Triple Power 4.56.3 Installation Guide 1
Triple Power 4.56.3 Installation Guide 1
Install the BMS on the batter y module. Fix it with M5 screws on holes shown as below with L-type Wrench.
Please pay attention to the correct direction of BMS and batter y modules, and put the same side of BMS
and batter y modules at front.
- Mark the position of the holes. - Drill holes with a Φ 10 drill bit. - Hammer the expansion tubes
- Depth: at least 50mm. into the holes.
Bracket(353*138*42mm)
(for wall mounting)
Ground wire×1 Rotation Wrench×1
Short Circuit Plug×1 L-type wrench×1 User Manual ×1
M5 Screw×4 - Screw the expansion bolts. - Match the battery module with the bracket.
Note: for floor mounting, the distance between the bottom of battery module and the lower hole of wall bracket is 375mm;
It is recommended to keep a distance of at least 250mm between battery modules;
Expansion bolt ×5 M6 Screw×1 Ring Terminal×2 Quick installation guide×1
for wall mounting, the distance between the bottom of battery module and floor shall not exceed 300mm.
NOTE!
- For more battery modules:
The Triple Power battery is rated at IP55 and thus can be installed outdoors as well as indoors. Step.1 Plug either end of the 120mm power cable into the XPLUG port
However, if installed outdoors, do not expose the battery directly to sunlight and moisture. on BMS, and the other end into the XPLUG port on the first battery
module.
Step.2 Then plug one end of the 400mm power cable into the YPLUG
NOTE! port on the first battery module, and the other end into the XPLUG port
on the next battery module.
If the ambient temperature is beyond the operating range, the battery will stop operating to protect itself. Step.3 Repeat the same step on all the battery modules.
The optimal temperature range for the battery to operate is from 15°C to 30°C. Frequent exposure to harsh Step.4 Once finished, please connect the short-circuit plug to the YPLUG
temperatures may deteriorate the performance and lifetime of the battery. port on the last battery module to complete the internal circuit.
VI RS485 Connection IX Battery Power Cable Connection 1
Step2. Tighten the plastic - One end of the battery power cable needs to be connected manually as below:
Step1. Connect the screw caps on both ends of the
RS485 communication cable with the rotation wrench
cable (120mm) from the from the package. Step1.
RS485 port on BMS to Note: For 2-4 modules, please screw connection
screw connection
the RS485 I port on the connect RS485 II port of the
first battery module. first battery module to RS485 I
port on the next battery
module. Repeat the same step
to connect the rest battery
modules.
The wiring order of the communication cable is as follow:
Sequence 1 2 3 4 5 6 7 8
wire strands Torgue:2.0±0.2Nm
RS485I VCC_485 GND_485 B2 N- P+ A2 VCC_485_2 GND_485
RS485II VCC_485 GND_485 B2 N- P+ A2 VCC_485_2 GND_485
Step1: Make sure the inverter is turned off, and then insert one end
of the CAN communication cable to the BMS port on the Inverter.
Assemble the cable gland and screw the cable cap.
- Insert the other end of the battery power cable into the BAT connectors on the BMS:
CAN
+ BAT -
The wiring order of the communication cable is the same as RS485 communication cable - To dismantle the charging cable, please
operate it with slotted screwdriver as
Sequence 1 2 3 4 5 6 7 8 shown in the figure. Please DO NOT
unplug them directly with brute force!
CAN / GND / CAN_H CAN_L / A1 B1
4
1
For 2~4 battery modules:
The terminal points for GND connection between battery modules are circled in red below.
614.00330.03