0% found this document useful (0 votes)
47 views3 pages

Platform Ascm (Format KG)

Uploaded by

pras.yourlink
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
47 views3 pages

Platform Ascm (Format KG)

Uploaded by

pras.yourlink
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

General Contractor & Supplier TRADING

Jl. Mayjend Sungkono No.05 BC 03 RT.06 RW.02 Segoromadu, Kec. Kebomas, Gresik 61123
Phone : 0811 228 3633, Email : [email protected], Website : www.sigloya.com

To : PT. OTE ENGINEERING INDONESIA No Quote. : 0402/PNH/SGK/VI/24


Address: Desa Roomo Kec. Manyar Date : June 24, 2024
Kab. Gresik, Jawa Timur 61151 Rev. :-
Attn : Mr. Herly
No. Telp: 031 - 398 6241
No. Fax : 031 - 398 6240
Cc. :

Project : Add Platform For Repair Incline Conv ASCM

Quantity
No. Description Orde Uni Unit Price Total Price
r t
A Fabrication & Installation Work

1 Preparation Work 1 Lot 6,500,000 6,500,000

2 Fabrication Add Platform For Repair Incline Conv ASCM 1 Lot 20,564,560 20,564,560

a. Fab. Frame Platform 1328.02 kg

- UNP150x75x6,5

- L 70x70x7

- Grating

b. Fab. Support Platform 595.03 kg

- HB 150x150x7x10

c. Fab. Handrail 227.8 kg

- Pipe 1 1/4" SCH 40

- Roundbar Ø19

- Flatbar 6x100mm

d. Fab. Ladder 137.25 kg

- L 70x70x7

- Flatbar 5x50mm

- Plate 16mm

3 Installation Add Platform For Repair Incline Conv ASCM 1 Lot 15,725,840 15,725,840

4 Painting Work 1 Lot 3,598,125 3,598,125

Sub total A 46,388,525

B Indirect Cost

1 Tools & Equipment 1 Lot 11,400,000 11,400,000

2 Material & Consumable 1 Lot BY PTS

3 Safety Gear 1 Lot 5,000,000 5,000,000

4 Transport 1 Lot 3,500,000 3,500,000

Sub total B 19,900,000

Total ( A+B ) 66,288,525

C Overhead 10% 6,628,853

Grand Total 72,917,378


Rounded 72,900,000
Term and Conditions:
1 The above price Exclude VAT 11%
2 work schedule : 4 Weeks
3 Term And Payment : 2 weeks
4 Payment by transfer to : PT. SILVERINDO GLOBAL KARYA
No. Rek : 345-3469-996 ( Bank BNI, Cab. Gresik )
5 Validity : This quotation is valid for 1 months form date of submission
Yours Truly,
PT. SILVERINDO GLOBAL KARYA

Ahmad Saroni
Project : Install Cable Tray Jetty

Unit Price In
MATERIAL Qty Unit Total Cost in Rupiah
Rupiah

Lampu high bay 120 w 8 ea 2,600,000 20,800,000


Lampu TCW 1x20W 4 ea 675,000 2,700,000
Receptacle 4 ea 21,000 84,000
Single switch 4 ea 3,750,000 15,000,000
-
145,000 -
155,000 -
93,750 -

TOTAL 38,584,000

TOOLS Qty Unit Total Cost in Rupiah

Alumunium Spilit Level ( Water level ) 1 ea 54,000


Cable Power - length ( m ) 3 roll ̴ 93,600
Combination Plier 2 ea 112,000
Combination /Ring Pass Wrench 4-10mm 2 ea 15,552
Combination/Ring Pass Wrench 12mm 2 ea 21,000
Combination/Ring Pass Wrench 14mm 2 ea 31,500
Cutting Plier 1 ea 105,000
Drill Bit 3~8mm 1 ea 20,304
Drill Bit 10mm 1 ea 34,020
Drill Bit 12mm 1 ea 51,300
Drill Bit ~12mm for Beton 1 ea 67,500
Drilling Machine (to 19mm) " Makita" 1 ea 546,480
Grinding Machine (4 inch) " Makita" 1 ea 1,260,000
Grinding Machine 16 inch ( Cutting Wheal ) 1 set 1,240,000
Multitester Digital " merk??" 1 ea 180,000
Ring Pass Wrench Set 2 ea 130,000
Screw Driver Set 2 set 180,000
Stick Paint 2 ea 165,000
Welding Machine set (c/w cable) 1 set 4,950,000
TOTAL 9,257,256

CONSUMABLES Qty Unit Total Cost in Rupiah


pc By PTS
Cable Ties 300mm 200 pc By PTS
Cable Ties 500mm 200 pc By PTS
Cup Brush (4") 1 ea By PTS
Cutting disc (4") 30 ea By PTS
Grinding Wheel (4") 2 ea By PTS
Roll Brush 4 ea By PTS
Small Paint Brush 2" ( Kuas 2") 2 ea By PTS
Welding Rod LB-52 2.6 5 kg By PTS
TOTAL 0

SAFETY GOODS Qty Unit Total Cost in Rupiah


DUST Cartridge of Mask 180 pc 1,080,000
Hand Gloves cotton 360 pair 1,971,000
hand Gloves Welder 3 pair 120,000
SO2 gas Cartridge Of Mask 90 pc 900,000
Respirator STS 90 pc 121,500
TOTAL 4,192,500
General Contractor & Supplier TRADING
Jl. Mayjend Sungkono No.05 BC 03 RT.06 RW.02 Segoromadu, Kec. Kebomas, Gresik 61123
Phone : 0811 228 3633, Email : [email protected], Website : www.sigloya.com

Project : Concrete Slab Anode Yard SCHEDULE


DAY
No Description
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35
A. Civil works

I. Demolish Work
1 Cutting Concrete Slab Existing
2 Demolish Existing Concrete Slab
II. Fabrication Work
1 Fabrication Rebar
2 Fabrication Formwork
III. Installation Work
1 Base Coarse & Compaction
2 Install Plastic Sheet
3 Install Rebar & Formwork
4 Pouring Concrete
5 T/O Formwork
6 Curing Time
IV. Finishing Work
1 Disposal Existing Debris & Soil
2 Finishing & Cleaning
Indirect Cost
1 Tools & Equipment
2 Safety Gear
3 Rest Area Shelter & Temp. Site Workshop
4 Transportation