Contents
Contents
2011
CONTENTS
S.I No. Contents Internship Scheduling Summary of work during internship Acknowledgment Page No. I II IV
CHAPTER 1 INTRODUCTION TO T&T ELECTROMECHANICAL ENGINEERING WORKS 1.1 1.2 1.3 1.4 1.5 About the Firm About the Departments Factory layout Flow process diagram Their production and supply goods CHAPTER 2 ELEVATOR TECHNOLOGY 2.1 2.2 2.3 2.4 2.5 2.6 History of elevators Types of elevators Traction elevator Hydraulic elevator Hoist drives
Choice between hydraulic and traction elevators
2 4 6 7 8
12 12 13 17 21 23
CHAPTER 3 DEVELOPMENT OF DESIGN AND CONSTRUCTION 3.1 3.2 3.3 3.4 3.5 3.6
Introduction Permission to erect a lift Technical data for elevators Engineering activity Modernization survey report Equipment selection
25 25 26 27 32 33
CHAPTER 4 EQUIPMENT REQUIRMENT AND THEIR PERFORMANCE 4.1 4.2 4.3 4.4 4.5 4.6
Introduction Summary Signals Materials Car performance System performance
35 35 37 37 38 40
2011
Page No. 40 41
CHAPTER 5 WORK TO BE DONE BY SUPPLIER ERECTION COMMISSION DEPARTMENT 5.1 5.2 5.3 5.4 5.5 5.6 Hoistway Machine room Electrical service Standby power provision Miscellaneous Permits, Test and Inspection CONCLUSION Conclusion and Training experience REFERANCE 47 42 43 43 44 45 45
48