0% found this document useful (0 votes)
16 views8 pages

Both Rates

Uploaded by

murali3685
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
16 views8 pages

Both Rates

Uploaded by

murali3685
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 8

S.

No Item Description Unit Qty


SUB HEAD - I : EARTH WORK & EXCAVATION

Earth work in excavation by mechanical means (Hydraulic excavator)


/manual means in foundations, retaining wall footings including dressing
001 of sides and ramming of bottoms, lift upto 2.1 m, and getting out the
excavated soil / Rock and disposal of surplus excavated soil as directed,
within a lead of 50 m. Note: excavation shall be paid as per IS 1200.

001a Lift up to 2.1m For Isolated Footings & Lift (2.1m Height) Cum 650.00

Refilling Filling available excavated earth (excluding rock) in trenches,


plinth,sides of foundations etc. in layers not exceeding 20cm in
002 depth,consolidating each deposited layer by ramming and watering Cum 900.00
throughly compacted by mechanical device, lead upto 50 m and lift upto
1.5 m. with excavated soil for foundation pits

a) Consolidation & Compaction: Cum 1,000.00


Supply and spreading of Gravel brought from out side and compaction
with Vibro Max Roller as per specification.
TOT 2550.00

SUB HEAD - II : ANTI TERMITE TREATMENT

Supply, diluting and injecting chemical emulsion for PRE-CONSTRUCTIONAL


anti-termite treatment and creating a continuous chemical barrier under
and alround the column pits, wall trenches, basement excavation, top
surface of plinth, junction of wall and floor, along the external perimeter
003 of building, expansion joints, top surface of consolidated earth on which
apron is to be laid, surroundings of pipes and conduits etc., complete as
per specifications (Plinth area of building at ground floor only shall be
measured for payment).

a) Chloropyriphos emulsifiable concentrate 20% with 1% concentration or Sqm 1,470.00


approved equivalent as specified.

SUB HEAD -III : PLAIN & REINFORCED CONCRETE

Providing and laying plain cement concrete 1 : 3 : 6 (1 cement : 3 coarse


sand : 6 graded crushed stone aggregate (40mm nominal size) including
004 shuttering in levelling courses under foundations, pipelines, pits, under Cum
floors etc., complete at all levels and locations as directed.

a) Footings 46.00
b) Plinth Beams 26.55
c) Floor PCC 135.00
TOT 207.55

Providing and laying reinforced cement concrete of grade not less than
M30 using design mix with minimum cement content of 400 Kg. per cum
of concrete and water cement ratio not more than 0.45 at all levels and
locations etc., complete rate including vibraction/compaction, curing etc.,
005 but excluding the cost of centering, shuttering and reinforcement for the Cum
following: list of make Ultratech 53 grade (OPC) (Note :- Cement content
considered in this item is @ 400 kg/cum. Excess/less cement used as per
design mix is payable/recoverable separately).
S.No Item Description Unit Qty
a) Footings 143.38
b) Pedestal 19.76
c) Columns up to ground level 18.00
d) Plinth beams 63.00
e) Columns from plinth to first slab 43.45
f) first slab 185.00
e) Columns from first to second slab 43.45
f) second slab 185.00

Fabrication and fixing in position reinforcement steel for RCC work at all
levels and locations including the cost of binding wire, straightening,
006 cutting, bending, placing of reinforcement in position and placing the
cover blocks as specified etc., as per drawings and specifications including
the cost of labour etc., complete. The rate shall be inclusive of necessary
testing charges carried out when asked by the engineer in charge.

Note : Reinforcement shall be measured only in lengths of bars as actually


placed in position on standard weight basis, no allowance being made in
the weight for rolling margin. Authorised laps and splices only will be
measured. Chairs of any shape & profile, Spacer bar of any shape & profile,
cover block, wastage of 3% and binding wire will not be measured and
shall be included in the quoted rates. Chairs of any shape & profile, Spacer
bar of any shape & profile, wastage will be measured & recorded for
reconciliation

TMT steel bars of grade Fe- 500 make of material Tata (or) sail Mt 65.00
TOT 65.00

Providing, fixing and stripping off plywood shuttering of 12mm thk


plywood having film faced desnsified shuttering for the following items of
007 RCC works including the cost of centering and staging finishing of concrete Sqm
surface and removing of form work as per the specifications etc., complete
all as per drawings, specifications and as directed.

a) Footings 235.97
b) Pedestal 99.00
c) Columns up to ground level 124.56
d) Plinth beams 410.00
e) Columns from plinth to first slab 353.00
f) first slab 1,160.00
e) Columns from first to second slab 353.00
f) second slab 1,160.00
TOT 3895.53

SUB HEAD - IV : MASONARY WORKS

Providing red brick masonry( 230 mmthk) with first class bricks of
minimum 50 kg/cm2 compression strength in cement mortar 1:6 (1
cement : 6 coarse sand) in superstructure at all levels and locations
including scaffolding, curing, and laying of concrete bands in not more
008 than 1000mm height with providing a minimum reinforcement as per the Cum 575.25
specifications provided etc. complete all ap per drawing and specification.
Lintel beam of 150 mm thick with all round out side wall. but excluding the
cost of centering, shuttering and reinforcement .

TOT 575.25
SUB HEAD - V : FLOORING
S.No Item Description Unit Qty

Flooring and skirting with vitrified tiles of 800 x 800 mm for first floor
and groung floor of 1st quality glossy finish of approved make and colour
set over base coat of CM (1:4), 20 mm thick over CC bed laid on RCC roof
slab, including neat cement slurry of honey like consistency spread @ 3.3
kg per sqm & jointed neatly with white cement paste to full depth mixed
009 with pigment of matching shade to full depth, cost and conveyance of all Sqm
materials like sand, tiles etc., seigniorage charges, etc., complete for all
floors and heights for finished item of work as directed by the Engineer in
charge. Note: measurement should be taken for plan area only. Expansion
joints must be aestheticaly planed in harmony with the floor plan with
5mm aprox. 6.4m length.

a)Ground Floor 658.35


b) First Floor 763.23
TOT 1421.58

Providing and laying approved brand or shade group-V non skid matt finish
ceramic tile of size 200 x 300 mm for flooring and skirting with out
warpage, jointed in white cement mixed with pigment to match the shade
010 of tile over and including base cement mortar of 1:4, (1 cement : 4 coarse Sqm
sand) 20 mm thick etc., complete for all floors and heights and as
directed. at toilets, balcony, utility Note: measurement should be taken for
plan area only.

a)Ground Floor 60.65


b) First Floor 60.77
TOT 121.42

011 Item same as Above 010 for dado upto door height with CM 1:3 (1 Sqm
cement : 3 coarse sand)
a)Ground Floor 153.30
b) First Floor 153.30
TOT 306.60

012 skriting 100mm thk at Staircase ,front steps,back side steps. rmts
a)Ground Floor 46.50
b) First Floor 50.00
TOT 96.50
013 Granite flooring:
Staircase 25 mm thk Granite floor Sqm 28.00
lobby and entrance stairs 61.00
back stairs 2.70
TOT 91.70

Industrial Flooring (VDF) at LBTF Sqm 502.00

Provide Vaccum Dewatering Flooring operation consisting of side


shuttering with MS Chanels, Angles to the required levels, Vibrating the
concrete by using screed vibrator and finishing the top surfce to required
level and grade using skim floaters/discs/power trowels.The rate
includeing of M30 Grade Concerete.

Grove Cutting & Sealant Filling : Rmt 650.00


S.No Item Description Unit Qty

5mm width and 25mm depth cutting of groves in concrete floor using
diamond cutter as per specification (Panel size 4m x 4m). Cleaning of
groves with air buffer and filling with Two components of Polysulphide
sealent make of FOSROC Thioflex 600/ Equivalent as per direction.

Grouting: Cum 1.00


Supply and filling of Grout Cement in the gaps between Column Base Plate
and Pedestal

014 Open terrace Sqm 42.00

SUB HEAD - VI: FINISHES


Plastering (external wall)

18 mm thick sand faced cement plastering on external surfaces of brick or


concrete surfaces in two layers consisting of 6 mm thick cement mortar
1:6 (1 cement :6 fine sand) top coat mixed with integral water proofing
compound over a base coat 12 mm thick cement mortar 1:5 (1 cement :5
015 coarse sand), finished semi-rough including providing and fixing of Sqm 1409.00
approved quality haxagonal chicken mesh with all necessary hardware at
the junction of RCC and brick work with overlapping of 100 mm on both
sides, etc., complete at all levels and locations etc, complete

016 Plastering (internal wall)

Plastering in CM 1:5 proportion 12mm thick internal with dubara sponge


finish including cost and conveyance of all materials to site, tools and
plants, labour charges, leads, lifts, scaffolding, curing and all other
incidental and operational charges etc. including providing and fixing of Sqm 4,073.00
approved quality haxagonal chicken mesh with all necessary hardware at
the junction of RCC and brick work with overlapping of 100 mm on both
sides, etc.,complete for finished item of work.

017 Plastering (ceiling)

Plastering in CM 1:4 proportion single coat of 12mm thick ceilings


including cost and conveyance of all materials to site, tools and plants,
labour charges, leads, lifts, scaffolding, curing and all other incidental and Sqm 600.00
operational charges etc. complete for finished item of work.

Interior paints

Painting to new walls with 3 coats of Premium Acrylic Smooth interior


paint of required shade New work (Two or more coats applied @ 1.43 ltr/
10 sqm approved colour and shade over a base coat of Birla Putty in
making 2 coats in all to give an even shade after thourughly brushing the
018 surface to remove all dirt and remains of loose powdered materials, Sqm 4,073.00
including cost and conveyance of all materials to work site and all
operational, incidental, labour charges etc. complete for finished item of
work as directed by the engineer in charge.

019 same as item 018 for Ceilings Sqm 600.00

Exterior paints
S.No Item Description Unit Qty

Painting to new walls with 3 coats of Premium Acrylic Smooth exterior


paint with Silicone additives of required shade New work (Two or more
coats applied @ 1.43 ltr/ 10 sqm approved colour and shade over a base
coat of Birla Putty in making 2 coats in all to give an even shade after
020 thourughly brushing the surface to remove all dirt and remains of loose Sqm 1409.00
powdered materials, including cost and conveyance of all materials to
work site and all operational, incidental, labour charges etc. complete for
finished item of work as directed by the engineer in charge.

SUB HEAD - VII : DOOR AND WINDOWS AND ROLING SHUTTERS

Providing and fixing in position Teak wood doors and upvc windows in
fixed and openable panels with standard bronze anodized alminium
extruded sections of 2 mm thickness, Hindalco / jindalco or equivalent
make with powder coating of 18 microns and 5.5 mm thick clear glass of
021 approved make and quality, including fixing the frames with lugs and glass
with aluminium glazing beading, EPDM gaskets, locking arrangements and
other hardwares like handles, tower bolts, dead bolts etc., complete all as
shown in the drawing and as directed. for all floors and heights.

D1 (Standard Metal Door With Vision Panel) Sqm 5.76


D2(Standard Metal Door With Vision Panel) Sqm 8.64
D3 (Flush door ) Sqm 40.80
D4 (Flush door ) Sqm 8.60
D5 (Flush door ) Sqm 16.20
FD(FIRE DOOR) (Standard Metal Door With Vision Panel) Sqm 17.28
RS1(ROLLING SHUTTERS) Sqm 27.20
RS2(ROLLING SHUTTERS) Sqm 5.76
FOD(FOLDABLE DOOR) Sqm 41.04
FG (fixed glass with metal frame) Sqm 108.80
W1 sliding upvc window with 6mm toughned Sqm 16.20
W2 sliding upvc window with 6mm toughned Sqm 1.80
V1 upvc frame with 6mm toughned glass louvered Sqm 2.88
MD sliding glass door with metal frame Sqm 15.13
JALI brick Terracoat bricks Sqm 21.53

SUB HEAD - VIII: WATER PROOFING WORKS

Providing chemical waterproof treatment with Brick bat coba &


chemical cement mortars to exposed RCC roof slab surfaces to required
slopes mixed with – Conproof NO.1/ rain Proof No 1/Zoriproof (100 ML
Per Bag of 50 Kgs Cement) waterproofing chemical compound, laid over
roof slab and brickbat coba treatment in chemical cement mortar 80
mm thick at the centre and 60 mm thick at the edges finished smooth
with a floating coat of chemical mixed cement mortar as per the
022 manufacturer specification including cost and conveyance of all Sqm 800.00
materials like sand, chemical –Conproof NO.1/ Rain Proof No 1/Zoriproof
(100 ml Per Bag of 50 Kgs Cement) waterproofing compound, water etc.,
to site, including seigniorage charges and operational, incidental, and
labour charges for mixing mortar, laying, lift charges, rendering smooth
curing including rounding off junctions of wall and slab etc., complete
for finished item of work (with a guarantee of 10 years)
S.No Item Description Unit Qty
SUB HEAD - IX: STEEL WORKS

Fabrication and erection in position structural steel work in built up


sections, rolled steel sections, trusses and framed work including cutting,
023 hoisting fixing in position and applying zinc chromate primer to exposed Mt 12.00
surfaces of steel etc., complete as per specification and as directed.
Note:Wastage should be below 03% (Three Percent)

Foundation Bolts: Nos 128.00


Supply and Fixing of foundation bolts for columns with templates of
fabricated structure

SUBHEAD - XI: ROOFING WORKS

Providing and Fixing Colour coated GALVALUME SHEET for Roofing of


1000 / 1020mm cover width, 28 to 30mm high crests at 250 / 255mm
centres in lengths upto 12m to suit site requirements, in hot dip metallic
coated steel.Sheet to have wide pans with three stiffening ribs for efficient
water shedding and special male female sides with full return leg on side
024 lap for supports from Ends and anticapillarity flute in side lap. The material Sqm 555.00
shall be cold rolled steel, 550Mpa yield stress ( ASTM A446 Grade E ) With
hot dipped mettalic coating of aluminium Zinc alloy ( 150 gms/sqm total of
both sides, AZ 150 as per ASTM A792 or AS per IS 1397),0.5mm total
coated thickness.The rate should be inclusive of preparation of shop
drawings, scaffoldings, etc., complete. Note: net laid area should be
measured.(Include turbo ventilators and rainwater gutter alroud the roof)

SUB HEAD -XII : COMPOUND WALL

025 Earth work, refiiling, pcc(1:3:6), RCC, brick masonary, shuttering, steel over Rum 69.00
all quantity for compound wall in running meter
SUB HEAD -XIII : MISCELLANEOUS

026 ELEVATIONS WORK PERGOLA Design (Specify the make and model) LUMPSUM

027 ELECTRICAL WORK (Specify the make and model) legrand LUMPSUM

Plumbing and Sanatary : Supply and Fixing of EWC, Wah Basins , and
Other Items ( EWC , Wah Basin ,Urinals Taps , Rain Water Pipes etc )
028 ( Make : EWC : Parry Ware /Hind Ware , Taps Jaquar and Pipes : Sudhakar LUMPSUM

029 Glass railing in ground floor and first floor Rmt 65.45

Hand Rails : Supplying and fixing of stainless steel ( grade 304 ) hand
railing as per approved drawing with top rail and vertical posts of 50mm
dia pipe and 2mm thick medium class and 3 Nos. 25mm dia 1.6mm thick
medium class for horizontals fixed to the vertical posts along the flight
direction, each vertical fixed with base plate of 75mm dia using bonding
030 agent and anchor fastner and welding, drilling of 50mm dia holes with Rmt 50.00
pneumatic compressor for fixing railing, buffing, polishing all members of
the railing thouroughly , lacquer finishing to present seamless finish
including cost and conveyance of all materials, electrodes, welding
charges, cost of all consumables, labour charges , overheads & contractors
profit etc., complete for finished item of work.
S.No Item Description Unit Qty

Plinth Protection :Making pinth protection 75 mm thick of cement


concrete 1:2:4 over 100m thick bed of lean concrete 1:4:8 over well
rammed and consolidated earth I/c finishing the top surfaces with floating
031 coat of neat cement including providing 12mm thk. Joints @5.0mt. Interval SQM 600.00
and filling with sand bitumin mix (3sand and 1bitumin) shuttering etc all
complete. (If required, shall be executed)

DPC- Providing and laying damp proof course 50 mm thick with 1:1.5:3
cement concrete (1 Cement : 1.5 Coarse Sand : 3 graded stone Aggregate
12.5 mm nominal size), including providing and mixing approved
032 waterproofing compound in the proportion of @300ML. per 50 kg bag of SQM 350.00
cement or as recommended by the manufacturer, complete. (Liquid water
proofing Pidilide LW+) (If required, shall be executed)

Supply & Laying suspended grid ceeling with 24mm x32 mm x.25 mm thick
pre fabriacted powdercoated G I channels make Armstrong with 12 mm
033 thick miniral fiber board (or) calcuim silicate board, make Aerolite, grid SQM 500.00
hanging supports 4 mm thick G I Wire In 1200mm x 1200mm

Supply & Fixing (ACP) Aluminium composite panneling cladding, Frame


034 50mm x 25mm x1.5mm aluminium box Section with 4 mm thick ACP Sheet SQFT 2000.00
and jointing weather proop Silicon jointing.

035 S & F of Glazing Elevation frame 50mm x 50mm x 1.5 mm box section and SQFT 408.00
5 mm sun reflected glass with taughened fix with Silicon sealent.

036 Fabrication and Erection of Car Shed with Pipe Structure 30 x 5 Mtr SQM 150.00
Road Work : Earth work, refiiling, pcc(1:3:6), RCC M 30 and VDF , but
037 excluding the cost of centering, shuttering and reinforcement .all quantity RM 125.00
for Road Work running meter

038 CC Drain along the building periphery depth 30 cm and width 30cm RM 90.00

039 fixing of sky light with 12mm laminated glass with ss frame alround SQM 160.00
ROAD WORK NSTL
SL NO ITEAM LENGTH WIDTH HIGHT TOTAL RATE AMOUNT
1 GSB
A south side 50 6.5 0.100 32.50
B north side 50 4.5 0.100 22.50
C west side 50 6.5 0.100 32.50
D enternce 15 8.5 0.100 12.75
100.25 2100 210,525.00
2 PCC - M10 -
A south side 50 6 0.10 30.00
B north side 50 4 0.10 20.00
C west side 50 6 0.10 30.00
D enternce 15 8 0.10 12.00
92.00 5150 473,800.00
3 RCC- M30 -
A south side 50 6 0.10 30.00
B north side 50 4 0.10 20.00
C west side 50 6 0.10 30.00
D enternce 15 8 0.10 12.00
92.00 6500 598,000.00
4 LAYING (PCC + RCC) CUM 184.00 600 110,400.00
5 STEEL EXTRA
6 EARTH WORK EXTRA AS PER SITE MESUREMENTS
TOTAL WITH OUT VDF 1,392,725.00
1 IF VDF NEEDED per Sqmts 920 150 138,000.00
2 GRUE CUTTING WITH BITMIN FILLING PER RMT 247 90 22,230.00
TOTAL INCLUDING VDF 1,552,955.00