38. The useful dismantled material shall be used in construction & spare
useful dismantled material may be taken from the site by the contractor
on his cost & recovery shall be done for the useful material as per rules.
39. (i) The contractor or his nominated sub contractor should possess the
required valid license for executing water supply / sanitary works.
(ii) The contractor or his nominated sub contractor should possess the
required valid registration from PWD/ Discoms for executing
electrical works in appropriate category.
(iii) It is mandatory to submit the copy of valid electrical license issued
from Electrical Inspectorate prior to start the work with
competency certificate of supervisor & wireman certificate of
electrician executing work at site.
40. Contractor will make his own arrangement for permission of vehicles
from traffic department, in no entry zone area and will make his own
arrangement of movement of vehicles within time allowed by Traffic
Police authorities.