SLD C2250D5 11kV-SLD
SLD C2250D5 11kV-SLD
OES SCOPE
A A
CUSTOMER SCOPE
B B
C C
D D
E E
F F
G G
0 ISSUE FOR APPROVAL 30-12-2024 AR ZA
PRELIMINARY DRAWING RevNo Revision note Date Drawn Sign. Chkd.
H NOTE:- -- H
CLIENT M/s. DASU DAM DRAWING-NO
1. Short Circuit, Load flow and protection coordination Analysis based on Actual Plant Load is Customer responsibility.
2. Feeder / Distribution / MV outgoing Panel needs to be confirmed by customer. Orient Energy Systems (Pvt.)Ltd. --
1 2 3 4 5 6 7 10 11 12 13 14 15 16