0% found this document useful (0 votes)
12 views6 pages

Module of Instructions

Module of Instructions

Uploaded by

Juzielou Resare
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
12 views6 pages

Module of Instructions

Module of Instructions

Uploaded by

Juzielou Resare
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 6

CORE COMPETENCIES

NOMINAL DURATION: __154____HOURS

Unit of Competency TRAINING OJT/SIL


Nominal Allocated Nominal Allocated
Duration Days Duration Days
(Hours/Days (Hours/Days
) )
1. PERFORM ROUGHING-IN 32 HOURS/ 4 4 DAYS
ACTIVITIES, WIRING AND DAYS
CABLING WORKS FOR
SINGLE-PHASE
DISTRIBUTION, POWER,
LIGHTING AND AUXILIARY
SYSTEMS
2. INSTALL ELECTRICAL 48 HOURS/ 6 6 DAYS
PROTECTIVE DEVICES FOR DAYS
DISTRIBUTION, POWER,
LIGHTING, AUXILIARY,
LIGHTNING PROTECTION
AND GROUNDING
SYSTEMS
3. INSTALL WIRING 80 10 DAYS
DEVICES OF FLOOR AND HOURS/10
WALL MOUNTED OUTLETS, DAYS
LIGHTING
FIXTURE/SWITCHES AND
AUXILLIARY OUTLETS
MODULES OF INSTRUCTION: CORE COMPETENCIES

Unit of Competency: INSTALL WIRING DEVICES OF FLOOR AND WALL


MOUNTED OUTLETS, LIGHTING FIXTURE/SWITCHES
AND AUXILLIARY OUTLETS

Modules Title: INSTALLING WIRING DEVICES OF FLOOR AND WALL


MOUNTED OUTLETS, LIGHTING FIXTURE/SWITCHES
AND AUXILLIARY OUTLETS

Module Descriptor: This unit covers the knowledge, skills and attitudes on selecting and
installing wiring devices, installing lighting fixtures/switches and notifying completion of
work of floor and wall mounted outlets and auxiliary outlets.

Nominal Duration: 80 hours

Summary of Learning Outcomes:

LO1. Select wiring devices


LO2. Install wiring devices
LO3. Install lighting fixture/ switches
LO. 4 Notify completion of work

Details of Learning Outcomes:

LO1.
Assessment Contents Conditions Methodologies Assessment
Criteria Methods
1. Drawings  Interpret The trainees shall  Lecture/  Skill
are read and plans/drawin be provided with Discussion demonstra
interpreted g for the following: with PPT, tion with
to selection of Video Clips, oral
 Workplace
determine wiring and Audio questioning
location
job devices presentatio  Written
 Tools and
requirement based on n Exam
equipment
s specific job Demonstra  Task Sheets
appropriate for 
2. Correct  Technical tion
installation of
type and Plans and  Observation
wiring devices
quantity of Schematic and lighting
wiring Diagram fixtures/switche
devices and  Signs, s
consumable Symbols and  Materials
items are Abbreviation relevant to the
identified in s proposed
line with job  Electrical activity
requirement Tools and  Drawings and
s Equipment’s specifications
 Occupational relevant to the
3. Tools and health and task
equipment safety
are selected procedures
in line with
job
requirement
s

4. Correct
PPE are
identified
and selected
in line with
safety
requirement
s

LO2.
Assessment Contents Conditions Methodologies Assessment
Criteria Methods
1. Safety  Occupational The trainees shall  Lecture/  Skill
procedures health and be provided with Discussion demonstra
are followed safety the following: with PPT, tion with
based on procedures Video Clips, oral
 Workplace
safety  Electrical and Audio questionin
location
regulations wiring presentatio g
 Tools and
diagrams n  Written
equipment
2. Correct  Basic concepts  Demonstra Exam
appropriate
procedures in electrical tion
for installation
for installation  Observatio
of wiring
installation and n
devices and
of wiring maintenance lighting
devices are  Observe fixtures/switch
performed safety es
in line with procedures in  Materials
job installing the relevant to the
requirement wiring devices proposed
s for ground activity
fault current  Drawings and
3. Schedule interrupter in specifications
of work is accordance relevant to the
followed with OHS task
based on procedures
agreed time,  Philippine
quality Electrical Code
standard (PEC)
and
minimum
wastage

4. Further
instructions
are sought if
unplanned
events or
conditions
occur

5. On-going
checking of
quality of
work is done
in
accordance
with
instructions
and
requirement
s.

LO 3.
Assessment Contents Conditions Methodologies Assessment
Criteria Methods
1. Safety  PEC provisions The trainees shall  Lecture/  Skill
procedures on installing be provided with Discussion demonstra
are followed lighting the following: with PPT, tion with
fixtures. Video Clips, oral
 Workplace
2. Correct  Types of and Audio questioning
location
procedures lighting presentatio  Written
 Tools and
for fixtures n Exam
equipment
installation  Occupational Demonstra Task Sheets
appropriate for  
of lighting health and tion
installation of
fixtures/swit safety Observatio
wiring devices 
ches are procedures n
and lighting
performed  Procedures in fixtures/switch
in line with installing
job Lighting es
requirement Fixture  Materials
s  Philippine relevant to the
Electrical proposed
3. Schedule Code (PEC) activity
of work is  Drawings and
followed to specifications
ensure work relevant to the
is completed task
in an agreed
time, to a
quality
standard
and with a
minimum
waste

4. Further
instructions
are sought
from a
supervisor if
unplanned
events or
conditions
occur

5. On-going
checks of
quality of
work are
undertaken
in
accordance
with ins

LO 4.
Assessment Contents Conditions Methodologies Assessment
Criteria Methods
1. Final  Preventive The trainees shall  Lecture/  Skill
checks are Maintenanc be provided with Discussion demonstra
made to e of the following: with PPT, tion with
ensure that Electrical Video Clips, oral
 Workplace
work System and Audio questioning
location
conforms  Continuity presentation  Written
 Tools and
with Testing  Demonstrati Exam
equipment
instructions  Maintaining appropriate for on
and to Tools and installation of  Observation
requirement Equipment wiring devices
s  Five S in and lighting
workplace fixtures/switche
2. Supervisor s
is notified  Materials
upon relevant to the
completion proposed
of work activity
 Drawings and
3. Tools, specifications
equipment relevant to the
and any task
surplus
resources
and
materials
are, where
appropriate,
cleaned,
checked and
returned to
storage in
accordance
with
established
procedures

4. Work area
is cleaned
and made
safe