00% 0.00%
Qty Not Start In Progress Completed Actual% Planned %

IWS UT AREA 1 1 0 0 0.00% 0.00%


RBI EQUIPMENT 19 19 0 0
RBI PIPE 16 16 0 0
ANALYZER 53 53 0 0
PMT 5 3 2 0
PU 3 3 0 0
1 2 3 4 5 6 7 8 9 10
Day 1 Day 2 Day 3 Day 4 Day 5 Day 6 Day 7 Day 8 Day 9 Day 10 Day 11 Day 12 Day 13 Day 14 Day 15 Day 16 Day 17 Day 18 Day 19 Day 20 Day 21 Day 22 Day 23 Day 24 Day 25 Day 26 Day 27 Day 28 Day 29 Day 30
Date 1-Oct 2-Oct 3-Oct 4-Oct 5-Oct 6-Oct 7-Oct 8-Oct 9-Oct 10-Oct 11-Oct 12-Oct 13-Oct 14-Oct 15-Oct 16-Oct 17-Oct 18-Oct 19-Oct 20-Oct 21-Oct 22-Oct 23-Oct 24-Oct 25-Oct 26-Oct 27-Oct 28-Oct 29-Oct 30-Oct
Planned % 4.00% 5.00% 6.00% 5.00% 6.00% 5.00% 6.00% 5.00% 4.00% 6.00% 4.00% 6.00% 5.00% 5.00% 6.00% 4.00% 5.00% 6.00% 7.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Actual % 3.50% 5.00% 5.00% 4.00% 5.00% 6.00% 5.00% 4.50% 5.00% 6.00% 4.00% 6.00% 5.00% 3.00% 1.00% 0.00% 0.00% 0.00% 5.00% 6.00%
Cum. Planned % 4.00% 9.00% 15.00% 20.00% 26.00% 31.00% 37.00% 42.00% 46.00% 52.00% 56.00% 62.00% 67.00% 72.00% 78.00% 82.00% 87.00% 93.00% 100.00%
Cum. Actual % 3.50% 8.50% 13.50% 17.50% 22.50% 28.50% 33.50% 38.00% 43.00% 49.00% 53.00% 59.00% 64.00% 67.00% 68.00%