0% found this document useful (0 votes)
17 views49 pages

Ware House 17.3.2024

Uploaded by

soewunna1987
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
17 views49 pages

Ware House 17.3.2024

Uploaded by

soewunna1987
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 49

ကားဂိုဒေါင် (196'10"x98'5") တည်ဆောက်ခြင်းလုပ်ငန်း

Civil Work

SUMMARY

Sr.
PARTICULARS MATERIALS LABOURS TOTAL
No

ကားဂိုဒေါင် (196'10"x98'5")
1 - - -
တည်ဆောက်ခြင်းလုပ်ငန်း

Ground Tank ( 38' x 14' x


2 - - -
10' )

ခြံစည်းရိုးဖြိုဖျက်ခြင်း
3 နှင့် တည်ဆောက်ခြင်း - - -
လုပ်ငန်း

Ramp(100'x20'x9") & Drain


4 - - -
Work (100'x3'x3')

5 Septic Tank ( 9'x7'x5') - -

Total Cost - - -

Grand Total - - -
ကားဂိုဒေါင် (196'10"x98'5") တည်ဆောက်ခြင်းလုပ်ငန်း

SUMMARY

Sr.
PARTICULARS MATERIALS LABOURS TOTAL
No

ကားဂိုဒေါင် (196'10"x98'5")
1 - - -
တည်ဆောက်ခြင်းလုပ်ငန်း

Total Of Materials + Labours Cost -


ကားဂိုဒေါင် (196'10"x98'5") တည်ဆောက်ခြင်းလုပ်ငန်း

Bills of Quantities

Sr
Particular Qty Unit Rate Per Amount Remark
No.

Material Charges

1 Cement 2595.96 Bag Bag -


2 Sand 194.74 Sud Sud -
3 6"x9" Stone 5.14 Sud Sud -
4 Chippings 140.39 Sud Sud -
5 Brick 40387.11 Nos Nos -
7 J-Wood 8.00 Ton Ton -
8 5 Ply Wood 61.45 Sht Sht -
9 Wire Nail 46.79 Viss Viss -
10 16mm Dia MS Rod 8.30 Ton Ton -
11 12mm Dia MS Rod 11.20 Ton Ton -
12 10mm Dia MS Rod 6.44 Ton Ton -
13 X-Met 2817.79 Nos Nos -
14 Putty 24.50 Gal Gal -
15 Sand Paper 16.34 Doz Doz -
16 Putty Trowel 8.17 Nos Nos -
17 Emusion Paint 32.83 Nos Nos -
18 Roller 12.25 Lot Lot -
19 Binding Wire 81.92 Viss Viss -

Cost of Materials Ks; -

Labour Charges

1 Worker 2744.20 Nos Nos -


2 Mason 469.17 Nos Nos -
3 Carpenter 317.48 Nos Nos -
4 Smith ( steel Fixer) 294.90 Nos Nos -

5 Painter 81.68 Nos Nos -

Cost Of Labour Ks; -

Total Of Materials + Labours Cost Ks; -


ကားဂိုဒေါင် (196'10"x98'5") တည်ဆောက်ခြင်းလုပ်ငန်း

Abstract Cost

Sr
Qty Unit Particular Rate Per Amounts
No.

1 22,424.51 Sft Site Clearing Work - Sft -

2 19,372.01 Sft Surveying & Leveling Work - Sft -

3 9,581.38 Cft Earthwork Excavation Work - Cft -

4 514.25 Cft Hard Core Work - Cft -

5 7,688.88 Cft (1:3:6) Concrete Work - Cft -

Retaining Wall Brick Work with


6 1,993.39 Cft - Cft -
(1:3) Cement Motor

7 18,106.81 Cft Earth Filling Work - Cft -

8 9,053.40 Cft Sand Filling Work - Cft -

9 4,393.20 Cft 1:2:4 Concrete Work - Cft -

10 5,129.76 Sft Timber Shuttering Formwork - Sft -

11 14.75 Ton Rebar Work - Ton -

4-1/2''thk; Brick Work with (1:3)


12 2,450.25 Sft - Sft -
motar
1/2''thk;Plastering Work with
13 4,900.50 Sft - Sft -
(1:3) motar
1-1/2''thk; (1:2:4) Cement
14 22,745.66 Sft Concrete Topping Work For - Sft -
Ground Floor
Surface Preparation Before
15 4,900.50 Sft - Sft -
Painting With Putty ( 2 Coats)
Plastic Emulsion Painting Work
16 4,900.50 Sft - Sft -
( 2 Coats )

Total Of Materials + Labours Cost Ks; -


ကားဂိုဒေါင် (196'10"x98'5") တည်ဆောက်ခြင်းလုပ်ငန်း

Builder Estimate

Sr
Particular Quantity Unit Rate Per Amount Remark
No.

1 Site Clearing Work ### Sft Pg-1/1(b)

Labour
Worker 56.06 Nos - Nos -
-

2 Surveying & Leveling Wo ### Sft


Material
j-Wood 1.16 Ton - Ton -
Wire Nail 4.04 Viss - Viss -
Labour
Carpenter 9.69 Nos - Nos -
Worker 19.37 Nos - Nos -
-

3 Earthwork Excavation Wo9,581.38 Cft Pg-1/4


Labour
Worker 287.44 Nos - Nos -
-

4 Hard Core Work 514.25 Cft Pg-38/3


Material
6"x9" Stone 5.14 Sud - Sud -
Sand 1.29 Sud - Sud -
Labour
Worker 5.14 Nos - Nos -
-

5 (1:3:6) Concrete Work 7,688.88 Cft


Material
Cement 988.57 Bag - Bag -
ကားဂိုဒေါင် (196'10"x98'5") တည်ဆောက်ခြင်းလုပ်ငန်း

Builder Estimate

Sr
Particular Quantity Unit Rate Per Amount Remark
No.

Chippings 73.81 sud - sud -


Sand 36.91 sud - sud -
Labour
Mason 76.89 Nos - Nos -
Worker 692.00 Nos - Nos -
-

6 Retaining Wall Brick Work with (1:3) Cement Motor Pg-33/2


1,993.39 Cft
Material
Cement 138.83 Bag - Bag -
Brick 26,910.73 Nos - Nos -
Sand 5.18 Sud - Sud -
Labour
Mason 79.74 Nos - Nos -
Worker 119.60 Nos - Nos -
-

7 Earth Filling Work ### Cft Pg-2/5


Labour
Worker 135.80 Nos - -
-

8 Sand Filling Work 9,053.40 Cft Pg-3/12


Material
Sand 113.17 Sud - Sud -
Labour
Worker 90.53 Nos - Nos -
-
ကားဂိုဒေါင် (196'10"x98'5") တည်ဆောက်ခြင်းလုပ်ငန်း

Builder Estimate

Sr
Particular Quantity Unit Rate Per Amount Remark
No.

9 1:2:4 Concrete Work 4,393.20 Cft


Material
Cement 811.96 Bag - Bag -
Sand 20.21 Nos - Nos -
Chippings 40.42 Sud - Sud -
Labour
Mason 43.93 Nos - Nos -
Worker 395.39 Nos - Nos -
-
10 Timber Shuttering Formwork Pg-124/1
5,129.76 Sft
Material
J-Wood 6.84 Ton - Ton -
5 Ply Wood 61.45 Sht - Sht -
Wire Nail 42.75 Viss - Viss -
Labour
Carpenter 307.79 Nos - Nos -
Worker 102.60 Nos - Nos -
-

11 Rebar Work 14.75 Ton Pg-134/12


Material
16mm Dia MS Rod 8.30 Ton - Ton -
12mm Dia MS Rod 11.20 Ton - Ton -
10mm Dia MS Rod 6.44 Ton - Ton -
Binding Wire 81.92 Viss - Viss -
Labour
Smith ( steel Fixer) 294.90 Nos - Nos -
Worker 294.90 Nos - Nos -
-
ကားဂိုဒေါင် (196'10"x98'5") တည်ဆောက်ခြင်းလုပ်ငန်း

Builder Estimate

Sr
Particular Quantity Unit Rate Per Amount Remark
No.

12 4-1/2''thk; Brick Work with (1:3) motar Pg-82/8


2,450.25 Sft
Material
Cement 64.98 bag - bag -
Sand 2.45 Sud - Sud -
Brick 13,476.38 No - No -
X-Met 2,817.79 Rft - Rft -
Labour
Mason 49.01 Nos - Nos -
Worker 73.51 Nos - Nos -
-

13 1/2''thk;Plastering Work with (1:3) motar Pg-41/3


4,900.50 Sft
Material
Cement 65.63 bag - bag -
Sand 2.45 Sud - Sud -
Labour
Mason 49.01 Nos - Nos -
Worker 98.01 Nos - Nos -
-

14 1-1/2''thk; (1:2:4) Cement Concrete Topping Work For Ground Floor Pg-70/8
### Sft
Material
Cement 525.99 Bag - Bag -
Sand 13.08 Sud - Sud -
Chippings 26.16 Sud - Sud -
Labour
Mason 170.59 Nos - Nos -
ကားဂိုဒေါင် (196'10"x98'5") တည်ဆောက်ခြင်းလုပ်ငန်း

Builder Estimate

Sr
Particular Quantity Unit Rate Per Amount Remark
No.

Worker 341.18 Nos - Nos -


-

15 Surface Preparation Before Painting With Putty ( 2 Coats) Pg.122/45


4,900.50 Sft
Material
Putty 24.50 Gal - Gal -
Sand Paper 16.34 Doz - Doz -
Putty Trowel 8.17 No - No -
Labour
Painter 32.67 No - No -
Worker 32.67 No - No -
-

16 Plastic Emulsion Painting Work ( 2 Coats ) Pg-122/46


4,900.50 Sft
Material
Emusion Paint 32.83 Gal - Gal -
Roller 12.25 No - No -
Labour
Painter 49.01 Nos - Nos -
-

Total Of Materials + Labours Cost Ks; - Kyats


ကားဂိုဒေါင် (196'10"x98'5") တည်ဆောက်ခြင်းလုပ်ငန်း

Detail Measurement

Measurement
Sr Particular No Dedu; Total Unit
L B H
1 Site Clearing Work 1 206.83 108.42 22,424.51
22,424.51 Sft

2 Surveying & Leveling Work


1 196.83 98.42 19,372.01
19,372.01 Sft

3 Earthwork Excavation Work


Footing 34 5.50 5.50 5.75 5,913.88
Retaining Wall 40 14.67 2.50 2.50 3,667.50
9,581.38 Cft

4 Hard Core Work


Footing 34 5.50 5.50 0.50 514.25
514.25 Cft

5 (1:3:6) Concrete Work


Footing 34 5.50 5.50 0.25 257.13
Retaining Wall 40 14.67 2.50 0.25 366.75
Ground Floor 1 196.83 98.42 0.375 7,264.50
7,888.38
Deduction
Ground Tank Area 1 38.00 14.00 0.375 199.50 7,688.88
7,688.88 Cft

6 Retaining Wall Brick Work with (1:3) Cement Motor


40 18.33 1.50 0.25 274.95
40 18.33 1.13 0.25 206.21
40 18.33 0.75 2.75 1,512.23
1,993.39 Cft

7 Earth Filling Work 1 196.83 98.42 1.00 19,372.01


Deduction
Ground Tank Area 1 38.00 14.00 1.00 532.00
Plith Beam Area 40 18.33 1.00 1.00 733.20
1265.20 18,106.81
18,106.81 Cft
ကားဂိုဒေါင် (196'10"x98'5") တည်ဆောက်ခြင်းလုပ်ငန်း

Detail Measurement

Measurement
Sr Particular No Dedu; Total Unit
L B H
8 Sand Filling Work 1 196.83 98.42 0.50 9,686.00
Deduction
Ground Tank Area 1 38.00 14.00 0.50 266.00
Plith Beam Area 40 18.33 1.00 0.50 366.60
632.60 9,053.40
9,053.40 Cft

9 1:2:4 Concrete Work


Footing 34 5.00 5.00 1.00 850.00
Column 34 2.67 1.33 10.56 1,274.99
Plith Beam 40 18.33 1.00 1.00 733.20
Floor Slab 1 79.68 42.34 0.46 1,535.01
4,393.20 Cft

10 Timber Shuttering Formwork


Footing 34 20.00 1.00 680.00
Column 34 8.00 10.56 2,872.32
Plith Beam 40 18.33 2.00 1,466.40
Floor Slab 1 244.04 0.46 111.04
5,129.76 Sft

11 Rebar Work 12 mm 16 mm 10 mm
Footing
16mm Dia MS Rod 34x24 6.00 4,896.00
Column
16mm Dia MS Rod 34x14 13.81 6,573.56
Stirrup 6c/c 10mm Dia MS Rod 34x24 6.25 5,100.00
Stirrup 6c/c 10mm Dia MS Rod 34x24 6.25 5,100.00
Stirrup 6c/c 10mm Dia MS Rod 34x24 4.58 3,737.28
Plith Beam
16mm Dia MS Rod 2x6 199.67 2,396.04
3x6 102.58 1,846.44
4x6 42.13 1,011.00
Stirrup 5c/c 10mm Dia MS Rod 2x473 3.00 2,838.00
3x242 3.00 2,178.00
4x98 3.00 1,176.00
Ground Floor
LD ### 101.00 ###
ကားဂိုဒေါင် (196'10"x98'5") တည်ဆောက်ခြင်းလုပ်ငန်း

Detail Measurement

Measurement
Sr Particular No Dedu; Total Unit
L B H
SD 99.42 201.00 ###

Floor Slab
LD 82.00 79.93 6,554.26
SD ### 40.50 6,520.50
Total Rft ### 16,723.04 ###
Unit Weight of steel 0.595 1.059 0.414
Total Lbs ### 17,709.70 ###
Total ton 10.67 7.91 6.14
Total of 16mmØ M.S Rod 7.91 Ton 8.30 Ton ( with 5% waste )
Total of 12mmØ M.S Rod ### Ton 11.20 Ton ( with 5% waste )
Total of 10mmØ M.S Rod ### Ton 6.44 Ton ( with 5% waste )
ကားဂိုဒေါင် (196'10"x98'5") တည်ဆောက်ခြင်းလုပ်ငန်း

Ground Tank ( 38' x 14' x 9'-6" )

SUMMARY

Sr.
PARTICULARS MATERIALS LABOURS TOTAL
No

1 Ground Tank ( 38' x 17' x 9'-6" - - -

Total Of Materials + Labours Cost -


ကားဂိုဒေါင် (196'10"x98'5") တည်ဆောက်ခြင်းလုပ်ငန်း

Ground Tank ( 38' x 14' x 9'-6" )

Bills of Quantities

Sr
Particular Qty Unit Rate Per Amount Remark
No.

Material Charges

1 Cement 262.88 Bag Bag -


2 Sand 8.45 Sud Sud -
3 6"x9" Stone 2.66 Sud Sud -
4 Chippings 10.95 Sud Sud -
5 Brick 9218.81 Nos Nos -
6 J-Wood 1.04 Ton Ton -
7 5 Ply Wood 9.36 Sht Sht -
8 Wire Nail 6.51 Viss Viss -
9 16mm Dia MS Rod 1.23 Ton Ton -
10 10mm Dia MS Rod 1.31 Ton Ton -
11 Binding Wire 14.14 Viss Viss -
12 Readymade MS Manhole(M+ 2.00 Nos Nos -

Cost of Materials Ks; -

Labour Charges

1 Worker 342.97 Nos Nos -


2 Mason 58.77 Nos Nos -
3 Carpenter 46.86 Nos Nos -
4 Smith ( steel Fixer) 50.90 Nos Nos -

Cost Of Labour Ks; -

Total Of Materials + Labours Cost Ks; -


ကားဂိုဒေါင် (196'10"x98'5") တည်ဆောက်ခြင်းလုပ်ငန်း

Ground Tank ( 38' x 14' x 9'-6" )

Abstract Cost

Sr
Qty Unit Particular Rate Per Amounts
No.

1 4,921.00 Cft Earthwork Excavation Work - Cft -

2 266.00 Cft Hard Core Work - Cft -

3 399.00 Cft (1:3:6) Concrete Work - Cft -

13.5" Thick Brick Work with (1:3)


4 682.88 Cft - Cft -
Cement Motor

5 693.06 Cft 1:2:4 Concrete Work - Cft -

6 781.00 Sft Timber Shuttering Formwork - Sft -

7 2.54 Ton Rebar Work - Ton -

3/4''thk;Plastering Work with


8 1,045.00 Sft - Sft -
(1:3) motar

1-1/2''thk; (1:2:4) Cement


9 646.00 Sft - Sft -
Concrete Topping Work

10 2.00 Nos MS Manhole Fixing Work - Nos -

Total Of Materials + Labours Cost Ks; -


ကားဂိုဒေါင် (196'10"x98'5") တည်ဆောက်ခြင်းလုပ်ငန်း

Ground Tank ( 38' x 14' x 9'-6" )

Builder Estimate

Sr
Particular Quantity Unit Rate Per Amount Remark
No.

1 Earthwork Excavation Wo4,921.00 Cft


Labour
Worker 147.63 Nos - Nos -
-

2 Hard Core Work 266.00 Cft


Material
6"x9" Stone 2.66 Sud - Sud -
Sand 0.67 Sud - Sud -
Labour
Worker 2.66 Nos - Nos -
-

3 (1:3:6) Concrete Work 399.00 Cft


Material
Cement 51.30 Bag - Bag -
Chippings 3.83 sud - sud -
Sand 1.92 sud - sud -
Labour
Mason 3.99 Nos - Nos -
Worker 19.95 Nos - Nos -
-

4 13.5" Thick Brick Work with (1:3) Cement Motor


682.88 Cft
Material
Cement 47.56 Bag - Bag -
Brick 9,218.81 Nos - Nos -
Sand 1.78 Sud - Sud -
Labour
Mason 27.32 Nos - Nos -
Worker 40.97 Nos - Nos -
-

5 1:2:4 Concrete Work 693.06 Cft


Material
Cement 128.09 Bag - Bag -
Sand 3.19 Nos - Nos -
Chippings 6.38 Sud - Sud -
Labour
Mason 6.93 Nos - Nos -
Worker 34.65 Nos - Nos -
-

6 Timber Shuttering Form 781.00 Sft


Material
J-Wood 1.04 Ton - Ton -
5 Ply Wood 9.36 Sht - Sht -
Wire Nail 6.51 Viss - Viss -
Labour
Carpenter 46.86 Nos - Nos -
Worker 15.62 Nos - Nos -
-

7 Rebar Work 2.54 Ton


Material
16mm Dia MS Rod 1.23 Ton - Ton -
10mm Dia MS Rod 1.31 Ton - Ton -
Binding Wire 14.14 Viss - Viss -
Labour
Smith ( steel Fixer) 50.90 Nos - Nos -
Worker 50.90 Nos - Nos -
-

8 3/4''thk;Plastering Work with (1:3) motar


1,045.00 Sft
Material
Cement 20.99 bag - bag -
Sand 0.52 Sud - Sud -
Labour
Mason 15.68 Nos - Nos -
Worker 20.90 Nos - Nos -
-

9 1-1/2''thk; (1:2:4) Cement Concrete Topping Work


646.00 Sft
Material
Cement 14.94 Bag - Bag -
Sand 0.37 Sud - Sud -
Chippings 0.74 Sud - Sud -
Labour
Mason 4.85 Nos - Nos -
Worker 9.69 Nos - Nos -
-

10 MS Manhole Fixing Work 2.00 Nos


Material + Labour
Readymade MS Manhole(M+ 2.00 No - No -
-

Total Of Materials + Labours Cost Ks; - Kyats


ကားဂိုဒေါင် (196'10"x98'5") တည်ဆောက်ခြင်းလုပ်ငန်း

Ground Tank ( 38' x 14' x 9'-6" )

Detail Measurement

Measurement
Sr Particular No Dedu; Total Unit
L B H
1 Earthwork Excavation Work
1 38.00 14.00 9.25 4,921.00
4,921.00 Cft

2 Hard Core Work 1 38.00 14.00 0.50 266.00


266.00 Cft

3 (1:3:6) Concrete Wor 1 38.00 14.00 0.75 399.00


399.00 Cft

4 13.5" Thick Brick Work with (1:3) Cement Motor


2 35.75 0.75 9.50 509.44
2 12.50 0.75 9.25 173.44
682.88 Cft

5 1:2:4 Concrete Work


Footing 1 38.00 14.00 0.75 399.00
Column 6 0.75 0.75 9.50 32.06
Cover Slab 1 38.00 14.00 0.50 266.00
697.06
Deduction
Manhole 2 2.00 2.00 0.50 4.00 693.06
693.06 Cft

6 Timber Shuttering Formwork


Footing 1 104.00 0.75 78.00
Column 6 3.00 9.50 171.00
Cover Slab 1 38.00 14.00 532.00
781.00 Sft
7 Rebar Work 10 mm 16mm
Footimg
Ld 76 14.50 1,102.00
Sd 28 38.50 1,078.00
Column
16mm Dia MS Rod 24 12.75 306.00
Stirrup 6c/c 10mm Dia MS Rod 126 2.50 315.00
Cover Slab 10mmØMS Rod @ 6"c/c Bothway 2 Layers
LD 158 20.50 3,239.00
SD 80 40.00 3,200.00
Total Rft 6,754.00 ###
Unit Weight of steel 0.414 1.059
Total Lbs 2,796.16 ###
Total ton 1.25 1.18
Total of 16mmØ M.S Rod ### Ton 1.23 Ton ( with 5% waste )
Total of 10mmØ M.S Rod ### Ton 1.31 Ton ( with 5% waste )

8 3/4''thk;Plastering Work with (1:3) motar


Internal Wall 2 38.00 9.50 722.00
2 17.00 9.50 323.00
1,045.00 Sft

9 1-1/2''thk; (1:2:4) Cement Concrete Topping Work


1 38.00 17.00 646.00
646.00 Sft

10 MS Manhole Fixing W 1 2.00 2.00


2.00 Nos
ကားဂိုဒေါင် (196'10"x98'5") တည်ဆောက်ခြင်းလုပ်ငန်း

ခြံစည်းရိုးဖြိုဖျက်ခြင်းနှင့် တည်ဆောက်ခြင်း(112'x11')လုပ်ငန်း

SUMMARY

Sr.
PARTICULARS MATERIALS LABOURS TOTAL
No

ခြံစည်းရိုးဖြိုဖျက်ခြင်း
1 နှင့် တည်ဆောက်ခြင်း - - -
လုပ်ငန်း

Total Of Materials + Labours Cost -


ကားဂိုဒေါင် (196'10"x98'5") တည်ဆောက်ခြင်းလုပ်ငန်း

ခြံစည်းရိုးဖြိုဖျက်ခြင်းနှင့် တည်ဆောက်ခြင်း(112'x11')လုပ်ငန်း

Bills of Quantities

Sr
Particular Qty Unit Rate Per Amount Remark
No.

Material Charges

1 Cement 126.53 Bag Bag -


2 Sand 4.29 Sud Sud -
3 6"x9" Stone 0.54 Sud Sud -
4 Chippings 3.49 Sud Sud -
5 Brick 6728.22 Nos Nos -
6 Fuel 7.48 Gal Gal -
7 J-Wood 1.01 Nos Nos -
8 5 Ply Wood 9.08 Sht Sht -
9 Wire Nail 17.99 Viss Viss -
10 16mm Dia MS Rod 1.10 Ton Ton -
11 6.5mm Dia MS Rod 0.13 Ton Ton -
12 X-Met 760.58 Nos Nos -
13 Putty 11.53 Gal Gal -
14 Sand Paper 7.69 Doz Doz -
15 Putty Trowel 3.84 Nos Nos -
16 Emusion Paint 15.45 Nos Nos -
17 Roller 5.76 Lot Lot -
18 Binding Wire 6.86 Viss Viss -
19 1.5"x1.5" Angle Iron(M+ 30.00 Rft Rft -
20 Blade Wire (M+L) 224.00 Rft Rft -
21 Bamboo 36.30 Viss Viss -
22 Coilyan 7.78 Viss Viss -

Cost of Materials Ks; -

Labour Charges

1 Chainlink Fencing 1344.00 Sft Sft -


2 Brick Fencing 1800.00 Sft Sft -
3 Worker 202.87 Nos Nos -
4 Mason 49.19 Nos Nos -
5 Carpenter 45.50 Nos Nos -
6 Smith ( steel Fixer) 24.68 Nos Nos -
7 Machine Driver 1.87 Nos Nos -

8 Painter 38.43 Nos Nos -

Cost Of Labour Ks; -

Total Of Materials + Labours Cost Ks; -


19,372.01

-
ကားဂိုဒေါင် (196'10"x98'5") တည်ဆောက်ခြင်းလုပ်ငန်း

ခြံစည်းရိုးဖြိုဖျက်ခြင်းနှင့် တည်ဆောက်ခြင်း(112'x11')လုပ်ငန်း

Abstract Cost

Sr
Qty Unit Particular Rate Per Amounts
No.

Dimentling Work For Fencing


1 3,144.00 Sft - Sft -
With Site Cleaning

2 859.25 Cft Earthwork Excavation Work - Cft -

3 54.00 Cft Hard Core Work - Cft -

4 123.25 Cft (1:3:6) Concrete Work - Cft -

Retaining Wall Brick Work with


5 228.94 Cft - Cft -
(1:3) Cement Motor

6 250.64 Cft 1:2:4 Concrete Work - Cft -

7 758.38 Sft Timber Shuttering Formwork - Sft -

8 1.23 Ton Rebar Work - Ton -

4-1/2''thk; Brick Work with (1:3)


9 661.38 Sft - Sft -
motar

1/2''thk;Plastering Work with


10 2,305.75 Sft - Sft -
(1:3) motar

Surface Preparation Before


11 2,305.75 Sft - Sft -
Painting With Putty ( 2 Coats)

Plastic Emulsion Painting Work


12 2,305.75 Sft - Sft -
( 2 Coats )

13 224.00 Rft 2 Line Blde Wire Fencing Work - Rft -

14 2,240.00 Sft Bamboo Scaffolding Work - Sft -

Total Of Materials + Labours Cost Ks; -


ကားဂိုဒေါင် (196'10"x98'5") တည်ဆောက်ခြင်းလုပ်ငန်း

ခြံစည်းရိုးဖြိုဖျက်ခြင်းနှင့် တည်ဆောက်ခြင်း(112'x11')လုပ်ငန်း

Builder Estimate

Sr
Particular Quantity Unit Rate Per Amount Remark
No.

1 Dimentling Work For Fencing With Site Cleaning


3,144.00 Sft
Labour
Chainlink Fencing 1,344.00 Sft - Sft -
Brick Fencing 1,800.00 Sft - Sft -
-

2 Earthwork Excavation Wo 859.25 Cft Pg-1/4


Labour
Worker 25.78 Nos - Nos -
-

3 Hard Core Work 54.00 Cft Pg-38/3


Material
6"x9" Stone 0.54 Sud - Sud -
Sand 0.14 Sud - Sud -
Labour
Worker 0.54 Nos - Nos -
-

4 (1:3:6) Concrete Work 123.25 Cft p-28/1


Material
Cement 15.85 Bag - Bag -
Chippings 1.18 Sud - Sud -
Sand 0.59 Sud - Sud -
Fuel 2.47 Gal - Gal -
Labour
Mason 1.23 Nos - Nos -
Machine Driver 0.62 Nos - Nos -
Worker 7.40 Nos - Nos -
-
5 Retaining Wall Brick Work with (1:3) Cement Motor Pg-33/2
228.94 Cft
Material
Cement 15.94 Bag - Bag -
Brick 3,090.66 Nos - Nos -
Sand 0.60 Sud - Sud -
Labour
Mason 9.16 Nos - Nos -
Worker 13.74 Nos - Nos -
-

6 1:2:4 Concrete Work 250.64 Cft p-28/2


Material
Cement 46.32 Bag - Bag -
Sand 1.15 Sud - Sud -
Chippings 2.31 Sud - Sud -
Fuel 5.01 Gal - Gal -
Labour
Mason 2.51 Nos - Nos -
Machine Driver 1.25 Nos - Nos -
Worker 22.56 Nos - Nos -
-

7 Timber Shuttering Form 758.38 Sft Pg-124/1


Material
J-Wood 1.01 Ton - Ton -
5 Ply Wood 9.08 Sht - Sht -
Wire Nail 6.32 Viss - Viss -
Labour
Carpenter 45.50 Nos - Nos -
Worker 15.17 Nos - Nos -
-
8 Rebar Work 1.23 Ton Pg-134/12
Material
16mm Dia MS Rod 1.10 Ton - Ton -
6.5mm Dia MS Rod 0.13 Ton - Ton -
Binding Wire 6.86 Viss - Viss -

Labour
Smith ( steel Fixer) 24.68 Nos - Nos -
Worker 24.68 Nos - Nos -
-

9 4-1/2''thk; Brick Work with (1:3) motar Pg-82/8


661.38 Sft
Material
Cement 17.54 bag - bag -
Sand 0.66 Sud - Sud -
Brick 3,637.56 No - No -
X-Met 760.58 Rft - Rft -
Labour
Mason 13.23 Nos - Nos -
Worker 19.84 Nos - Nos -
-

10 1/2''thk;Plastering Work with (1:3) motar Pg-41/3


2,305.75 Sft
Material
Cement 30.88 bag - bag -
Sand 1.15 Sud - Sud -
Labour
Mason 23.06 Nos - Nos -
Worker 46.12 Nos - Nos -
-

11 Surface Preparation Before Painting With Putty ( 2 Coats) Pg.122/45


2,305.75 Sft
Material
Putty 11.53 Gal - Gal -
Sand Paper 7.69 Doz - Doz -
Putty Trowel 3.84 No - No -
Labour
Painter 15.37 No - No -
Worker 15.37 No - No -
-

12 Plastic Emulsion Painting Work ( 2 Coats ) Pg-122/46


2,305.75 Sft
Material
Emusion Paint 15.45 Gal - Gal -
Roller 5.76 No - No -
Labour
Painter 23.06 Nos - Nos -
-

13 2 Line Blde Wire Fencing Work


224.00 Rft
Material+Labour
1.5"x1.5" Angle Iron(M+L 30.00 Rft - Rft 0.00
Blade Wire (M+L) 224.00 Rft - Rft 0.00
-

Pg-
14 Bamboo Scaffolding Wor 2,240.00 Sft 126/
(8+7)
Material
Bamboo 36.30 No - No -
Coilyan 7.78 Viss - Viss -
Wire Nail 11.67 Viss - Viss -
Labour
Worker 11.67 No - No -
-
Total Of Materials + Labours Cost Ks; - Kyats
-124/1
-134/12

122/45
122/46
-
ကားဂိုဒေါင် (196'10"x98'5") တည်ဆောက်ခြင်းလုပ်ငန်း

ခြံစည်းရိုးဖြိုဖျက်ခြင်းနှင့် တည်ဆောက်ခြင်း(112'x11')လုပ်ငန်း

Detail Measurement
Measurement
Sr Particular No Dedu; Total Unit
L B H
1 Dimentling Work For Fencing With Site Cleaning
Brick Fencing 1 180.00 10.00 1,800.00
Chainlink Fencing 1 224.00 6.00 1,344.00
3,144.00 Sft

2 Earthwork Excavation Work


Footing 12 3.00 3.00 3.50 378.00
Retaining Wall 11 7.00 2.50 2.50 481.25
859.25 Cft

3 Hard Core Work


Footing 12 3.00 3.00 0.50 54.00
54.00 Cft

4 (1:3:6) Concrete Work


Footing 12 3.00 3.00 0.25 27.00
Retaining Wall 11 7.00 2.50 0.50 96.25
123.25 Cft

5 Retaining Wall Brick Work with (1:3) Cement Motor


11 9.25 1.13 0.50 57.23
11 9.25 0.75 2.25 171.70
228.94 Cft

6 1:2:4 Concrete Work


Footing 12 3.00 3.00 0.75 81.00
Column 12 0.75 0.75 11.00 74.25
Plith Beam 11 9.25 0.75 0.75 57.23
Lintel Beam 11 9.25 0.75 0.50 38.16
250.64 Cft

7 Timber Shuttering Formwork


Footing 12 12.00 0.75 108.00
Column 12 3.00 11.00 396.00
Plith Beam 11 9.25 1.50 152.63
Lintel Beam 11 9.25 1.00 101.75
758.38 Sft

8 Rebar Work 16 mm 6.5 mm


Footing
16mm Dia MS Rod 12x16 3.50 672.00
Column
16mm Dia MS Rod 12x4 13.50 648.00
tirrup 6c/c 6.5mm Dia MS Rod 12x24 2.50 720.00
Plith Beam
16mm Dia MS Rod 4 113.00 452.00
tirrup 6c/c 6.5mm Dia MS Rod 225 2.50 562.50
Lintel Beam
16mm Dia MS Rod 4 112.50 450.00
tirrup 6c/c 6.5mm Dia MS Rod 225 1.75 393.75
Total Rft 2,222.00 ###
Unit Weight of steel 1.059 0.167
Total Lbs 2,353.10 279.93
Total ton 1.05 0.12
Total of 16mmØ M.S Rod 1.05 Ton 1.10 Ton ( with 5% waste )
otal of 6.5mmØ M.S Rod ### Ton 0.13 Ton ( with 5% waste )

9 4-1/2''thk; Brick Work with (1:3) motar


11 9.25 6.50 661.38
661.38 Sft

10 1/2''thk;Plastering Work with (1:3) motar

Plith level 2 112.00 2.00 448.00

Column 12 2.25 11.00 297.00

Lintel Beam 1 112.00 2.13 238.00


As Per Item 9 2x661.38 1,322.75
2,305.75 Sft
11 Surface Preparation Before Painting With Putty ( 2 Coats)
As per Plastering work Item 13 2305.75 Sft

12 Plastic Emulsion Painting Work ( 2 Coats )


As per Putty Work Item 14 2305.75 Sft

13 2 Line Blde Wire Fencing Work


1'5"x1'5" Angle Iron Pos 12 2.50 30.00 Rft
Blade Wire 2 112.00 224.00 Rft

14 Bamboo Scaffolding Work


2 112.00 10.00 2240.00
2240.00 Sft
ကားဂိုဒေါင် (196'10"x98'5") တည်ဆောက်ခြင်းလုပ်ငန်း

Ramp(100'x20'x9") & Drain Work (100'x3')

SUMMARY

Sr.
PARTICULARS MATERIALS LABOURS TOTAL
No

Ramp(100'x20'x9") & Drain


1 - - -
Work (100'x3')

Total Of Materials + Labours Cost -


ကားဂိုဒေါင် (196'10"x98'5") တည်ဆောက်ခြင်းလုပ်ငန်း

ခြံစည်းရိုးဖြိုဖျက်ခြင်းနှင့် တည်ဆောက်ခြင်း(112'x11')လုပ်ငန်း

Bills of Quantities

Sr
Particular Qty Unit Rate Per Amount Remark
No.

Material Charges

1 Cement 211.14 Bag Bag -


2 Sand 7.89 Sud Sud -
3 Chippings 13.56 Sud Sud -
4 Brick 4556.25 Nos Nos -
5 Fuel 28.25 Gal Gal -
6 J-Wood 0.12 Nos Nos -
7 Wire Nail 0.42 Viss Viss -
8 12mm Dia MS Rod 1.71 Ton Ton -
9 Binding Wire 9.48 Viss Viss -
Cost of Materials Ks; -
Labour Charges
1 Worker 229.02 Nos Nos -
2 Mason 32.13 Nos Nos -
3 Carpenter 1.00 Nos Nos -
4 Smith ( steel Fixer) 34.14 Nos Nos -
5 Machine Driver 7.06 Nos Nos -

Cost Of Labour Ks; -

Total Of Materials + Labours Cost Ks; -


-
ကားဂိုဒေါင် (196'10"x98'5") တည်ဆောက်ခြင်းလုပ်ငန်း

Ramp(100'x20'x9") & Drain Work (100'x3')

Abstract Cost

Sr
Qty Unit Particular Rate Per Amounts
No.

1 2,000.00 Sft Site Clearing Work - Sft -

2 2,000.00 Sft Surveying & Leveling Work - Sft -

3 2,462.50 Cft Earthwork Excavation Work - Cft -

4 1,412.50 Cft (1:3:6) Concrete Work - Cft -

9" thk: Brick Work with (1:3)


5 337.50 Cft - Cft -
Cement Motor

6 1.71 Ton Rebar Work - Ton -

7 450.00 Sft 1/2''thk;Plastering Work with (1:3 - Sft -

Total Of Materials + Labours Cost Ks; -


ကားဂိုဒေါင် (196'10"x98'5") တည်ဆောက်ခြင်းလုပ်ငန်း

Ramp(100'x20'x9") & Drain Work (100'x3')

Builder Estimate

Sr
Particular Quantity Unit Rate Per Amount Remark
No.

1 Site Clearing Work 2,000.00 Sft Pg-1/1(b)


Labour
Worker 5.00 Nos - Nos -
-

2 Surveying & Leveling Wo 2,000.00 Sft


Material
j-Wood 0.12 Ton - Ton -
Wire Nail 0.42 Viss - Viss -
Labour
Carpenter 1.00 Nos - Nos -
Worker 2.00 Nos - Nos -
-

3 Earthwork Excavation Wo2,462.50 Cft Pg-1/4


Labour
Worker 73.88 Nos - Nos -
-

4 (1:3:6) Concrete Work 1,412.50 Cft


Material
Cement 181.61 Bag - Bag -
Chippings 13.56 Sud - Sud -
Sand 6.78 Sud - Sud -
Fuel 28.25 Gal - Gal -
Labour
Mason 14.13 Nos - Nos -
Machine Driver 7.06 Nos - Nos -
Worker 84.75 Nos - Nos -
-
5 9" thk: Brick Work with (1:3) Cement Motor Pg-33/2
337.50 Cft
Material
Cement 23.50 Bag - Bag -
Brick 4,556.25 Nos - Nos -
Sand 0.88 Sud - Sud -
Labour
Mason 13.50 Nos - Nos -
Worker 20.25 Nos - Nos -
-

6 Rebar Work 1.71 Ton Pg-134/12


Material
12mm Dia MS Rod 1.71 Ton - Ton -
Binding Wire 9.48 Viss - Viss -
Labour
Smith ( steel Fixer) 34.14 Nos - Nos -
Worker 34.14 Nos - Nos -
-

7 1/2''thk;Plastering Work with (1:3) motar Pg-41/3


450.00 Sft
Material
Cement 6.03 bag - bag -
Sand 0.23 Sud - Sud -
Labour
Mason 4.50 Nos - Nos -
Worker 9.00 Nos - Nos -
-

Total Of Materials + Labours Cost Ks; - Kyats


-1/1(b)
-134/12

-
ကားဂိုဒေါင် (196'10"x98'5") တည်ဆောက်ခြင်းလုပ်ငန်း

Ramp(100'x20'x9") & Drain Work (100'x3')

Detail Measurement
Measurement
Sr Particular No Dedu; Total Unit
L B H
1 Site Clearing Work 1 100.00 20.00 2,000.00
2,000.00 Sft

2 Surveying & Leveling Work


1 100.00 20.00 2,000.00
2,000.00 Sft

3 Earthwork Excavation Work


Drain 1 100.00 3.50 3.50 1,225.00
Ramp 1 100.00 16.50 0.75 1,237.50
2,462.50 Cft

4 (1:3:6) Concrete Work


Drain 1 100.00 3.50 0.50 175.00
Ramp 1 100.00 16.50 0.75 1,237.50
1,412.50 Cft

5 9" thk: Brick Work with (1:3) Cement Motor


Drain 2 100.00 0.75 2.25 337.50
337.50 Cft

6 Rebar Work 12 mm
Ramp
LD 201 20.00 4,020.00
SD 21 100.00 2,100.00
Total Rft 6,120.00
Unit Weight of steel 0.595
Total Lbs 3,641.40
Total ton 1.63
Total of 12mmØ M.S Rod 1.63 Ton 1.71 Ton ( with 5% waste )

7 1/2''thk;Plastering Work with (1:3) motar


Drain 2 100.00 2.25 450.00
450.00 Sft
9.843

98.35 4.2

201.00
21.00