Madheshwari Est

blue print estmtion for tamil naducost qoutation

Uploaded by

ErSATHISHKUMAR
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
41 views3 pages

Madheshwari Est

blue print estmtion for tamil naducost qoutation

Uploaded by

ErSATHISHKUMAR
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

ESTIMATION FOR EXISTING R.C.

C TERRACED ROOF GROUND FLOOR


RESIDENTIAL BUILDING AT 369/83A,AND PROPOSED GROUND FLOOR AT S.F
NO369/83B,KALAR KAADU,SINGALANDHUPURAM VILLAGE PANCHAYATH,
RASIPURAM S.R.O NAMMAKAL DISTRICT.

APPLICANT:- MADHESHWARI W/O DURAISAMY , SUJITH S/O DURAISAMY

EST AMOUNT=Rs.11,78,000/-
DIEMENSIONS(m) QTY UNIT RATE AMOUNT
S.NO DISCRIPTION OF ITEM NOS L (m) B (m)D (m) Column1 (Rs) (RS)
GROUND FLOOR DETAILS
1 Earthwork excavation for 9 1.20 1.20 1.2 15.55 cum 120 1866.24
footings
Excavation - walls around 1 38.53 0.60 0.85 19.65 cum 120 2357.79
excavation - between walls(inner) 1 12.20 0.60 0.85 6.22 cum 120 746.64

2 P.C.C in foundation by using mix 9 1.20 1.20 0.15 1.94 cum 4850 9428.40
1:4:8 and 40mm H.G metal

3 R.C.C Footing by using 1:2:4 mix and 9 1.20 1.20 0.45 5.83 cum 5850 34117.20
20mm H.G metal

4 R.C.C column by using 1:2:4 mix and 5 0.23 0.23 5.5 1.45
20mm H.G metal 4 0.23 0.23 5.5 1.16
2.62 cum 8510 22283.86

5 R.C.C plinth beam in above the


basement by using 1:2:4 mix and 1 50.73 0.23 0.3 3.50 cum 8150 28525.77
20mm H.G metal

6 Brickwork in above the plinthbeam


by using CM 1:6 mix and first class 1 38.53 0.23 4.5 39.87
burnt bricks 2 4.42 0.23 3.2 3.25
1 8.20 0.23 3.2 6.04

49.16
Deduction for (window,door,Open)
WINDOW 2 0.90 0.23 1.2 0.42
WINDOW 2 0.90 0.23 1.2 0.50
MAIN DOOR 1 1.15 0.23 2.1 0.56
DOOR 1 0.90 0.23 2.1 0.43
DOOR1 1 0.75 0.23 2.1 0.36
OPENING 2 1.20 0.23 2.1 1.16
V 1 0.60 0.23 0.3 0.04
3.47065

After deduction the net quantity


of brickwork 45.69 cum 5850 267298.67
7 R.C.C Lintel by using 1:2:4 mix and 1 38.53 0.23 0.23 2.04
20mm H.G metal through out the wall 1 12.20 0.23 0.23 0.65
2.68 cum 6200 16637.11
8 R.C.C Sundhade by using 1:2:4 mix
20mm H.G metal 4 0.90 0.45 0.1 0.16
1 2.10 0.45 0.1 0.09
1 1.80 0.45 0.1 0.08
1 6.80 0.45 0.1 0.31
0.65 cum 6000 3885.00
9 R.C.C Roof slab by using 1:2:4 mix
and 20mm H.G metal 1 8.20 12.90 0.125 13.22
1 4.80 11.00 0.13 6.86
20.09 cum 10500 210908.25

10 Plastering work by using CM 1:5


mix over the wall surface
CELLING (HALL) 1 3.00 4.42 13.26
(KITCHEN) 1 1.82 2.4 4.37
(BED ROOM) 1 2.66 3.3 8.78
(BATH/TOILET) 1 2.62 0.83 2.17
28.58 sqm
INNER SIDE (HALL) 1 14.84 3 44.52
(KITCHEN) 1 8.44 3 25.32
(BED ROOM) 1 11.92 3 35.76
(BATH/TOILET) 1 6.90 3 20.70
126.30 sqm
OUTTER SIDE 1 38.53 4.5 173.37 sqm

Deduction for (window,door,Open)


WINDOW 2 1.50 1.2 3.60
WINDOW 2 0.90 1.2 2.16
MAIN DOOR 1 1.15 2.1 2.42
DOOR 1 0.90 2.1 1.89
DOOR1 1 0.75 2.1 1.58
OPENING 2 1.20 2.1 5.04
V 1 0.60 0.3 0.18
16.86
311.39 sqm 210 65391.40

11 Soil filling in the basement


(HALL) 1 3.00 1.50 4.42 19.89
(KITCHEN) 1 1.82 1.50 2.4 6.55
(BED ROOM) 1 2.66 1.50 3.3 13.17
(BATH/TOILET) 1 2.62 1.50 0.83 3.26
42.87 cum 165 7073.70
12 Flooring in cement concrete by
using 1:4:8 40mm H.G metal
(HALL) 1 3.00 4.42 0.15 1.99
(KITCHEN) 1 1.82 2.4 0.15 0.66
(BED ROOM) 1 2.66 3.3 0.15 1.32
(BATH/TOILET) 1 2.62 0.83 0.15 0.33
4.29 cum 752 3223.89

13 Tiles laying over the flooring by


using CM 1:6
(HALL) 1 3.00 4.42 13.26
(KITCHEN) 1 1.82 2.4 4.37
(BED ROOM) 1 2.66 3.3 8.78
(BATH/TOILET) 1 2.62 0.83 2.17
28.58 sqm 3200 91457.92

14 Teak wood work for making a door 1 1.50 2.1 3.15


and window frame including glass 1 0.90 2.1 1.89
fixing 1 1.15 1.2 1.38
1 0.90 2.1 1.89
1 0.75 1.2 0.90
1 1.20 0.3 0.36
9.57 cum 3800 36366.00

15 White washing is as like the inner,


outer plastering and including sun 1 311.39 sqm 165 51378.95
shade after deduction net area only

16 Painting is as like the inner,


outer plastering and including sun 1 311.39 sqm 170 52935.89
shade after deduction net area only

17 Electrical work L.S 120000.00

18 Plumbing work L.S 98000.00

19 Contigenious and miscellaneous L.S 54000.00


expence
TOTAL AMOUNT 1177882.68

TOTAL COST OF GROUND FLOOR CONSTRUCTION Rs.11,78,000 /-


(RUPEES ELEVEN LAKHS SEVENTY EIGHT THOUSAND ONLY)

ENIGNEER /LBS