0% found this document useful (0 votes)
26 views7 pages

Assignment 1

Uploaded by

drsrajakumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
26 views7 pages

Assignment 1

Uploaded by

drsrajakumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 7

A ABDUL MALIK YAQOOB SALIM AL-HARRASI

Status Finished
Started Friday, 6 December 2024, 10:12 AM
Completed Monday, 9 December 2024, 9:50 AM
Duration 2 days 23 hours
Grade 1.68 out of 5.00 (33.67%)
Question 1

Partially correct

Mark 0.60 out of 2.00


v1 (latest)

The activity details and their predecessors are given below use the PERT method to calculate the expected time (1 Mark) and construct the
network diagram (1 Mark) to find the critical path of the activity (1 Mark) also indicate the project duration (1 Mark) with the standard
deviation (1 Mark).

Activity Predecessors the expected Optimistic Most likely Pessimistic


time
time time time

(to) (tm) (tp)

A -- 4 9 16

B A 5 5 40

C A 1 1 1

D B,C 18 16 34

E C 6 24 6

F E 11 14 16

G E 6 14 4

H F,G 3 6 3

I D 5 14 19

J H,I 7 15 8

Note: Use upto 3 decimal in your answer and enter your answer in the box, also kindly upload your worked out sheet below.

Enter the expected activity time for A. 9.333

One possible correct answer is: 9.3333333333333

Enter the expected activity time for B. 10.83

One possible correct answer is: 10.833333333333

Enter the expected activity time for C. 1.000

One possible correct answer is: 1

Enter the expected activity time for D. 19.33

One possible correct answer is: 19.333333333333

Enter the expected activity time for E. 18.00

One possible correct answer is: 18

Enter the expected activity time for F. 13.83


One possible correct answer is: 13.833333333333

Enter the expected activity time for G. 11.00

One possible correct answer is: 11

Enter the expected activity time for G. 5.000

One possible correct answer is: 5

Enter the expected activity time for G. 13.33

One possible correct answer is: 13.333333333333

Enter the expected activity time for G. 12.50

One possible correct answer is: 12.5

Find the critical path value for the total project duration? 73.16

One possible correct answer is: 47.5

Standard deviation 5.947

One possible correct answer is: 0.37267799624996

Your answer is partially correct.

You have correctly answered 9 part(s) of this question.

Response history
Step Time Action State Marks

1 6/12/24, 10:12:39 Started Not yet


answered

2 9/12/24, 09:50:12 Saved: 9.333, 10.8333, 1.000, 19.333, 18.000, 13.833, 11.00, 5.000, 13.333, 12.500, Answer saved
73.167, 5.947

3 9/12/24, Attempt finished Partially 0.60


09:50:19 correct
Question 2

Partially correct

Mark 0.25 out of 2.00


v1 (latest)

A survey was conducted to study the relationship between expenditure on accommodation (X) and expenditure on Food and Entertainment
(Y) and the following results were obtained. Find a regression equation between expenditure on accommodation and expenditure on Food
and Entertainment (1 Mark). Then use the regression equation to find the expenditure on accommodation for 90 OMR (1 Mark) and for 200
OMR (1 Mark).

Expenditure Food
on accommodation expenditure &
(OMR) Entertainment
(OMR)

112 142
165 80

258 87.5
124 57.5
188 90.5

136 77.5
126 93

172 80
164 42.5
Note: Use upto 3 decimal in your answer and enter your answer in the box, also kindly upload your worked out sheet answer in link
provided below.

Enter the average expenditure on accommodation : 149.4

One possible correct answer is: 160.55555555556

Enter the average expenditure on Food and Entertainment : 83.38

One possible correct answer is: 83.388888888889

Enter the equation constant b value: -0.03

One possible correct answer is: -0.10601942425936

Enter the equation constant a value: 88.90

One possible correct answer is: 100.41089645053

Enter the expenditure on accommodation for OMR 90 : 85.58

One possible correct answer is: 90.869148267188

Enter the expenditure on accommodation for OMR 200 : 81.52


One possible correct answer is: 79.207011598658

Your answer is partially correct.

You have correctly answered 1 part(s) of this question.

Response history
Step Time Action State Marks

1 6/12/24, 10:12:39 Started Not yet answered

2 9/12/24, 09:50:12 Saved: 149.444, 83.389, -0.0369, 88.909, 85.584, 81.522 Answer saved

3 9/12/24, 09:50:19 Attempt finished Partially correct 0.25


Question 3

Partially correct

Mark 0.83 out of 1.00


v1 (latest)

ABC Ltd. uses EOQ logic to determine the order quantity for its various components and is planning its orders. The Annual consumption is
21200 units, Cost to place one order is 1175, Cost per unit is 63 and carrying cost is 22 % of Unit cost.

Calculate:

Note: use upto 3 decimal in your answer and also kindly upload your worked out sheet answer in link provided below.

A) Inventory carrying cost. 13.86

One possible correct answer is: 13.86

B) Economic Ordering Quantity. 1896

One possible correct answer is: 1895.9210412136

C) Optimum order interval in days. 32.63

One possible correct answer is: 32.64203679448

D) Average inventory at any time. 948.1

One possible correct answer is: 947.96052060682

E) storage cost at any time. 1313

One possible correct answer is: 13138.73281561

F) Minimum total inventory cost per year. 2956

One possible correct answer is: 26277.465631221

Your answer is partially correct.

You have correctly answered 5 part(s) of this question.


Response history
Step Time Action State Marks

1 6/12/24, 10:12:39 Started Not yet answered

2 9/12/24, 09:50:12 Saved: 13.864, 1896.373, 32.635, 948.187, 13137.548, 29563.958 Answer saved

3 9/12/24, 09:50:19 Attempt finished Partially correct 0.83

Question 4
Complete

Not graded
v1 (latest)

upload all your worksheets

Activity Completed (2).pdf

Response history

Step Time Action State Marks

1 6/12/24, 10:12:39 Started Not yet answered

2 9/12/24, 09:50:12 Saved: Attachments: Activity Completed (2).pdf (1.6 MB) Incomplete answer

3 9/12/24, 09:50:19 Attempt finished Complete

You might also like