0% found this document useful (0 votes)
20 views3 pages

POA_NAM_DC

Uploaded by

Raj Khanna
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
20 views3 pages

POA_NAM_DC

Uploaded by

Raj Khanna
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

PLAN OF ACTION

FOR

ACCESSMANAGER MIGRATION
Migration to 5.0.1
Upgradation to 5.0.2
Upgradation to 5.0.4

Version 1.0

Confidential and Proprietary

Document release notice:


Document title Plan of Action for Access manager migration to 5.0.4

Page 1 of 3
Status Draft/ In Review/ Approved
Classification Confidential
Release Date 11.07.2024

Document Publication History:


Name Date
Author
Reviewed by
Approved by

PRE REQUISITES

S.no Activity Status


1 New VM Server to be created with given specification Not ready
2 Backup of Access manager configuration and all configuration files Not ready
3 Take Backup of DC NAM Servers Snapshot Not ready

NAM VERSION MIGRATION PLAN OF ACTION

S Particulars Ownership Remarks


No

Remove the OLD server from the cluster and remove the network. IDAM /VM
1 team
Create New VM with the given ISO file.
2 VM/InfraTeam
Install Access Manager Appliance 5.0 Service Pack 1 as a secondary
3 appliance and point to the 4.5.3 primary appliance. IDAM Team
Performing basic configuration of the secondary access manager such
as hostfile,ntp etc. IDAM Team
4 Take a backup of the primary Administration Console which is on IDAM Team
4.5.3 by using the ambkup.sh script
5 Switch off the primary VM which is on 4.5.x. IDAM Team

Page 2 of 3
6 Log in as root at the secondary Access Manager Appliance and run IDAM Team
the migration script. Follow the steps in the upgrade document to
complete the process
7 Login to primary access manager 5.0.1 administration console, remove IDAM Team
the old primary Access Manager Appliance and all objects that
reference the old primary Access Manager Appliance as described in
the document
8 Checking of applications access IDAM Team

ROLLBACK PLAN
1. Take a VM backup of existing 4.5.x version before performing upgrade.
2. In case of failure power off the new VM 5.0.1 and restore the backup of 4.5.x to new VM.

---END OF THE DOCUMENT