If the charts don't look right, make sure you have set a baseline,
93.467 14.655
assigned costs to tasks or resources, and entered progress. Rp16.000.000.000
Rp14.000.000.000
Rp12.000.000.000
Rp10.000.000.000
Rp8.000.000.000
Rp6.000.000.000
Rp4.000.000.000
Rp2.000.000.000
Rp0
'23'23'23'23'23'24'24'24'24'24'24'24'24'24'24'24
'23'23'23'23'23'24'24'24'24'24'24'24'24'24'24'24
Rp100
Rp0
'23 '23 '23 '23 '23 '24 '24 '24 '24 '24 '24 '24 '24 '24 '24 '24 '24
-Rp100
-Rp200
-Rp300
-Rp400
-Rp500
-Rp600
-Rp700
CV SV
1,2
1
1
0,8
0,6
0,4
0,2
0
'23 '23 '23 '23 '23 '24 '24 '24 '24 '24 '24 '24 '24 '24 '24 '24 '24 '24
SPI CPI
BCWP
Rp14.228.8 Rp14.228.8
14.655 14.655 EARNED VALUE OVER TIME
The project’s earned value based on the status date. If
actual cost (ACWP) is higher than earned value (BCWP),
then the project is over budget. If planned value (BCWS)
is higher than earned value, then the project is behind
schedule.
'24'24'24'24'24'24'24'25
'24'24'24'24'24'24'24'25
BCWS