0% found this document useful (0 votes)
31 views8 pages

Assignment 9

Uploaded by

drsrajakumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
31 views8 pages

Assignment 9

Uploaded by

drsrajakumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 8

A AL HARITH SAIF GHANEEM AL AMRY

Status Finished
Started Sunday, 8 December 2024, 11:09 PM
Completed Monday, 9 December 2024, 1:12 AM
Duration 2 hours 2 mins
Grade 0.70 out of 5.00 (14%)
Question 1

Partially correct

Mark 0.20 out of 2.00


v1 (latest)

The activity details and their predecessors are given below use the PERT method to calculate the expected time (1 Mark) and construct the
network diagram (1 Mark) to find the critical path of the activity (1 Mark) also indicate the project duration (1 Mark) with the standard
deviation (1 Mark).

Activity Predecessors the expected Optimistic Most likely Pessimistic


time
time time time

(to) (tm) (tp)

A -- 4 9 28

B A 3 17 30

C A 1 1 1

D B,C 2 16 30

E C 6 24 6

F E 5 8 22

G E 6 14 4

H F,G 3 6 3

I D 3 6 16

J H,I 7 15 8

Note: Use upto 3 decimal in your answer and enter your answer in the box, also kindly upload your worked out sheet below.

Enter the expected activity time for A. 11.33

One possible correct answer is: 11.333333333333

Enter the expected activity time for B. 18.16

One possible correct answer is: 16.833333333333

Enter the expected activity time for C. 1.000

One possible correct answer is: 1

Enter the expected activity time for D. 16.33

One possible correct answer is: 16

Enter the expected activity time for E. 13.00

One possible correct answer is: 18

Enter the expected activity time for F. 9.500


One possible correct answer is: 9.8333333333333

Enter the expected activity time for G. 11.33

One possible correct answer is: 11

Enter the expected activity time for G. 4.500

One possible correct answer is: 5

Enter the expected activity time for G. 7.000

One possible correct answer is: 7.1666666666667

Enter the expected activity time for G. 12.50

One possible correct answer is: 12.5

Find the critical path value for the total project duration? 36.66

One possible correct answer is: 47.5

Standard deviation 7.921

One possible correct answer is: 0.37267799624996

Your answer is partially correct.

You have correctly answered 3 part(s) of this question.

Response history
Step Time Action State Marks

1 8/12/24, 23:09:27 Started Not yet


answered

2 9/12/24, 01:06:47 Saved: 11.333, 18.167, 1.000, 16.333, 13.000, 9.500, 11.333, 4.500, 7.000, 12.500, Answer saved
36.667, 7.921

3 9/12/24, Attempt finished Partially 0.20


01:12:24 correct
Question 2

Partially correct

Mark 0.50 out of 2.00


v1 (latest)

The following data relate to advertisement expenditure and their corresponding sales, create a scatter plot and find a regression equation
between advertisement expenditure and their corresponding sales (1 Mark). Then use the regression equation to find sales the advertisement
expenditure for 35 (1 Mark) and 100 (1 Mark).

Note: Use upto 3 decimal in your answer and enter your answer in the box, also kindly upload your worked out sheet answer in link
provided below.

Advertisement Sales
expenditure

44 107
55 85
86 34.5

64 48
79 72

50 87.5
67 87

75 62.5
55 43

Enter the average advertisement expenditure : 63.88

One possible correct answer is: 63.888888888889

Enter the average corresponding sales : 69.61

One possible correct answer is: 69.611111111111

Enter the equation constant b value: -0.73

One possible correct answer is: -1.0394517116616

Enter the equation constant a value: 116.8

One possible correct answer is: 136.02052602282

Enter the sales for 35 advertisements : 91.64

One possible correct answer is: 99.639716114667

Enter the sales for 100 advertisements : 43.39

One possible correct answer is: 32.075354856666


Your answer is partially correct.

You have correctly answered 2 part(s) of this question.

Response history
Step Time Action State Marks

1 8/12/24, 23:09:27 Started Not yet answered

2 9/12/24, 01:06:47 Saved: 63.888, 69.611, -0.735, 116.897, 91.646, 43.397 Answer saved

3 9/12/24, 01:12:24 Attempt finished Partially correct 0.50


Question 3

Incorrect

Mark 0.00 out of 1.00


v1 (latest)

Raymond Bro. has been buying a given item in lots of 8226 units. The cost per unit is 20 and the order cost is 46 per order and the carrying
cost is 31 %.

Calculate:

Note: use up to 3 decimal in your answer and also kindly upload your worked out sheet answer in link provided below.

A) Inventory carrying cost. 2550

One possible correct answer is: 6.2

B) Economic Ordering Quantity. 6674

One possible correct answer is: 349.3754796869

C) Optimum order interval in days. 0.811

One possible correct answer is: 15.502315838283

D) Average inventory at any time. 3337

One possible correct answer is: 174.68773984345

E) storage cost at any time. 2069

One possible correct answer is: 1083.0639870294

F) Minimum total inventory cost per year. 4138

One possible correct answer is: 2166.1279740588

Your answer is incorrect.


Response history
Step Time Action State Marks

1 8/12/24, 23:09:27 Started Not yet


answered

2 9/12/24, 01:06:47 Saved: 25500.6, 6674.809167, 0.811428297, 3337.404584, 20691.90842, Answer saved
41383.81684

3 9/12/24, Attempt finished Incorrect 0.00


01:12:24
Question 4

Complete

Not graded
v1 (latest)

upload all your worksheets

note : I could not transfer two files from my phone due to some reason which are 1 page answer for each of the question 2,3 and I tried
doing them on Ms EXEL and it didnt work either ,so now Im forced to submit becuase I dont have much time left.
Thank you Dr.
Have a nice day.

screen shot Q1.pdf

Response history

Step Time Action State Marks

1 8/12/24, Started Not yet


23:09:27 answered

2 9/12/24, Saved: Incomplete


01:06:47 answer

3 9/12/24, Saved: note : I could not transfer two files from my phone due to some reason which are 1 Answer
01:12:19 page answer for each of the question 2,3 and I tried doing them on Ms EXEL and it didnt saved
work either ,so now Im forced to submit becuase I dont have much time left. Thank you Dr.
Have a nice day.Attachments: screen shot Q1.pdf (429.4 KB)

4 9/12/24, Attempt finished Complete


01:12:24

You might also like