0% found this document useful (0 votes)
253 views27 pages

SOP Part A-Works

Uploaded by

Srinivas
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
253 views27 pages

SOP Part A-Works

Uploaded by

Srinivas
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 27

SOUTH WESTERN RAILWAY

DELEGATION OF POWERS IN RESPECT OF WORKS MATTERS


DRM/ADRM Divisional Officers,
Sl Nature of Powers PHOD/HOD SAG Officers Extra Divisional REMARKS
No. in Field Units Officers & Officers
in Headquarters
1 a)
i) Ordinary repairs and maintenance Full Powers Full Powers JAG For item 1.a–i) Finance concurrence is not necessary.
to service buildings, staff quarters, Full Powers
water supply and sanitation
installations, work shops and
sheds, etc.
ii) including track and Bridge For item 1.a-ii) Finance Concurrence is necessary.
maintenance cleaning of coaches
etc.
b) Special repairs (i.e.) other than 1. Prior finance concurrence is necessary.
ordinary repairs and maintenance 2. The expenditure under Item No.1(b)(i) should not
excluding repairs due to flood exceed Rs.3 lakhs for the financial year for the
damages to: Railway as a whole in terms of Board’s letter
No.94/LM(B)/10/8-Policy dt.27.5.94 and Para-
i) Officer’s bungalows. PCE , CEE DRM Nil 1904-E.
upto Rs.10,000/- for upto Rs.5000/- for 3. Works are to be carried out on condition basis
each bungalow. each bungalow subject to no improvements or alterations to the
standard design being made.
ii) Quarters for Group C & D staff. PCE , CEE DRM , ADRM JAG 4. The exercise of the powers is subject to availability
Full Powers Full Powers Full Powers of funds, observance of codal provisions regarding
the preparation /sanction to estimates etc. and
other orders issued from time to time.
iii) Other than staff quarters. PCE , CEE DRM , ADRM JAG 5. The exercise of the powers is subject to availability
Full Powers Full Powers Full Powers of funds, observance of codal provisions regarding
the preparation /sanction to estimates etc. and
other orders issued from time to time.
6. Powers under item No.1 b(iv) to be exercised:
for repair works to restore to the original condition
iv) Rolling stock. CME , CEE DRM Nil only subject to observing the restrictions envisaged
upto Rs.50 lakhs in upto Rs.5 lakhs in in item No.55&56 of GM’s delegation of powers
each case. each case. and provisions of Para-1524 of Mechanical code.
c) To sanction urgency certificate PHODs only upto Rs.25 lakhs. JAG 1. Finance concurrence is necessary.
chargeable to special revenue. upto Rs.50 lakhs. upto Rs.5 lakhs. 2. Provision contained in 1103 & 1104 of Engg. code
and other instructions issued from time to time shall
apply.

1 - A (Works)
DRM/ADRM Divisional Officers,
Sl Nature of Powers PHOD/HOD SAG Officers Extra Divisional REMARKS
No. in Field Units Officers & Officers
in Headquarters
1 d) To dispense with calling of Full Powers Full Powers * JAG 1. Finance concurrence is necessary.
tenders & accept quotations for Full Powers. 2. Quotation route can be adopted for works costing
works, which are urgent in nature upto:
and to accept offers received in SAG/PHOD – Rs.2 lakhs with an annual ceiling of
response to quotations. Rs.10 lakhs;
JAG/SG – RS.1 lakh with an annual ceiling of Rs.5
lakhs;
Sr.Scale holding the independent charge:
Rs.50,000/- with an annual ceiling of Rs.2 lakhs.
Authority:
Board’s letter No. 94/CE.I/CT/4 dated 17-10-2002
* CWM is empowered for Mechanical Works

2. Technical sanction to detailed 1. Finance vetting is necessary.


estimates 2. Work to be administratively approved by the
a) Works itemised in the works competent authority.
Programme (RSP & M&P) or 3. This power will also apply for sanction to sub-
approved by the higher authority or estimates or detailed estimates, which may form
included in LAW/LSWP. part of a work, the abstract estimate of which has
PCE DRM JAG been sanctioned by higher authority.
i) Track renewal works upto Rs.50 crores. Upto Rs.10 upto Rs. 2 crore. 4. In case of estimates costing above Rs.50 crores
CTE crores. Sr.Scale but below Rs.100 crores, where such a work was
upto Rs.30 crores. ADRM upto Rs. 1 crore. included on the basis of a survey report, personal
upto Rs.5 crores. approval of FA&CAO and General Manager is to
be obtained.
ii) Other than track renewal works. PHOD DRM JAG 5. Escalation from Abstract Estimate to Detailed
upto Rs.30 crores. upto Rs.4 crores. upto Rs.1 Crore. Estimate is governed by item 40 (1) (b) of GM’s
ADRM/ CWM Sr.EDPM / SWR. delegation.
HOD
upto Rs.3 crores. upto Rs 50 lakhs in 6. The powers delegated under 2 (a) (ii) will be
upto Rs.20 crores.
each case for applicable for sanctioning detailed estimate
CAO/CN computer related chargeable to Revenue and Special Revenue also.
Upto Rs. 50 Crores estimates. Authority: Item No.40 (1) (a) & (b) of GM’s
delegation. : Para-703 of Engg. Code.
SAG/CN
Upto Rs. 20 Crores.

2 - A (Works)
DRM/ADRM Divisional Officers,
Sl Nature of Powers PHOD/HOD SAG Officers Extra Divisional REMARKS
No. in Field Units Officers & Officers
in Headquarters
2 iii) Survey estimates. PHOD, CAO/CN Nil Nil Finance vetting is necessary.
Full Powers within
the yard stick Note: Final location survey chargeable to preliminary
prescribed in expenditure of the work requires GM’s personal
respect of plan sanction.
heads: new lines,
gauge conversion, Authority: Item No.40(3) of GM’s delegation, subject
doubling, for to Board’s orders and yardsticks issued from time to
surveys included in time.
the sanctioned
budget or
sanctioned
separately.
PHOD , CAO/CN
upto Rs.5 lakhs in
respect of all other
plan heads for
surveys included in
the sanctioned
budget or
sanctioned
separately.

b) Deposit Works including private PHOD, CAO/CN Up to Rs.2 crores JAG 1. Finance concurrence is necessary.
Sidings. Up to Rs.10 crores in each case upto Rs.50 lakhs in 2. Observance of extant rules for deposit
in each case. each case. works/sidings.
3. Administrative approval of PHOD/CAO/CN/DRM to
be obtained.
SAG Sr.Scale Where the work is partly chargeable to Railway, the
Up to Rs.5 crores in (independent charge) item stands included in the approved works
each case. upto Rs.15 lakhs in program.
each case. 4. For undertaking of outside works in Railway
Workshop provisions of para-1417 of Mechanical
Code as mended vide Board’s letter
No.94/Dev.Cell/ERSI/9 dt.26.2.99 will apply.

Assisted sidings are governed by Item No.46 of GM’s


delegation and Board’s letter Nos.85/W1/SP/45 dt
1.12.86, No.94/CE.1/SP/1 dt.26.4.94, 10.11.94,
No.94/CE1/SP/19 dt.2/6.8.96 and requires the
approval of Railway Board.

3 - A (Works)
DRM/ADRM Divisional Officers,
Sl Nature of Powers PHOD/HOD SAG Officers Extra Divisional REMARKS
No. in Field Units Officers & Officers
in Headquarters
3 a) To accord administrative approval 1. Pre vetting of Sr.DFM is necessary for inclusion
to Divisional Works/ Lumpsum works Upto Rs.30 Lakhs Upto Rs.15 lakhs NIL of works in the Lumpsum works Programme.
Programme. 2. All works costing less than 30 lakhs each will
come under the category of Divisional works
Programme works
3. DRM will have full powers for giving
administrative approval for works upto Rs. 15
Lakhs each under all Plan Heads except Staff
amenities.
4. Prior approval of Railway board should be
obtained for inclusion of new staff amenities
works such as schools, subsidised Hostels,
Institutes, Clubs, Canteens, Holiday Homes etc
costing above Rs. 10 Lakhs.
5. All works above Rs.15 Lakhs and upto Rs. 30.
lakhs will need the administrative approval of
concerned HOD/PHOD and concurrence of
FA&CAO after initial concurrence of Sr.DFM and
approval of DRM at Divisional level.
6. FA&CAO will be the nodal officer for
computerization Plan Head.
7. Whenever any work originally included under
category of Lumpsum works costing less than
Rs.30 Lakhs is subsequently found to cost
Rs.30 Lakhs or more, fresh sanction of GM or
higher Authority has to be obtained.
Authority: Item 39 (a) of GM’s Delegation
i) Sanction of Users/Passenger amenity Nil DRM Nil 1. DRMs may exercise these powers within the ceiling
works Rs. 30 lakh per limit prescribed by Zonal Railways for sanctioning
case. new works.
2. Proposals over 30 Lakhs may be processed
through PHOD/HOD for GMs sanction
Authority: Railway Board Letter No. F(X)II-
2003/PW/10 dated 10.8.2004 & F(X)II-2006/PW/2
dated 27.2.2006, 30.3.2006 & 16.5.2006.

4 - A (Works)
DRM/ADRM Divisional Officers,
Sl Nature of Powers PHOD/HOD SAG Officers Extra Divisional REMARKS
No. in Field Units Officers & Officers
in Headquarters
3 b) To incur expenditure on out of
turn works (not provided for in
the sanctioned budget for the
year or not carried forward from
the sanctioned budget for any
previous year)

1. Finance concurrence is necessary.


i) Users/Passenger amenity works NIL NIL NIL
2. Administrative approval of GM should be
obtained before incurring expenditure on out of
NIL NIL NIL turn works.
ii) Line capacity works.
3. Strict compliance of the ceiling limits and other
conditions laid down from time to time as
iii) Staff amenity works in hospitals, advised by CPDE who is the nodal officer for
NIL NIL NIL
dispensaries, institutes and
this purpose.
railway schools.
4. The lumpsum provision in the sanctioned budget
for such works is not exceeded for each division.
NIL NIL NIL 5. CMD/CPO to be consulted for staff amenity
iv) Staff amenity works other than
given in (iii) above. works in Hospital/Dispensaries and institutes/
railway schools respectively.
6. The powers for out of turn works will be
NIL NIL NIL restricted to only one work of special and
v) Machinery and Plant.
emergency nature to be taken up by a unit in a
year.
vi) Other Works Costing upto Rs.30 Authority: Item no.38 & 39 of GM’s delegation.
NIL NIL NIL
lakhs.
For users’ amenity works powers to sanction an out
of turn work between Rs.10 lakhs and Rs.20 lakhs
each should be exercised personally by G.M. with
the personal concurrence of FA&CAO.
Authority: Item No.39 (a) (iii) of GM’s delegation.

Before obtaining Out of turn sanction of GM for line


capacity work, approval of COM should be taken.
Authority: Item No. 39(a)(ii) of GM’s delegation,
Para-740 Financial Code-Vol.I.

5 - A (Works)
DRM/ADRM Divisional Officers,
Sl Nature of Powers PHOD/HOD SAG Officers Extra Divisional REMARKS
No. in Field Units Officers & Officers
in Headquarters
3 c) To incur expenditure on PHOD DRM NIL 1. Finance concurrence is necessary if the cost of the
(i) Trial and experimental Full Powers upto Rs.10,000/- per work exceeds Rs.50,000/-
works. Rs.10 lakhs case and annual 2. The expenditure should be within the sanctioned
ceiling limit of budget allotment.
Rs.1 lakh. 3. The sanction will be subject to the restriction
(ii) Works chargeable to PHOD DRM JAG imposed by the code Rules, Railway Board and
ordinary revenue and Full powers upto Full powers upto Upto Rs.25 lakhs GM from time to time.
special revenue. Rs.2 crores Rs.50 lakhs 4. It will be necessary to prepare detailed estimate
ADRM before sanctioning expenditure on repairs and
Upto Rs.25 reconditioning works exceeding Rs.50,000/- in
lakhs. each case. In respect of other cases rough
estimates are to be prepared and kept on record
vide note under Para 701 E.
5. Expenditure for Trial and Experimental works in
excess of Rs.10 lakhs shall be incurred with the
prior concurrence of FA & CAO and the sanction of
AGM.
6. Powers delegated under 3 (c ) (ii) are applicable
only to accord administrative approval.
4. Sanction to excess over estimates 1. Finance vetting is necessary.
(sanctioned by higher authority) at 2. Provisions contained in Item No.40 (1) (b) of GM’s
the time of preparing revised/ delegation of powers shall apply.
completion estimates. 3. No powers to incur any excess over the percentage
a) Other than M&P and surveys. (for PHOD, CAO/CN DRM , ADRM JAG provision for works, establishment and general
Standard works and LAW items) a) due to cost a) due to cost a) due to cost charges.
escalation upto escalation upto escalation upto 4. For other than LAW items these powers are subject
100%of the 100%of the 100% of the original to the condition that the total cost of works
original estimate. original estimate. (including the excess) does not exceed the powers
b) other than cost estimate. b) other than cost of the original sanctioning authority. For LAW items
escalation- b) other than cost escalation-upto the total cost including excess should be
upto20% of the escalation-upto 20% of the original regulated as per the provisions contained in Item
original estimate. 20% of the estimate. No.40 (1) (b) including Note under 40 (i) (b) and 40
HOD, CE/CN original (4) of GM’s delegation of powers.
a) due to cost estimate. 5. These are the overall variations in the original
escalation upto estimate and cannot be exceeded even if more
100%of the than one revised estimate is sanctioned.
original estimate. 6. This delegation will not affect rules in force
b) other than cost regarding material modification in para-1109 to
escalation-upto 1113 of Engg. Code.
20% of the original Authority item No.40 (2) of GM’s delegation.
estimate.

6 - A (Works)
DRM/ADRM Divisional Officers,
Sl Nature of Powers PHOD/HOD SAG Officers Extra Divisional REMARKS
No. in Field Units Officers & Officers
in Headquarters
4 b) Survey estimates. PHOD, CAO/CN NIL NIL Authority: Item No.40(3) of GM’s delegation
upto 20% of the
original estimate.

c) M&P estimates. PHOD NIL NIL


Finance concurrence is necessary
a) Increase in cost Authority: Board’s letter No. F(X)-II/2006/PW/17
due to price dt.24.5.07)
escalation upto
30% of the original
estimate value or
Rs.25 lakhs
whichever is less.
b) Increase in cost
due to reasons
other than price
escalation upto
10% of original
estimate value or
Rs.25 lakh which
ever is less.

5 Sanction to dismantle of assets not PHOD , CAO/CN 1. Finance concurrence is necessary.


proposed to be replaced, other than Full Powers Upto Rs.5 lakhs Nil 2. The value refers to the original cost of the asset.
dismantling / permanently closing to in each case. 3. The powers to be exercised subject to the approval
public traffic of any open line SAG Officers in of user department and concurrence of associate
section. Construction finance.
Organisation. 4. Sanction of necessary estimates.
Upto Rs.5 lakhs 5. The dismantled assets should be disposed off as
in each case. per normal procedure and realistic resale costs
obtained
Authority: Item No.41 and 42 of GM’s delegation.

6 Minor modifications on purely PHOD CAO/CN DRM, ADRM, JAG Finance concurrence is necessary.
engineering considerations in upto Rs.10,000/- CWM upto Rs.10,000/- Authority: Para-1114 of Engg. Code.
sanctioned works. upto Rs.10,000/-
CE/CN
upto Rs.10,000/-

7 - A (Works)
DRM/ADRM Divisional Officers,
Sl Nature of Powers PHOD/HOD SAG Officers Extra Divisional REMARKS
No. in Field Units Officers & Officers
in Headquarters
7 Material Modification in works PHOD, CAO/CN 1. Finance concurrence is necessary.
estimated to cost at least Rs.1 crore. upto Rs.15 lakhs. Upto Rs.5 lakhs. NIL 2. Subject to a ceiling of 10% of original estimated
cost.
SAG 3. Material modification estimated to cost more than
upto Rs.5 lakhs. Rs.15 lakhs but below Rs.50 lakhs should be
certified and sanctioned personally by FA&CAO &
GM/AGM.
4. The excess over the revised cost of the estimate
does not go beyond GM’s Power.

Authority: Para-1110(f) of Engg. Code and Item


No.49 of GM’s delegation as per Boards letter no. F(X)
II-2006/PW/17 of 18.10.2006 & 24.5.2007.

8 Purchase of seedlings/saplings. PCE, CAO/CN DRM, ADRM Sr.DEN, DEN 1. Finance concurrence is not necessary.
Full Powers Full Powers upto Rs.50,000/- per 2. All purchase of seedlings/saplings should invariably
year. be made from District Forest Officers, Agriculture
departments, Horticulture Department or other
Chairman/RRB AEN Government agencies. For purchases from other
Full Powers upto Rs.500/- in each than Government agencies the approval of the
case. Annual ceiling Sr.DEN should be taken.
limit: Rs.10,000/- 3. Where prepayment is insisted upon by the
Officer incharge of Government agencies, the payment may be made
Training Institutions by cheque.
Rs.500/- in each
case. Annual ceiling
limit: Rs.10,000/-
9 Acquisition of land-
(a) against provision made in a PCE , CAO/CN DRM, ADRM JAG 1. Finance vetting is necessary as regards funds
sanctioned estimate CE/CN Full Powers Full Powers availability.
Full Powers 2. Subject to overall sanctioned cost for land in the
estimate not being exceeded by more than 10%.
Authority: Para-913 of Engg. Code
(b) in case of urgency. PCE , CAO/CN DRM, ADRM JAG 1. Finance concurrence is necessary including
Full Powers Full Powers Full Powers availability of funds.
subject to 2. Total cost of the work including acquisition of land
submission of in such cases should be within the respective
report to higher powers of sanction.
authorities Authority: Para-913 and 914 of Engg. Code.
immediately.

8 - A (Works)
DRM/ADRM Divisional Officers,
Sl Nature of Powers PHOD/HOD SAG Officers Extra Divisional REMARKS
No. in Field Units Officers & Officers
in Headquarters
10 Contract for approved and 1. Tender conditions to be Standardized for different
sanctioned works- or supplies types of Works. Prior concurrence is required if
related to sanctioned works or Zonal deviations are resorted to in the standard formats.
contracts. 2. Pre vetting of Tender schedule is not necessary.
This should be necessary only in the rare urgent
A) Calling of Tenders: PHOD, CAO/CN DRM / ADRM JAG cases where tenders are called without sanction
Full Powers Full Powers Full Powers of the detailed estimate. Pre vetting is also not
i) Open Tenders. necessary in case of Zonal works and Revenue
HOD, SAG Sr. EDPM works in open line for which detailed estimates are
Full Powers Full Powers for not to be framed.
computer related 3. All zonal contracts should be open tenders.
works. 4. Prior finance concurrence is necessary for two
packet system and tenders invited for
consultancy. For entering into consultancy
contract GM’s personal approval is necessary.
Authority: Item No.47 of GM’s delegation.
5. Powers to call tenders by JAG is restricted upto
the value of tenders to be accepted at SAG level.
Authority: RB Lr. No.94/CE-I/CT/4 Dt.22-10-2001 and
17-10-2002.

ii) Limited Tenders from approved 1. Pre vetting of Tender schedule is not necessary.
list for Works Contracts. PHOD, CHOD DRM , SAG JAG This should be necessary only in the rare urgent
more than Rs. 1 More than Up to Rs.25 lakhs cases where tenders are called without sanction of
Crore and upto Rs. Rs.25 lakhs and the detailed estimate. Pre vetting is also not
5. Crore upto Rs. 1 Crore necessary in case of Zonal works and Revenue
works in open line for which detailed estimates are
not be framed. (Authority Boards letter no
94/CE.1/CT/4 of 17-10-2002)
2. Norms of approved list as per RB lr. No.94/CE-
I/CT/4/Dt.17-09-1997 and 23-10-98 to be observed.
3. Approved list is to be updated annually in
consultation with associate finance.
4. Atleast 10 names should be on the list.
5. Selection committee for A and B categories:
Executive Dept. SAG; Sister Dept.-SAG; Accounts
Dept-SAG – Accepting Executive – PHOD.
6. For C, D & E categories, Executive Dept. JAG;
Sister Dept.-JAG; Accounts Dept-JAG – Accepting
Executive – SAG (Open line – DRM).
7. Instructions in para 2.4.4.1 to 2.4.4..6 of RB lr.
No.94/CE-I/CT/4 Dt.17-10-2002 are to be followed
9 - A (Works)
DRM/ADRM Divisional Officers,
Sl Nature of Powers PHOD/HOD SAG Officers Extra Divisional REMARKS
No. in Field Units Officers & Officers
in Headquarters
regarding limited tenders.
8. Regarding approved list of contracts, paras 2.5.4.1
to 2.5.4.11 of RB lr. No.94/CE-I/CT/4 Dt.17-10-
2002 are to be followed regarding limited tenders.
Authority: Rly Boards letter No. 2007/CE.1/CTE/18
dated 28.9.2007
10 iii) Special Limited Tender 1. Finance concurrence is necessary.
1. Works of specialised nature PHOD – NIL NIL 2. Tender from whom special limited tender are to be
Full powers invited should preferably be more than six but not
HOD - NIL less than four.
3. Tenders need not necessarily be borne on the
2. Works of urgent nature NIL NIL NIL approved list.
Authority: Rly Bd letter No. 94/CE/I/CT/4 dt
17.10.2002 and 11.6.2003.
3. Consultancy work NIL NIL NIL
CAO(C) with the concurrence of FA&CAO (C) may invite Special Limited tenders not only for specialized nature of works
but all types of works depending upon the merit of the case. Authority: Rly Boards letter No. 2007/CE.1/CTE/18 dated
28.9.2007
iv) Single Tender. 1. To be operated in times of cyclone, floods,
a) in case of accidents, breaches PHOD DRM NIL accidents, sabotage, enemy action, explosions,
involving dislocation to traffic. upto Rs.20 lakhs upto Rs.10 lakhs cases of extreme urgency such as works or
per case subject to per case subject supplies necessary to safeguard life or property or
annual limit of Rs.1 to annual limit of repair damage to track caused by flood, breaches,
crore. Rs.50 lakhs. washaways, accidents or other unforeseen
contingency so as to maintain through
b) Works of specialized nature. CAO/CN NIL NIL communication.
Full Powers 2. Lighting, transhipment, hiring of plant, machinery
and equipment (including communication
Other PHODs equipment) in cases listed under 1 above will be
Nil covered in this para.
3. Report to GM is necessary for incorporating it in the
annexure to the PCDO.
c) Any other situation NIL NIL NIL 4. The discretion to classify any item of work as one of
extreme urgency for the purpose should be

10 - A (Works)
DRM/ADRM Divisional Officers,
Sl Nature of Powers PHOD/HOD SAG Officers Extra Divisional REMARKS
No. in Field Units Officers & Officers
in Headquarters
exercised personally by the DRMs with the
concurrence of associate finance.
Authority:
1. Para-1214 (A) & 1260 (II) Engg. code.
2. Board’s lr. No.93/WZ/PQR/SC/4 Pt dt. 27.9.96 and
lr. No. 97/CE-1/CT-32 dt. 27.8.97 and 94/CE-I/CT/4
dt. 17.9.97
Works of specialised nature to be personally
approved by CAO/CN with prior concurrence of the
FA&CAO/CN. This power is not to be redelegated to
any other authority.
v) For Consultancy Contracts. CAO/CN * DRM’s -- * Powers of CAOs will be in addition to and separate
Rs.25 Lakhs per Rs. 50,000/- per from the powers delegated to GM.
case subject to case subject to 1. If the consultancy contract is to be fixed only on
annual ceiling limit annual ceiling limit single tender basis due to special circumstances,
of 1.5 Crore with of Rs. 1.0 Lakh GM’s personal approval would be required
the personal with the irrespective of the value of the contract.
concurrence of concurrence of 2. For consultancy contracts the minimum level of
FA&CAO/CN associate finance. Tender committee shall be SAG for Zonal
Hqrs/Construction and the minimum level of tender
PCE, CE/Co-ord committee shall be JAG/SG level for Divisions. If
Rs. 5.0 Lakh per JAG/SG officers are not available at Division, DFM
case subject to may be nominated as finance member.
annual ceiling limit
of Rs. 10.0 Lakh Authority: Rly Board letter No.F(X)II-2006/PW/3 dt
with the personal 16.5.2006, 27.2.2006, 18.10.2006 and Item No 30 of
concurrence of GM’s delegation
FA&CAO
10 B) Acceptance of Tenders:
i) Open/Limited/ Special limited Refer to Refer to Refer to Constitution of Tender Committee and acceptance as
Annexure ‘A’ & ‘B’ Annexure ‘A’ & B’ Annexure ‘A’ & ‘B’. per Annexure-A for Open line and Annexure-B for
construction.

CWM is empowered for Mechanical Works


ii) Acceptance of single tender. Refer to Annexure Refer to Annexure Refer to Annexure The tender committee composition and the accepting
‘A’ & ‘B’. ‘A’ & ‘B’. ‘A’ & ‘B’. authority should be atleast one step higher than the
members nominated in case of open tenders/limited
tenders except where the GM is the accepting
authority. Authority: Rly Bd letter No. 97/CE/I/CT/32
dt 27.08.1997.

11 - A (Works)
DRM/ADRM Divisional Officers,
Sl Nature of Powers PHOD/HOD SAG Officers Extra Divisional REMARKS
No. in Field Units Officers & Officers
in Headquarters
iii) To issue of work orders Up to Rs.2 lakhs Up to Rs.2 lakhs JAG 1. Finance concurrence is not necessary.
for each work for each work Up to Rs.1 lakh 2. Work orders of Rs.100001/- to Rs.200000/- shall
be issued by JAG officer with the approval of SAG
Sr.Scale (*) officer/DRM
Up to Rs.50000/- 3. The total value of work orders issued under zonal
contract should not exceed the contract value
specified in the tender by more than Rs.1 lakh or
20% whichever is greater.
(*) Sr.Scale holding independent charge only.
Authority:
1. Rly Board letter No.63/W2/OT/12 dt. 29.5.65.
2. Rly Board letter no.2001/CE-I/CT/17 dt. 22.11.2001
11 Signing of contract agreements PHOD, CAO/CN DRM JAG 1. Finance vetting is necessary.
including rider agreements in Full Powers upto Rs.8 Crores upto Rs.3crore. 2. The powers under this item are to be exercised
respect of tenders accepted by for each contract. only after the contract, purchase, lease etc. are
competent authority. HOD approved by competent authority.
Up to Rs. 15 ADRM, CWM Sr.Scale 3. Contract/Lease agreement to be got vetted by Law
crores for each upto Rs.5 Crores upto Rs.50 lakhs for Officer where no standard agreement exists.
contract for each contract. each contract. 4. Rider agreements to the main agreement may
SAG/CN likewise be signed by the authorities who signed
Up to Rs. 15 the original agreement provided the approval of the
crores for each competent authority is obtained.
contract. 5. The signing authority should be those empowered as per
Ministry of Law notification issued from time to time.
Authority: Para-1259 of Engg. code & Para-410 of
Stores code Vol.I.
12 Introduction of additional PHOD, CAO/CN DRM , ADRM JAG Irrespective of value, finance concurrence is
standard/schedule items in contract Full Powers Full Powers Full Powers necessary.
for works. SAG/CN provided provided
Full Powers a) the excess does a) the excess does not Authority: Board’s letter No.87/W1/CT/10 dated
provided not exceed 25% exceed 25% of the 17.3.1988. and No.94/CE.I/CT/37 dt.6.6.95.
a) the excess does of the original original contract
not exceed 25% of contract value, value, and
the original and b) the revised
contract value, & b) the revised monetary value of
b) the revised monetary value the amended
monetary value of of the amended contract does not
the amended contract does exceed their
contract does not not exceed their powers of
exceed their powers of acceptance.
powers of acceptance.
acceptance.
12 - A (Works)
DRM/ADRM Divisional Officers,
Sl Nature of Powers PHOD/HOD SAG Officers Extra Divisional REMARKS
No. in Field Units Officers & Officers
in Headquarters
13 Introduction of new non-schedule PHOD , CAO/CN DRM, ADRM JAG 1. Prior finance concurrence is not necessary.
items in works contract due to HOD , SAG/CN CWM Sr.EDPM 2. Rates of such a non-schedule items cannot be
unavoidable and inescapable quoted as last accepted rate (LAR) for justifying
reasons without finance upto Rs.5 lakhs in upto Rs.5 lakhs upto Rs.50,000/- (or) similar rate in future tenders. Only rates obtained
concurrence. a contract (or) 10% (or) 10% of 10% of the original through competitive tender process can be
of original value of original value of value of the contract adopted as LAR.
the contract the contract whichever is less. 3. Rs. 5 Lakh or 10 % of original value of contract
whichever is less. whichever is less. whichever is less, is the overall ceiling, where NS
items are introduced at more than one level and
this should not be exceeded on any account.
Authority: Board’s letter No. 2007/CE-1/CT/1 dated
31.08.2007.
(i) Introduction of new non-schedule PHOD, CAO/CN JAG 1. In all cases, it should be ensured that the rates
items in contract for works with sanctioned for such non- schedule items, are
finance concurrence. upto Rs.3 lakhs for Upto Rs.1 lakh for Upto Rs.25,000/- for comparable to the rates for similar works executed
each item. each item. each item. in the area.
provided: 2. Rate should be derived from the items included in
HOD,SAG/CN a) the excess Sr.EDPM the standard Schedule of Rates(SOR) and where
upto Rs.1 lakh for does not Rs.25,000/- for each new items vary marginally from standard SOR
each item. exceed 25% of item. items, market rate should be used only to the
provided: the original provided: extent of variation to work out new rate.
a) the excess does contract value a) the excess does 3. For introduction of any new schedule items
not exceed 25% & not exceed 25% of irrespective of value, finance concurrence is
of the original b) the revised the original necessary.
contract value & monetary value contract value & Authority: Board’s letter No. 87/ W1/CT/10 dt.
b) the revised of the b) the revised 17.3.1988 and No. 94/ CE-I/ CT/ 37 dt. 6.6.95.
monetary value amended monetary value of
of the amended contract does the amended
contract does not exceed contract does not
not exceed their their powers of exceed their
powers of acceptance. powers of
acceptance. acceptance.
14 Variation in the rates of items in PHOD , HOD DRM , ADRM JAG , Sr.Scale. Prior finance concurrence is necessary.
contracts for works. CAO/CN , SAG/CN CWM
Authority: Para-1265(b) of Engg. Code.
Full Powers Full Powers Full Powers

13 - A (Works)
DRM/ADRM Divisional Officers,
Sl Nature of Powers PHOD/HOD SAG Officers Extra Divisional REMARKS
No. in Field Units Officers & Officers
in Headquarters
15 Variation in quantities specified in 1. Individual NS items in contracts shall be operated
contracts. (other than Zonal with variation of plus or minus 25% and payment
contracts) would be made as per the agreement rate. For this
no finance concurrence would be required.
i) Increase in quantities specified in PHOD, HOD DRM, ADRM JAG 2. In case of increase in quantity of an individual item
contract. CAO/CN, SAG/CN CWM upto 25% excess of by more than 25% of the agreement quantity is
Upto 25% excess of upto 25% excess accepted tender cost considered as unavoidable, the same shall be got
accepted tender of accepted tender in respect of contracts executed by floating a fresh tender. If floating a
cost in respect of cost in respect of accepted by them fresh tender is considered not practicable,
contracts accepted contracts and beyond 25% as negotiations may be held with the existing
by them and accepted by them per notes in remarks contractor for arriving at reasonable rates for
beyond 25% as per and beyond 25% column. additional quantities in excess of 125% of
notes in remarks as per notes in agreement quantity.
column. remarks column. 3. The limit for varying quantities for minor value items
shall be 100% (as against 25% prescribed for other
PCE, CAO – Full items). A minor value item for this purpose is
powers in case of defined as an item whose original agreement value
contracts approved is less than 1% of the total original agreement
by GM or higher value.
authorities, 4. No such quantity variation limit shall apply for
variation up to 25% foundation items.
of the tender value 5. As far as SOR items are concerned, the limit of
or Rs.25 lakhs 25% would apply to the value of SOR schedule as
whichever is less. a whole and not on individual SOR items. However,
in case of NS items, the limit of 25% would apply
on the individual items irrespective of the manner of
quoting the rate (single percentage rate or
individual item rate).
6. For the tenders accepted at the Zonal Railway level,
the variation in the quantities will be approved by
the authority in whose powers the revised value of
the agreement lies.
7. For tenders accepted by General Manager,
variations upto 125% of the original agreement
value (even if the revised agreement is beyond
GM’s competence to accept tenders) may be
accepted by General Manager.
8. for tenders accepted by Board Members and
Railway Ministers, variations upto 110 % of the
original agreement value may be accepted by
General Manager.
9. The aspect of vitiation of tender with respect to
14 - A (Works)
DRM/ADRM Divisional Officers,
Sl Nature of Powers PHOD/HOD SAG Officers Extra Divisional REMARKS
No. in Field Units Officers & Officers
in Headquarters
variation in quantities should be checked and
avoided.
10. While processing the tenders, effort should be
made to avoid vitiation during execution due to
variation in quantities. Should variation occur
despite this, the sanction of the competent
authority, as per single tender has to be obtained.
11. In zonal contracts the variation in the contract
should not exceed 25% of the contract value or one
Lakh, whichever is higher.

Authority: Railway Board’s letter No. 94/CE-I/CT/4 dt.


17.10.2002. & 2007/CE.1/CT/18 dt 28.9.07

ii) Decrease in quantities specified in PHOD, HOD Full Powers in JAG , Sr.Scale 1. The contracting authority can decrease contract
contract. CAO/CN, respect of Full Powers in value upto 25% without finance concurrence,
SAG/CN contracts respect of contracts beyond which finance concurrence will be
Full Powers in accepted by them. accepted by them. necessary
respect of contracts 2. ‘No claim’ certificate from the contractor not
accepted by them. necessary for decrease in quantities to any limit.
3. It should be certified that the quantities proposed to
be reduced will not be required in the same work at
a later stage.
4. It should be ensured that due to decreased
quantities tender is not vitiated. In case of vitiation
of the tender sanction of competent authority as
per single tender is to be obtained.

16 Extension to the date of completion PHOD , HOD JAG , Sr.Scale 1. Subject to the offer not having been accepted
of contracts for works or supplies. CAO/CN, SAG/CN against the other lower offers in the tender in
Full Powers in Full Powers in Full powers in consideration of earlier date of completion.
respect of contract respect of contract respect of contract 2. The delay will not cause loss or damage.
agreements signed agreements agreements signed 3. If any or both the above conditions are not
by them. signed by them. by them. satisfied, such extension shall be given only in
consultation with associate finance after taking
legal advice, if necessary.
Authority: Para-1266 and 1267 of Engg. Code and
Para-445 of Stores Code Vol. I.

15 - A (Works)
DRM/ADRM Divisional Officers,
Sl Nature of Powers PHOD/HOD SAG Officers Extra Divisional REMARKS
No. in Field Units Officers & Officers
in Headquarters
17 Advances to contractors. 1. Finance concurrence is not necessary
i) mobilization advance PHOD, CAO/CN DRM 2. Grant of advances limited to a maximum of 10% of the
CE/CN Full Powers as per NIL contract value for a capital intensive and specialized
Full Powers as per accepted tender nature of work may be considered in case the tender
accepted tender and agreement value of the work exceeds Rs.10 crore and above.
and agreement signed by them. 3. Advance against new plant and machinery
signed by them. brought to the site of work limited to 10% of the
contract value or 75% of the value of new plant and
machinery which ever is less. No advance must be
given against old plant and machinery.
4. The interest rate and other terms and conditions are as
ii) advance against new plant & PHOD , CAO/CN DRM NIL per Board’s orders received from time to time.
machinery. CE/CN Full Powers as 5. The above advances are only on submission of
Full Powers as per per accepted irrevocable Bank Guarantee.
accepted tender tender and Authority:
and agreement agreement signed 1. Board’s letter No.90/CE-I/CT/1, dt.21.5.97, 25.6.99,
signed by them. by them. No. F (X) II/97/PW/4 dated 5.5.1998 and Board’s
Letter no. 2007/CE-I/CT/18 dt. 27.3.2008 and para-
1264 of Engg. code.
2. Item No. 48 of GM’s delegation.
18 a) Refund of security deposit of PHOD, HOD Full Powers in JAG, Sr.Scale 1. Finance concurrence is not necessary.
contractors. CAO/CN, respect of contract Full Powers in 2. Provided maintenance period or guarantee period,
SAG/CN agreements respect of contract if any, is satisfactorily completed and there are no
Full Powers in signed by them. agreements signed dues to be paid by / recovered from the contractor.
respect of contract by them. Authority: Para-1261 of Engg. code.
agreements signed
by them.
b) Determination of amount of PHOD, HOD JAG Finance concurrence is necessary.
penalty recoverable or waiver CAO/CN, SAG/CN Authority: Para-1267 of Engg. code & Clause 62 of
thereof from contractors failing to Full Powers Full Powers Full Powers general Conditions of Contract (GCC).
fulfill contracts for works. in respect of in respect of in respect of contracts
contracts accepted contracts accepted by them
by them. accepted by them
c) Forfeiture of earnest money PHOD, HOD JAG 1. Finance concurrence is not necessary.
deposited along with tenders and CAO/CN, SAG/CN 2. Subject to endorsing copies to associate
of security deposit for works. Full Powers Full Powers Full Powers accounts/traffic accounts and construction book
in accordance with in accordance with in accordance with section to ensure credit to earnings in the same
the provision of the provision of the provision of month.
tenders and tenders and tenders and contracts Authority: Para-1243 and 1244 of Engg. code.
contracts accepted contracts accepted by them.
by them. accepted by them.

16 - A (Works)
DRM/ADRM Divisional Officers,
Sl Nature of Powers PHOD/HOD SAG Officers Extra Divisional REMARKS
No. in Field Units Officers & Officers
in Headquarters
19 To cancel/terminate contracts in PHOD , HOD JAG, Sr.Scale 1. Finance concurrence is necessary to terminate the
accordance with the conditions of CAO/CN , SAG/CN Full Powers Full Powers contract under Clause 61 of GCC.
contract. Full Powers in respect of in respect of contracts 2. The cancellation/termination of contracts shall be
in respect of contracts accepted by them. conveyed to the contractor under the signature of
contracts accepted accepted by the authority not lower in rank than the original
by them. them. signing authority.
Authority:
1. Para-1270 of Engg. code.
2. Board’s lr.No.87/W1/CT/5 dt.18.12.87.
20 Revocation of termination of 1. Prior finance concurrence is necessary for
contracts. PHOD, HOD Full Powers revocation of termination.
CAO/CN, in respect of NIL 2. Subsequent extension of period of contract should
SAG/CN, tenders accepted generally be made under Clause 17(4) of GCC
Full Powers in the unless otherwise specifically justified.
in respect of Division/Units. 3. Such a revocation will be considered only on a
tenders upto their written request from the contractor as per terms
powers of and conditions of the contract.
acceptance.
21 a) Re-appropriation of revenue PHOD DRM, ADRM
grants. Full Powers within Full powers for the NIL 1. Finance concurrence is necessary.
the grant for the Grants within the 2. Subject to Railway Board’s special orders/local
department under Demand, orders issued from time to time.
each demand. Department and Authority:
the Division 1. Para-377 to 381 of Financial code (Vol.I).
subject to not 2. Board’s letter No. 95/B/342 dt. 1.5.96
affecting the staff
PUs.

b) Re-appropriation of funds from PHOD, CAO/CN NIL NIL


one work to another under works Full Powers within
grant. the funds allotted to
the department
under the
respective plan
heads.

22 Temporary arrangements at stations PHOD, CAO/CN Upto Rs.1 lakh JAG 1. Finance concurrence is necessary.
for festivals. Full Powers in each case(also upto Rs.25,000/- 2. For ceremonial occasions and other functions refer
to permit licensee in each case. to SOP Misc. Matters. (Part-C)
to erect pandals
etc. temporarily)

17 - A (Works)
DRM/ADRM Divisional Officers,
Sl Nature of Powers PHOD/HOD SAG Officers Extra Divisional REMARKS
No. in Field Units Officers & Officers
in Headquarters
23 Transfer of machinery and plant from PHOD Full Powers JAG Finance concurrence is not necessary. However
one station to another. Full Powers Full Powers Adjustment Memos (AM) should be prepared and
submitted to accounts office for concurrent
adjustments.
Authority: Para-3507 of Way and Works Manual.
24 Payment of petty bills for demarcation CE , CAO/CN, JAG Finance concurrence is necessary.
of land. CE/CN Full Powers Full Powers Authority: Para-1047 of Engg. code.
Full Powers
25 Compensation for cutting of trees of PHOD , CAO/CN, DRM JAG Finance concurrence is necessary.
private parties (obstructing the view CE/CN upto Rs.10,000/- upto Rs.1000/- Authority: Section 35 of Land Acquisition Act, 1894.
of railway signals, level crossings Full Powers in each case. in each case.
etc.) and damage to crops or other
properties in the course of execution JAG/CN
of railway works. upto Rs.10,000/-
in each case.

26 Lease of : PCE , HOD of Civil Engg. Full Powers Sr.DEN, DEN 1. Finance concurrence is not necessary.
a) Fruit bearing trees. Full Powers Full Powers 2. Lease to be effected through public auction or on
tender basis.
AEN SE-Works/PWay upto Rs.1000/- in each case by
upto Rs.2500/- at any public auction.
one time or place. 3. The reserve price and sale price to be reviewed
once in six months by Sr.DEN/Co-ord. for issue of
necessary guidelines for future.
Authority: Board’s lr. No.74-EB/3000 dt.14.1.75.

b) rights for fishing in ditches etc. in PCE , HOD of Civil Engg. Full Powers Sr.DEN ,DEN ,AEN Finance concurrence is not necessary.
Railway limits. Full Powers by public auction Full Powers Authority: Board’s lr. No.74-EB/3000 dt.14.1.75 & lr.
by public auction or or on tender basis. by public auction or No.81/W2/18/117 dt. 19.1.87.
on tender basis. on tender basis.

c) cutting grass etc. in Railway PCE , HOD of Civil Engg. Full powers Sr.DEN , DEN ,AEN Finance concurrence is not necessary.
limits. Full Powers Full Powers Authority: Board’s lr. No.74-EB/3000 dt.14.1.75.

27 Write off of ground rent. PHOD, CAO/CN DRM Prior finance concurrence is necessary.
upto Rs.10,000/- upto Rs.5000/- NIL Authority: Item No.27 of GM’s delegation.
when irrecoverable. when
irrecoverable.

18 - A (Works)
DRM/ADRM Divisional Officers,
Sl Nature of Powers PHOD/HOD SAG Officers Extra Divisional REMARKS
No. in Field Units Officers & Officers
in Headquarters
28 Write off from the numerical returns PHOD Finance concurrence is not necessary.
of stores and tools and plant lost/ Full Powers Full Powers NIL Authority: Item No.44 of GM’s delegation.
detected during stock verification
(i.e.) when no adjustment of value is
necessary.

29 Write off of ballast found short PCE , CAO/CN 1. Prior finance concurrence is necessary.
during verification. Full Powers NIL NIL 2. If the shortage is due to theft or other irregularities
and is over Rs.10,000 in value, a report should be
sent to GM.
Authority: Item No. 44 of GM’s delegation.

30 Adjustment of charges of credits PHOD, CAO/CN DRM , ADRM Finance concurrence is necessary.
relating to completed works after the Full Powers CWM NIL Authority: Para-1717 &1718 of Engg. code.
completion report (CR) has been Full Powers
drawn awaiting sanction.

31 Acceptance of claims settled by PHOD , CAO/CN Subject to the condition that


arbitration award against any dispute Full Powers NIL NIL 1. the awards accepted by them should be put up to
arising out of a contract. in respect of Award G.M. along with their comments duly concurred by
Value up to Rs.10 associate finance, if any, in a statement form at the
Lakhs irrespective end of each half-year ending 31st March and 30th
of contracts within September.
their acceptance. 2. the Railway Board should be informed of the
details of cases-
i) where payment to a contractor as a result of the
arbitrator’s award, exceeded by more than
Rs.50,000 of the amount considered due by the
Railway administration before the arbitration
proceedings began and
ii) where deficiencies in the general conditions of
contract or of procedures laid down by the
Railway Board came to light.
Authority: Para-1276 of Engg. code and Item No.36
of GM’s delegation.

32 Classification of quarters for PCE DRM/ADRM Finance concurrence is not necessary.


subordinate staff. Full Powers Full Powers NIL Authority: Para-1902 and 1904 of Engg. code.

19 - A (Works)
DRM/ADRM Divisional Officers,
Sl Nature of Powers PHOD/HOD SAG Officers Extra Divisional REMARKS
No. in Field Units Officers & Officers
in Headquarters
a) conversion of vacant service SDGM DRM
building into staff quarters. Full Powers Full Powers upto NIL Finance concurrence is not necessary.
50 sq Mtrs (Type Authority: Para-1967 of Engg. code.
II Qtrs.)
b) to approve utilisation of PCE, CAO/CN Subject to
residential buildings as service SDGM Full Powers NIL 1. Such residential buildings are surplus to
buildings. Full Powers requirement at the station and there are no
essential staff for whom quarters of the particular
type have to be provided at the station as
confirmed by the divisions.
2. For any additional expenditure by way of providing
partition walls or alterations, prior finance
concurrence is necessary.
Authority: Board’s letter No. 79/W2/18/130/0 dt.
8/12.8.80.
33 Payment to outsiders for supply of PCE , HODs of DRM, ADRM JAG 1. Finance concurrence is necessary.
water to Railway in respect of Engg. SAG Officers in Upto Rs.30,000/-per 2. These powers are to be exercised where Railways
stations/colonies. Full Powers independent station per year. have not developed its own sources of water
charge supply at that particular station.
3. Railways’ own sources of water supply have
1. Full Powers in fully/partially dried up and there is necessity to
case of supply purchase water from outside.
from State Govt. 4. Where departmental arrangements are in progress
bodies/Civic at any location, the arrangement for supply of water
authorities. from external source has to cease on
2. In case of commissioning of departmental facilities.
purchasing 5. In case of advance payment, necessary safe guards
water from Pvt. for protection against failure of supply to be ensured.
Agencies 6. Assessment will have to be made on annual basis
in advance and necessary estimates sanctioned.
ADRM For part period partial powers shall be used.
upto Rs.1 lakh 7. The working sheet for the assessment has to be
prepared taking into account the norms specified
DRM by PCE for Domestic and non –Domestic demand
Upto Rs. 3 lakh per day.
(inclusive of 8. A quarterly statement of the expenditure incurred
ADRMs Power of on purchase of water to be sent to PCE by DRMs
Rs. 1 lakh) 9. Where ever Metro/Municipal water facilities are
available, these should be availed to the extent
possible.
Authority: Board’s lr. No.74-EB/3000 dt. 14.1.75.

20 - A (Works)
DRM/ADRM Divisional Officers,
Sl Nature of Powers PHOD/HOD SAG Officers Extra Divisional REMARKS
No. in Field Units Officers & Officers
in Headquarters
34 Water tap connection to outsiders PCE, CAO/CN Full Powers NIL The rate for recovery should be fixed with prior
and to Railway contractors. Full Powers finance concurrence and necessary agreement
executed duly vetted by finance. Powers of CAO/CN
are in respect of contracts entered into by
Construction branch duly taking permission from
divisions.
Authority: Board’s lr. No.74-EB/3000 dt. 14.1.75.

35 Track Machines 1. Finance concurrence is necessary for POs costing


a) for planned procurement of the PCE Nil Dy.CE/TM more than Rs.50,000/- (Authority: Bd’s lr.
spares, consumables and small above Rs.25 lakhs above Rs.1.5 lakhs No.2001/f(S)-I-PW-7/2 Dt.12-10-2000.)
tools. and upto Rs.2.5 and upto Rs.8 lakhs. 2. Constitution of Tender Committee and accepting
crores. authority for Stores purchases will apply.[refer to
XEN/TM Annexure - C
CE(TM) upto Rs.1.5 lakhs. Authority: Board’s letter No.96/Track-III/TK/28
above Rs.8 lakhs dt.9.9.98 to be followed in toto.
and upto Rs.25
lakhs.
b) for emergency repairs and PCE, CAO/CN Dy.CE/TM, Dy.CE/CN 1. Cases exceeding Rs.1 lakh would require GM’s
purchases of spares incidental to SAG/CN, CE(TM) upto Rs.20,000/- per sanction with prior finance concurrence.
such repairs. upto R.1 lakh per upto Rs.1 lakh break down without 2. Procurement of spare parts along with the
break down with per break down finance concurrence emergency repairs should not be piecemeal in
finance with finance when purchase of order to avoid finance concurrence and the
concurrence. concurrence. proprietary article purchase should be resorted to only when planned
certificate (PAC) procurement has not materialized.
spares is not involved. 3. A register showing the details of expenditure
Where purchase of incurred on each break down should be maintained
proprietary article so as to enable a watch being kept over the ceiling
certificate spares is limit prescribed.
involved each PAC 4. The overall ceiling limit for emergency
item costing more than repairs/purchases of spares should not exceed
Rs.10,000/- should be Rs.20 lakhs per annum.
purchased with prior Authority:
finance concurrence. 1. Board’s letter No.78/WSC/TK/11 dt. 15.6.78.
(Total expenditure 2. Board’s letter No. 96/Track-III/TK/28 dt. 9.9.98.
should not exceed
Rs.10 lakhs per
annum.)
XEN/TM - Upto
Rs.10,000/- per break
down without finance
concurrence when
21 - A (Works)
DRM/ADRM Divisional Officers,
Sl Nature of Powers PHOD/HOD SAG Officers Extra Divisional REMARKS
No. in Field Units Officers & Officers
in Headquarters
purchase of PAC
spares is not involved.
(The total exp. should
not exceed
Rs.5 lakhs per
annum.)
c) Scheduled overhauling/ PCE 1. Finance concurrence is necessary for PO costing
reconditioning repairs to Full Powers Nil DY.CE/TM more than Rs.50,000/-
machines (schedules not covered upto Rs.30,000/- at a 2. Subject to usual procedure of calling of
under Annual Maintenance CE(TM) time. tender/quotation etc. being followed as per extant
Contract) and for purchase of upto Rs.50,000/- at XEN/TM orders.
spare parts for these equipments. a time. upto Rs.10,000/- at a Authority: Railway Board’s letter No. 78/WSC/TK/II
time. dt. 15.6.78.
Powers are delegated to CE(TM), Dy.CE/TM,
XEN/TM, vide item 35 (c) will be exercised by
DRM/Sr.DEN/DEN respectively till a regular base
Depot is established in SWR, subject to not exceeding
the ceiling mentioned in Para 35 (b) which will be
monitored by CE(TM).

36 Disposal of dead and live trees by PCE, CGE, JAG, Sr.Scale/, 1. Finance concurrence is not necessary.
sale/auction. CAO/CN, SAG/CN Jr Scale in Engg. 2. SE-Works/P Way upto Rs.500/- per tree when the
deptt. including reserve price is not fixed by AEN and upto
Full Powers Full Powers Construction Rs.1000/- when reserve price is fixed by AEN.
Full Powers 3. Reserve price to be fixed prior to sale/auction.
4. The reserve price and sale price to be reviewed
once in six months by Sr.DEN/Co-ord. for the issue
of necessary guidelines for the future.
Authority: Board’s lr. No.74-EB/3000 dt.14.1.75.

37 Disposal of unserviceable wooden PCE , CTE JAG, Sr.Scale in 1. Finance concurrence is not necessary.
sleepers by auction or tender. CAO/CN, Engg. deptt. including 2. Delivery to be witnessed as per extant orders.
SAG/CN Construction 3. The reserve price and sale price to be reviewed
Full Powers Full Powers once in six months by Sr.DEN/Co-ord. for the issue
Full Powers of necessary guidelines for the future.
Authority: JPO Order No. S.13/8/81-82 dt. 30.5.83

22 - A (Works)
ANNEXURE “A”

CONSTITUTION OF TENDER COMMITTEE AND ACCEPTING AUTHORITY FOR WORKS TENDERS – OPEN LINE

Composition of Tender Committee


Sl.
Value of Tender Accepting Authority
No. Executive Dept. Sister Dept. Accounts Dept.

OPEN/LIMITED/SPECIAL LIMITED TENDER

1 Upto Rs. 25 lakhs. Jr.Scale - Jr.Scale JAG/SG

2 Above Rs.25 lakhs and upto Rs.2 Crore. Sr.Scale Sr.Scale Sr.Scale JAG/SG

3 Above Rs. 2 Crore and upto Rs.5 Crore. JAG/SG JAG/SG JAG/SG ADRM/HOD

4 Above Rs.5 Crore and upto Rs.8 Crores. JAG/SG JAG/SG JAG/SG DRM/HOD

5 Above Rs.8 Crore and upto Rs.30 crores SA Grade SA Grade SA Grade CHOD/PHOD

6 Above Rs.30 Crore and upto Rs.50 crores SA Grade SA Grade SA Grade PHOD

7 Above Rs.50 crores and upto Rs.100 crores PHOD PHOD PHOD GM

Railway Board with the


8 Above Rs.100 crores PHOD PHOD PHOD
recommendations of GM

Authority : Railway Boards letter No. F(X)II/2006/PW/14 dated 26.9.2006 & No. 2007/CE/I/CT/13 dated 3.9.2007 & 15.10.2007
NOTE:
1. Jr.Scale officer of the field units should not be Tender Committee members. Jr.Scale officer posted at the Divisional Headquarters can be Tender Committee Members.
However, under exceptional circumstances with duly recorded reasons, branch officers of the Division may nominate Jr.Scale officer (Open line attached to field) in Tender
Committee.
2. In the Divisions where no JA Grade Officer in Sister/ Accounts Department is available, Senior Scale Officer may be a member of the Tender Committee (TC) with the
approval of DRM.
3. (a) In Divisions where there are no Sr. Scale Accounts Officer, Jr. Scale/Asst. Accounts Officer may be a member of Tender Committee in place of Sr. Scale Accounts
Officer upto Rs.50 lakhs.
(b) In Division where there are no JAG Accounts Officer and only one Sr.Scale Accounts officer available, Jr.Scale Asst. Acounts Officer may be a member of Tender
committee upto Rs.50 Lakhs with the approval of DRM.
23 - A (Works)
4. Where Sr. Scale officers are not available, JA Grade officer may be a member of the tender committee in which case the tender is to be accepted by ADRM.
5. Where Sr.DEN/Co-Ordination is the JA grade Officer of the TC, accepting authority will be ADRM.
6. The nomination of officers in a Tender Committee will be done by PHODs/DRMs
7. For Passenger Amenity works besides the Technical and Finance members the third member should invariably be from Commercial department.
8. In Department headed by Coordinating HOD, he will accept tenders upto Rs. 30 Crore, and tenders above Rs. 30 Crore will be accepted by GM.

SINGLE TENDER.

NOTE:
1. Constitution of Tender Committee and Accepting Authority should be atleast one level higher than the members nominated in case of open tender/limited tender
except where GM is the accepting authority.
Authority: Railway Board letter no. F(X)/II/1994/PW/3/Pt.VII Dt.03-09-1997.
2. For consultancy contract for open line FA&CAO (Budget & Expenditure) shall be a member of the tender committee. Consultancy contracts shall be personally
accepted by the GM. Authority: Railway Boards letter no. F(X)/I/2000/PW/2 dated 27-3-2001

Authority: 1. Railway Board’s Lr.No.F(X)II/2001/PW/6 dt. 21-9-2001. 2. FA&CAO/SR’s Lr.No.G.203/Delegation of Powers Vol.23 dated 18-2-2002.

NOTE
(1) Tender Committee composition will also include CWM wherever necessary. (2) Nomination of lower rank Accounts officer requires FA&CAO’s
concurrence.

24 - A (Works)
ANNEXURE ‘B’

CONSTITUTION OF TENDER COMMITTEE AND ACCEPTING AUTHORITY FOR WORKS TENDERS – CONSTRUCTION

Sl. Composition of Tender Committee


Value of Tender
No. Accepting Authority
Executive Dept. Sister Dept. Accounts Dept.
OPEN/LIMITED/SPECIAL LIMITED TENDER

1 Upto Rs.25 lakhs. Sr.Scale - Jr.Scale JAG/SG

2 Above Rs.25 lakhs and upto Rs.2 Crore. Sr.Scale Sr.Scale Sr.Scale JAG/SG
3 Above Rs.2 Crore and upto Rs.8 crores JAG/SG JAG/SG JAG/SG SA Grade

4 Above Rs.8 crores and upto Rs.30 crores SA Grade SA Grade SA Grade CE/CN/Co-ord/ CAO(CN)

5 Above Rs.30 crores and upto Rs.50 crores SA Grade SA Grade SA Grade CAO/CN in HAG

6 Above Rs.50 crores and upto Rs.100 crores CAO/CN/PHOD PHOD/CAO/CN PHOD/OL GM
Railway Board with the
7 Above Rs.100 crores CAO/CN/PHOD PHOD/CAO/CN PHOD/OL
recommendations of GM

Note

1. In field construction offices, where there is no Sr.Scale Accounts Officer, Jr.Scale Accounts Officer can be a member of Tender Committee for works of
value upto Rs.50 Lakhs. The nomination of officers of a Tender Committee will be done by CAO(CN)/PHODs.

2. CE/CN/Cord will accept tenders upto Rs. 30 Crore and tenders above Rs. 30 Cr upto Rs. 50 Cr will be accepted by GM with the recommendation of
CE/CN/Cord.

3. Incase of single tender constitution of Tender Committee and Accepting Authority should be atleast one step higher than the members nominated in case
of open tender/limited tender except where GM is the accepting authority. Authority: Railway Board letter no. F(X)/II/1994/PW/3/Pt.VII Dt.03-09-1997.

4. For consultancy contract the minimum level of Tender Committee shall be SAG for Construction. Authority: Railway Boards letter no. F(X)/I/2006/PW/3
dated 18.10.2006

Authority: Railway Board’s Lt. (1) No.F(X)II/2001/PW/6 dt. 21.9.2001. 2) F(X)II/2003/PW/1 dated 26.5.2003 (3) F(X)II-2006/PW/14 dated 26.9.2006
(4) 2007/CE-I/CT/I3 dated 03.09.2007

25 - A (Works)
Sister departments for association in the Tender Committees as
Third Member for works costing more than
Rs.10 lakhs for Annexure ‘A’ & ‘B’ Works Matters.

Sl. No. The Executive Department The Sister Department

1. Civil Engineering S&T, Electrical

2. Mechanical including Workshops Civil Engineering

3. Electrical including Workshops excluding RE Mechanical, Civil Engineering, S&T

4. Electrical Wing of RE S&T

5. S&T including Workshops excluding RE Civil Engineering, Electrical

6. S&T wing of RE Electrical

7. Operating Commercial

8. Commercial Engineering

Note:
1) In the event of an officer from Sister Department is not available, DRM/PHOD/GM may nominate an officer of the
same scale from other department to associate in the Committee.

2) For Passenger Amenity works at divisional and headquarter level, besides the Technical and Finance members the
third member should invariably be from Commercial department. (Authority Rly Bd letter No. 2007/TGIV/10/PA/Works dated
25.5.2007)

26 - A (Works)
Annexure ‘C’

CONSTITUTION OF TENDER COMMITTEE AND ACCEPTING AUTHORITY FOR PLANNED PROCUREMENT OF


SPARES, CONSUMABLES AND SMALL TOOLS FOR TRACK MACHINES

Authority Railway Boards letter No. 2001/F(S) 1/PW 7/1 dated 7.12.2007

Sl. No. Value limit of tender Acceptance by Stores Concern Deptt. Finance.
1. Rs. 10 lakhs to Rs. 30 JAG Sr.Scale. Sr.Scale. Jr.Scale.
lakhs.
2. Rs. 30 lakhs to Rs. 1 crore. SAG JAG JAG Sr.Scale.
3. Rs. 1 crore to Rs. 2 crores. SAG JAG JAG JAG

4. Rs. 2 crore to Rs. 15 crore. PHOD/CHOD SAG SAG SAG


5. Rs. 15 crore to Rs. 25 crore. AGM* PHOD/CHOD PHOD/CHOD SAG
6. Rs. 25 crores to Rs. 50 GM PHOD/CHOD PHOD/CHOD PHOD/CHOD
crores.

*In units, where there is no AGM, the accepting authority will be GM against item 5 as well of above table.

1) All purchase proposals not involving foreign exchange valued over Rs.50 crores and purchase proposals involving foreign exchange valued over Rs. 50 crores are to
be submitted to Railway Board, duly approved by GM.

2) It is reiterated that the total value of a tender will be the criterion to decide the competent authority for acceptance where purchase proposals against the tender which
are put up in parts. The convener of Tender Committee will put up the proceedings direct to the accepting authority.

3) The structure and composition of Tender Committees detailed above should not be altered locally excepting in an individual case, for reason to be recorded and with
the concurrence of FA&CAO and approval of General Manager.

4) The instructions laid down vide Railway Board letter No. 96/Track-III/28 dated 9.9.1998 shall be followed in toto.

-0-