0% found this document useful (0 votes)
86 views5 pages

Truss Estimate

Uploaded by

sanjayshah8380
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
86 views5 pages

Truss Estimate

Uploaded by

sanjayshah8380
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 5

Nepal Government

Nepal National Library


SanoThimi, Nepal

Project: Quotations Truss works


S.N Description of Works Unit Quantity Rate Amount Remarks
1 Site Clarance sft 1,600.00 5 8000.00
2 Excavation Works cft 637.50 20 12750.00
3 Soling Works sft 2488.347 95 236392.99
4 PCC (1:2:3) Works cft 676.25 430 290787.50
5 PCC of RCC (1:1.5:3) Works cft 120.00 500 60000.00
6 Brick Masonay (1:6) Works cft 354.38 520 184275.00
7 Back Filling Works cft 2,870.85 18 51675.25
8 UPVC Sheet Works sft 1,482.00 100 148200.00
9 Riged Cover rft 38.00 100 3800.00
10 Plaster(1:4) Works sft 350.00 55 19250.00
11 Punning Works sft 350.00 40 14000.00
12 Flooring and Finishing (kora masino) sft 1,225.00 75 91875.00
13 MS Steel Truss Works kg 2836.26 200 567251.45
14 Reinforcement kg 260.54 120 31264.39
15 Cement Boards Patation(12mm) Works sft 1,680.00 260 436800.00
16 Aluminium Works sft 272.00 750 204000.00
Anchor Bolt
15 4.6 grade 16mm Anchor Bolt no 80 150 12000.00
16 4.6 grade 12mm Anchor Bolt no 40 20 800.00
Total 2373121.578
13% Vat 308,505.805
G.Total 2,681,627.384
Government of Nepal
Ministry of Education, Science and Technology
Central Level Project Implementation Unit ( CLPIU), Gyaneshwor, Kathmandu
Education Development and Cordination Unit (EDCU)
Disaster Resilience of Schools Project
JOINT MEASUREMENT SHEET of BLOCK-5
Employer :Central Level Project Implementation Unit (CLPIU) Education Contract ID: DRSP/077/78-Retro-…….9...........
Consultant :DSC, Umar Munshi in association with ERMC, PACE, PCRS School Name:Shree Satyawati S S,Adamghat
Contractor :Sharma-Khani JV , New Baneshowr- Kathamdu Location:Siddhalek RM-07
18 17.1 Plate Section NO Length Wt/m Total
12mm flat plate
Base Plate 10 0.35 0.35 0.012 115.395
6mm flat plate 0.0915
Base Plate 10 0.15 0.15 0.006 10.597
Top plate 10 0.15 0.15 0.006 10.597
Stiffner plate 80 0.075 0.075 0.006 21.195
Total of plate Section 157.785 Kg
20 17.3 MS pipe NO Length Wt/m Total
For Truss
MS 50mm pipe
Vertical post 4 6.9342 5.1 141.458 0.785
Incland Post 4 9.5504 5.1 194.828
MS 100mm/80mm pipe
Vertical post(100mm) 4 10.7442 12.1 520.019
Inclined Post(80mm) 4 11.8364 8.47 401.017
MS Square
For Column Post 72*72*3.2mm SHS 8 3.658537 9.19392 269.090
For Column Post 91.5*91.5*4.8mm SHS 2 3.658537 15.072 110.283
Parlin
For parlin 72*72*3.2mm SHS 12 12 7.23456 1041.777
Total of MS Pipe 2678.472 Kg
20 17.3 MS Ancer bolt NO Length Wt/m Total
4.6 grade 16mm Anchor Bolt 80.0 80.0
4.6 grade 12mm Anchor Bolt 40.0 40.0 2836.257

Contractor SE Consultant SE 2 of 5
Name:Dipesh Kumar Thakur Name:Anup Karki
NEC No:23173 NEC No:
Project : Different Maintanance Works
Type of work : Maintanance Work
Unit : Shree Birendra Hospital
Location : Chhauni Kathmandu

Detailed Estimate Sheet

BOQItem
S.N. Description No Length Breadth Height Qty Unit Remarks
no
A
1 1 Site Clarance - ###
1 40' 40' 1,600.00 ###
Total of Site Clarance 1,600.00 sft
2 2 Excavation Works - ###
Footing 10 3' 3' 2' 6.0'' 225.00 ###
Grid 1- 1, 3 - 3 2 26' 1' 6.0'' 2' 6.0'' 195.00 26.00
Grid A -A, D -D 2 29' 1' 6.0'' 2' 6.0'' 217.50 ###
Total of Excavation Works 637.50 cft
3 3 Soling Works - ###
Carpet Area Soling 2 33' 5.0'' 33' 5.0'' 2,233.35 ###
Footing 10 3' 3' 90.00 ###
Grid 1- 1, 3 - 3 2 26' 1' 6.0'' 78.00 ###
Grid A -A, D -D 2 29' 1' 6.0'' 87.00 ###
Total of Soling Works 2,488.35 sft
4 4 PCC (1:2:3) Works - ###
Carpet Area PCC 2 35' 35' 3.0'' 612.50 ###
Footing 10 3' 3' 3.0'' 22.50 ###
Grid 1- 1, 3 - 3 2 26' 1' 6.0'' 3.0'' 19.50 ###
Grid A -A, D -D 2 29' 1' 6.0'' 3.0'' 21.75 ###
Plinth Beam
Total of PCC(1:2:3) Works 676.25 cft
5 5 PCC of RCC (1:1.5:3) Works - ###
Footing 10 3' 3' 1' 90.00 ###
Coloum 10 1' 1' 3' 30.00 ###
Total of PCC of RCC(1:1.5:3) Works 120.00 cft
6 6 Brick Masonay (1:6) Works - ###
Grid 1- 1, 3 - 3 2 31' 9.0'' 3' 9.0'' 174.38 ###
Grid A -A, D -D 2 32' 9.0'' 3' 9.0'' 180.00 ###
Total of Brick Masonay (1:6) Works 354.38 cft
7 7 Back Filling Works - ###
Carpet Area 1 33' 5.0'' 33' 5.0'' 2' 2,233.35 ###
Footing 10 3' 3' 2' 6.0'' 225.00 ###
Grid 1- 1, 3 - 3 2 26' 1' 6.0'' 2' 6.0'' 195.00 ###
Grid A -A, D -D 2 29' 1' 6.0'' 2' 6.0'' 217.50 ###
(321.00)
Total of Back Filling Works 2,870.85 cft
7 8 UPVC Sheet Works - ###
1 39' 38' .0'' ' 1,482.00 ###
Total of UPVC Sheet Works 1,482.00 sft
7 9 Riged Cover - ###
1 38' .0'' ' 38.00 ###
Total of Rigid Sheet Works 38.00 Rft
7 10 Plaster(1:4) Works - ###
4 35' .0'' 2' 6.0'' 350.00 ###
Total of Plaster(1:4) Works 350.00 sft
7 11 Punning Works - ###
4 35' .0'' 2' 6.0'' 350.00 ###
Total of Punning Works 350.00 sft
7 12 Flooring and Finishing (kora masino) - ###
1 35' 35' .0'' 1,225.00 ###
Total of Flooring and Finishing (kora masino) 1,225.00 sft
7 12 Reinforcement - ###
Footing 140 3' .0'' 420.00 ###
Column 80 5' .0'' 400.00 ###
Column Struff 80 4' .0'' 38.54 ###
Total of Reinforcement 260.54 Kg
7 13 Cement Boards Patation(12mm) Works - ###
Grid 1-1 & 3- 3 2 35' 12' 840.00 ###
Grid A-A & D- D 2 35' 12' 840.00 ###
Doors -2 7' 4' (56.00) ###
3
BOQItem
S.N. Description No Length Breadth Height Qty Unit Remarks
no
Windows -8 6' 4' 6.0'' (216.00) ###

Total of Cement Boards Patation Works 1,680.00 cft


7 14 Aluminium Works - ###
Doors 2 7' 4' 56.00 ###
Windows 8 6' 4' 6.0'' 216.00 ###

Total of Aluminium Works 272.00 sft

4
Sn