Boiler Overhaul & Mod Check List COS
Boiler Overhaul & Mod Check List COS
SL
ACTIVITIES STATUS TARGET DATE REMARK
NO
1 CRANE
4 RH COIL SHIFTING
5 RH HEADER SHIFTING
7 LOOSE RH TUBES
8 BENT TUBES
11 OTHER ATTACHMETS
17 VEHICLE ARRANGEMENT
18 FOOD ARRANGMENT
21 SECURITY
22 FORM-V
24 CONTRACT AGREEMENT
25 ESI OF WORKMEN
26 T&P SHIFTING
31 ARGON TEST
32 WELDER TEST
37 DA, O2 MOBILISATION
39 STUDY OF DRAWINGS
40 OFFICE READINESS
44 AGENCY APPROVAL
50 UT AGENCY
51 SR AGENCY
52 RT SOURCE MOBILISATION
58 DRINKING WATER
8 MATERIAL SEGREGATION
9 PIPE TEST PIECE AVAILABILITY - 15 Nos
12 WELDING SUPPLY
13 LIGHTING SUPPLY
MATERIAL
1 54MM SIZE CLAMP PROCUREMENT
2 TARPAULIN PROCUREMENT
3 2 Nos TEMPERATURE GUN PROCUREMENT
EMD
ADDITIONAL HALOGEN LAMPS,LIGHTING &
1
WELDING SUPPLY POINTS (WITH ELCB)
C&I
REMOVAL & RESTORATION OF
1
THERMOCOUPLES
REMOVAL OF LHS & RHS JB AND CABLE TRAY AT
2
16TH Floor
FQA
1 Evaluation of RT films at Boiler 12th Floor
OTHERS
DEPUTATION OF ADDITIONAL EXECUTIVES
1
FROM OTHER DEPT