0% found this document useful (0 votes)
61 views17 pages

24eb0094 Plans-Supp Compressed Part2

Uploaded by

francisco rivera
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
61 views17 pages

24eb0094 Plans-Supp Compressed Part2

Uploaded by

francisco rivera
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 17

A B C D E F G H I J K L M

100650

7600 8000 8368 8528 8867 8227 8627 8627 8310 8883 8634 7979

ROOFING LINE

BB

1
182 182

MULTI-PURPOSE HALL/

8168
VIEWING DECK

69 69

2 283 283

FIRE EXIT
FIRE EXIT

8168
237 237

52 265 265 52
3
DOWN DOWN

ELEVATOR
LOBBY
170 170
9623

DOWN

135 135
DOWN

CONTROL
9268

ROOM

TOTAL SEATING CAPACITY:


192 163 163 192
7261
5 70 70
80454

10000

MULTI-PURPOSE HALL/
VIEWING DECK AA

70 70
6
VIP AREA
192 163 163 192
9268

DOWN
135 135 NWOD

ELEVATOR
9623

LOBBY

DOWN
170 170 NWOD

265 265
52 52
8
237 237
8168

FIRE EXIT
FIRE EXIT

283 283
9
69 69
MULTI-PURPOSE HALL/
8168

VIEWING DECK

182 182

10

FOURTH FLOOR PLAN


SCALE 1:500

PROJECT TITLE SHEET CONTENTS REVISION(S) DATE PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMENDED BY: APPROVED BY: SET NO. SHT NO.
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
MIMAROPA REGION (IV - B) CONSTRUCTION OF MULTI-PURPOSE BUILDING
MINDORO OCCIDENTAL DISTRICT ENGINEERING OFFICE (SABLAYAN COLISEUM), SABLAYAN, OCCIDENTAL AS SHOWN A-12
Mamburao, Occidental Mindoro MINDORO (PHASE 2) DPWH-IV-B
12 30
ALLANA LOUISE B. SERVANDO LIZELOTTE D. GULLA MA. THERESA J. PALIMA SHERYLL B. MULINGBAYAN JOSELITO A. ANTONIO
AIRPORT ROAD BRGY. 9, MAMBURAO OCC. MINDORO LOCATION : SABLAYAN, OCC. MINDORO ARCHITECT II ENGINEER II - BUILDING COORDINATOR CHIEF, PLANNING SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
A B C D E F G H I J K L M

100650

7600 8000 8368 8528 8867 8227 8627 8627 8310 8883 8634 7979

8168
2

8168
3

9623
4

9268

5
80454

93254
10000

6
9268

7
9623

8
8168

9
8168

10

113633

ROOF PLAN
SCALE 1:500

PROJECT TITLE SHEET CONTENTS REVISION(S) DATE PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMENDED BY: APPROVED BY: SET NO. SHT NO.
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
MIMAROPA REGION (IV - B) CONSTRUCTION OF MULTI-PURPOSE BUILDING
MINDORO OCCIDENTAL DISTRICT ENGINEERING OFFICE (SABLAYAN COLISEUM), SABLAYAN, OCCIDENTAL AS SHOWN A-13
Mamburao, Occidental Mindoro MINDORO (PHASE 2) DPWH-IV-B
13 30
ALLANA LOUISE B. SERVANDO LIZELOTTE D. GULLA MA. THERESA J. PALIMA SHERYLL B. MULINGBAYAN JOSELITO A. ANTONIO
AIRPORT ROAD BRGY. 9, MAMBURAO OCC. MINDORO LOCATION : SABLAYAN, OCC. MINDORO ARCHITECT II ENGINEER II - BUILDING COORDINATOR CHIEF, PLANNING SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
1 2 3 4 5 6 7 8 9 10
80454

8168 8168 9623 9268 10000 9268 9623 8168 8168

ROOF APEX

10732
TOP OF BEAM

4800
27532
4TH FLOOR

3500
3500 3RD FLOOR

2ND FLOOR
3800

GROUND FLOOR
NGL
1200

FRONT ELEVATION
SCALE 1:500

10 9 8 7 6 5 4 3 2 1
80454

8168 8168 9623 9268 10000 9268 9623 8168 8168

ROOF APEX
10732

TOP OF BEAM
4800
27532

4TH FLOOR
3500

3RD FLOOR
3500

2ND FLOOR
3800

GROUND FLOOR
NGL
1200

REAR ELEVATION
SCALE 1:500

PROJECT TITLE SHEET CONTENTS REVISION(S) DATE PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMENDED BY: APPROVED BY: SET NO. SHT NO.
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
MIMAROPA REGION (IV - B) CONSTRUCTION OF MULTI-PURPOSE BUILDING
MINDORO OCCIDENTAL DISTRICT ENGINEERING OFFICE (SABLAYAN COLISEUM), SABLAYAN, OCCIDENTAL AS SHOWN A-14
Mamburao, Occidental Mindoro MINDORO (PHASE 2) DPWH-IV-B
14 30
ALLANA LOUISE B. SERVANDO LIZELOTTE D. GULLA MA. THERESA J. PALIMA SHERYLL B. MULINGBAYAN JOSELITO A. ANTONIO
AIRPORT ROAD BRGY. 9, MAMBURAO OCC. MINDORO LOCATION : SABLAYAN, OCC. MINDORO ARCHITECT II ENGINEER II - BUILDING COORDINATOR CHIEF, PLANNING SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
A B C D E F G H I J K L M

100650

7600 8000 8368 8528 8867 8227 8627 8627 8310 8883 8634 7979

ROOF APEX

10732
TOP OF BEAM

4800
27532
4TH FLOOR

3500

3RD FLOOR
3500

2ND FLOOR
3800

GROUND FLOOR
NGL
1200

RIGHT SIDE ELEVATION


SCALE 1:500

M L K J I H G F E D C B A

100650

7979 8634 8883 8310 8627 8627 8227 8867 8528 8368 8000 7600

ROOF APEX
10732

TOP OF BEAM
4800
27532

4TH FLOOR
3500

3RD FLOOR
3500

2ND FLOOR
3800

GROUND FLOOR
NGL
1200

LEFT SIDE ELEVATION


SCALE 1:500

PROJECT TITLE SHEET CONTENTS REVISION(S) DATE PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMENDED BY: APPROVED BY: SET NO. SHT NO.
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
MIMAROPA REGION (IV - B) CONSTRUCTION OF MULTI-PURPOSE BUILDING
MINDORO OCCIDENTAL DISTRICT ENGINEERING OFFICE (SABLAYAN COLISEUM), SABLAYAN, OCCIDENTAL AS SHOWN A-15
Mamburao, Occidental Mindoro MINDORO (PHASE 2) DPWH-IV-B
15 30
ALLANA LOUISE B. SERVANDO LIZELOTTE D. GULLA MA. THERESA J. PALIMA SHERYLL B. MULINGBAYAN JOSELITO A. ANTONIO
AIRPORT ROAD BRGY. 9, MAMBURAO OCC. MINDORO LOCATION : SABLAYAN, OCC. MINDORO ARCHITECT II ENGINEER II - BUILDING COORDINATOR CHIEF, PLANNING SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
A B C D E F G H I J K L M

100650

7600 8000 8368 8528 8867 8227 8627 8627 8310 8883 8634 7979

ROOF APEX

10732
SEE TRUSS DETAILS

TOP OF BEAM

4800
VIEWING

27532
DECK
FIRE EXIT FIRE EXIT

4TH FLOOR

3500
MULTI-PURPOSE
AREA
3RD FLOOR

3500
MULTI-PURPOSE MULTI-PURPOSE
AREA AREA
2ND FLOOR
LOBBY
3800
STORAGE FOR STORAGE FOR
TEMPORARY TEMPORARY
LOBBY SEATING SEATING

GROUND FLOOR
NGL
1200

SECTION THRU AA
SCALE 1:500

1 2 3 4 5 6 7 8 9 10
80454

8168 8168 9623 9268 10000 9268 9623 8168 8168

ROOF APEX
10732

TOP OF BEAM
4800
27532

FIRE EXIT
FIRE EXIT
4TH FLOOR
3500

3RD FLOOR
3500

MULTI-PURPOSE MULTI-PURPOSE
AREA AREA
2ND FLOOR
3800

MULTI-PURPOSE MULTI-PURPOSE
AREA AREA
GROUND FLOOR
NGL
1200

SECTION THRU BB
SCALE 1:500

PROJECT TITLE SHEET CONTENTS REVISION(S) DATE PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMENDED BY: APPROVED BY: SET NO. SHT NO.
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
MIMAROPA REGION (IV - B) CONSTRUCTION OF MULTI-PURPOSE BUILDING
MINDORO OCCIDENTAL DISTRICT ENGINEERING OFFICE (SABLAYAN COLISEUM), SABLAYAN, OCCIDENTAL AS SHOWN A-16
Mamburao, Occidental Mindoro MINDORO (PHASE 2) DPWH-IV-B
16 30
ALLANA LOUISE B. SERVANDO LIZELOTTE D. GULLA MA. THERESA J. PALIMA SHERYLL B. MULINGBAYAN JOSELITO A. ANTONIO
AIRPORT ROAD BRGY. 9, MAMBURAO OCC. MINDORO LOCATION : SABLAYAN, OCC. MINDORO ARCHITECT II ENGINEER II - BUILDING COORDINATOR CHIEF, PLANNING SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
GENERAL CONSTRUCTION NOTES
GENERAL NOTES F. LOAD COMBINATIONS NOTES ON REINFORCEMENTS 2D (NO PIPE SLEEVE PROPOSED PIPE SLEEVE LOCATIONS
SHALL BE ALLOWED W/IN
TABLE OF LOAD COMBINATIONS FOR ULS: TABLE OF LOAD COMBINATIONS FOR SLS: 1. UNLESS OTHERWISE NOTED IN PLANS, THE YIELD STRENGTH OF REINFORCING BARS SHALL BE: THIS ZONE (TYP.)
SCH. 40 G.I. PIPE SLEEVE
1. STANDARDS AND REFERENCES 2 - EXTRA STIR. EA. SIDE
ROOF WIND SEISMIC ROOF WIND SEISMIC A. FOR BARS 16 mmØ AND GREATER fy = 414 MPa (60,000 psi)
STRUCTURAL DESIGN CRITERIA IS BASED ON THE THE NATIONAL STRUCTURAL CODE OF THE PHILIPPINES CASE DEAD LIVE CASE DEAD LIVE B. FOR BARS 12 mmØ AND LESS fy = 276 MPa (40,000 psi)
OF SLEEVE
(D) (L) LIVE (Lr) (W) (E) (D) (L) LIVE (Lr) (W) (E) 2D 0 2D
(NSCP), VOL.1, 7TH EDITION, 2ND PRINTING, WHICH IS BASED ON THE INTERNATIONAL ACCEPTED CODES, 50 P.)
Y
NAMELY, UBC1997, ACI318-14, AISC AND ASCE 7-10. 1 1.4 - - - - 1 1.0 1.0 - - - 2. ALL REINFORCING BARS SIZE 10 mm OR LARGER SHALL BE DEFORMED IN ACCORDANCE WITH THE TOP BARS (T FACE OF
ASTM A706. BARS SMALLER THAN 10 mm MAY BE PLAIN. SUPPORT
2 1.2 1.6 0.5 - - 2 1.0 - 1.0 - -
2. GENERAL 3. SPLICES SHALL BE SECURELY TIE TOGETHER USING G.I. WIRE. SPLICE LENGTH SHALL BE IN ACCORDANCE

D/5
3 1.2 - 1.6 ± 0.5 - 3 1.0 0.75 0.75 - - WITH TABLES A & B (TABLE OF LAP SPLICE & ANCHORAGE LENGTH) UNLESS OTHERWISE SHOWN IN PLANS.
2.1 CONSTRUCTION NOTES AND TYPICAL DETAILS APPLY TO ALL DRAWINGS UNLESS
4 1.2 f1 - ± 0.5 - 4 1.0 - - ± 0.6 -
OTHERWISE SHOWN OR NOTED. MODIFY TYPICAL DETAILS AS DIRECTED TO MEET 4. SPLICES SHALL BE STAGGERED WHENEVER POSSIBLE. IN NO CASE SHALL MORE THAN 33% OF THE BOT. BARS Ø 16 EXTRA BARS E.F.
SPECIAL CONDITIONS. 5 1.2 f1 0.5 ± 1.0 - 5 1.0 - - - ± 0.714 REINFORCING BARS BE SPLICED WITHIN THE REQUIRED SPLICE LENGTH. (TYPICAL)
FACE OF
2.2 SHOP DRAWINGS WITH ERECTION AND PLACING DIAGRAMS OF ALL STRUCTURAL 6 0.9 - - ± 1.0 - THE REQUIRED LAP LENGTH, MINIMUM DISTANCE BETWEEN TWO ADJACENT SPLICED SHALL BE 600mm. SUPPORT STIR. AS SCHED.
WHERE: 4d (MIN.)
STEEL, MISCELLANEOUS IRON, PRE-CAST CONCRETE ETC. SHALL BE SUBMITTED f1 = 1.0 for live loads in excess of 4.8KPa 5. INDIVIDUAL BAR SPLICES WITHIN A BUNDLE SHALL NOT OVERLAP. ENTIRE BUNDLES SHALL NOT BE SPLICED.
FOR IMPLEMENTING OFFICE ENGINEER'S APPROVAL BEFORE FABRICATION. 7 1.2 f1 - - ± 1.0 L/4 L/4
= 0.5 for other live loads L/2
8 0.9 - - - ± 1.0 6. NO SPLICE SHALL BE MADE WITHIN BEAM AND COLUMN JOINTS. LIMIT LOCATION OF PIPE SLEEVE
2.3 CONTRACTOR SHALL VERIFY ALL DIMENSIONS BEFORE ALL WORK IS TO BEGIN, DETAILED SEISMIC CASES: L
CHECK WITH MECHANICAL AND ELECTRICAL CONTRACTORS FOR CONDUITS, PIPE 9 0.9 - - ± 1.0 - E = ρEH +- 0.5CaID 7. SPLICES SHALL BE CONFINED WITH ADDITIONAL TRANSVERSE REINFORCEMENT 10 mm Ø AT 100 mm O.C. LEGEND:
SLEEVES, ETC. TO BE EMBEDDED IN CONCRETE. PIPE SLEEVE MAXIMUM DIAMETER
EHX = 1.0 RS1 +- 0.3 RS2 8. ALL REINFORCEMENT SHALL BE BENT COLD UNLESS. HOOKS AND BEND DIAMETERS SHALL BE IN 1. D = DEPTH OF BEAM/GIRDER IS : (LEAST GOVERNS)
EHY = 1.0 RS2 +- 0.3 RS1 ACCORDANCE WITH TABLES C & D (TABLE OF MINIMUM BEND DIAMETER AND HOOK LENGTH). 2. d = PIPE SLEEVE DIAMETER
2.4 IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE ADEQUATE 4. CAMBER REQUIREMENTS A) 1/5 OF BEAM DEPTH
SHORINGS AND BRACINGS OF THE STRUCTURE FOR ALL LOADS THAT MAYBE 2 EXTRA STIRRUPS B) 100 MM (MAX ALLOWED)
9. CLOSE TIES & STIRRUPS MUST TERMINATE AT 135° HOOKS. EACH SIDE OF SLEEVE
IMPOSED DURING CONSTRUCTION. 1. UNLESS OTHERWISE NOTED ON THE PLANS OR SPECIFICATIONS CAMBER ALL RC
10. DEVELOPMENT LENGTH OF INDIVIDUAL BARS WITHIN A BUNDLE, IN TENSION OR COMPRESSION, B TOP BARS
BEAMS AT LEAST 10mm. FOR EVERY 4000mm. OF CLEAR SPAN EXCEPT NOTES:
2.5 IN REFERENCE TO OTHER DRAWINGS, SEE ARCHITECTURAL DRAWINGS FOR DEPRESSIONS IN SHALL BE THAT FOR INDIVIDUAL BARS, INCREASED 20% FOR THREE-BUNDLED

40
CANTILEVERS WHICH SHALL BE 50mm. FOR EVERY 3000mm. OF CLEAR SPAN. Ø16 EXTRA BARS 1. SEEK STRUCT'L ENGINEER'S APPROVAL FOR

SEE BEAM
FLOOR SLABS, OPENINGS IN WALLS AND SLABS, INTERIOR PARTITIONS, ETC. AND 33% FOR FOUR-BUNDLED BARS. E.F. (DIAGONALS)

SCHED.
PIPE SLEEVES W/ DIAMETERS BIGGER THAN
2. UNLESS OTHERWISE NOTED IN PLANS OR SPECIFICATIONS, CAMBER ALL SLABS

D
10. BARS UNABLE TO DEVELOP (ℓdh) DUE TO SUPPORT MEMBER SIZE SHALL BE ANCHORED TO A PIPE SLEEVE 100MM.

D/5
2.6 IN CASE OF DISCREPANCIES AS TO THE LAYOUT, DIMENSIONS AND ELEVATIONS BETWEEN THE 8mm PER 3000mm. OF SHORTER SPAN AND 14mm. FOR EVERY 2000mm. OF
STRUCTURAL PLANS AND ARCHITECTURAL DRAWINGS, THE CONTRACTORS SHALL NOTIFY BOTH MINIMUM EMBEDMENT LENGTH OF (ℓd) SEE FIGURE 3 Ø 16 CROSS ANCHORS 2. PIPE SLEEVES SHALL BE LOCATED WITHIN

40
SLABS CANTILEVER SPAN SECTION WELDED TO SLEEVE TENSION ZONES OF BEAM.
THE DESIGN ARCHITECT AND ENGINEERS. TABLE A: TABLE A:
5. FOUNDATION TABLE OF LAP SPLICE, DEVELOPMENT AND ANCHORAGE LENGTH (mm) TABLE OF LAP SPLICE, DEVELOPMENT AND ANCHORAGE LENGTH (mm) BOTTOM BARS 3. PIPE SHALL NOT BE ALLOWED TO PASS THRU
BEAMS VERTICALLY.
2.7 ALL CONCRETE WORKS AND CONCRETE REINFORCEMENTS SHALL BE DONE IN ACCORDANCE WITH f"c = 5000 psi fy
60,000 Ø16 mm & GREATER
f"c = 4000 psi fy
60,000 Ø16 mm & GREATER

ACI 318-14M BUILDING CODE REQUIREMENT AND ALL STRUCTURAL STEEL WORKS WITH AISC 360-10 1. BEFORE DEPOSITING CONCRETE. THE REPORT SHALL BE BASED FROM CONDUCTING A GEOTECHNICAL 40,000 Ø12 mm & LESS 40,000 Ø12 mm & LESS
INVESTIGATION USING CONFIRMATORY BORING SAMPLES IN ACCORDANCE WITH NSCP 2015 AND DPWH
C PIPE SLEEVE THRU BEAM DETAIL
IN SO FAR AS THEY DO NOT CONFLICT WITH THE LOCAL BUILDING CODE REQUIREMENT. LAP SPLICE LAP SPLICE S-1 SCALE NTS
DGCS 2015. IN CASES WHERE THE ACTUAL SBC IS LOWER THAN THE ASSUMED VALUE OF 100 kPA EMBEDMENT/ EMBEDMENT/
BAR TENSION BAR TENSION
2.8 CONSTRUCTION NOTES AND TYPICAL DETAILS APPLY TO ALL DRAWINGS UNLESS OTHERWISE SHOWN (2080 psf) OR IT CANNOT BE ATTAINED AT ANY PRACTICAL DEPTHS, THE DESIGNER SHALL REVISE ANCHORAGE DEVELOPMENT ANCHORAGE DEVELOPMENT
SIZE BEAM LENGTH LENGTH SIZE BEAM LENGTH LENGTH
THE DESIGN OF THE FOUNDATION TO SUIT SITE CONDITIONS. COMPRESSION (ℓdh) COMPRESSION (ℓdh)
OR NOTED. NOTIFY DESIGNER FOR MODIFICATION OF TYPICAL DETAILS TO MEET SPECIAL CONDITIONS. Ø COLUMN (ℓd) Ø COLUMN (ℓd)
TOP BOTTOM TOP BOTTOM
2. FOUNDATION SHALL REST ON NATURAL SOIL AND NOT ON FLL.
390 390 300 390 390 300 LAP SPLICE LENGTH:
2.9 ALL RESULTS OF MATERIAL TESTING FOR CONCRETE, REINFORCING BARS, AND STRUCTURAL STEEL 10 390 300 150 10 430 330 150
3. THE CONTRACTOR SHALL NOTIFY THE ENGINEER AFTER FOOTING EXCAVATION 1. AT ANY LEVEL NO MORE THAN
MUST BE NOTED AND APPROVED BY THE MATERIALS ENGINEER. 12 460 390 390 300 350 150 12 520 390 390 300 400 180

H (CLEAR HEIGHT OF COL.)


ALTERNATE BARS SHOULD BE

CONF. REINF. WITHIN CENTER


HAVE BEEN COMPLETED AND PRIOR TO CONCRETING TO CONFIRM THE DESIGN SPLICED.
710 710 480 700 780 780 480 790

HALF OF "H"
16 910 200 16 1030 220
SOIL BEARING CAPACITY.
3. DESIGN CRITERIA 20 1410 1080 1080 590 1080 280 20 1580 1210 1210 590 1210 310 2. MIN. DISTANCE BETWEEN TWO
ADJACENT BAR SPLICES SHALL
A. DEAD LOAD 25 1760 1360 1360 740 1350 390 25 1970 1510 1510 740 1510 430 BE 600mm.
TYPICAL SPACE 2.64 kPa CONCRETE 24.00 kN/m 3 NOTES ON CONCRETE MIXES & PLACING 28 1970 1530 1530 830 1510 460 28 2200 1690 1690 830 1690 510
STEEL 77.00 kN/m 3 L
STAIRS/EXIT/RAMP 1.44 kPa 3 1. ALL CONCRETE SHALL DEVELOP A MINIMUM COMPRESSIVE STRENGTH AT THE END OF TWENTY 32 2250 1730 1730 950 1730 560 32 2510 1940 1940 950 1930 630
WATER 9.81 kN/m L/4

TIES (Lo)
STORAGE (LIGHT) 2.64 kPa 3 EIGHT (28) DAYS WITH CORRESPONDING MAXIMUM SIZE AGGREGATE & SLUMP AS FOLLOWS. 36 2540 1950 1950 1060 1950 670 36 2830 2180 2180 1060 2170 750
ELEC./MECH. ROOM 3.84 kPa SOIL 18.00 kN/m TOP BARS @ SUPPORT (CONT.)
ROOF DECK 2.64 kPa 150 mm THK. CHB WALL 2.25 kPa MAX. SIZE OF
28 DAYS STRENGTH MAX SLUMP REQ'D. BOT. BARS @ SUPPORT
100 mm THK. CHB WALL 1.50 kPa LOCATION AGGREGATE TABLE C: TABLE D:
MINIMUM BEND DIAMETER, HOOK LENGTH MINIMUM BEND DIAMETER & HOOK LENGTH FOR STIRRUPS,
ℓd (MIN.)

JT. REINF.
B. LIVE LOAD

LAT. TIES
SUSPENDED SLABS 27.6 MPa (4000 psi) 20 mm 100 mm FOR MAIN BARS (mm) TIES & HOOPS (mm)
TYPICAL SPACE 4.80 kPa CORRIDORS 3.84 kPa BEAMS & COLUMNS 27.6 MPa (4000 psi) 20 mm 100 mm BEND STRAIGHT EXTENSION (ℓext)
BAR DIAMETER BEND STRAIGHT EXTENSION (ℓext)
STAIRS/EXIT/RAMP 4.80 kPa ROOF DECK 3.84 kPa COLUMNS 27.6 MPa 4000 psi) 20 mm 100 mm SIZES
BAR DIAMETER
(D) 90° HOOK 180° HOOK SIZES (D)
STORAGE (LIGHT) 6.00 kPa 90° HOOK 135° HOOK 180° HOOK

CONF. REINF.
FOOTINGS 27.6 MPa (4000 psi) 20 mm 100 mm 0.165L Ø10@100

TIES (Lo)
ELEC./MECH. ROOM 7.20 kPa Ø10 60 150 110 Ø10 40 75 75 65 SPLICE
EXTRA BOT. BARS
SLAB ON FILL 21.0 MPa (3000 psi) 20 mm 100 mm Ø12 72 180 120
@ MIDSPAN
Ø12 48 80 80 65 HOOPS
BOT. BARS
C. ROOF LIVE LOAD 2. MAINTAIN MINIMUM CONCRETE COVER FOR REINFORCING STEEL AS FOLLOWS. Ø16 96 240 130 Ø16 64 100 100 70 2d @ MIDSPAN
B < ℓdh
ROOF 0.60 to 1.00 kPa SUSPENDED SLABS Ø20 120 300 160 Ø20 120 240 120 80 EXTRA TOP BARS
20 mm B
SLABS ON FILL Ø25 150 380 230 @ SUPPORT
40 mm Ø25 150 300 150 100 FIGURE 3
D. WIND LOAD WALLS 20 mm Ø28 224 420 260
OCCUPANCY CATEGORY (NSCP) = I (ESSENTIAL OCCUPANCY STRUCTURES) BEAMS AND COLUMNS ABOVE GRADE
*REFER TO FIGURE 2 FOR ILLUSTRATION COLUMN LAP SPLICE & EXTERIOR
40 mm Ø32 256 480 290 GIRDER TO COLUMN CONNECTION DETAIL
WIND SPEED: 3% PROBABILITY OF EXCEEDANCE IN 50 YEARS WALLS BELOW GRADE 40 mm D
SCALE NTS
BUILDING CATEGORY MWFRS, Kd = 0.85 GRADE AND TIE BEAMS 75 mm Ø36 288 540 330 S-1

90-D BEND
GUST EFFECT FACTOR G = 0.85 COLUMNS AND PEDESTALS BELOW GRADE 75 mm *REFER TO FIGURE 1 FOR ILLUSTRATION

EG
db

180 DEGREE

db

RE
BASIC WIND SPEED, V = 270 KPH FOOTINGS 75 mm

E
BEND
EXPOSURE CATEGORY = B (URBAN AND SUBURBAN AREAS) SAW-CUT GROOVE 8MM
POINT AT WHICH POINT AT WHICH D
WHEN REQUIRED WIDE TO BE FILLED WITH
ENCLOSURE CLASSIFICATION = ENCLOSED 3. CONCRETE MIX SHALL BE DEPOSITED IN ITS FINAL POSITION WITHOUT SEGREGATION. RE-HANDLING BAR IS DEVELOPED BAR IS DEVELOPED VAPOR BARRIER
POLYURETHANE SEALANT

ℓext
D BEDDING (TYP.)

90-D BEND
DESIGN WIND PRESSURE, P = q (GCp) - qi (GCpi) OR PLACING SHALL BE DONE PREFERABLY WITH BUGGIES, BUCKETS OR WHEELBARROWS. NO CHUTES ℓext
SLAB REINF.

EG
COMPACTED GRAVEL

db

135
WILL BE ALLOWED EXCEPT TO TRANSFER CONCRETE MIX FROM HOPPERS TO BUGGIES, WHEELBARROWS

db

RE
db
WHERE: q = VELOCITY PRESSURE, kPa

180 DEGREE

°
BEND
GCp = EXTERNAL PRESSURE COFFECIENT OR BUCKETS IN WHICH CASE THEY SHALL NOT EXCEED SIX (6) METERS IN AGGREGATE LENGTH. FLR. LVL. 20MM MIN.

SLAB
GCpi = INTERNAL PRESSURE COFFECIENT MAXIMUM HEIGHT OF FREE FALL OF CONCRETE MIX SHALL BE 1.5 METERS DURING PLACEMENT

"t"
D
CONC. COVER

ℓext
D D

VERIFY
DURING PLACEMENT TO AVOID SEGREGATION. ℓext
CONSTRUCTION JOINT
ℓ ext
E. SEISMIC LOAD ℓdh ℓdh
SUBGRADE COMPACTED
4. NO DEPOSITING OF CONCRETE SHALL BE ALLOWED WITHOUT THE USE OF VIBRATORS UNLESS TO 95% OF MAXIMUM
TYPE OF ANALYSIS: RESPONSE SPECTRUM ANALYSIS
FIGURE 1 FIGURE 2 DRY DENSITY @ OPTIMUM MOISTURE
AUTHORIZED IN WRITING BY THE DESIGNER AND ONLY FOR UNUSUAL CONDITIONS WHERE CONTENT (MAX DEPTH OF COMPRESSED
OCCUPANCY CATEGORY (NSCP) = I (ESSENTIAL OCCUPANCY STRUCTURES)
VIBRATIONS ARE EXTREMELY DIFFICULT TO ACCOMPLISH. FILL = (200mm PER LAYER).
IMPORTANCE FACTOR, I = 1.50
SLAB-ON-GRADE CONSTRUCTION
SEISMIC SOURCE TYPE = A (UP TO MAGNITUDE 8.4) 5. ALL ANCHOR BOLTS, DOWELS, AND OTHER INSERTS SHALL BE PROPERLY POSITIONED AND SECURED NOTES ON CONSTRUCTION JOINTS IN CONCRETE MAIN REINFORCEMENTS
TO BE CONTINUOUS E JOINT DETAIL
DISTANCE FROM FAULTLINE = 47.3 KM IN PLACE PRIOR TO PLACING OF CONCRETE. S-2 SCALE NTS
1. WHERE A CONSTRUCTION JOINT IS TO BE MADE, THE SURFACE OF CONCRETE Ø10x1000 LONG
SOIL PROFILE TYPE = S D (STIFF SOIL) 6. ALL CONCRETE SHALL BE KEPT MOIST FOR A MINIMUM OF SEVEN (7) CONSECUTIVE DAYS IMMEDIATELY SHALL BE CLEANED AND ALL LAITANCE AND STANDING WATER REMOVED @ 300 O.C.
NEAR SOURCE FACTORS, NA = 1.00 AFTER POURING BY THE USE OF WET BURLAP, FOG SPRAYING, CURING COMPOUNDS OR OTHER SHEAR KEY SHALL BE PROVIDE AT THE JOINT. ALL LAITANCE AND STANDING 40
FOUNDATION TOP ADDITIONAL SHEAR BARS
WATER REMOVED SHEAR KEY SHALL BE PROVIDE AT THE JOINT. BARS AS SCHEDULED Ø25 X 1500 LONG @ 200 O.C.
N V = 1.00 APPROVED METHODS.

t/3 t/3
(EACH DIAGONAL PAIR PER SET)

t/3

t
SEISMIC RESPONSE COEFFICIENTS, CA = 0.44 7. STRIPPING OF FORMS AND SHORES: SLAB

H/3
THICKNESS (H)
CV = 0.64 FOUNDATION 24 HOURS 30 BAR DIA. 30 BAR DIA.

VERIFY DEPRESSION
(min.) (min.) MAIN REINFORCEMENTS TO BE
SEISMIC RESPONSE MODIFICATION FACTOR, R = 8.50 (RC SMRF) SUSPENDED SLAB EXCEPT WHEN

H/3
8 DAYS CONTINUOUS (TOP & BOTT. BARS)

D=FOR BEAM
t=FOR SLAB
ADDITIONAL LOADS ARE IMPOSED
DESIGN BASE SHEAR, V = Cvl W WHERE JOINTS IS AT POINT OF
STRESS, PROVIDE SHEAR RODS
RT WALLS 21 DAYS

H/3
WITH ENGINEERS APPROVAL
Vmax = 2.50 CaI W Vmin = 0.11 Cal W BEAMS 14 DAYS 30Ø BAR 30Ø BAR
R 50
0.80 ZNvI COLUMNS 21 DAYS (MIN.) (MIN.)
Vmin = W (ZONE 4) 225 mm WIDE x 6mm THK.
R FOUNDATION BOTTOM

D/3
D=FOR BEAM PVC WATERSTOP W/FLAT TYPE
8. THE CONTRACTOR SHALL SUBMIT THE SCHEDULE OF POURING AND LOCATIONS OF CONSTRUCTION

D/3
WHERE: W = SEISMIC WEIGHT = TOTAL DEAD LOAD UNDERSIDE W/ FINS ON THE

D
2t=FOR SLAB BARS AS SCHEDULED
JOINTS TO THE DESIGNER AT LEAST FOUR (4) DAYS PRIOR TO CONCRETE POURING FOR APPROVAL. BLINDING CONCRETE FOUNDATION SIDE
T = NATURAL PERIOD = Ct (h) 3/4

D/3
30 BAR DIA. (min.) (THICKNESS AS DETAILED)
C = NUMERICAL COEFFICIENT BEAM
9. THE CONTRACTOR SHALL FURNISH AND MAINTAIN ADEQUATE FORMS AND SHORINGS UNTIL THE BEAM/SLAB CHANGE SOFFIT DETAIL
h = BUILDING HEIGHT, m CONCRETE MEMBERS HAVE ATTAINED THEIR WORKING CONDITION AND STRENGTH.
A
SLAB & BEAM CONSTRUCTION JOINT DETAIL F FOOTING CONSTRUCTION JOINT DETAIL
S-1 SCALE NTS B SCALE NTS
SCALE NTS S-1
S-1

PROJECT TITLE SHEET CONTENTS REVISION(S) DATE PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMENDED BY: APPROVED BY: SET NO. SHT NO.
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
MIMAROPA REGION (IV - B) CONSTRUCTION OF MULTI-PURPOSE BUILDING
MINDORO OCCIDENTAL DISTRICT ENGINEERING OFFICE (SABLAYAN COLISEUM), SABLAYAN, OCCIDENTAL AS SHOWN S-1
Mamburao, Occidental Mindoro MINDORO (PHASE 2) DPWH-IV-B
17 30
JERSON M. FAGUTAO LIZELOTTE D. GULLA MA. THERESA J. PALIMA SHERYLL B. MULINGBAYAN JOSELITO A. ANTONIO
AIRPORT ROAD BRGY. 9, MAMBURAO OCC. MINDORO LOCATION : SABLAYAN, OCC. MINDORO ENGINEER II ENGINEER II - BUILDING COORDINATOR CHIEF, PLANNING SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
GENERAL CONSTRUCTION NOTES
NOTES ON CONCRETE SLABS NOTES ON CONCRETE WALLS
SEE NOTE
NO. 5 CHB WALL
1. UNLESS OTHERWISE SPECIFIED IN DETAILED DRAWINGS, REINFORCEMENT IN CONTINUOUS ADDITIONAL Ø10 @ 400 O.C.
1. ALL WALLS SHALL BE REINFORCED ACCORDING TO THE FOLLOWING SCHEDULE OF WALL
SUSPENDED SLABS SHALL FOLLOW THE TYPICAL DETAIL SHOWN ALONG WITH SLAB SCHEDULE Ø10 MAIN BARS REINFORCEMENT UNLESS OTHERWISE INDICATED IN THE PLANS.
@ 250MM CHB WALL
Ø10 @ 250MM
2. IF SLABS ARE REINFORCED BOTH WAYS, BOTTOM BARS ALONG THE SHORT SAN SHALL BE 3-Ø10 BOT. BARS
PLACED BELOW THOSE ALONG THE LONG SPAN AT MIDSPAN AND TOP BARS ALONG THE
TABLE G
VERIFY
MAX 8% SLOPE

SEE NOTE
SHORT SPAN OVER THOSE ALONG THE LONG SPAN AT NEAR THE SUPPORTS. WALL REINFORCEMENT VERTICAL

NO. 5
2-Ø16 EXTRA ADDITIONAL Ø10 1-Ø16 EXTRA VERT. BARS THICKNESS HORIZONTAL VERTICAL REMARKS SECTION

225
3. PROVIDE EXTRA REINFORCEMENTS FOR CORNER SLAB AS SHOWN BELOW. N
LG VERT. REINF. @ 400 O.C.
CHB VERT. REINF. (SEE CHB VERT. REINF. (SEE 100mm Ø10mm @ 250mm O.C. Ø10mm @ 300mm O.C. HORIZONTAL BARS

300

125
4. PROVIDE EXTRA REINFORCEMENTS FOR SLAB OPENINGS AS SHOWN BELOW. SCHED. OF REINF.) VER. BARS
SCHED. OF REINF.) 125mm Ø10mm @ 200mm O.C. Ø10mm @ 250mm O.C. AT CENTERS, VERTICAL

100
Ø10 SECONDARY BARS HOR. BARS
5. SLAB REINFORCEMENT LAYERS SHALL BE SUPPORTED WITH 10 mm STEEL CHAIR SPACED AT @ 300MM 400 CHB HOR. REINF. (SEE
CHB HOR. REINF. (SEE 150mm Ø12mm @ 250mm O.C. Ø12mm @ 300mm O.C. BARS ON BOTH FACES
125 GRAVEL BASE SCHED. OF REINF.)
ONE (1) METER O.C. BOTH WAYS. IN NO CASE THERE SHALL BE LESS THAN TWO (2) CHAIRS SCHED. OF REINF.)
VAPOR BARRIER
WHEN REQ. 2. CARRY VERTICAL BARS AT LEAST 60mm ABOVE FLOOR LEVEL TO PROVIDE FOR SPLICES WHEN NECESSARY
NOTE: STOP AT 50mm BELOW TOP SLAB OR SOLID BAND WHERE THE WALL ENDS VERTICAL AND HORIZONTAL BARS
1. PROVIDE THESE ADDITIONAL BARS FOR ALL OPENINGS
H TYPICAL RAMP ON FILL DETAIL L WALL CORNER DETAIL M WALL INTERSECTION DETAIL SHALL BE SPLICED BY LAPPING A DISTANCE EQUAL TO 30 DIAMETERS AND WIRED SECURELY WITH 16 G.I. WIRE
PLUS BARS (SHOWN AS DOTTED LINES) PARALLEL TO SIDE OF OPENING PROVIDED THAT SPLICES IN ADJACENT BARS ARE STAGGERED AT LEAST 1.50M O.C.
SCALE NTS SCALE NTS SCALE NTS
EQUAL TO THE NUMBER OF INTERRUPTED BARS BY THE OPENING. S-2 S-2 S-2

Ø12x1000mm LONG DIAGONALS AT 2. OMIT TRIMMER BARS WHERE OPENING IS FRAMED BY BEAMS 3. UNLESS OTHERWISE NOTED IN THE PLANS, ALL OPENINGS IN WALLS 250mm OR THICKER SHALL BE REINFORCED
MID-DEPTH OF SLAB AT EACH CORNER.
4-Ø12@1800MM LONG NOTES ON CONCRETE HOLLOW BLOCKS WALLS TYP.FLR LVL SEALANT W/ BACKER AROUND WITH 2-20mmØ BARS. FOR 225mm, 200mm, 175mm, 150mm THICK WALLS, USE 2-16mmØ. FOR 125mm AND
1-Ø12 TOP &
TOP BARS BENT DOWN ROD ON BOTH SIDE 100mm THICK WALLS, USE 2-12mmØ BARS. ALL WALLS SPANNING SHALL HAVE VERTICAL REINFORCEMENT BENT
INTO EDGE BEAM. EXTEND
400

BOT. BARS BARS MIN. OF 1200 (4'-0") 1. ALL NON-LOAD BEARING TYPE CONCRETE BLOCKS SHALL HAVE A UNIT WEIGHT NOT TO EXCEED 80PCF. A U-FORM LIKE STIRRUPS AND SPACED ACCORDING TO THE SCHEDULE UNLESS OTHERWISE NOTED.

25MM
FOR NON-LOAD BEARING TYPEOF CONCRETE BLOCK, A MINIMUM COMPRESSIVE STRENGTH OF 3.45 MPA
(500 PSI) SHALL BE DEVELOPED.
38mm. CLEAR 75 mm BEAM DOWEL BARS TO MATCH
SIZE AND SPACING OF SEALANT W/ BACKER
MAXIMUM 60 2. ALL CONCRETE HOLLOW BLOCKS (CHB) SHALL BE REINFORCED AS SHOWN IN TABLE E. ROD ON BOTH SIDE 4-Ø16 VERT. BARS
0 DOWEL BARS TO MATCH
VERTICAL BARS COLUMN 4-Ø16 VERT. BARS

550
IN TWO WAY SIZE AND SPACING OF SEE REINF. SCHEDULE
TABLE E TABLE F SEE REINF. SCHEDULE

550
SLAB EXTEND
400

VERTICAL BARS
BARS UP TO BOTTOM BARS CHB WALL REINFORCEMENT LINTEL BEAM IN BLOCK WALLS SEE NOTE NO.5
BEAM SUPPORT SPACED @150MM O.C. EXTERIOR WALL
600

1-Ø12x675MM BLOCK CLEAR HEIGHT OF REINFORCEMENT


ADDITIONAL TRIMMER BARS(SHOWN AS 1-Ø12x975MM HORIZONTAL VERTICAL TYP.FLR LVL EXTERIOR WALL WITH
THICKNESS SPAN LINTEL
DOTTED LINES), AT SIDES OF OPENING 1-Ø12x1275MM BOT & TOP STIRRUPS DOWEL BAR TO MATCH SIZE AND 550 550
EQUAL TO THE NUMBER OF BARS (L) (mm) BENTONITE STRIP
600 1-Ø12x1575MM
TERMINATED BY THE OPENING. 12MM SPACING OF VERTICAL BARS
100 mm Ø10 EVERY 3RD LEVEL Ø10 @ 600mm O.C. 1.20 M 200 1 - Ø10 Ø10 @ 200mm SEE NOTE NO.5 RC WALL CONNECTION DETAIL
U
125 mm Ø10 EVERY 3RD LEVEL Ø10 @ 600mm O.C. 1.80 M 200 1 - Ø12 Ø10 @ 200mm BEAM SEALANT W/ BACKER S-2 SCALE NTS
ROD ON BOTH SIDE 1050
SLAB OPENING DETAIL CORNER SLAB DETAIL

ANCHORAGE LENGTH
A B Ø10 @ 200mm
150 mm Ø12 EVERY 3RD LEVEL Ø12 @ 600mm O.C. 2.20 M 250 2 - Ø12
S-2 SCALE NTS
S-2 SCALE NTS WALL - BEAM / SLAB SOFFIT DETAIL WALL - COLUMN / WALL DETAIL

SEE TABLE OF
2.80 M 300 2 - Ø12 Ø10 @ 200mm N O Ø16x1500mm
Ø12x1000mm

(TABLE A)
200 mm Ø12 EVERY 3RD LEVEL Ø12 @ 600mm O.C. S-2 SCALE NTS
S-2 SCALE NTS
LONG DIAGONALS

825
LONG DIAGONALS AT MID-DEPTH
3.20 M 300 2 - Ø16 Ø10 @ 200mm AT MID-DEPTH OF WALL AT
6. PROVIDE EXPANSION JOINT AND CONTRACTION JOINT 3.80 M 350 2 - Ø16 Ø10 @ 200mm SEE CONSTRUCTION NOTES OF WALL AT EACH CORNER
FOR MASONRY WALL REIN- EACH CORNER WINDOW
FORCEMENTS (TYPICAL) OPENING
3. PROVIDE 150mm x 400mm STIFFENER COLUMN REINFORCED WITH 4 - 16 mm Ø MAIN BARS WITH 1-Ø16 E.F. (TYP.)
SAW-CUT GROOVE 8MM WIDE PEJ
WHEN REQUIRED 6.5MM DEEP TO BE FILLED WITH 10 mm Ø TIES AT 150 mm O.C. WHERE CHB WALLS TERMINATE AND AT EVERY 3.0 m OF LENGTH.
DOWEL BARS TO MATCH CHB WALL DOOR
RET. WALL/CHB WALL VAPOR BARRIER POLYURETHANE SEALANT
BEDDING (TYP.) CHB VERT. BARS OPENING
FIN. FLR. LVL. CHB VERT. REINF. (SEE

600 (MIN.) VARIES


POLYURETHANE SEALANT COMPACTED GRAVEL 150 SCHED. OF REINF.)
SLAB REINF. CHB. VERT. REINF. (SEE 1-Ø16 E.F. OF
OPENING (TYP.) NOTE:

SEE NOTE NO.5


SCHED. OF REINF.) 400

NOTE NO.5
SLAB REINF. NAT. GRD. LVL.
FLR. LVL. CHB VERT. REINF. DOWELS 1. PROVIDE THESE ADDITIONAL BARS FOR ALL OPENINGS
FLR. LVL. 20MM MIN.

SEE
SLAB

PLUS BARS (SHOWN AS DOTTED LINES) PARALLEL TO SIDE


"t"

CONC. COVER OF OPENING EQUAL TO THE NUMBER OF INTERRUPTED


VERIFY

150MM
2Ø12 HOR. BAR BARS BY THE OPENING EQUAL TO THE NUMBER OF

250
INTERRUPTED BARS BY THE OPENING.
3-Ø10 BOT. BARS
400

Ø10 SPACED 4Ø16 VERT. BARS W/1Ø10


SUBGRADE COMPACTED @150 O.C (TYP.) TIES; SPACED@150 FTB V RC WALL OPENING DETAIL
SUBGRADE COMPACTED Ø10 BOT. BARS
COMPACTED GRAVEL TO 95% OF MAXIMUM TO 95% OF MAXIMUM ALTERNATELY PLACED TO C.L (TYPICAL) (SEE PLAN) S-2 SCALE NTS
BEDDING (TYP.) DRY DENSITY @ OPTIMUM DRY DENSITY @ OPTIMUM (FOR 3M CMU WALL HEIGHT) ALTERNATELY PLACED @ @ 300 O.C.
400
MOISTURE CONTENT (MAX. MOISTURE CONTENT (MAX. EVERY 3M
VAPOR BARRIER DEPTH OF COMPRESSED
WHEN REQUIRED
DEPTH OF COMPRESSED
FILL = (200mm PER LAYER).
FILL = (200mm PER LAYER).
P WF-1 (PERIMETER/EDGE) Q CHB AT FTB NOTES ON STRUCTURAL STEEL:
I STIFFENER BEAM DETAIL J STIFFENER COLUMN DETAIL SCALE NTS SCALE NTS
S-2 S-2
S-2 SCALE NTS
S-2 SCALE NTS 1. UNLESS OTHERWISE NOTED IN PLANS, DESIGN STRENGTHS OF STEEL SHALL BE:
SLAB-ON-GRADE EXPANSION SLAB-ON-GRADE CONTRACTION A. STRUCTURAL STEEL
C JOINT DETAIL D JOINT DETAIL FOR TRUSSES, BRACINGS, PURLINS, PLATES, AND STRUTS fy = 248 MPa (36,000 psi)
SCALE NTS SCALE NTS
S-2 S-2 CHB WALL CHB END DOWEL TO MATCH
BLOCK CHB VERT. BARS
B. WELDS E70XX ELECTRODE
DOWEL TO MATCH
(SEE TABLE H) CHB VERT. BARS C. STRUCTURAL BOLTS
(FOR L=1000MM+ 200 200 CHB "t" WHERE SLAB
RC BEAM/GIRDER VERIFY DEPRESSION OCCURS
CONSULT STRUCTURAL ENGR.) A 300 300 a. ASTM A325 BOLTS b.1 Fnt = 620 MPa (90,000 psi)
(SEE PLAN)

NOTE NO.5
(TYP.) (TYP.)

NOTE NO.5
b.2 Fnv= 330 MPa (48,000 psi)
ARCHITECTURAL

SEE

SEE
ELEVATION)

CHB HOR. REINF. (SEE


(SEE SCHED.)

FOR ANCHORAGE

1-Ø16 VERT. REINF.


(VERIFY

SCHED. OF REINF). FIN. FLR. LVL. 2. ALL STRUCTURAL STEEL WORKS SHALL BE IN ACCORDANCE WITH AISC
SEE TABLE A

Ø12 MAIN BARS A


(SECTION B-B)
SPECIFICATION FOR DESIGN, FABRICATION AND ERECTION OF STRUCTURAL STEEL

250
@250MM O.C.

250
LINTEL BEAM W/ 2-Ø12 CHB "t" FOR BUILDINGS.
B B CONTINUOUS HORIZONTAL
REINFORCEMENTS
6-Ø10 BARS (AS SHOWN) 6-Ø10 BARS (AS SHOWN) 3. ALL SPLICES AND CONNECTIONS SHALL BE DESIGNED FOR AT LEAST 125 % OF THE
2-Ø10 TEMP. BARS Ø10 BOT. BARS @ 300 O.C. Ø10 BOT. BARS @ 300 O.C. CAPACITY OF THE MEMBER BEING JOINED OR A MINIMUM STRESS OF 6 KIPS.
H
(MIN.)

@ 300MM O.C. 400 400


STRUCTURAL ENGR.

1-Ø16 ADDITIONAL
100

VERTICAL BARS
4. THE CONTRACTOR SHALL SUBMIT SHOP / FABRICATION DRAWINGS OF ALL
H=2000 (MAX.)

CHB WALL ABOVE


OR CONSULT

STRUCTURAL STEEL FRAMING TO INCLUDE MATERIAL SCHEDULE, ERECTION,


CHB. (SEE DETAILS) R WF-2 (INTERIOR WALLS) S WF-3 (INTERIOR W/ SLAB DIFFERENCE) SCHEMES, DETAIL OF CONNECTIONS AND SPLICES FOR REVIEW AND APPROVAL OF
CHB. VERT. REINF. (SEE S-2 SCALE NTS
S-2 SCALE NTS
IMPLEMENTING OFFICE ENGINEER PRIOR TO ERECTION.
E TYP. CANOPY SLAB DETAIL SCHED. OF REINF.)
5. ALL STRUCTURAL STEEL SURFACE SHALL BE APPLIED WITH A SHOP COAT OF ZINC
SCALE NTS
S-2 CHROMATE PRIMER PAINT AFTER FABRICATION AND PRIOR TO ERECTION AND
SECOND OF THE SAME PAINT AFTER WELDING AND/OR ERECTION.
(SEE TABLE F.)

FLOOR LINE
CHB "t"
Ø10 NOSING BARS Ø10 NOSING BARS K CHB WALL OPENING LINTEL BLOCK 6. THE CONTRACTOR SHALL VERIFY ACTUAL DIMENSIONS SHOWN IN THIS DRAWINGS
Ø10 MAIN BARS Ø10 MAIN BARS SLAB DETAIL (SEE TABLE F.) AT JOB SITE PRIOR TO PREPARATION OF SHOP DRAWINGS.
@ 250MM S-2 SCALE NTS
C PIPE SLEEVE
@ 250MM (SEE PLAN) REQUIRED
Ø10 CUT BARS (SECTION A-A) 7. ALL WELDS NOT SPECIFIED SHALL BE CONTINUOUS FILLET WELDS, USING NOT
Ø10 CUT BARS
125

@250MM CONCRETE FILLER LESS THAN THE MIN. SIZE, BASED ON THE THINNER PART JOINED PER AISC/AWS.
@250MM 4. ALL CELLS CONTAINING REINFORCING BARS OR INSERTS SHALL BE SOLIDLY FILLED WITH CONCRETE
VERIFY GROUT. (REFER TO SPECIFICATIONS) PIPE 8. PROVIDE STIFFENER PLATES EACH FACE OF STEEL BEAMS TO MATCH THICKNESS
VERIFY OF THE WEB AT 2000MM O.C.
VERIFY
VERIFY

SLAB DETAIL Ø10 SECONDARY BARS CONCRETE


(SEE PLAN) Ø10 SECONDARY @ 300MM
5. BLOCK WALL REINFORCING SHALL BE LAPPED A MINIMUM OF 30 BAR DIAMETERS WHERE SPLICED, 9. PROVIDE STIFFENER PLATES EACH FACE OF STEEL COLUMN TO MATCH
BARS @ 300MM FILLER
12

HORIZONTAL/VERTICAL DOWELS FROM FOOTINGS, COLUMNS/WALLS OR SLABS SHALL EXTEND INTO THE
12

THICKNESS OF THE WEB AT 1500MM O.C.


5
5
100125

BLOCK WALL A MINIMUM OF 30 BAR DIAMETERS OR A MINIMUM OF 400 mm. WHICHEVER IS LONGER
MASTIC SEALANT
300

3-Ø10 BOT. BARS AND DOWELS TO MATCH VERTICAL REINFORCEMENTS OF WALL.


EACH SIDE TABLE G:

12mm GAP
PIPE SLEEVE PIPE SLEEVE MINIMUM SIZE OF GROOVE AND FILLET WELDS
GRAVEL BASE 6. VERTICAL REINFORCING SHALL BE CONTINUOUS FROM STRUCTURAL LEVEL TO STRUCTURAL LEVEL.

(MIN.)
GRAVEL BASE REQUIRED
UNLESS OTHERWISE NOTED. COMPRESSIBLE THICKNESS OF THINNER MATERIAL CONNECTED, mm WELD SIZE, mm
3-Ø10 BOT. BARS VAPOR BARRIER VAPOR BARRIER
WHEN REQ. MATERIALS
Ø10 TO MATCH SLAB REINF. WHEN REQ. TO 6 INCLUSIVE 3
125 7. HORIZONTAL SPACING SHALL START AND END FROM NOT MORE THAN 1/2 THE SCHEDULE SPACING. CHB WALL
C
(SECTION C-C) OVER 6 TO 13 5
F TYP. STAIR ON FILL DETAIL-1 G TYP. STAIR ON FILL DETAIL-2 8. SPLICES IN HORIZONTAL REINF. SHALL BE STAGGERED. SPLICES IN TWO CURTAINS SHALL NOT OCCUR
PIPE SLEEVE THRU WALL
SCALE NTS SCALE NTS IN THE SAME LOCATION T OVER 13 TO 19 6
S-2 S-2 SCALE NTS
S-2 OVER 19 8
9. TENSION SPLICES SHALL BE AS FOR SEISMIC TENSION SPLICES.

PROJECT TITLE SHEET CONTENTS REVISION(S) DATE PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMENDED BY: APPROVED BY: SET NO. SHT NO.
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
MIMAROPA REGION (IV - B) CONSTRUCTION OF MULTI-PURPOSE BUILDING
MINDORO OCCIDENTAL DISTRICT ENGINEERING OFFICE (SABLAYAN COLISEUM), SABLAYAN, OCCIDENTAL AS SHOWN S-2
Mamburao, Occidental Mindoro MINDORO (PHASE 2) DPWH-IV-B
18 30
JERSON M. FAGUTAO LIZELOTTE D. GULLA MA. THERESA J. PALIMA SHERYLL B. MULINGBAYAN JOSELITO A. ANTONIO
AIRPORT ROAD BRGY. 9, MAMBURAO OCC. MINDORO LOCATION : SABLAYAN, OCC. MINDORO ENGINEER II ENGINEER II - BUILDING COORDINATOR CHIEF, PLANNING SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
LEGEND

FOOTING AND COLUMN


FOR PHASE 1

FOOTING AND COLUMN FOR THE


NEXT PHASE

PROJECT TITLE SHEET CONTENTS REVISION(S) DATE PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMENDED BY: APPROVED BY: SET NO. SHT NO.
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
MIMAROPA REGION (IV - B) CONSTRUCTION OF MULTI-PURPOSE BUILDING
MINDORO OCCIDENTAL DISTRICT ENGINEERING OFFICE (SABLAYAN COLISEUM), SABLAYAN, OCCIDENTAL AS SHOWN S-3
Mamburao, Occidental Mindoro MINDORO (PHASE 2) DPWH-IV-B
19 30
JERSON M. FAGUTAO LIZELOTTE D. GULLA MA. THERESA J. PALIMA SHERYLL B. MULINGBAYAN JOSELITO A. ANTONIO
AIRPORT ROAD BRGY. 9, MAMBURAO OCC. MINDORO LOCATION : SABLAYAN, OCC. MINDORO ENGINEER II ENGINEER II - BUILDING COORDINATOR CHIEF, PLANNING SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
PROJECT TITLE SHEET CONTENTS REVISION(S) DATE PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMENDED BY: APPROVED BY: SET NO. SHT NO.
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
MIMAROPA REGION (IV - B) CONSTRUCTION OF MULTI-PURPOSE BUILDING
MINDORO OCCIDENTAL DISTRICT ENGINEERING OFFICE (SABLAYAN COLISEUM), SABLAYAN, OCCIDENTAL AS SHOWN S-4
Mamburao, Occidental Mindoro MINDORO (PHASE 2) DPWH-IV-B
20 30
JERSON M. FAGUTAO LIZELOTTE D. GULLA MA. THERESA J. PALIMA SHERYLL B. MULINGBAYAN JOSELITO A. ANTONIO
AIRPORT ROAD BRGY. 9, MAMBURAO OCC. MINDORO LOCATION : SABLAYAN, OCC. MINDORO ENGINEER II ENGINEER II - BUILDING COORDINATOR CHIEF, PLANNING SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
PROJECT TITLE SHEET CONTENTS REVISION(S) DATE PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMENDED BY: APPROVED BY: SET NO. SHT NO.
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
MIMAROPA REGION (IV - B) CONSTRUCTION OF MULTI-PURPOSE BUILDING
MINDORO OCCIDENTAL DISTRICT ENGINEERING OFFICE (SABLAYAN COLISEUM), SABLAYAN, OCCIDENTAL AS SHOWN S-5
Mamburao, Occidental Mindoro MINDORO (PHASE 2) DPWH-IV-B
21 30
JERSON M. FAGUTAO LIZELOTTE D. GULLA MA. THERESA J. PALIMA SHERYLL B. MULINGBAYAN JOSELITO A. ANTONIO
AIRPORT ROAD BRGY. 9, MAMBURAO OCC. MINDORO LOCATION : SABLAYAN, OCC. MINDORO ENGINEER II ENGINEER II - BUILDING COORDINATOR CHIEF, PLANNING SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
PROJECT TITLE SHEET CONTENTS REVISION(S) DATE PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMENDED BY: APPROVED BY: SET NO. SHT NO.
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
MIMAROPA REGION (IV - B) CONSTRUCTION OF MULTI-PURPOSE BUILDING
MINDORO OCCIDENTAL DISTRICT ENGINEERING OFFICE (SABLAYAN COLISEUM), SABLAYAN, OCCIDENTAL AS SHOWN S-6
Mamburao, Occidental Mindoro MINDORO (PHASE 2) DPWH-IV-B
22 30
JERSON M. FAGUTAO LIZELOTTE D. GULLA MA. THERESA J. PALIMA SHERYLL B. MULINGBAYAN JOSELITO A. ANTONIO
AIRPORT ROAD BRGY. 9, MAMBURAO OCC. MINDORO LOCATION : SABLAYAN, OCC. MINDORO ENGINEER II ENGINEER II - BUILDING COORDINATOR CHIEF, PLANNING SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
PROJECT TITLE SHEET CONTENTS REVISION(S) DATE PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMENDED BY: APPROVED BY: SET NO. SHT NO.
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
MIMAROPA REGION (IV - B) CONSTRUCTION OF MULTI-PURPOSE BUILDING
MINDORO OCCIDENTAL DISTRICT ENGINEERING OFFICE (SABLAYAN COLISEUM), SABLAYAN, OCCIDENTAL AS SHOWN S-7
Mamburao, Occidental Mindoro MINDORO (PHASE 2) DPWH-IV-B
23 30
JERSON M. FAGUTAO LIZELOTTE D. GULLA MA. THERESA J. PALIMA SHERYLL B. MULINGBAYAN JOSELITO A. ANTONIO
AIRPORT ROAD BRGY. 9, MAMBURAO OCC. MINDORO LOCATION : SABLAYAN, OCC. MINDORO ENGINEER II ENGINEER II - BUILDING COORDINATOR CHIEF, PLANNING SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
PROJECT TITLE SHEET CONTENTS REVISION(S) DATE PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMENDED BY: APPROVED BY: SET NO. SHT NO.
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
MIMAROPA REGION (IV - B) CONSTRUCTION OF MULTI-PURPOSE BUILDING
MINDORO OCCIDENTAL DISTRICT ENGINEERING OFFICE (SABLAYAN COLISEUM), SABLAYAN, OCCIDENTAL AS SHOWN S-8
Mamburao, Occidental Mindoro MINDORO (PHASE 2) DPWH-IV-B
24 30
JERSON M. FAGUTAO LIZELOTTE D. GULLA MA. THERESA J. PALIMA SHERYLL B. MULINGBAYAN JOSELITO A. ANTONIO
AIRPORT ROAD BRGY. 9, MAMBURAO OCC. MINDORO LOCATION : SABLAYAN, OCC. MINDORO ENGINEER II ENGINEER II - BUILDING COORDINATOR CHIEF, PLANNING SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
PROJECT TITLE SHEET CONTENTS REVISION(S) DATE PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMENDED BY: APPROVED BY: SET NO. SHT NO.
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
MIMAROPA REGION (IV - B) CONSTRUCTION OF MULTI-PURPOSE BUILDING
MINDORO OCCIDENTAL DISTRICT ENGINEERING OFFICE (SABLAYAN COLISEUM), SABLAYAN, OCCIDENTAL AS SHOWN S-9
Mamburao, Occidental Mindoro MINDORO (PHASE 2) DPWH-IV-B
25 30
JERSON M. FAGUTAO LIZELOTTE D. GULLA MA. THERESA J. PALIMA SHERYLL B. MULINGBAYAN JOSELITO A. ANTONIO
AIRPORT ROAD BRGY. 9, MAMBURAO OCC. MINDORO LOCATION : SABLAYAN, OCC. MINDORO ENGINEER II ENGINEER II - BUILDING COORDINATOR CHIEF, PLANNING SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
PROJECT TITLE SHEET CONTENTS REVISION(S) DATE PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMENDED BY: APPROVED BY: SET NO. SHT NO.
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
MIMAROPA REGION (IV - B) CONSTRUCTION OF MULTI-PURPOSE BUILDING
MINDORO OCCIDENTAL DISTRICT ENGINEERING OFFICE (SABLAYAN COLISEUM), SABLAYAN, OCCIDENTAL AS SHOWN S-10
Mamburao, Occidental Mindoro MINDORO (PHASE 2) DPWH-IV-B
26 30
JERSON M. FAGUTAO LIZELOTTE D. GULLA MA. THERESA J. PALIMA SHERYLL B. MULINGBAYAN JOSELITO A. ANTONIO
AIRPORT ROAD BRGY. 9, MAMBURAO OCC. MINDORO LOCATION : SABLAYAN, OCC. MINDORO ENGINEER II ENGINEER II - BUILDING COORDINATOR CHIEF, PLANNING SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
PROJECT TITLE SHEET CONTENTS REVISION(S) DATE PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMENDED BY: APPROVED BY: SET NO. SHT NO.
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
MIMAROPA REGION (IV - B) CONSTRUCTION OF MULTI-PURPOSE BUILDING
MINDORO OCCIDENTAL DISTRICT ENGINEERING OFFICE (SABLAYAN COLISEUM), SABLAYAN, OCCIDENTAL AS SHOWN S-11
MINDORO (PHASE 2) DPWH-IV-B
27 30
JERSON M. FAGUTAO LIZELOTTE D. GULLA MA. THERESA J. PALIMA SHERYLL B. MULINGBAYAN JOSELITO A. ANTONIO
AIRPORT ROAD BRGY. 9, MAMBURAO OCC. MINDORO LOCATION : SABLAYAN, OCC. MINDORO ENGINEER II ENGINEER II - BUILDING COORDINATOR CHIEF, PLANNING SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
PROJECT TITLE SHEET CONTENTS REVISION(S) DATE PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMENDED BY: APPROVED BY: SET NO. SHT NO.
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
MIMAROPA REGION (IV - B) CONSTRUCTION OF MULTI-PURPOSE BUILDING
MINDORO OCCIDENTAL DISTRICT ENGINEERING OFFICE (SABLAYAN COLISEUM), SABLAYAN, OCCIDENTAL AS SHOWN COLUMN DETAILS S-12
MINDORO (PHASE 2) DPWH-IV-B
28 30
JERSON M. FAGUTAO LIZELOTTE D. GULLA MA. THERESA J. PALIMA SHERYLL B. MULINGBAYAN JOSELITO A. ANTONIO
AIRPORT ROAD BRGY. 9, MAMBURAO OCC. MINDORO LOCATION : SABLAYAN, OCC. MINDORO ENGINEER II ENGINEER II - BUILDING COORDINATOR CHIEF, PLANNING SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER