0% found this document useful (0 votes)
169 views24 pages

Design of Septic Tank and Manhole

Uploaded by

MOHAMED
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
169 views24 pages

Design of Septic Tank and Manhole

Uploaded by

MOHAMED
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 24

Design of Manholes for sub Sewers

1- Design of Side Wall


2- Design of Top Plate

1- Design of Side Wall


The Side Wall Should Be Designed for Vertical and Horizontal Forces

A - Horizontal Force
Load of One Big Car = 12 Ton
Load on Tire 11.4/2 = 6 Ton
Height of Manholes = 2 m
Width of Manholes = 1 m
Thickness of Wall = 15 cm
Depth of Manholes From Surface of

Ground up to Base of Manholes = 2 m


Unit Weight of Soil = 2200 kg/m3

Distributed load =6*1000/(1.5*.75) = 5333 kg/m2

Distributed load = q = For H = 3 m = 5333 kg/m2

Normal stress = σ v = q +γH = 9733 kg/m2

For H = 0 σ v= = 5333 kg/m2

For H = 3 σ v= = 9733 kg/m2

ø of soil = 30
k 0=1−sin Φ=1−sin 30=1−0 . 5=0. 5 = 0.5
k 0= Coefficient of soil stress

σ H =k 0∗σ V = 4869

Page 1
Design of side wall for one meter Length

P1 =k 0 qH = 5736 kg/m
1
P2  H 2 k 0 = 2544 kg/m
2
P0 =P1 +P2 = 8280 kg/m
H H
P1 ( )+ P 2 ( )
2 3 0.96 m
z̄=
P0

5333 kg/m²

2.5 m

concrete wall

Maximum bending moment will be at

the bottom of side walls at ( H ) = 2.0 m


Clear height of side wall = 2.0 m
Assume depth of foundation = 15 cm

Page 2
Effective height of side wall = H+

(1/2 depth of foundation) = 2.08 m


Maximum bending moment =
= 8610 kg . m
P(Z+ 1/2* Depth of Foundation)

0.5m
50cm
0.25m

25cm
45°
Axle

Assume Thickness of foundation ( h = 15 cm


Cover = 5 cm
Effective Depth of side wall ( h ) = 10 cm
M n As f y (d  a / 2)
(d  a / 2) 0.85d = 9 cm
fy
= 4200 kg/cm2
As = 24.12 cm2
Use Steel bar = 12 mm
Spacing of Steel bar C - C = 6 cm

1.00m

Page 3
10 cm

1.00m
1m

6 cm
0.4m

15 cm

Design of side walls for vertical load:


Load of axle = 12.0 Ton
Load of tire = 6.0 Ton
F = 6.0 Ton
Cross sectional Area

h (Thickness of Side Wall) = 15 cm


L = 1 m
F
P0  = 40000 kg
A

P0
Pn  = 47059 kg

Pn  Ps  Pc  As fy  Ac fc
fc  c = 200 kg/cm2

fy  st 3000 kg/cm2

P  Ac fc 
As  n 16 cm2
fy
As / 2

Page 4
As / 2 = 7.8 cm2 ,
Use Steel bar = 10 mm
Spacing of Steel bar C - C = 10.0 cm
Max Spacing = Min h of Column = 15 cm
Chose Spacing C - C = 27 cm

10 cm

1.00m
27 cm

1.00m

30 cm

15 cm

Design of Top slab


Effective span = 2.00 m
Thickness of Top Plate = 20 cm
250cm

30cm
1.4m

Live Load on Slab (F/ Area Plate ) = 3000.0 kg/m2

Dead Load of Slab = 480.0 kg/m2

Total Load (1.4DL+1.7LL) = 5772.0 kg/m2


W L2 = 2886.0 kg . m
M max 
8
Page 5
W L2
M max 
8
M n As f y (d  a / 2)
(d  a / 2) 0.85d = 14.5 cm
fy = 4200 kg/cm2
As = 4.76 cm2
A min = 5.7 cm3
Use Steel bar = 16 mm
Spacing of Steel bar C - C = 36 cm

20 cm 2.00 m
36 cm

2.00 m

Design of foundation for Manhole


The foundation is Designed for one meter Length

Critical Cross Section = b0d = 1*d cm2


b0 = 1 m

U b0 d [ (0.34) fc]


f c = 20 Map

F1 = 12000 kg

F2 = Weight of Side Wall = 1548 kg

U Total Factor Load = 22567 kg

Page 6
U Total Factor Load
Total Load = 37612 kg/m2

U = 225672 N

d Thickness of Foundition Slab = 18 cm


Check for Bearing Capacity
q for Soil = 1.3 kg/cm2

Total Load
 = 0.98 kg/cm2
A rea Fou ...
q  The Streanght of Soil is enough to Carry the Load

Design of Slab for foundation of Manhole


The Slab is Designed for one meter Length
W L2
M max  = 7945.5 kg . m
8
W L2
M max  = 5778.6 kg . m
11

Moment at Midspan = 2167 kg . m

Moment at Support = 5779 kg . m

Page 7
Design of Foundation Slab at Midspan

M n As f y (d  a / 2)
(d  a / 2) 0.85d = 15 cm
fy = 4200 kg/cm2
As = 3 cm2
A min = 6 cm2
Use Steel bar = 14 mm
Area used bra = 1.5386 cm2
Spacing of Steel bar C - C = 26 cm

Design of Foundation Slab at Support

M n As f y (d  a / 2)
(d  a / 2) 0.85d = 15 cm
fy = 4200 kg/cm2
As = 9 cm2
Amin = 6 cm2
Use Steel bar = 14 mm
Area used bra = 1.5386 cm2
Spacing of Steel bar C - C = 26 cm

23 cm 1.30 m
Use ø 16mm at 26 cm C-C

1.30 m
Use ø 16 mm at 26 cm C-C

Page 8
Design of Septic Tank

1- Geometrical Design
1- Structural Design

1- Geometrical Design

Total Population after 30 Years = 69250 Person

Total Valume of Sluge for one


= 0.02 m3/Year
persone per year

Total Valume of Sluge for Total


= 1385 m3/Year
Population per year
Assume that the tank is be
Cleaned
After Six Mounth
Total Valume of Sluge X 3 Month/12
= 200 m3
month (TC1)

Total Flow quantity = 8400 m3/day

Assume detention period = 12 hour

Tank Capacity (TC2) = 4200 m3

Total Tank Capacity = TC1+TC2 = 4400 m3

Assume Numbers of Septic tank = 10 Nos

Capacity of each Septic tank is


= 440 m3
equal to

Assume depth of Septic tank = 6.00 m

Assume Free board for Septic tank = 50 cm

Plane area of Septic tank = 73 m2


Assume The ratio of Length to Wide
= 3.5
of Tank =3.5
Width of Septic tank = 4.58 m

Length of Septic tank = 16.0 m

Page 9
Page 10
Geometrical Design Sock Well

Assume Noumbers of Sock well for


= 10 Nos
one Septic Tank

Total valume of flow for one Septic = 840 m3/day

Total Valume of flow for one Sock


well =Total flow for one Septic = 84 m3/day
/Noumbers of Sock Well

Precolating Capacity of filter of Well = 1.95 m3/m3/day


valume required for each Soak
= 43.1 m3
Well
Depth of Sock Well = 10.0 m

Area of Sock Well = 4.31 m2

Diameter of Each Sock Well = 2.34 m

Page 11
Summery Dimension of Septic Tank and Sock
Well

Numbers of Septic tank = 10 Nos

Length of Septic tank = 16 m

Width of Septic tank = 5 m

Height of Septic tank = 6 m

Assume Free board for Septic tank = 50 cm

Total Height of Septic tank = 6.5 m

Numbers of Sock Well = 10 Nos

Diameter of Sock Well = 2 m

Depth of Sock Well = 10 m

1- Structural Design

a- Design of Side Walls Per one meter Length

Load of One Car = 3 Ton


Load on Tire 11.4/2 ton = 1.5 Ton
Height of Septic tank = 6.5 m
Thickness of Wall = 40 cm
Assume depth of foundition = 30 cm
Depth of Septic tank From Surface
of = 6.8 m
Ground up to Base of Septic tank
Unight Weight of Soil = 1800 kg/m3

Distributed load =2.5*1000/(1.7*3.4) = 260 kg/m2

Page 12
Distributed load = q For H = 6.8 = 260 kg/m2

Normal stress = σ v = q +γH = 12500 kg/m2

For H = 0 σ v= = 260 kg/m2

For H = 3 σ v= = 12500 kg/m2

ø of soil = 30
k 0=1−sin Φ=1−sin 30=1−0 . 5=0. 5 = 0.5
k 0= Coefficient of soil stress
 H k0  V = 6253

P1 =k 0 qH = 5102 kg/m
1
P2  H 2 k 0 = 20818 kg/m
2
P0 =P1 +P2 = 25920 kg/m
H H
P1 ( )+ P 2 ( )
2 3 2.49 m
z̄=
P0

260 kg/m²

6.8m

concrete wall

Page 13
Maximum bending moment will be
at
= 6.8 m
the bottom of side walls at
( H )
Clear height of side wall = 6.5 m
Assume depth of foundation = 30 cm
Effective height of side wall = H+
= 6.95 m
(1/2 depth of foundation)

Maximum bending moment =


= 34211 kg . m
P(Z+ 1/2* Depth of Foundation)

Cover = 5 cm
Effective Depth of side wall ( h ) = 35 cm
M n As f y (d  a / 2)
(d  a / 2) 0.85d = 30 cm
fy = 3000 kg/cm2

As = 38.33 cm2
Use Steel bar = 28 mm
Spacing of Steel bar C - C = 16 cm
Distribution Reinforcement = 0.20%
= 8 cm2
Area of Concret
Use Steel bar = 16 mm
Spacing of Steel bar C - C = 25 cm

35 cm

25 cm

1.00m 16 cm

Page 14
40 cm

Page 15
b- Design of Top Slab

Effective Short span = 4.6 m


Effective Long span = 16.0 m
Thickness of Top Plate = 30 cm
Live Load on Slab = 300 kg/m2

Dead Load of Slab = 720 kg/m2

Total Load = 1020 kg/m2

Design of slab for one meter Length

Short Span
W L2 = 2698 kg . m
M max 
8
M n As f y (d  a / 2)
(d  a / 2) 0.85d = 23.0 cm
fy = 4200 kg/cm2
As = 3 cm2
A min = 9.0 cm3
Use Steel bar = 16 mm
Spacing of Steel bar C - C = 22 cm

Long Span

W L2 = 32640 kg . m
M max 
8
M n As f y (d  a / 2)
(d  a / 2) 0.85d = 17.0 cm
fy = 4200 kg/cm2
As = 46 cm2
A min = 6.7 cm3
Use Steel bar = 28 mm

Page 16
Spacing of Steel bar C - C = 14 cm

Page 17
Design of foundation for Septic tank

The foundation is Designed for one meter Length

Critical Cross Section = b0d = 1*d cm2


b0 = 1 m

U b0 d [ (0.34) fc]


f c = 20 Map

F1 = Weight of slab = 52992 kg

F2 = Weight of Side Wall = 257088 kg

U Total Factor Load = 310080 kg

Total Weight = 4213 kg/m2

U = 3100800 N

d Thickness of Foundition Slab = 24 cm


Total thickness of Foundition Slab = 25 cm

Check for Bearing Capacity

q for Soil = 1.3 kg/cm2

Total Load
 = 0.21 kg/cm2
A rea Fou ... Page 18
Total Load
 = 0.21 kg/cm2
A rea Fou ...
q  The Streanght of Soil is enough to Carry the Load

Design of Slab for foundation of Septic tank

The Slab is Designed for one meter Length

Short Span

W L2
M max  = 11144 kg . m
8
W L2
M max  = 8104 kg . m
11
Moment at Midspan = 3039 kg . m

Moment at Support = 8104 kg . m

Design of Foundation Slab at Midspan

M n As f y (d  a / 2)
(d  a / 2) 0.85d = 20 cm
fy = 4200 kg/cm2
As = 4 cm2
Amin = 8 cm2
Use Steel bar = 14 mm
Spacing of Steel bar C - C = 19 cm

Page 19
Design of Foundation Slab at Support

M n As f y (d  a / 2)
(d  a / 2) 0.85d = 20 cm
fy = 4200 kg/cm2
As = 9 cm2
Amin = 8 cm2
Use Steel bar = 14 mm
Spacing of Steel bar C - C = 16 cm

Long Span

W L2
M max  = 134817 kg . m
8
W L2
M max  = 98049 kg . m
11
Moment at Midspan = 36768 kg . m

Moment at Support = 98049 kg . m

Design of Foundation Slab at Midspan

M n As f y (d  a / 2)
(d  a / 2) 0.85d = 20 cm
fy = 4200 kg/cm2
As = 43 cm2
Amin = 8 cm2
Use Steel bar = 22 mm
Spacing of Steel bar C - C = 18 cm

Page 20
Design of Foundation Slab at Support

M n As f y (d  a / 2)
(d  a / 2) 0.85d = 21 cm
fy = 4200 kg/cm2
As = 110 cm2
Amin = 8 cm2
Use Steel bar = 32 mm
Spacing of Steel bar C - C = 15 cm