Nhai Project
Nhai Project
Page 1 of 46
Completed PCC / PCOD Issued
Status as on 01 July 2024
All length in Km.
Page 2 of 46
Completed PCC / PCOD Issued
Status as on 01 July 2024
All length in Km.
54 Andhra Pradesh Giddalur-Vinukonda from Design km 212.983 to Design km 322.800 544D 112.8 HAM 2L PS 06/02/2019 GV Road Projects Private Limited
4L of Kathipudi to start of Kakinada bypass from Km 0.000 to Km
55 Andhra Pradesh 216 27.5 EPC 4L 18/05/2016 Dhyan Singh Prop Dhyan Singh
27.500 of NH-214 (New NH-216)
Operation and Maintenance of Tirupati Tiruttani Chennai Section of
56 Andhra Pradesh 716 107.18 Item Rate 2L/4L PS 01/08/2022 G.R Engineers & Contractors
NH 205
O&M of 2L PS Markapuram-Vaggampalle Section from Km. 198.694 to
57 Andhra Pradesh 565 94.572 OMT 2L PS 12/10/2021 Sai Balaji constructions
Km. 293.266 of NH-565
Routine maintenance including incident Management for O&M of
58 Andhra Pradesh Vaggampalli - Dornal T section from km 293.266 to km 359.422 of NH- 565 67.327 EPC 2L PS 12/07/2021 R R Associates
565
O&M of 2L PS Davulapalli to Markapuram Section from Km. 153.939
59 Andhra Pradesh 565 43.379 OMT 2L PS 12/10/2021 Sai Balaji constructions
to km.197.318 of NH-565
60 Andhra Pradesh Penchalkona - Yerpedu from Km 425.400 to Km 509.400 of Old NH-565 565 84 EPC 2L PS 28/08/2021 Garrison Constructions
4L of Vijayawada to Machilipatnam from Km. 0.000 to Km. 63.800 of
61 Andhra Pradesh 65 64.61 EPC 4L 24/11/2016 Dilip Buildcon Ltd.
Old NH-09 (New NH-65)
Routine Maintenance for Ibrahimpatnam – Chandragudem – Abhipsa Construction, Engineer and
62 Andhra Pradesh 30 70.19 Item Rate 2L PS 01/04/2022
AP/Telangana Border section from Km. 0.000 to Km. 70.190 of NH-30 Contractors
Maintenance of 2L PS Mydukuru – Dornala T Junction from Km
63 Andhra Pradesh 67 52 Item Rate 2L PS 22/04/2022 RP Projects Pvt Ltd
589.000 to 641.000 of NH-67
Routine Maintenance including incident Management of Dornala T
64 Andhra Pradesh Juction to Nellore section from km. 641.000 to Km. 741.950 of NH 67 67 100.95 Item Rate 2L PS 08/04/2022 R R Associates
(Designe length 100.95 Km) in the state of Andhra Pradesh.
4L of Bijni - Assam / WB Border from km. 60.0 to km. 30.00 of NH-31 C
65 Assam 31 C 30 EPC 4L 06/10/2005 Gayatri-ECI (JV)
(AS-11)
4L of Bijni - Assam/WB Border section of NH-31C from km. 93.00 to
66 Assam 31C 33 EPC 4L 06/10/2005 Gayatri - ECI (JV)
km. 60.00 (Contract Pkg- EW-II (AS-10))
Strengthening including Special Repair and operation, maintenance on
existing rigid and flexible 4-lane Pavement surface from km 30.000 to
67 Assam 31C 63 Item Rate 4L 05/04/2023 Raju Chandra Basumatary
ch. 93.000 on NH-31C (AS-10 & AS-11) (New NH No. 27) And Repair
and Rehabilitation of 8 Nos. of Distressed Brid
68 Assam Nalbari-Bijni(AS-08) from km.1013 to km.983 of Old NH-31 27 30 EPC 4L 15/12/2005 Punj Lloyd Infrastructue Ltd.
69 Assam Nalbari-Bijni(AS-09) from 983.00 km to 961.50 km of Old NH-31 27 22 EPC 4L 30/11/2005 Punj Lloyd Infrastructue Ltd.
Strengthening including Operation and Maintenance of 4L PS from
70 Assam Km. 961.500 to Km. 1013.000 on NH 27 (AS-08 & AS-09) (New NH No. 27 51.5 Item Rate 4L 26/04/2023 Raju Chandra Basumatary
27)
Nalbari to Bijni section of NH-31 from km. 1040.30 to Km. 1013.00
71 Assam 31 27.3 EPC 4L 21/10/2005 KMC Construction Ltd.
(Contract Package EW-II/ AS-07) in Assam
Page 3 of 46
Completed PCC / PCOD Issued
Status as on 01 July 2024
All length in Km.
Page 4 of 46
Completed PCC / PCOD Issued
Status as on 01 July 2024
All length in Km.
Page 5 of 46
Completed PCC / PCOD Issued
Status as on 01 July 2024
All length in Km.
145 Chhattisgarh End of Durg Bypass - MH/CG Border from km. 322.40 to km. 405.00 53 82.6 BOT Toll 4L 22/07/2008 Ashoka Buildcon Limited
146 Chhattisgarh Durg Bypass 53 18 BOT Toll 4L 01/04/2011 SMS
147 Chhattisgarh Raipur - Aurang from km. 239.00 to km. 281.00 53 43.46 BOT Toll 4L 11/04/2006 DSC
4L of Odisha/Chhattisgarh border-Aurang Section from Km.88.000 to
148 Chhattisgarh 53 151 BOT Toll 4L 15/02/2013 BSCPL Aurang Tollway Ltd
Km. 239.000 of NH-6
149 Chhattisgarh 4/6 Laning of Raipur-Simga (Pkg-I) from km. 0.00 to km. 48.58 30 48.58 EPC 4L/6L 21/04/2016 Punj Lloyd Infrastructue Ltd.
150 Chhattisgarh Simga (km 48.580) to Sargaon (km. 91.026) 130 42.45 EPC 4L 05/05/2016 Larsen & Toubro Ltd.
Page 6 of 46
Completed PCC / PCOD Issued
Status as on 01 July 2024
All length in Km.
Page 7 of 46
Completed PCC / PCOD Issued
Status as on 01 July 2024
All length in Km.
Page 8 of 46
Completed PCC / PCOD Issued
Status as on 01 July 2024
All length in Km.
Page 9 of 46
Completed PCC / PCOD Issued
Status as on 01 July 2024
All length in Km.
229 Gujarat Samakhiyali to Gandhidham section km 306.0 to km 362.160 of NH-8A 41 56 BOT Toll 6L 11/09/2010 Larsen & Toubro Ltd.
Four Laning of NH-8A from Padana (km. 346.00) to Gandhidham (km.
230 Gujarat 357.00) and strengthening of existing 4 Lanes including drainage 8A 16.16 Item Rate 4L 16/04/1999 Agrawal -Sadbhav - Backbone (JV)
improvement from km. 357.00 to km. 362.16 (Pkg - III)
231 Gujarat 4L of Ahmedabad-Godhra from km. 04.200 to km. 122.420 of NH-59 59 117.6 BOT Toll 4L 27/12/2010 Essel Infraprojects Ltd
Page 10 of 46
Completed PCC / PCOD Issued
Status as on 01 July 2024
All length in Km.
264 Haryana Three Underpasses at Rajiv Chowk, Signature Tower and IFFCO Chowk 48 6.31 EPC 8L 01/12/2016 Gawar Construction Ltd
Under Ground U-turn near Ambience Mall and Elevated U-Turn near
265 Haryana Shankar Chowk from km. 23.66 to km. 24.446 & km. 25.684 to km. 48 2.78 EPC 4L 05/03/2019 Ram Kumar Contractor
26.123
Permanent Longitudinal Drain for disposal of Storm Water along Old
266 Haryana NH-8 from Rajiv Chowk to Kherki Dhaula Toll Plaza (except the project 48 5.49 EPC Others NKC Projects Private Limited
limits of Hero Honda Flyover)
267 Haryana Foot Over Bridge across NH-2 2 0 EPC 4L/MIP 07/03/2018 Atlas Construction Pvt. Ltd.
Additional Structures under Six Laning of Delhi-Agra section of NH-44 Gawar Construction Ltd. - E5
268 Haryana 44 0 EPC 6L 19/09/2019
in the State of Haryana between km. 34.0 and km. 93.00 Infrastructure Pvt. Ltd (JV)
269 Haryana Major Saraswati Bridge 44 0.51 EPC 6L 14/08/2018 Ram Kumar Contractor
O&M of 6L Panipat-Jalandhar section from Km. 96.000 to Km. 387.100
270 Haryana 44 291.1 Item Rate 6L 01/10/2021 Ceigall India Ltd.
of NH-44
Construction of balance works of FoBs of Panipat-Jalandhar section
271 Haryana 44 0.8 Item Rate 6L 16/11/2021 Dhingra Brothers (India)
from km. 96.000 to km. 387.100 on NH-44
Repair of Slip road (LHS) joining Kali Paltoon bridge at Km. 200.600
272 Haryana including dismantling and reconstruction of retaining wall at km. 44 0.3 Item Rate 6L 07/09/2021 Dhingra Brothers (India)
200.600 of NH-44
Page 11 of 46
Completed PCC / PCOD Issued
Status as on 01 July 2024
All length in Km.
Page 12 of 46
Completed PCC / PCOD Issued
Status as on 01 July 2024
All length in Km.
Page 13 of 46
Completed PCC / PCOD Issued
Status as on 01 July 2024
All length in Km.
321 Haryana Kaithal to Rajasthan border from Design Ch. Km. 0.50 to Km. 165.759 152&52 166 BOT Toll 4L PS 15/07/2015 IRB Infrastructure Developers Ltd.
Bhiwani - Mundhal - Jind from Km.6.875 to Km. 68.857 of NH-709A
322 Haryana 709A 61.98 EPC 2L PS 11/09/2018 Gawar Construction Ltd
(Package-I) under NH (O)
Jind - Karnal from junction with Narwana road (NH-352) at Subhash
323 Haryana Chowk to ITI Chowk (intersection with NH-1 of NH-709A from km. 709A 85.36 EPC 2L PS 11/09/2018 Gawar Construction Ltd
68.660 to km. 153.700
Strengthening and improvement of 2/4L PS of Jind-Karnal section from
324 Haryana 709A 13.37 EPC 2L/4L 11/02/2022 Kaluwala Construction Private Limited
km. 68.857 to km. 82.227 of NH-709A
325 Haryana Ambala - Saha 444A 14.84 EPC 4L 20/11/2019 Ceigall India Ltd.
Four Laning of Yamunanagar-Panchkula section of Old NH 73 from Km
326 Haryana 7 & 344 44.57 EPC 4L 18/11/2015 Sadbhav Engineering Pvt. Ltd.
70.830 to Km 115.400 (Pkg-I)
Routine Maintenance and Incident Management of Yamunanagar
327 Haryana Panchkula Highway Section of NH-344 (Old NH-73) from km. 70.830 to 344 86.36 Item Rate 4L PS 05/04/2023 A. S. Patel
km. 157.192 (Package-I and Package-II)
328 Haryana UP/HR Border - Sonepat - Jhajjar 334B 40.5 HAM 4L 22/01/2020 Gawar Construction Ltd
Four Laning of Rohna/ Hassangarh section from Km.44.800 to
329 Haryana 334B 35.45 HAM 4L 18/12/2018 Gawar Construction Ltd
km.80.250 (Package-2)
Ceigall India Ltd. - Shiv Buildtech Pvt.
330 Haryana Jhajjar - Loharu from Km.130.770 to Km. 228.630 334B 97.86 EPC 2L PS 17/12/2018
Ltd. (JV)
Improvement of section from km 173.050 to 177.770 (design ch.
331 Haryana 42.280 to 47.000) and from km 212.130 to 213.130 (design ch. 81.360 NH-334B 97.864 Item Rate 2L PS 15/05/2023 Suraj Construction Company
to 82.360) of Jhajjar-Loharu section of NH-334B
Zirakpur -Parwanoo from km.39.96 to km. 67.65 including Pinjore -
332 Haryana 5 27.59 BOT Toll 4L 28/02/2008 HEL
Kalka Parwanoo Bypass in the State of PB, HR, HP
Construction of Half VUP for Amravati Enclave at Km.53.550 on
333 Haryana 05 1 EPC 4L 09/09/2019 Singla constructions Limited
Zirakpur-Parwanoo section of NH-05
Providing access from service road to MCW (BHS)at Km.62.200 in
334 Haryana 05 1 Item Rate 4L PS 22/09/2022 Jassu Construction Company
village Tipra
335 Haryana Dharuhera-Bhiwadi 71B 8.6 Item Rate 4L 29/06/2018 Atlas Construction Pvt. Ltd.
Overlay work on Ambala-Kala Amb section of NH-72 from km 1.000 to
336 Haryana Km. 9.250, from 13.750 to km. 16.800, from 24.600 to km. 26.600 & 72 25.38 Item Rate 2L PS 02/02/2024 Jassu Construction Company
Patch work in km 26.600 to km 38.680
Overlay work on Jagadhri-Poanta Sahib old NH-73A (New NH-907)
337 Haryana form Km 2.500 to Km 5.000 and from Km. 5.000 to Km. 7.520 LHS and 907 11.255 Item Rate 2L PS 22/05/2023 Mahipal Construction Co.
from Km.9.400 to Km 15.635
Short term Operation & Maintenance (O&M) of Access Controlled
338 Haryana, Delhi Six/Eight lane Highway of Delhi-Gurugram Section of NH-48 from Km. 48 27.7 Item Rate 6L/8L 15/03/2023 Krishna Constructions.
14.300 (Rao Tula Ram Marg in Delhi) to Km. 42.000
Operation and Maintenance including Routine Maintenance and
339 Haryana, Punjab incident Management of 6L Panipat-Jalandhar Section of NH-44 from NH44 291.1 Item Rate 6L 12/11/2022 Rajinder Infrastructure Private Limited
KM 96.000 to 387.000
Operation and Maintenance of Six Laning of Panipat-Jalandhar Section
of NH-1 from KM 96.000 to 387.000 in state of Haryana and Punjab Chaudhary Construction Company
340 Haryana, Punjab 4,444 291.1 Item Rate 6L 05/01/2023
Major Maintenance Works Including construction of boundary walls Pvt. Ltd.
and rectification of WIM & SWB at Toll Plazas
Rectification/closure of unauthorized Median Cuts and unauthorized
341 Haryana, Punjab access from Main Carriage on Six laning of Panipat-Jalandhar old NH-1 44 9.05 Item Rate 6L 10/07/2023 Satish Aggarwal & Co
(New NH-44) from Km 96.000 to Km 387.100 (length-291.100 km)
Page 14 of 46
Completed PCC / PCOD Issued
Status as on 01 July 2024
All length in Km.
Strengthening with renewal work from Km 159+945 to km 167+080 Gawar Kiratpur Nerchowk Highway
344 Himachal Pradesh 1,54,154 11.49 Item Rate 4L 05/11/2023
(Jarol to Pung) & km 177+860 to km 182+215 (Dadour to nagchala) Private Limited
Pandoh bypass (221.305) to Takoli (242.000) of NH-21 in the state of Shapoorji Pallonji Pandoh Takoli
345 Himachal Pradesh 3 18.91 HAM 4L 26/03/2018
Himachal Pradesh Highway Private Limited
346 Himachal Pradesh Takoli ( 242.000) to Kullu (272.000) 3 28.69 EPC 4L 02/06/2017 NKC Projects Private Limited
Kullu ( 272.000) to Manali ( 309.345) of NH-21 in the state of Himachal
347 Himachal Pradesh 3 37.35 EPC 2L 09/02/2017 Gawar Construction Ltd
Pradesh
Strengthening and maintenance of existing 02 lane National Highway
348 Himachal Pradesh 154 13.135 Item Rate 2L 18/05/2023 Gawar Construction Ltd
NH-154 section from Rajol at km 72 to Thanpuri at km 85.135
Strengthening of existing stretch in patches from km. 1.000 to km.
349 Himachal Pradesh 2.000, Km. 10.000 to km. 24.000, km. 30.000 to km. 34.000 & km. 205 58.6 Item Rate 2L 03/06/2022 P K Construction Shimla Pvt. Ltd.
49.000 to km. 51.000 of Shimla-Mataur section of NH-205
350 Himachal Pradesh Parwanoo (Km 67.00) to Solan (Km 106.14) 5 39.14 EPC 4L 21/09/2015 G R Infraprojects Limited
Construction of 6 nos. Foot Over Bridges (FOBs) on Parwanoo to SOlan
351 Himachal Pradesh Section of NH-22 (Now NH-05) from Km. 67.000 to Km 106.139 in the 05 0.095 EPC Others 24/01/2024 Shiva Associates
satae of Himachal Pradesh on EPC Mode.
Maintenance of existing highway from Kaithlighat to Dhalli bypassed
352 Himachal Pradesh by proposed Shimla bypass (Kaithlighat to Dhalli Section) of New NH- 05 27.45 Item Rate 2L
05 from Km. 129.050 to Km 156.507
Strengthening under One time improvement from km. 0.000 to km.
353 Himachal Pradesh 24.250 & km. 153.180 to km. 156.500 of existing Kaithlighat to Dhalli 555 41.63 Item Rate 2L 28/06/2021 State PWD
section of NH-05
Banihal to Srinagar (KM 187.00 to KM 189.35 and KM 220.70 to KM SRINAGAR BANIHAL EXPRESSWAY
354 Jammu and Kashmir 44 65.41 BOT Annuity 4L 27/06/2011
286.11) LIMITED
355 Jammu and Kashmir Banihal (Km 189.350) to Quazigund (KM 220.700) 44 16.27 BOT Annuity 4L 05/06/2011 Navyuga Road Projects Pvt Ltd.
Udhampur - Ramban section of NH-1A from km. 67.00 to km. 89.00 Gammon Engineers & Contractors
356 Jammu and Kashmir 44 40.07 EPC 4L 28/12/2015
and km. 130.00 to km. 151.00 Pvt. Ltd.
4L of Chenani - Nashri including 9 Km long tunnel (2L) with parallel
357 Jammu and Kashmir 44 10.87 BOT Annuity 2L/4L 23/05/2011 Chenani Nashri Tunnelway Limited
escape tunnel
4L of Chenani - Nashri (old Alignment) via Patnitop from Km. 89.00 to
358 Jammu and Kashmir 44 41 OMT 4L
Km. 130.00 of NH-44
4L of Jammu - Udhampur from km. 15.00 to km. 67.00 [Jammu Bypass Athaang Jammu Udhampur Highway
359 Jammu and Kashmir 44 64.59 BOT Annuity 4L 17/06/2011
- Udhampur] (Pkg No. NHDP-II/BOT/VI/J&K) Private Limited
Stand-alone Ring road/bypass around Jammu City from Raya Morh
360 Jammu and Kashmir 58.26 EPC 4L 08/01/2018 Gayatri- KMB (JV)
km. -0.687 to Jagti km. 57.568
4L of Kunjwani - Vijaypur from km. 80.00 to km. 97.20 of Pathankot -
361 Jammu and Kashmir 44 17 Item Rate 4L 01/04/2002 Border Roads Organisation
Jammu (NS-15)
4L of Vijaypur-Hiranagar from km. 50.00 to km. 80.00 of Pathankot -
362 Jammu and Kashmir 44 30 EPC 4L 01/09/2005 ITD Cementation India Ltd
Jammu (NS-35)
Rectification of 02 Nos. Black spots at Maheshwar (From Km. 65.338
363 Jammu and Kashmir to Km. 65.746, From Km. 66.175 to Km. 66.885) & at Chichi Mata 44 1.744 EPC 4L 21/12/2021 Ceigall India Ltd.
(From Km. 70.684 to Km. 71.310) in District Samba of NH-44(Pkg-IV)
Rectification of Black Spot at Samba from Km. 67.180 to Km 69.030 of
364 Jammu and Kashmir 44 1.85 EPC 4L 07/10/2021 Kaluwala Construction Private Limited
NH-44 (Pkg-V)
Page 15 of 46
Completed PCC / PCOD Issued
Status as on 01 July 2024
All length in Km.
Page 16 of 46
Completed PCC / PCOD Issued
Status as on 01 July 2024
All length in Km.
Page 17 of 46
Completed PCC / PCOD Issued
Status as on 01 July 2024
All length in Km.
435 Kerala Service Road on ICTT (Kalamassery-Vallapardam) (Additional Works) 966A 2.6 EPC 2L 11/08/2018 Yoga & Co. - Notch India Projects (JV)
436 Kerala NH Connectivity to ICTT Vallarpadam 966A 17.12 EPC 4L 10/08/2007 G.R Engineers & Contractors
4 lane ROB and its approaches including allied works near
437 Kerala 66 0.78 EPC 4L 13/05/2018 EKK Infrastructure Limited
Neleshwaram town (Pallikara Railway Gate) Kasargad district
Thalassery Mahe Bypass (Km 170.600 to Km 189.200) of NH-17(New GHV India Pvt. Ltd. -EKK
438 Kerala 66 18.6 EPC 4L 04/12/2017
NH-66) in Kerala Infrastructure Pvt. Ltd(JV)
439 Kerala Edappally-Vyttila-Aroor Section 66 17 EPC 4L 31/10/2008 RDS-CVCC (JV)
440 Kerala Kazhakkoottam to Mukkola Section from Km 0.000 to Km 26.500 66 26.8 EPC 4L 12/06/2015 KNR Constructions Limited
4L of Kazhakuttam Junction - Technopark Junction from km. 547.080
441 Kerala 66 2.72 EPC 4L 05/04/2019 RDS-CVCC (JV)
to km. 549.801
Maintenance work of Kazhakkoottam (Km.1+800) to Mukkola
442 Kerala 66 24.998 EPC 4L 03/07/2023 KLR constructions
(Km.26.798)
Operation and Maintenance of Four laning of Thiruvanthapuram
443 Kerala Bypass from Kazhakkoottam to Mukkola section of NH-66 in the State 66 24.998 PBMC 4L 01/03/2024 TTK Construction
of Kerala on PBMC.
Mukkola Junction to Kerala/ Tamil Nadu Border from Km 26.5 to Km
444 Kerala 66 16.2 EPC 4L 15/06/2016 Larsen & Toubro Ltd.
43.00 of NH 66 ( old NH 47)
Maintenance of Kozhikode to Palakkad from Km 15.656 (junction with
445 Kerala NH-66 near Ferokh) to Km 140.960 (Junction with NH-544 near 966 125.304 Item Rate 2L
Palakkad) of NH-966
Delhi-Vadodara Greenfield Alignment (NH-148N) (Pkg-17) (Ch. JiangXi Construction Engineering
446 Madhya Pradesh 452+420 to Ch. 484+420) [Rajasthan/MP Border to Jodmi village of 148N 32 EPC 8L 08/10/2020 (Group) Corporation Ltd. - MKC
Mandsaur district] Infrastructure Ltd. (JV)
Delhi-Vadodara Greenfield Alignment (NH-148N) (Pkg-18) (Ch.
447 Madhya Pradesh 484+420 to Ch. 517+420) [Jodmi village to Bani village of Mandsaur 148N 33 EPC 8L 07/02/2020 G R Infraprojects Limited
district]
Delhi-Vadodara Greenfield Alignment (NH-148N) (Pkg-19) (Ch. JiangXi Construction Engineering
448 Madhya Pradesh 517+420 to Ch.546+920) [Bani village to Bardawadi village of 148N 29.5 EPC 8L 05/11/2020 (Group) Corporation Ltd. - MKC
Mandsaur district] Infrastructure Ltd. (JV)
Delhi-Vadodara Greenfield Alignment (NH-148N) (Pkg-20) (Ch.
449 Madhya Pradesh 546+920 to Ch. 572+220) [Bardawadi village of Mandsaur district to 148N 25.3 EPC 8L 06/12/2019 GHV (India) Pvt Ltd.
Kamliya village of Ratlam district]
Page 18 of 46
Completed PCC / PCOD Issued
Status as on 01 July 2024
All length in Km.
Page 19 of 46
Completed PCC / PCOD Issued
Status as on 01 July 2024
All length in Km.
Page 20 of 46
Completed PCC / PCOD Issued
Status as on 01 July 2024
All length in Km.
Page 21 of 46
Completed PCC / PCOD Issued
Status as on 01 July 2024
All length in Km.
Page 22 of 46
Completed PCC / PCOD Issued
Status as on 01 July 2024
All length in Km.
Page 23 of 46
Completed PCC / PCOD Issued
Status as on 01 July 2024
All length in Km.
Page 24 of 46
Completed PCC / PCOD Issued
Status as on 01 July 2024
All length in Km.
600 Maharashtra Aurangabad - Karodi km 290.00 - km 320.104 of NH 211 (New NH 52) 52 30.44 EPC 4L 12/02/2019 Larsen & Toubro Ltd.
601 Maharashtra Karodi - Telwadi km 320.104 - km 375.00 of NH 211 (New NH-52) 52 55.61 EPC 4L/6L 09/10/2018 Dilip Buildcon Ltd.
Periodical Repairs from Km. 375.000 to Km. 390.000 including Autram Sant Satramdas Infrastructure Private
602 Maharashtra 52 15 OMT 4L 31/08/2021
Ghat of NH-52 Limited
603 Maharashtra Nagpur-Betul Section of NH-69 47 174.512 BOT Annuity 4L 28/02/2011 Oriental Structural Engineers Pvt. Ltd.
Flyover from Liberty cinema to Mental Hospital on Nagpur-
604 Maharashtra 47 3.96 EPC 4L 29/03/2017 KCC Buildcon Pvt. Ltd.
Obedullagunj road.
Development of Multi Lane Carriageway of Jalna Road in Aurangabad
605 Maharashtra city from Nagarnaka Junction to Cambridge School Road Section from 211 14.93 EPC 4L 19/03/2020 Shrushti Contech Pvt. Ltd.
km. 0.00 to km. 14.293
Balance work under Phase-I for 4L of Khed Sinner Section comprising
of the stretches (i) Khed Bypass (km 42.000 to km 46.981), (ii) Peth
606 Maharashtra 60 14.137 EPC 4L 14/10/2020 T&T Infra Pvt. Ltd.
(km 56.100 to km 56.780), (iii) Manchar bypass and (iv) linear length of
Eklahre from km 60.100 to km 68.576
Balance work of Khed Ghat realignment & Narayangaon bypass on
607 Maharashtra 60 9.31 EPC 4L Roadway Solutions India Infra Ltd.
Khed Sinnar section of NH-60
Strengthening of existing stretch (i.e. Strengthening (DBM +BC ) and
608 Maharashtra other Maintenance of 4/6L of Khed (42.00) to Sinnar (Km. 177.00) of 60 137.94 OMT 4L/6L 25/08/2020 MD-Infra India Pvt. Ltd.
Old NH - 50 (New NH - 60)
Development of existing road in Khed and Narayangaon town
609 Maharashtra 60 9.31 EPC 4L 31/08/2018 Roadway Solutions India Infra Ltd.
excluding rehabilitation of bridges on Khed Sinnar section of NH-60
4L Elevated Structure (Flyover) from Sakkar Chowk to SB Chowk on Dineshchandra R. Agrawal Infracon
610 Maharashtra 222 3.08 EPC 4L 18/12/2020
Pune - Aurangabad Road in Ahmednagar city Pvt. Ltd.
Altis - Holding Corporation and V.P.
611 Maharashtra Periodical Repairs of Jalna - Karanja - Pimpalgaon - Talegaon - Pulgaon SH207 285.4 Item Rate 2L PS 24/11/2020
Sethi Construction (JV)
Montecarlo Vadodara Mumbai
612 Maharashtra Sinnar-Shirdi (including Sinnar Bypass) 160 50.94 HAM 4L 18/08/2020
Expressway P2P1 Private Limited
JNPT Package 1 Km 3.600 to 6.073 of NH-4B and from Km 5.300 to Km J Kumar InfraProjects Ltd and J.M.
613 Maharashtra 348 4.59 EPC 6L/8L 16/05/2016
7.422 of NH-348 (old SH-54) in Maharashtra Mhatre Infra Pvt Ltd
JNPT Package 2 Gavanphata Interchange from 14.740 to Km 15.894 ( J Kumar InfraProjects Ltd and J.M.
614 Maharashtra 348 18.27 EPC 6L/8L 16/05/2016
Old SH -54) Mhatre Infra Pvt Ltd
JNPT Package 3 from Km-7.422-Km-13.160 and Amra Marg from Km- J Kumar InfraProjects Ltd and J.M.
615 Maharashtra 348A 11.09 EPC 6L/8L 16/05/2016
0.000-Km-5.360 Mhatre Infra Pvt Ltd
JNPT Package 4 FROM KM 21.200 TO KM 27.270 (D TO E SECTION)
616 Maharashtra 348 10.56 EPC 8L 16/05/2016 Ashoka Buildcon Limited
AND FROM KM 0.000 TO KM 4.492 (D TO G SECTION)
617 Maharashtra Solapur-Vijayapur 52 109.07 BOT Toll 4L 26/10/2018 IJM Corporation Berhad Ltd.
Four Laning of Sangli - Solapur (Pkg IV) [Mangalwedha-Solapur] from
618 Maharashtra 166 56.5 HAM 4L 23/05/2019 Dilip Buildcon Ltd.
km 321.6 - km 378.10
Four Laning of Sangli - Solapur (Pkg III) [Watambare-Mangalwedha]
619 Maharashtra 166 45.6 HAM 4L 31/12/2018 G R Infraprojects Limited
from km 276.0 - km 321.60
Four Laning of Sangli - Solapur (Pkg II) [Boregaon-Watambare] from
620 Maharashtra 166 52 HAM 4L 22/04/2019 Dilip Buildcon Ltd.
km. 224.00 to km. 276.00
Page 25 of 46
Completed PCC / PCOD Issued
Status as on 01 July 2024
All length in Km.
Page 26 of 46
Completed PCC / PCOD Issued
Status as on 01 July 2024
All length in Km.
Short Term Improvement and Routine Maintenance of Chandikhole – Abhipsa Construction, Engineer and
662 Odisha 53 76.588 OMT 4L 16/12/2020
Paradip from Km.0.000 to Km.76.588 of NH – 53 (old NH-5A) Contractors
4 laning of End of Kamakhyanagar Bypass - Duburi from km. 335.946
663 Odisha 53 51.1 EPC 4L PS 23/02/2019 G R Infraprojects Limited
to km 388.382 (Pkg-II)
Rehabilitation and Upgradation of NH-149 from Km.0.000 to
664 Odisha Km.68.280 (Pallahara to Pitiri section) to 2-lanes with paved shoulders 149 68.28 EPC 2L 14/01/2015 KMC - RKD (JV)
under NHDO-IV in the state of Odisha on EPC Mode
665 Odisha Birmitrapur - Brahmani Bypass end of NH-23 143 29.1 EPC 4L PS 23/05/2018 GKC Projects Ltd.
Urgent Repair and Maintenance of existing road of Birmitrapur Town
666 Odisha 143 4.7 Item Rate 2L 26/12/2022 RKD Construction Pvt. Ltd.
area from Km 211.200 to Km 215.900
667 Odisha Brahmani Bypass Rajmunda 143 46.95 EPC 4L PS 31/12/2018 RKD Construction Pvt. Ltd.
668 Odisha Rimuli Koida km 163 - km 206 of NH 215 520 43.2 EPC 4L PS 12/05/2018 Montecarlo Limited
669 Odisha Koida- Rajamunda (Pkg-II) km 206.00 - km 259.453 of NH 215 520 53.25 EPC 4L 08/05/2018 KMC - RKD (JV)
Urgent Repair and Maintenance/Strengthening of existing 2-Lane
670 Odisha Road from Ch.234.280 to Ch.235.600 at Roxy (De-scoped length) in the NH-520 1.32 Item Rate 2L PS 17/01/2023 Kapilash Infrasol Projects Pvt. Ltd.
Stretch of Koida to Rajamunda Section of NH-215 (New NH-520)
Page 27 of 46
Completed PCC / PCOD Issued
Status as on 01 July 2024
All length in Km.
Page 28 of 46
Completed PCC / PCOD Issued
Status as on 01 July 2024
All length in Km.
Page 29 of 46
Completed PCC / PCOD Issued
Status as on 01 July 2024
All length in Km.
Page 30 of 46
Completed PCC / PCOD Issued
Status as on 01 July 2024
All length in Km.
Page 31 of 46
Completed PCC / PCOD Issued
Status as on 01 July 2024
All length in Km.
Page 32 of 46
Completed PCC / PCOD Issued
Status as on 01 July 2024
All length in Km.
792 Rajasthan Four Laning of Agra-Bharatpur from km 17.756 to km 62.295 of NH-21 21 44.54 BOT Toll 4L 06/09/2006 Oriental Structural Engineers Pvt. Ltd.
4 Lane from Km 299.000 to 346.540 (Darah-Jhalawar-Teendhar
793 Rajasthan 52 48.88 HAM 4L 24/05/2018 Patel Infrastructure Limited
section) of NH-12.
Strengthening and Maintenance of 4L Jaipur-Reengus section of NH-52
794 Rajasthan 52 51.842 BOT Toll 4L 13/07/2023 K K Gupta Construction Pvt.
(Old NH-11) from Km. 246.300 to Km. 298.075
795 Rajasthan Reengus-Sikar Section of NH-52 52 43.887 BOT Annuity 2L PS 05/03/2012 Reengus - Sikar Exressway Pvt. Ltd.
796 Rajasthan Rajsamand-Bhilwara 758 87.25 BOT Toll 4L 09/10/2013 Sadbhav Engineering Pvt. Ltd.
797 Rajasthan Bhilwara-Ladpura 758 68 EPC 2L PS 04/03/2014 Laxmi Builders
Gangaria Baori Kalan-Serwa-Bakhasar section of NH-925 (km 0.000 to
798 Rajasthan 136.520) and Sata Gandhav Section oh NH-925-A (km 0.000 to km 925 & 925 A 196.97 EPC 4L/2L PS 24/09/2018 GHV (India) Pvt Ltd.
60.450)
Raisinghnagar - Anupgarh - Gharsana - Rojri - Sattasar - Pugal- (Part-2)
799 Rajasthan 911 162.46 EPC 2L PS 27/02/2019 G R Infraprojects Limited
(Pkg-BM/6)
Munabao(NH-25E)- Sundra- Myajlar-Dhanana-Asutar -Ghotaru-Tanot Dineshchandra R. Agrawal Infracon
800 Rajasthan 70 273.87 HAM 4L/2L PS 01/01/2019
[Design Chinange Km 0.0 to Km 46.00 and km 82.60 to Km 310.467] Pvt. Ltd.
Strengthening of the existing road from Sundra to Binjrad ka tala Via
801 Rajasthan 70 36.6 Item Rate 4L/2L PS 02/01/2024 Mundan Construction Company
myajlar from Km 46.000 to Km 82.600 of NH 70
Khajuwala-Poogal - Dantour- Jaggasar- Gokul- Goddu -Ranjeetpura-
802 Rajasthan 911 & 911 A 217.051 HAM 2L/4L 22/05/2019 Gawar Construction Ltd
Charanwala- Naukh-Bap section of NH
Rajasthan Border (Km 0.000) to Salasar (km 154.141) of NH-52 and 58 Galfar Engineering & Contracting
803 Rajasthan 52&58 154.14 BOT Toll 2L PS 06/02/2014
(old-65) in Rajasthan SAOG
Dineshchandra R. Agrawal Infracon
804 Rajasthan Salasar (Km 151.141) to Nagaur (Km 270.735) of NH-65 in Rajasthan 58 120 HAM 2L PS 28/03/2017
Pvt. Ltd.
805 Rajasthan Bikaner (km 4.20) to Phalodi (km 163.5) of NH - 15 in Rajasthan 11 159.17 BOT Toll 4L/2L PS 14/10/2015 IRCON International Limited
806 Rajasthan Phalodi (km 163.400) to Jaisalmer (km 323.857) of NH- 15 in Rajasthan 11 160.46 EPC 2L/4L 11/09/2015 Brahmaputra Infrastructure Ltd.
De-scoped section of NH-68 (Km 123.550 to 125.573) & Jaisalmer-
807 Rajasthan 6,811 162.48 Item Rate 2L PS 30/09/2023 Brahmaputra Infrastructure Ltd.
Phalodi section of NH-11 (km 105.143 to 265.600)
Bar-Bilara-Jodhpur (Km 0.000 to Km 111.000) of NH-112 in the State of
808 Rajasthan 112 109.65 EPC 4L PS 27/03/2017 Larsen & Toubro Ltd.
Rajasthan
Jodhpur Ring Road Package-I [4-laning of Dangiawas (Km. 96.595) to
809 Rajasthan 74.619 HAM 4L 14/12/2018 Gawar Construction Ltd
Jajiwal (Km. 283.500)
Bhimji Velji Sorathia Construction Pvt.
810 Rajasthan Jodhpur-Pokaran (2LPS) 125 164.43 EPC 2L PS 25/07/2015
Ltd.
Page 33 of 46
Completed PCC / PCOD Issued
Status as on 01 July 2024
All length in Km.
Page 34 of 46
Completed PCC / PCOD Issued
Status as on 01 July 2024
All length in Km.
Page 35 of 46
Completed PCC / PCOD Issued
Status as on 01 July 2024
All length in Km.
Page 36 of 46
Completed PCC / PCOD Issued
Status as on 01 July 2024
All length in Km.
Page 37 of 46
Completed PCC / PCOD Issued
Status as on 01 July 2024
All length in Km.
923 Tamil Nadu Salem - Ulundurpet section from km 0.313 to km 136.670 of NH-68 79 136.36 BOT Toll 2L/4L 15/01/2008 Reliance Infrastructure Ltd.
924 Tamil Nadu Thirumayam - Manamadurai 36 77.73 EPC 2L PS 17/07/2014 V. M and CO
Thirumayam - Manamadurai Section of NH-226 (New NH No. 36) from
925 Tamil Nadu 36 77.729 EPC 2L PS 21/09/2022 V. M and CO
Km.77.200 to Km.154.929
Nagarjuna Construction Company
926 Tamil Nadu,Puducherry Four Laning of Pondicherry - Tindivanam from km. 0.00 to km. 37.29 66 38.62 BOT Toll 4L 15/01/2008
Limited.
927 Telangana AP/Mah Border-Islam Nagar (AP 6) 44 55 BOT Annuity 4L 02/11/2007 Adilabad Expressway Pvt. Ltd
928 Telangana Islam Nagar-Kadthal (AP 7) 44 53 BOT Annuity 4L 11/06/2007 Patel - KNR (JV)
929 Telangana Four-laning of Kadtal to Armur from km.278.0 to km.308.0 of Old NH-7 44 30.9 BOT Annuity 4L PS 30/10/2007 Nirmal BOT Ltd
930 Telangana Armur - Adloor Yellareddy (Nagpur-Hyderabad) 44 60 BOT Toll 4L 02/02/2010 Navyuga Road Projects Pvt Ltd.
Km 367.000 (Adloor Yellareddy) to Km 447.000 and Improvement,
931 Telangana Operation & Maintenance of Km 447.000 to Km 464.000 (Gundla 44 103 BOT Annuity 4L 26/09/2006 GMR Infrastructure Ltd
Pochanpalli) on Nagpur - Hyderabad section of NH-44 AP-2
4L of Gundlapochanpally to Bowenpally from km. 464.000 to km.
932 Telangana 474.000 of Nagpur-Hyderabad Section of NH-7 (New No. NH-44) 44 10 EPC 4L 16/06/2021 KLR constructions
Contract Package No: NS-23 (TS)
933 Telangana Construction of two VUPs at Kompally on Nagpur - Hyderabad section 44 0 EPC 4L 05/05/2018 GHAI Construction Ltd.
934 Telangana Thondupally-Jadcherla 44 58 BOT Toll 4L 19/08/2006 Jadcherla Expressways Private Limited
935 Telangana Jadcherla-Kothakotta Bypass 44 56 BOT Toll 4L 19/08/2006 Larsen & Toubro Ltd.
936 Telangana Mangloor to Telangana Maharashtra Border 161 49 HAM 4L 12/04/2019 Dilip Buildcon Ltd.
937 Telangana Sangareddy - Nanded (Pkg. II) Ramsanpalle to Mangloor 161 46.8 HAM 4L 02/05/2019 KNR Constructions Limited
Ashoka Kandi Ramsanpalle Road
938 Telangana Sangareddy - Nanded - Akola (Pkg-I) [From Kandi to Ramsanpalle] 161 40 HAM 4L 05/10/2020
Private Limited
Adani Enterprises Ltd. and Prakash
939 Telangana 4L of Suryapet to Khamam from Km. 0.420 to Km.59.046 of NH 365BB 365BB 58.62 HAM 4L 27/12/2019 Asphaltings & Toll Highways (India)
Ltd.
Operation and Maintenance of 2L from Khammam 0.000 Km to
940 Telangana 365 BB 122.2 EPC 2L
Aswaraopet 122.200 Km. from NH365 BB
941 Telangana Kalyan to Nirmal Section from km. 615.00 to km. 668.60 61 54 EPC 2L PS 12/03/2014 Annapurna Constructions
Page 38 of 46
Completed PCC / PCOD Issued
Status as on 01 July 2024
All length in Km.
954 Telangana,Andhra Pradesh Hyderabad-Vijayawada 65 182 BOT Toll 4L/6L 06/04/2010 GMR Infrastructure Ltd
Eastern Peripheral Expressway Package - II from km 22.000 to km
955 Uttar Pradesh NE-II 25 EPC 6L 14/09/2015 Sadbhav Engineering Pvt. Ltd.
46.500 in the State of Haryana and Uttar Pradesh
Eastern Peripheral Expressway Package - III from km 46.500 to km
956 Uttar Pradesh NE-II 25 EPC 6L 14/09/2015 Jaiprakesh Associates Ltd.
71.00 in the State of Uttar Pradesh
Eastern Peripheral Expressway Package - IV from Km 71.000 to Km Ashoka Khairatunda Barwa Adda
957 Uttar Pradesh NE-II 22 EPC 6L 14/09/2015
93.000 in the state of Uttar Pradesh Road Limited
Eastern Peripheral Expressway Package - V from Km 93.000 to Km
958 Uttar Pradesh NE-II 21 EPC 6L 14/09/2015 Oriental Structural Engineers Pvt. Ltd.
114.000 in the state of Haryana and Uttar Pradesh.
Six Laning of Delhi - Agra section from Km.20.500 to Km.200 in the
959 Uttar Pradesh 19&44 179.5 BOT Toll 6L 16/10/2012 Reliance Infrastructure Ltd.
State of Haryana and U.P.
Grade seperated Structures including Highways at refinery Township
960 Uttar Pradesh 2 0 EPC 2L PS/MIP
Gate in NH-2 near Mohini Petrol P
961 Uttar Pradesh Construction of FOB across (i) Langde ki Chowki (ii) Lalaki Dargah 2 0 EPC Others 07/06/2018 Spacechem Enterprises
Chaudhary Construction Company
962 Uttar Pradesh Construction of 14 no. FOB on NH-2 in Mathura District 2 0 EPC Others 07/06/2018
Pvt. Ltd.
Additional Structures under Six Laning of Delhi-Agra section of NH-44
963 Uttar Pradesh 44 0 EPC 6L 01/01/2020 Atlas Construction Pvt. Ltd.
in the State of Uttar Pradesh between km. 143.0 and km. 195.10
Short term improvement and routine maintenance of 6L Delhi - Agra
964 Uttar Pradesh section from Km. 20.500 to Km. 200.00 of NH-2 in HR/UP for six 19 179.5 Item Rate 6L 20/05/2020 SEC Buildtech Pvt. Ltd.
months.
Providing and fixing square pipe fencing (1.95m height) in the portion
965 Uttar Pradesh from Km.134.000 to Km.151.750 in Mathura Town and Km.184.000 19 33.4 Item Rate 6L 01/09/2020 SEC Buildtech Pvt. Ltd.
to Km.199.650 in Agra Town in Section of Old NH-2
Agra - Etawah Bypass Section of NH-2 from Km. 199.660 to Km.
966 Uttar Pradesh 19 124.48 BOT Toll 6L 01/08/2016 Agra Etawah Tollways Ltd
323.525 in the State of Uttar Pradesh
967 Uttar Pradesh Etawah Bypass section km 307.500 to km 321.100 19 13.6 Item Rate 4L 01/03/2006 PNC Infratech Pvt. Ltd.
Oriental Structural Engineers Pvt. Ltd.
968 Uttar Pradesh Agra - Makhanpur km 199.660 - km 250.500 of NH-2 Pkg 1A 19 50.84 Item Rate 4L 30/03/2002
- GIL (JV)
969 Uttar Pradesh Makhanpur - Etawah from km 250.500 - km 307.500 of NH-2 Pkg 1B 19 57 Item Rate 4L 06/09/2005 Progressive Constructions Ltd.
Page 39 of 46
Completed PCC / PCOD Issued
Status as on 01 July 2024
All length in Km.
971 Uttar Pradesh Etawah - Sikandra (Kanpur Dehat) km 321.100 - km 393.00 Pkg 1C 19 72.825 Item Rate 4L 30/03/2002 PATI - BEL (JV)
972 Uttar Pradesh 6L of Chakeri - Allahabad from 483.687 to km. 628.753 of Old NH-02 19 145.07 HAM 6L 12/01/2019 PNC Infratech Pvt. Ltd.
973 Uttar Pradesh Allahabad Bypass (3B) (Packages ABP-I, II, III ) 19 84.708 Item Rate 4L 25/04/2014 Cube Highway
4L of Allahabad Bypass - Construction of Bridge across river Ganga
974 Uttar Pradesh 19 1.02 Item Rate 4L 07/10/2003 Larsen & Toubro Ltd.
from km. 163.28 to km. 164.30 (Construction Package ABP-I)
979 Uttar Pradesh 4L of Handia - Rajatalab Section Km. 245.00 to Km 317.398 of Old NH-2 19 72.398 Item Rate 4L G R Infraprojects Limited
Varanasi bypass (Ring Road, Phase-I) from Harhua (Km 0.000) to
980 Uttar Pradesh 31 17 EPC 4L 15/05/2015 APCO Infratech Pvt. Ltd.
Sandaha (Km 16.550)
4L Bypass connecting NH-2 (Rakhauna Village km. 782.546 of NH-2)
with NH-56 (Vajidpur Village km. 271.300 of NH-56) of Varanasi Ring
981 Uttar Pradesh 31 16.98 EPC 4L 15/09/2019 G R Infraprojects Limited
Road (Pkg-I, Phase -II) from km. 0.00 to km. 16.400 i/c Interchange
Loop at NH-2
Agra Bypass connecting km 176.8 of NH-2 to km 13.03 of NH-3 (km
982 Uttar Pradesh 19 32.8 Item Rate 4L 11/06/2011 SKS Infra Projects Pvt. Ltd.
0.000 to km 32.800)
Jhansi - Lalitpur section 1/2 from km. 0.00 to km. 49.70 (Package -
983 Uttar Pradesh 44 49.7 BOT Annuity 4L 28/03/2007 Gayatri Projects Limited
NS1/BOT/UP-2)
Jhansi - Lalitpur section 2/2 from km. 49.70 to km. 99.005 (Package -
984 Uttar Pradesh 44 49.3 BOT Annuity 4L 28/03/2007 Gayatri Projects Limited
NS1/BOT/UP-3)
4L of Jhansi-Lakhanadon section from km 99 to km 136.99 of NH-26 in Nagarjuna Construction Company
985 Uttar Pradesh 44 93.69 EPC 4L 24/06/2006
the state of UP (Civil Contract Package No. ADB-II/C-3) Limited.
Prakash Asphaltings and Toll
986 Uttar Pradesh Jhansi-Orai from Km. 90.300 to Km. 225.713 of NH-27 (OMT-Pkg 12) 27 135.41 EPC 4L 28/10/2016
Highways (India) Ltd.
4L of Orai - Bhognipur - Barah from km. 220.0 to km. 255.00 of Old NH-
987 Uttar Pradesh 25 & from km. 421.20 to km. 449.00 on Old NH-02 (Pkg No. EW-II/BOT- 27 62.8 BOT Annuity 4L 24/10/2006 O.B Infrastructure Pvt. Ltd. (OBIL)
UP)
988 Uttar Pradesh Kanpur - Lucknow - Ayodhya OMT - 10 27 217.315 OMT 4L 01/08/2013 PNC Kanpur Ayodhya Tollroad Pvt. Ltd
989 Uttar Pradesh Lucknow-Faizabad Section of NH-28, LMNHP-EW-II (WB-1) 28 36 EPC 4L 13/10/2005 Hindustan Construction Company Ltd.
990 Uttar Pradesh Lucknow-Faizabad Section of NH-28, LMNHP-EW-II (WB-2) 28 47 EPC 4L 13/10/2005 Hindustan Construction Company Ltd.
991 Uttar Pradesh Lucknow-Faizabad Section of NH-28, LMNHP-EW-II (WB-3) 28 46 EPC 4L 19/08/2005 Hindustan Construction Company Ltd.
Balance work of construction of segment of lucknow Bypass
Prakash Atlanta in (JV) with NKG
992 Uttar Pradesh connecting NH-25 and NH-28 via NH-56 passing through Lucknow city 56A & 56B 22.85 EPC 4L 02/03/2009
Infrastructure
(Contract Package No. EW-15A/UP)
4L of Km 11.380 to Km 21.800 of Lucknow-Kanpur section of NH-25 in
993 Uttar Pradesh 25 10.42 EPC 4L 04/04/2000 Vilayati Ram Mittal
the State of Uttar Pradesh (Contract Package No. EW-2/UP
4L of Km 21.800 to Km 44.000 of Lucknow-Kanpur section of NH-25
994 Uttar Pradesh 25 22.2 EPC 4L 30/08/2001 Vilayati Ram Mittal
(NSEW Phase-II) (Contract Package No. EW-8/UP)
Page 40 of 46
Completed PCC / PCOD Issued
Status as on 01 July 2024
All length in Km.
Page 41 of 46
Completed PCC / PCOD Issued
Status as on 01 July 2024
All length in Km.
Page 42 of 46
Completed PCC / PCOD Issued
Status as on 01 July 2024
All length in Km.
Special Repair and Maintenance of Phephna (Ballia) - Chiraiya More MCCMAHADEO Constructions Private
1065 Uttar Pradesh 31 45.1 Item Rate 2L 03/02/2022
(Barria) Section from Km 473.400 to Km 518.500 on NH-31 (Pkg-2) Limited
Special Repair and Maintenance of Phephna (Ballia) - Chiraiya More MCCMAHADEO Constructions Private
1067 Uttar Pradesh 31 45.1 Item Rate 2L 25/02/2022
(Barria) Section from Km 473.400 to Km 518.500 on NH-31 (Pkg-2) Limited
Shakarpur( Km 8.800) to Akbarpur (Km 73.512) of NH-235 in Uttar
1068 Uttar Pradesh 334 61.19 HAM 4L 28/04/2017 APCO Infratech Pvt. Ltd.
Pradesh (Meerut - Bulandshahar)
Nagarjuna Construction Company
1069 Uttar Pradesh Meerut - Muzaffarnagar 58 78.31 BOT Toll 4L PS 07/03/2006
Limited.
1070 Uttar Pradesh Meerut - Muzaffarnagar - Addl. Works (Structures) 334 78 EPC 4L 20/03/2018 Krishna Constructions.
1071 Uttar Pradesh Varanasi Gorakhpur Section from km. 84.160 to 149.540 ( PKG III) 24 65.38 EPC 4L 10/04/2017 Jaiprakesh Associates Ltd.
Varanasi (Km 12.01) to Birnon (Km 84.160) [Varanasi - Gorakpur] ( PKG-
1072 Uttar Pradesh 29 72.15 EPC 4L 31/03/2017 PNC Infratech Pvt. Ltd.
II)
Ambedkar Nagar (Km 0.000) to Raebareilly (Km 155.900) of NH-232 in
1073 Uttar Pradesh 128 155.9 EPC 2L PS 22/04/2014 GKC Projects Ltd.
UP
Operation and Maintenance including Partial Strengthening of
1074 Uttar Pradesh 128 148.9 PBMC 2L PS 30/03/2024 Kaluwala Construction Private Limited
Ambedkar Nagar to Raebareli section of NH-128 Under PBMC mode
2L PS of of Rudhauli to Basti side approach of Ghaghara Bridge Section
1075 Uttar Pradesh 28 54.36 EPC 2L PS 25/03/2015 KMC Construction Ltd.
from Km. 65.870 to Km. 122.270) of NH 233
Rehabilitation and Up-Gradation of 2L - PS Indo/ Nepal Border to JSP Projects Pvt Ltd. - Vijay
1076 Uttar Pradesh 28 65.87 EPC 2L PS 27/11/2018
Rudhauli Section from Km. 0.000 to Km. 65.870 of NH-28 Construction Pvt. Ltd. (JV)
1077 Uttar Pradesh Ghaghra Bridge to Varanasi Section of NH-233 (Package-1) 233 58.62 EPC 4L 15/12/2015 Dilip Buildcon Ltd.
Page 43 of 46
Completed PCC / PCOD Issued
Status as on 01 July 2024
All length in Km.
Page 44 of 46
Completed PCC / PCOD Issued
Status as on 01 July 2024
All length in Km.
Page 45 of 46
Completed PCC / PCOD Issued
Status as on 01 July 2024
All length in Km.
Page 46 of 46