0% found this document useful (0 votes)
10 views27 pages

typology x1

Uploaded by

Guesh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
10 views27 pages

typology x1

Uploaded by

Guesh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 27

L1 G+4

ER
IN T

NOMY ENGINEERING PLC


L1 G+4

NOMY ENGINEERING PLC


L1 G+4

NOMY ENGINEERING PLC


L1 G+4

NOMY ENGINEERING PLC


SPECIFICATION AND BILL OF QUANTITY
Project Name: Yeka Ayat II Typology.: L1 G+4
Client: Kolfe Kernayo Housing Development Project Office Pay.No. 02(Residence/Shop
Consultant:NOMY ENGINEERING PLC Block No.: ______
Contractor: ________________________ Parcel: _________

SUMMARY SHEET
Item Description Amount
No Unit
Cont.

B. SUPER-STRUCTURE

1.0 CONCRETE WORKS Birr

TOTAL B Birr

15% VAT Birr

GRAND TOTAL Birr


UANTITY
Typology.: L1 G+4
Pay.No. 02(Residence/Shop
Block No.: ______
Parcel: _________

Amount

Exect.

62,763.17

62,763.17

9,414.48

72,177.65
SPECIFICATION AND BILL OF QUANTITY
Project Name:- Yeka Ayat II Typology:-L1 G+4
Client:- Kolfe Kernayo Housing Development Project Office (Residence/Shop)
Consultant:- NOMY ENGINEERING PLC Block No.:- _____________
Contractor:- ________________________ Parcel:- ________________

Item Quantity Amount


Description Unit Unit Rate
No Cont. Exect. Cont.
B-SUPER STRUCTURE
1. CONCRETE WORKS
1.1 Reinforced concrete in class C-25 (with a 28-
day 15cm cube crushing strength of 25MPa),
cast into formworks and vibrated around rod
reinforcement bars.( formwork &
reinforcement bars are measured separately.)
in: "Type of cement to be ordinary portland
cement (OPC)"

a) elevation columns m3 8.77 404


b) intermediate & top tie beam m3 17.50 404
c) Stair case & Landing m 3
2.59 404

d) concrete fillers around columns & beam


connections at floor levels m3 1.10 404
1.2 Suspended ribbed slab of total 280mm thick
comprising of ribbed blocks rests on pre-cast
beams spaced at 625mm c/c and 60mm thick
C-25 topping concrete over pre cast unit &
slab HCB and b/n HCB blocks . Price
includes placing in position 220mm thick
Rosa-cometa (hollow concrete ribbed block)
type Class-C with 28 days minimum crushing
strength of 18kg/cm2, placed in position &
bottom face left for plastering and for props
and joist under 280mm thick ribbed floor
slabs ( props and joist to support at mid
quarter points of ribbed pre-cast beams).
Joists shall be of structural steel
50x50x2.5mm RHS sections or 50x70mm
seasoned Timber . Props may be tubular
sections or eucalyptus . Props spacing shall
not exceed two times ribbed spacing
( 1250mm c/c . Price measured in m2 of the
slab soffit

a) first floor ribbed slab m2 288.13 115.48


b) second floor ribbed slab m 2
- 115.48
c) third floor ribbed slab m2 - 115.48
d) fourth floor ribbed slab m2 - 115.48

e) Pre-cast rib unit of size (4930 X 120 X


80mm) consisting of 19 kg of reinforcing bar
and 0.05m3 of C-25 concrete (Price shall
include transportation and placing in
position) pcs 31.0 10.00

f) Pre-cast rib unit of size (3920 X 120 X


80mm) consisting of 16 kg of reinforcing bar
and 0.04m3 of C-25 concrete (Price shall
include transportation and placing in
position) pcs 32.0 10.00

NOMY ENGINEERING PLC


g) Pre-cast rib unit of size (2910 X 120 X
80mm) consisting of 10 kg of reinforcing bar
and 0.03m3 of C-25 concrete (Price shall
include transportation and placing in
position) pcs 50.00 10.00
h) Provide the necessary inputs (cement and
reinforcement) and supervise the production
of precast rib units by the client's nominated
MSE. The main Contractor shall be
responsible for the quality of the works and
eventually administer and commission the
nominated MSE by the Client.

ls 1.00
1.3 Sawn zigba wood form work for:
a) elevation columns m2 101.28 55.00
b) intermediate & top tie beam m2
138.03 65.00
c) Stair case & Landing m2 19.79 65.00
d) concrete fillers around columns & beam
6.60
connections at floor levels m2 65.00
1.4
Reinforcement steel bars according to
structural drawing. Price includes cutting,
bending, placing in position and tying wires.
a) dia. 6mm plain bar kg 0.00 1.84
b) dia. 8mm deformed bar kg 0.00 1.84
c) dia. 10mm deformed bar kg 0.00 1.84
d) dia. 12mm deformed bar kg 0.00 1.84
e) dia. 14mm deformed bar kg 0.00 1.84
f) dia. 16mm deformed bar kg 0.00 1.84
g) dia. 20mm deformed bar kg 0.00 1.84
TOTAL CARRIED TO SUMMARY
0.00

NOMY ENGINEERING PLC


TY

(Residence/Shop)
Block No.:- _____________
Parcel:- ________________

Amount
Exect.

3,542.22
7,068.28
1,046.42

445.37

-
33,272.81
-
-
-

310.00

320.00

NOMY ENGINEERING PLC


500.00

-
-
5,570.40
8,971.81
1,286.65

429.21

-
-
-
-
-
-
-
-

62,763.17

NOMY ENGINEERING PLC


Interim payment no 2 Take off sheet for (Typology L1) - Residence/Shop
Project Name: Yeka Ayat II Client: Kolfe Kernayo Housing Development Project Office
Block No. Consultant: NOMY ENGINEERING PLC
Parcel: Contractor Name:

Size Size
No Quantity Description No Quantity Description
(L*W*H) (L*W*H)
B.Super Structure 2 1.090 axis 4' b/n A'-B&G-G'(new)
1.0 Concrete Work 0.200 6.370
1.01 RC in class C-25 for:- 0.480 7.380
22 2.40 a) ground elevation column 0.21 m3 13.699
0.30 C1 ,C3,C4,C6 & C7 2 5.520 axis 6 10.395
0.40 0.200 9.160
6.34 m3 0.480 27.785
4 2.40 C2 1.06 m3 21.620
0.40 17.50 m3 Total(item 1.01b)
0.40 1 2.87 c) Stair case & Landing
1.54 m3 1.30 Landing at +1.44m
2 2.40 C5 0.16
0.25 0.60 m3
0.40 2 2.80 Flight from 0-1.44m & 1.44-2.88m
0.48 m3 1.385
2 2.40 C8 0.160
0.25 1.24 m3
0.35 8 1.385 Steps from 0-1.44m & 1.44-2.88m
0.42 m3 0.30
8.77 m3 Total(item 1.01a) 0.16
b) First floor intermediate beam 0.53 m3
Parallel to A 1 2.77 Landing beam at +1.44m
2 6.370 0.20
0.200 axis A&H 0.40
0.480 0.22 m3
1.22 m 3
2.59 m3 Total(item 1.01c)
2 7.380 axis B & G d) concrete fillers around columns
0.200 22 0.30 beam-column connections
0.480 0.40 C1 ,C3,C4,C6 & C7
1.42 m3 0.48
2 13.699 axis C&F 1.27 m3
0.200 4 0.40
0.480 0.400 C2
2.63 m3 0.48
1 3.550 axis D 0.31 m3
0.200 2 0.25 C5
0.480 0.40
0.34 m3 0.48
1 3.675 axis E 0.10 m3
0.200 2 0.25 C8
0.480 0.35
0.35 m3 0.48
Perpendicular to A 0.08 m3
2 10.395 1.75 m3 Add to beams
0.200 axis 1 & 3 b/n A-C 28 0.51 concrete fillers around columns
0.480 0.20 At edge
2.00 m3 0.28
2 9.160 axis 1 & 3 b/n F-F 0.79 m3
0.200 11 0.51 At middle pannel dimention shou
0.480 0.20 it is corrected
1.76 m3 0.28
1 27.985 axis 4 0.31 m3
0.200 1.10 m3 Total(item 1.01d)
0.480 1.02 Suspended ribbed slab
2.69 m3 1 11.220 a) first floor ribbed slab
1 21.620 axis 5 3.840 panel b/n axis A-C&1-3
0.200 43.08 m3
0.480 1 11.220
2.08 m3 2.830 panel b/n axis A-C&3-4
31.75 m3

Contractor Quantity Surveyor Site Supervisor Resident Engineer

Signature Signature Signature Signature

_________________ _______________________ ______________________ _____________________________


Size Size
No Quantity Description No Quantity Description
(L*W*H) (L*W*H)
2 1.090 cantilever b/n axis 4-5 b) First floor intermediate beam
3.655 axis A&H
7.97 m3 2 6.37 ext
2 5.920 panel b/n axis B-C&F-G/4-5 0.480
4.850 6.12
57.42 m3 2 6.37 int
2 5.920 panel b/n axis B-C&F-G/5-6 0.200
2.830 2.55
33.51 m3 2 6.37 soffit
1 8.700 panel b/n axis C-F&4-5 0.200
4.850 2.55
42.19 m3 axis B&G
1 8.700 panel b/n axis C-F&5-6 2 4.05 ext
1.115 0.480
9.70 m3 3.89
1 9.960 4 5.36 int
3.840 panel b/n axis F-G&1-3 0.200 *(7.38+3.33)/2=5.355
38.25 m3 4.28
1 9.960 2 7.38 soffit
2.830 panel b/n axis F-G &3-4 0.200
28.19 m3 2.95
-39 0.505 concrete fillers around columns axis C&F
0.200 2 8.03 ext
(3.94) m3 0.480
288.13 m3 Total(item 1.02) 7.71
4 9.68 int
0.200 *(13.699+5.665)/2=9.68 8.034
7.74 5.665
e)PB1(493x12x8cm) 2 13.699 soffit 19.36
31.00 pcs(item 1.02e) 0.200 9.68
f)PB2(392x12x8cm) 5.48
32.00 pcs(item 1.02f) axis D
g)PB3(291x12x8cm) 1 3.55 ext
50.00 pcs(item 1.02g) 0.480
h) administer and commission 1.70
1.00 ls(item 1.02h) 1 3.55 int
0.200
0.71
1 3.55 soffit
1.03 zigba wood form work for: 0.200
a) elevation columns 0.71
22 2.40 C1 ,C3,C4,C6 & C7 axis E
1.40 1 3.68 ext
73.92 m2 0.480
4 2.40 C2 1.76
1.60 1 3.68 int
15.36 m2 0.200
2 2.40 C5 0.74 1.3
1.30 1 3.68 soffit
6.24 m2 0.200
2 2.40 C8 0.74
1.20 axis 1 b/n A-C
5.76 m2 1 10.40 ext
101.28 m3 Total(item 1.03a) 0.480
4.99
1 10.40 int
0.200
2.08
1 10.40 soffit
0.200
2.08

Contractor Quantity Surveyor Site Supervisor Resident Engineer

Signature Signature Signature Signature

_________________ _______________________ ______________________ _____________________________


Size Size
No Quantity Description No Quantity Description
(L*W*H) (L*W*H)
axis 5 b/n A'-G'
axis 1 F-H 1 2.18 ext 2.18
1 9.16 ext 0.480
0.480 1.05
4.40 2 20.53 int 19.44
1 9.16 int 0.200 *(21.62+19.44)/2=20.53 41.06
0.200 8.21 20.53
1.83 1 21.62 soffit
1 9.16 soffit 0.200
0.200 4.32
1.83 axis 6
axis 3 b/n A-C 2 5.52 ext
ext 0.480
5.30
- 2 5.52 int
2 10.40 int 0.200

0.200 2.21
4.16 2 5.52 soffit
1 10.40 soffit 0.200
0.200 2.21
2.08 138.03 m2 Total(item 1.03b)
axis 3 b/n F-H
ext
c) Stair case & Landing
- 1 2.83 Landing
2 9.16 int 1.30
0.200 3.68 m2
3.66 2 2.800 flight
1 9.16 soffit 1.385
0.200 7.76 m2
1.83 2 2.800 wing of flight
axis 4 0.301
1 13.975 ext 1.69 m2
0.480 18 1.365 risers
6.71 0.160
2 21.00 int 3.93 m2
0.200 *(27.985+14.01)/2=21 2 1.300 sides of landing
8.40 0.160
1 27.985 soffit 0.42 m2
0.200 Landing beam
5.60 1 2.770 ext.
axis 4' b/n A'-B&G-G' 0.400
2 1.090 ext 1.11 m2
0.480 1 2.770 int. 13.975
1.05 0.240 - 12.89
2 1.09 int 0.66 m2 - 11.80
0.200 1 2.770 soffit - 5.90
0.44 0.200
2 1.090 soffit 0.55 m2
0.200 19.79 m2 Total(item 1.03c)
0.44

Contractor Quantity Surveyor Site Supervisor Resident Engineer

Signature Signature Signature Signature

_________________ _______________________ ______________________ _____________________________

Size Size
No Quantity Description No Quantity Description
(L*W*H) (L*W*H)
d) concrete fillers around
columns & beam connections concrete fillers around columns
at floor levels 28 0.550 At edge soffit
*beam connections:- 0.300 int.
8 0.700 1(A,C,F,H),6(B,C,F,H) 4.62 m2
0.480 ext. 11 0.601 At middle soffit
2.69 m2 0.300 int.
8 0.700 1(A,C,F,H),6(B,C,F,H) 1.98 m2
0.480 int. 6.60 m2 Total(item 1.03d)
2.69 m2
6 0.400 3A,1B,3C,3F,1G,3H
0.480 ext.
1.15 m2
6 0.400 3A,1B,3C,3F,1G,3H
0.480 int.
1.15 m2
- 4A,4H
- ext.
- m2
2 0.650 4A,4H
0.480 int.
0.62 m2
- 4B,4G
- ext.
- m2 8.034
2 0.600 4B,4G -
0.480 int. -
0.58 m2 -
2 0.800 5C,5F
0.480 ext.
0.77 m2
3 1.000 3B,3G,5D
0.480 int.
1.44 m2
2 0.100 5B,5G
0.480 ext.
0.10 m2
2 0.700 5B,5G
0.480 int.
0.67 m2
2 0.100 4C,4F
0.480 ext.
0.10 m2
2 0.500 4C,4F
0.480 int.
0.48 m2 1.3
1 0.200 4D
0.480 ext.
0.10 m2
1 0.500 4D
0.480 int.
0.24 m2
2 0.600 2D,2E
0.480 int.
0.58 m2
2 0.200 2D,2E
0.480 int.
0.19 m2
13.54 m2 Add to beams

Contractor Quantity Surveyor Site Supervisor Resident Engineer

Signature Signature Signature Signature

_________________ _______________________ ______________________ _____________________________


Filer around stair should be added
1 2.78
0.154
0.4
0.171 m3

pannel dimention should be face to face of beam


8.38
9.21 9.81

4.775

3.79

4.38
4.05

10.71
5.355

27.985

.4*4
1.4

8.565
8.59
1.2

24.875

25.000
*flight wing form work
*For stair case
0.3
-a

h
34
0.
0.16 a
0.34

h2+a2=0.162 h2=0.162-a2
h2+(0.34-a)2=0.302 h2=0.302-(0.34-a)2

0.162-a2 = 0.302-(0.34-a)2
0.162-a2 = 0.302-(0.342-2*0.34*a+a2)
0.162-a2 = 0.302-0.342+2*0.34*a-a2
0.162 = 0.302-0.342+2*0.34*a
0.16 - 0.30 +0.34 =
2 2 2
2*0.34*a
0.16*0.16-0.3*0.3+0.34*0.34 =2*0.34*a
a=(0.16*0.16-0.3*0.3+0.34*0.34)
2*0.34
a = 0.07529411765
h2+a2=0.162
h2=0.162-a2
h2=0.162-0.07532
h = 0.141173333
0.16
0.301173333

2.970

1.512
4.05

10.71
5.355

27.985

.4*4
1.4

8.565
8.59
1.2

24.875

25.000
NOMY ENGINEERING PLC

Interim payment no Bar Take off for (Typology x1) - Residence/Shop


Project Name: cuye feche II Block No.
BAR SCHEDULE
Structure:- Super Structure Page:-

Bar Dia No No Total


Location No (mm) Shape Length of of No.of Total length in meters
bars elem bars Ø6 Ø8 Ø10 Ø12 Ø14 Ø16 Ø20 Ø24
Ground floor elevation column
C1 14 3.44 8 12 96 - - - - 330.24 - - -
8 1.2 14 12 168 - 201.60 - - - - - -
C2 20 3.68 12 17 204 - - - - - - 750.72
8 1.2 14 17 238 - 285.60 - - - - - -
C3 20 3.68 14 4 56 - - - - - - 206.08
C3 8 1.3 14 4 56 - 72.80 - - - - - -
first floor elevation column
C1 14 3.44 6 12 72 - - - - 247.68 - - -
8 1.2 14 12 168 - 201.60 - - - - - -
C2 16 3.52 12 17 204 - - - - - 718.08 - -
8 1.2 14 17 238 - 285.60 - - - - - -
C3 20 3.68 12 4 48 - - - - - - 176.64 -
8 1.2 14 4 56 - 67.20 - - - - - -
second floor elevation column
C1 14 3.44 6 12 72 - - - - 247.68 - - -
8 1.2 14 12 168 - 201.60 - - - - - -
C2 16 3.44 3 17 51 - - - - - 175.44 - -
8 1.2 14 17 238 - 285.60 - - - - - -
C3 16 3.52 10 4 40 - - - - - 140.80 - -
8 1.2 14 4 56 - 67.20 - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
Total length - 1,668.80 - - 825.60 1,034.32 1,133.44 -
Unit weight 0.222 0.395 0.617 0.889 1.209 1.580 2.469 3.556
Total weight - 659.18 - - 998.15 1,634.23 2,798.46 -

Contractor Quantity Surveryor Site Supervisor Resident Engineer


Signature Signature Signature Signature
_____________________ ________________________ _________________________ _________________________
NOMY ENGINEERING PLC
Interim payment no Bar Take off for (Typology x1) - Residence/Shop
Project Name: cuye feche II Block No.
BAR SCHEDULE
Structure:- Super Structure Page:-

Bar Dia No No Total


Location No (mm) Shape Length of of No.of Total length in meters
bars elem bars Ø6 Ø8 Ø10 Ø12 Ø14 Ø16 Ø20 Ø24
third floor elevation column
C1 14 3.44 6 12 72 - - - - 247.68 - - -
8 1.2 14 12 168 - 201.60 - - - - - -
C2 14 3.44 6 17 102 - - - - 350.88 - - -
8 1.2 14 17 238 - 285.60 - - - - - -
C3 14 3.44 8 4 32 - - - - 110.08 - - -
8 1.2 14 4 56 - 67.20 - - - - - -

forth floor elevation column


C1 14 3.05 6 12 72 219.60
8 1.2 14 12 168 201.60
C2 14 3.05 6 17 102 311.10
8 1.2 14 17 238 285.60
C3 14 3.05 6 4 24 73.20
8 1.2 14 4 56 67.20

- - - - - - - -
- - - - - - - -
Total length - 1,108.80 - - 1,312.54 - - -
Unit weight 0.222 0.395 0.617 0.889 1.209 1.580 2.469 3.556
Total weight - 437.98 - - 1,586.86 - - -

Contractor Quantity Surveryor Site Supervisor Resident Engineer


Signature Signature Signature Signature
_____________________ ________________________ _________________________ _________________________
NOMY ENGINEERING PLC
Interim payment no Bar Take off for (Typology x1) - Residence/Shop
Project Name: cuye feche II Block No.
BAR SCHEDULE
Structure:- Super Structure Page:-

Bar Dia No No Total


Location No (mm) Shape Length of of No.of Total length in meters
bars elem bars Ø6 Ø8 Ø10 Ø12 Ø14 Ø16 Ø20 Ø24
stair case
flight 1st 8 12 5.1 11 4 44 - - - 224.40 - - -
9 12 1.71 11 4 44 - - 75.24 - - -
10 12 2.28 11 4 44 - - 100.32 - - -
11 12 1.45 11 4 44 - - 63.80 - - - -
steps 8 3.84 20 4 80 - 307.20 - - - - -
8 1.45 29 4 116 - 168.20 - - - - -
8 1.45 9 4 36 - 52.20 - - - - -
8 0.89 54 4 216 - 192.24 - - - - -
0
second flight 4 12 5.1 11 4 44 224.40
5 12 1.8 11 4 44 79.20
6 12 2.79 11 4 44 122.76
7 12 1.47 11 4 44 - - 64.68 - - -
flight 8 8 1.45 29 4 116 - 168.20 - - - - -
steps 8 1.45 9 4 36 - 52.20 - - - - -
8 0.89 54 4 216 - 192.24 - - - - - -
landing beam
top bar 14 4.8 2 4 8 38.40
14 1.62 2 4 8 12.96
14 4.3 2 4 8 34.40
8 1.2 21 4 84 100.80

- - - - - - - -
Total length - 1,233.28 - 954.80 85.76 - - -
Unit weight 0.222 0.395 0.617 0.889 1.209 1.580 2.469 3.556
Total weight - 487.15 - 848.82 103.68 - - -

Contractor Quantity Surveryor Site Supervisor Resident Engineer


Signature Signature Signature Signature

_____________________ ________________________ _________________________ _________________________


NOMY ENGINEERING PLC
Interim payment no Bar Take off for (Typology x1) - Residence/Shop
Project Name: cuye feche II Block No.
BAR SCHEDULE
Structure:- Super Structure Page:-

Bar Dia No No Total


Location No (mm) Shape Length of of No.of Total length in meters
bars elem bars Ø6 Ø8 Ø10 Ø12 Ø14 Ø16 Ø20 Ø24
First floor beam
14 6.87 4 4 16 - - - 109.92 - - - 1.00 1.00 dia 10
14 8.49 2 4 8 - - - 67.92 - - - 1.00 1.00 dia 10
14 4.4 2 4 8 - - - 35.20 - - -
8 1.26 62 4 248 312.48 - - - - -
14 5.15 2 8 16 82.40
14 4.29 2 8 16 - - 68.64 - - -
8 1.26 20 8 160 201.60 - - - - - -
FB 2A 16 10.52 2 4 8 - - - 84.16 - -
Beam on axis 2-3 16 2.69 1 4 4 - - - - 10.76 - - 4.28 3.65 1.10
16 3.2 3 4 12 - - - - 38.40 - -
16 9.66 3 4 12 - - - - 115.92 - - 0.00 0.00
FB 4 16 5.77 2 4 8 - - - - 46.16 - - 1.00 1.00 dia 10
8 1.26 50 4 200 252.00 - - - - - 1.00 1.00 dia 10
FB 4A 14 10.52 2 4 8 - - - 84.16 - -
14 2.69 1 4 4 - - - 10.76 - -
16 3.2 3 4 12 - - - - 38.40 - - 0.00 0.00
16 9.66 3 4 12 - - - - 115.92 - - 48.56 27.07 dia 10
16 5.77 2 4 8 - - - - 46.16 - -
8 1.26 50 4 200 252.00 - - - - - 1.00 1.00 dia 10
- - - - - - - 540.51 194.37 dia 10
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
Total length - 1,018.08 - - 459.00 495.88 - -
Unit weight 0.222 0.395 0.617 0.889 1.209 1.580 2.469 3.556
Total weight - 402.14 - - 554.93 783.49 - -

Contractor Quantity Surveryor Site Supervisor Resident Engineer

Signature Signature Signature Signature


_____________________ ________________________ _________________________ _________________________
NOMY ENGINEERING PLC
Interim payment no Bar Take off for (Typology x1) - Residence/Shop
Project Name: cuye feche II Block No.
BAR SCHEDULE
Structure:- Super Structure Page:-

Bar Dia No No Total


Location No (mm) Shape Length of of No.of Total length in meters
bars elem bars Ø6 Ø8 Ø10 Ø12 Ø14 Ø16 Ø20 Ø24

FB2 14 10.87 2 4 8 86.96 1.00 1.00 dia 10


14 8.67 2 4 8 69.36 1.00 1.00 dia 10
14 10.87 2 4 8 86.96
14 1.77 1 4 4 7.08
14 2.69 7 4 28 75.32
14 8.44 2 4 8 67.52
14 8.67 2 4 8 69.36
14 8.62 2 4 8 68.96
14 4.4 2 4 8 35.20 4.28 3.65 1.10
8 1.26 140 4 560 705.60
FB 14 14 6.1 2 4 8 48.80 0.00 0.00
16 5.25 3 4 12 63.00 1.00 1.00 dia 10
8 1.26 25 4 100 126.00 1.00 1.00 dia 10

FB 6 14 9.78 2 4 8 78.24 0.00 0.00


14 2.89 1 4 4 11.56 48.56 27.07 dia 10
16 5.09 3 4 12 61.08
14 4.46 3 4 12 53.52 1.00 1.00 dia 10
8 1.26 40 4 160 540.51 194.37 dia 10
- - - - - - -
FB 7 14 9.8 2 4 8 - - - 78.40 - - -
20 2.9 1 4 4 - - - - - 11.60 -
16 8.98 3 4 12 - - - - 107.76 - -
8 1.26 40 4 160 1,280.00 - - - - - -
Total length - 2,111.60 - - 837.24 231.84 11.60 -
Unit weight 0.222 0.395 0.617 0.889 1.209 1.580 2.469 3.556
Total weight - 834.08 - - 1,012.22 366.31 28.64 -

Contractor Quantity Surveryor Site Supervisor Resident Engineer


Signature Signature Signature Signature
_____________________ ________________________ _________________________ _________________________
NOMY ENGINEERING PLC
Interim payment no Bar Take off for (Typology x1) - Residence/Shop
Project Name: cuye feche II Block No.
BAR SCHEDULE
Structure:- Super Structure Page:-

Bar Dia No No Total


Location No (mm) Shape Length of of No.of Total length in meters
bars elem bars Ø6 Ø8 Ø10 Ø12 Ø14 Ø16 Ø20 Ø24

FB 8 14 11.17 2.00 4 8 89.36 1.00 1.00 dia 10


20 2.89 1.00 4 4 11.56 1.00 1.00 dia 10
16 10.31 3.00 4 12 123.72
8 1.26 40.00 4 160 201.60
14 11.17 2.00 4 8 89.36
FB 9 20 2.89 1.00 4 4 11.56
16 10.31 4.00 4 16 164.96
8 1.26 58.00 4 232 292.32

FB 10 14 11.17 2 4 8 89.36
14 2.89 1 4 4 11.56
16 10.3 4 4 16 164.80
8 1.26 53 4 212 267.12
FB 11 14 11.17 2 4 8 89.36
16 2.89 2 4 8 23.12 4.28 3.65 1.10
16 10.31 7 4 28 288.68
8 1.26 53 4 212 267.12 0.00 0.00
FB 12 14 7.43 2 4 8 59.44 1.00 1.00 dia 10
14 7.47 2 4 8 59.76 1.00 1.00 dia 10
14 4.52 4 4 16 72.32
14 5.61 3 4 12 67.32
8 1.26 65 4 260 327.60 0.00 0.00
FB 13 14 9.84 2 4 8 78.72 48.56 27.07 dia 10
16 2.89 2 4 8 23.12
16 8.98 3 4 12 107.76 1.00 1.00 dia 10
8 1.26 43 4 172 216.72 540.51 194.37 dia 10
- - - - - - -
FB 14 14 11.92 2 4 8 95.36
14 11.48 2 4 8 91.84
14 2.93 2 4 8 23.44
14 4.4 5 4 20 - 88.00 -
14 4.74 2 4 8 - 37.92 -
16 9.05 2 4 8 - 72.40 -
8 1.26 108 4 432 3,456.00 - - - - - -
Total length - 5,028.48 - - 1,043.12 968.56 23.12 -
Unit weight 0.222 0.395 0.617 0.889 1.209 1.580 2.469 3.556
Total weight - 1,986.25 - - 1,261.13 1,530.32 57.08 -

Contractor Quantity Surveryor Site Supervisor Resident Engineer


Signature Signature Signature Signature
_____________________ ________________________ _________________________ _________________________
NOMY ENGINEERING PLC
Interim payment no Bar Take off for (Typology x1) - Residence/Shop
Project Name: cuye feche II Block No.
BAR SCHEDULE
Structure:- Super Structure Page:-

Bar Dia No No Total


Location No (mm) Shape Length of of No.of Total length in meters
bars elem bars Ø6 Ø8 Ø10 Ø12 Ø14 Ø16 Ø20 Ø24
TOP TIE BEAM
TTB 1 14 6.69 4 1 4 26.76 1.00 1.00 dia 10
14 8.49 2 1 2 16.98 1.00 1.00 dia 10
14 4.4 2 1 2 8.80
8 1 60 1 60 60.00
TTB 2 14 10.69 4 1 4 42.76
14 8.67 2 1 2 17.34
14 8.44 2 1 2 16.88
14 8.67 4 1 4 34.68
14 4.4 2 1 2 8.80 4.28 3.65 1.10
8 1 140 1 140 140.00
TTB 3 14 10.16 2 1 2 20.32 0.00 0.00
14 9.66 2 1 2 19.32 1.00 1.00 dia 10
8 1 47 1 47 47.00 1.00 1.00 dia 10
TTB 2A 14 8.76 2 1 2 17.52
14 8.26 2 1 2 16.52
8 1 40 1 40 40.00 0.00 0.00
TTB 4 14 8.83 2 1 2 17.66 48.56 27.07 dia 10
14 8.33 2 1 2 16.66
8 1 40 1 40 40.00 1.00 1.00 dia 10
TTB 5 14 9.48 2 1 2 18.96 540.51 194.37 dia 10
14 8.98 2 1 2 - - - 17.96 - - -
8 1 43 1 43 43.00 - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
Total length - 370.00 - - 317.92 - - -
Unit weight 0.222 0.395 0.617 0.889 1.209 1.580 2.469 3.556
Total weight - 146.15 - - 384.37 - - -

Contractor Quantity Surveryor Site Supervisor Resident Engineer


Signature Signature Signature Signature
_____________________ ________________________ _________________________ _________________________
NOMY ENGINEERING PLC
Interim payment no Bar Take off for (Typology x1) - Residence/Shop
Project Name: cuye feche II Block No.
BAR SCHEDULE
Structure:- Super Structure Page:-

Bar Dia No No Total


Location No (mm) Shape Length of of No.of Total length in meters
bars elem bars Ø6 Ø8 Ø10 Ø12 Ø14 Ø16 Ø20 Ø24

TTB 2B 14 8.76 2 1 2 17.52 1.00 1.00 dia 10


14 8.26 2 1 2 16.52 1.00 1.00 dia 10
8 1 40 1 40 40.00
TTB 6 14 10.81 2 1 2 21.62
14 10.31 2 1 2 20.62
8 1 51 1 51 51.00
TTB 7 14 7.29 4 1 4 29.16
14 9.52 2 1 2 19.04
14 4.52 2 1 2 9.04 4.28 3.65 1.10
8 1 66 1 66 66.00
TTB 8 14 11.77 2 1 2 23.54 0.00 0.00
14 11.33 2 1 2 22.66 1.00 1.00 dia 10
14 9.4 2 1 2 18.80 1.00 1.00 dia 10
14 4.7 2 1 2 9.40
14 9.01 2 1 2 18.02
8 1 108 1 108 108.00 0.00 0.00
TTB9 14 5.75 2 1 2 11.50 48.56 27.07 dia 10
14 5.25 2 1 2 10.50
8 1 25 1 25 25.00 1.00 1.00 dia 10
TTB8A 14 4.84 2 1 2 9.68 540.51 194.37 dia 10
14 4.31 2 1 2 8.62 - -
8 1 20 1 20 20.00 - -
TTB8B 14 2.23 2 1 2 4.46 - -
14 1.73 2 1 2 3.46 - -
8 1 8 1 8 8.00 - - - - -
Total length - 318.00 - - 274.16 - - -
Unit weight 0.222 0.395 0.617 0.889 1.209 1.580 2.469 3.556
Total weight - 125.61 - - 331.46 - - -

Contractor Quantity Surveryor Site Supervisor Resident Engineer


Signature Signature Signature Signature
_____________________ ________________________ _________________________ _________________________
NOMY ENGINEERING PLC
Interim payment no Bar Take off for (Typology x1) - Residence/Shop
Project Name: cuye feche II Block No.
BAR SCHEDULE
Structure:- Super Structure Page:-

Bar Dia No No Total


Location No (mm) Shape Length of of No.of Total length in meters
bars elem bars Ø6 Ø8 Ø10 Ø12 Ø14 Ø16 Ø20 Ø24
PRE CAST
CONNECTION 1.00 1.00 dia 10
BARS 8 1.92 63 8 504 967.68 1.00 1.00 dia 10
12 2.69 26 8 208 559.52
12 2.71 36 8 288 780.48
10 1.92 2 8 16 30.72
12 3.07 24 8 192 589.44
12 2.35 2 8 16 37.60

SLAB MESH 4.28 3.65 1.10


8.3 73 4 292 2,423.60
B/N AXIS F- H 6 21.8 28 4 112 2,441.60 0.00 0.00
B/N AXIS A - D 6 10.2 42 4 168 1,713.60 1.00 1.00 dia 10
6 12.34 34 4 136 1,678.24 1.00 1.00 dia 10
B/N AXIS E- F 6 4.15 34 4 136 564.40
6 10.2 14 4 56 571.20
B/N AXIS E- D 6 4.1 14 4 56 229.60 0.00 0.00
6 4.1 14 8 112 459.20 48.56 27.07 dia 10

1.00 1.00 dia 10


540.51 194.37 dia 10
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
Total length 10,081.44 967.68 30.72 1,967.04 - - - -
Unit weight 0.222 0.395 0.617 0.889 1.209 1.580 2.469 3.556
Total weight 2,238.08 382.23 18.95 1,748.70 - - - -
GRAND TOTAL 2,238.08 5,460.77 18.95 2,597.52 6,232.80 4,314.35 2,884.18 -

Contractor Quantity Surveryor Site Supervisor Resident Engineer


Signature Signature Signature Signature
_____________________ ________________________ _________________________ _________________________

You might also like