GENERAL PLUMBING NOTES

1. ALL WORKS HEREUNDER SHALL CONFORM WITH THE RULES AND

REGULATIONS OF THE LATEST EDITION OF THE PHILIPPINE PLUMBING CODE,


A B C D E
NATIONAL BUILDING CODE AND MUNICIPAL LAWS PERTINENT TO THE PRACTICE

OF SANITARY ENGINEERING AND THE REQUIREMENTS OF THE LOCAL


ST
AUTHORITIES CONCERNED. 14000
2. ALL WASTE PIPES SHALL BE POLYVINYL CHLORIDE PIPES, SCHEDULE 40.

SIZES AS INDICATED ON THE PLANS AND SPECIFICATIONS. ALL WATER PIPE 4''Ø PVCSP 4''Ø PVCSP 4''Ø PVCSP
LINES SHALL BE G.I. PIPES. CO EXIT
3. NOMINAL SIZE OF OUTLET PIPE FROM SEPTIC VAULT TO MAIN STREET 1A
SEWER LINE SHALL NOT BE LESS THAN 100mm AND SHALL BE PROVIDED WITH FD
2% ADEQUATE NOMINAL SLOPE.
SHO/F
4. ALL MATERIALS / EQUIPMENT TO BE INSTALLED SHALL BE NEW AND FREE

FROM ANY DEFECT AND APPROVED AS TO LOCATION AND PURPOSE. KITCHEN DINING AREA BEDROOM 1
5. ALL WORKS HEREIN SHALL BE UNDER THE DIRECT SUPERVISION OF A
KS WC
DULY LICENSED SANITARY ENGINEER AND/OR MASTER PLUMBER.

4''Ø PVCSP
6. TOP OF CATCH BASIN COVER SHALL BE AT GRADE LEVEL.

7. MINIMUM SLOPE OF SEWER AND DRAIN PIPES SHALL BE 1%

8. PROPOSED SANITARY UTILITIES SHALL CONFORM TO ACTUAL LOCATION, 2


DEPTH AND INVERT ELEVATION OF ALL EXISTING PIPES AND STRUCTURES AS

VERIFIED BY THE CONTRACTOR.


7000
9. THE CONTRACTOR SHALL VERIFY ALL EXISTING UTILITIES AT SITE AND

COORDINATE THE WORK WITH THE SEWER LINE EFFLUENT DISPOSAL POINT AND
MASTER BEDROOM
WATERLINE SERVICE CONNECTING POINT.
CARPORT LIVING AREA
PLUMBING LEGEND:
LAV
MARK DESCRIPTION
WC
FD FLOOR DRAIN

LAV LAVATORY
SHO/F
WC WATER CLOSET
FD
SHO SHOWER HEAD
3
CO 4''Ø PVCSP CO
KS KITCHEN SINK

F FAUCET

CO CLEAN OUT
GROUND FLOOR
WASTE PIPE
1 WASTE WATER LAYOUT
ST SEPTIC TANK
P-01 SCALE 1:100MTS

SCHOOL: RA 9266 NAME: TITLE: INSTRUCTOR: SUBJECT: REVISION: GRADE:


Drawings and specificatione duly signed, stamped or sealed, as

UNIVERSITY OF SANTO TOMAS-LEGAZPI


instruments of esrvice, are the intellectual properties and
documents of the architect, whether the object for which they are BALATON, KATHLEEN JADE G. PROPOSED RESIDENTIAL BUILDING CE 316.1 - Building
RAWIS, LEGAZPI CITY
made la executed or not. It shall be unlawful for any person,
without the consent of the architect or author of said documents, to ENGR. SHAINA LYNN HIMOR, SO2 System Design, lab
duplicate or to make coples of said documents for use in the
repetition of and for other projects or buildings, whether partly or in
whole.
BS CIVIL ENGINEERING 3A WASTE WATER LAYOUT
GENERAL PLUMBING NOTES
1. ALL WORKS HEREUNDER SHALL CONFORM WITH THE RULES AND

REGULATIONS OF THE LATEST EDITION OF THE PHILIPPINE PLUMBING CODE,

NATIONAL BUILDING CODE AND MUNICIPAL LAWS PERTINENT TO THE PRACTICE


A B C D E
OF SANITARY ENGINEERING AND THE REQUIREMENTS OF THE LOCAL

AUTHORITIES CONCERNED.
14000
2. ALL WASTE PIPES SHALL BE POLYVINYL CHLORIDE PIPES, SCHEDULE 40. 3/4''Ø PPRCWLR 3/4''Ø PPRCWLR 3/4''Ø PPRCWLR
SIZES AS INDICATED ON THE PLANS AND SPECIFICATIONS. ALL WATER PIPE

LINES SHALL BE G.I. PIPES.


1A
GV FD
3. NOMINAL SIZE OF OUTLET PIPE FROM SEPTIC VAULT TO MAIN STREET
1
SEWER LINE SHALL NOT BE LESS THAN 100mm AND SHALL BE PROVIDED WITH SHO/F 2''Ø PPRCWLR
2% ADEQUATE NOMINAL SLOPE.
KITCHEN DINING AREA
4. ALL MATERIALS / EQUIPMENT TO BE INSTALLED SHALL BE NEW AND FREE

KS WC BEDROOM 1

3/4''Ø PPRCWLR

3/4''Ø PPRCWLR
FROM ANY DEFECT AND APPROVED AS TO LOCATION AND PURPOSE.

5. ALL WORKS HEREIN SHALL BE UNDER THE DIRECT SUPERVISION OF A

DULY LICENSED SANITARY ENGINEER AND/OR MASTER PLUMBER.


GV
6.

7.
TOP OF CATCH BASIN COVER SHALL BE AT GRADE LEVEL.

MINIMUM SLOPE OF SEWER AND DRAIN PIPES SHALL BE 1%


2
8. PROPOSED SANITARY UTILITIES SHALL CONFORM TO ACTUAL LOCATION,

DEPTH AND INVERT ELEVATION OF ALL EXISTING PIPES AND STRUCTURES AS


7000
VERIFIED BY THE CONTRACTOR.

9. THE CONTRACTOR SHALL VERIFY ALL EXISTING UTILITIES AT SITE AND


MASTER BEDROOM
COORDINATE THE WORK WITH THE SEWER LINE EFFLUENT DISPOSAL POINT AND
HB
WATERLINE SERVICE CONNECTING POINT.
CARPORT LIVING AREA
PLUMBING LEGEND: GV LAV
MARK DESCRIPTION
WC
FD FLOOR DRAIN SHO/F
LAV LAVATORY
FD
WC WATER CLOSET
3 GV
SHO SHOWER HEAD
WM M GV
KS KITCHEN SINK
CV
F FAUCET

FROM MAIN
HB HOSE BIBB
WATER SUPPLY GROUND FLOOR
CLEAN WATER LINE
2 CLEAN WATER LAYOUT
M WATER METER

GATE VALVE
P-02 SCALE 1:100MTS
CHECK VALVE

SCHOOL: RA 9266 NAME: TITLE: INSTRUCTOR: SUBJECT: REVISION: GRADE:


Drawings and specificatione duly signed, stamped or sealed, as

UNIVERSITY OF SANTO TOMAS-LEGAZPI


instruments of esrvice, are the intellectual properties and
documents of the architect, whether the object for which they are BALATON, KATHLEEN JADE G. PROPOSED RESIDENTIAL BUILDING CE 316.1 - Building
RAWIS, LEGAZPI CITY
made la executed or not. It shall be unlawful for any person,
without the consent of the architect or author of said documents, to ENGR. SHAINA LYNN HIMOR, SO2 System Design, lab
duplicate or to make coples of said documents for use in the
repetition of and for other projects or buildings, whether partly or in
whole.
BS CIVIL ENGINEERING 3A CLEAN WATER LAYOUT