0% found this document useful (0 votes)
14 views11 pages

Details 1

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
14 views11 pages

Details 1

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 11

FABRICARES LIMITED

Building construction & textile manufacturer


Index no : C – 1046, Tell : +88028932440, +880248955266
Email : [email protected]

DETAILS MEASUREMENTOF RUBBER BEARING


Project :Construction of 97.326 m (2 × 30.488 m + 1 × 33.54 m) longP.C Girder Bridge
(Mahalia Bridge)at 5th km (Ch= 4 km + 923.50m N-105)
of Keranihat-Bandarban road (N-108)

SL TS Pay
Description Unit Measurement Quantity
No Item No
Middle Span:
Neopr ene rubber bearing or Elastomeric bearing supplying and fitting
34 5/13/01 nos Rubber Bearing (used) :2 × 2 = 4.00 4.00
fixing (b) etc.
Total = 4.00

Project Engineer Project Engineer Project NCO Project JCO PO


contractor 20 ECB 20 ECB 20 ECB 20 ECB
Page-
FABRICARES LIMITED
Building construction & textile manufacturer
Index no : C – 1046, Tell : +88028932440, +880248955266
Email : [email protected]

DETAILS MEASUREMENTOF P.C GIRDER CASTING


Project :Construction of 97.326 m (2 × 30.488 m + 1 × 33.54 m) longP.C Girder Bridge
(Mahalia Bridge)at 5th km (Ch= 4 km + 923.50m N-105)
of Keranihat-Bandarban road (N-108)
SL TS Pay
Description Unit Measurement Quantity
No Item No
Middle Span (34.25 m) Girder
End cas ting: 2.0 ×1.80× 0.80× 2 = 5.760
: 2.0 × {(0.15 + 0.25)/2} × 0.15 × 2 × 2 = 0.240
Middle: 30.250× 0.375× 0.80 = 9.075
: 30.250×{(0.80 + 0.25)/2}× 0.250 = 3.970
: 30.250× 0.825× 0.25 = 6.239
29 05/01/03m Concrete class 40 (Prestress girder) : 30.250×{(0.25 + 0.45)/2} × 0.10 = 1.059
Cum : 30.250×{(0.45 + 1.10)/2} × 0.10 = 2.344
: 30.250×1.10× 0.15 = 4.991
Diaphragm: {(0.825 + 1.275)/2} × {(0.25 + 0.40)/2} × 0.275 × 3 × 2 = 0.563
Bottle :½ × {(0.825 + 1.275)/2} × 0.50× 0.275 × 4 = 0.289
Total = 34.530
For two Gi rder = 34.530 × 2 = 69.060 69.060
Total = 69.060

Project Engineer Project Engineer Project NCO Project JCO PO


Contractor 20 ECB 20 ECB 20 ECB 20 ECB Page-
FABRICARES LIMITED
Building construction & textile manufacturer
Index no : C – 1046, Tell : +88028932440, +880248955266
Email : [email protected]

DETAILS MEASUREMENT OF P.C GIRDER REINFORCEMENT


Project :Construction of 97.326 m (2 × 30.488 m + 1 × 33.54 m) longP.C Girder Bridge
(Mahalia Bridge)at 5th km (Ch= 4 km + 923.50m N-105)
of Keranihat-Bandarban road (N-108)

SL TS Pay
Description Unit Measurement Quantity
No Item No
Middle Span (34.25 m) Girder Middle Span (34.25 m) Girder
End bar: End bar:
Main U Bar length : 0.13 + 1.83 + 0.724 + 1.83 + 0.13 = 4.644 M 12 mm Φ Main U ba r = 4.644 × 35 × 2 × 0.89 = 289.321
Top T length : 0.30 + 0.15 + 0.074+ 1.024+ 0.074 + 0.15 + 0.30 = 2.072 M 12 mm Φ Top T = 2.072 × 35 × 2 × 0.89 = 129.086
End vertical bar spacing : (2.50 / 0.075) + 1 = 35 Nos 12 mm Φ Extra verti cal ba r-1 = 4.092 × 28 × 1 × 0.89 = 101.973
End extra vertical U bar-1 length : 1.83 + 0.432 + 1.83 = 4.092 m
12 mm Φ Extra verti cal ba r-2 = 3.804 × 28 × 1 × 0.89 = 94.796
End extra vertical U bar-1 : (2.00 / 0.075) + 1 = 28 Nos
End extra vertical U bar-2 length : 1.83 + 0.144 + 1.83 = 3.804m 12 mm Φ short binder = 0.724 × 560 × 2 × 0.89 = 721.683
End extra vertical U bar-2 : (2.00 / 0.075) + 1 = 28 Nos 12 mm Φ binder bottle ba r = 3.15 × 10 × 2 × 2 × 0.89 = 112.140
End short binder ba r length : 0.724 m 12 mm Φ Bea ring bottom = 1.124 × 9 × 2 × 2 × 0.89 = 36.013
End short binder ba r : 28 × 20 = 560 Nos
End bi nder bottle ba r length :0.20 + 1.95 + 0.50 + 0.50 = 3.15 m Middle bar:
30 5/2/02 End bi nder bottle ba r : 10 Nos 12 mm Φ Main U ba r = 4.194 × 102 × 1 × 0.89 = 380.731
Ton 12 mm Φ Bottom T = 2.424 × 102 × 1 × 0.89 = 220.051
End bottom (Bea ring) length : 0.2 + 0.724 + 0.2 = 1.124 m
End bottom (Bea ring) spaci ng : (0.724 / 0.1) + 1 = 9 Nos 12 mm Φ Top T = 2.624 × 102 × 1 × 0.89 = 238.207
12 mm Φ Middle binder = 30.65 × 16 × 1 × 0.89 = 436.456
Middle bar: 12 mm Φ Middle binder lapping = 19.2 × 1 × 1 × 0.89 = 17.088
Main U bar length : 0.13 + 0.13 + 1.75 + 0.174 +1.75 + 0.13 +0.13 = 4.194 m Total (kg) = 2777.545
Bottom T length : 0.30 + 0.35 + 0.2 + 0.724 + 0.2 + 0.35 + 0.30 = 2.424 m For two Gi rder = 2777.545× 2 = 5555.09
Top T length : 0.30 + 0.10 + 0.30 + 0.1 + 1.024 + 0.1 + 0.30 + 0.10 + 0.3 = 2.624 m Total (ton) = 5555.09/1000 = 5.555
5.555
Middle ba r spa cing : (30.25 / 0.30) + 1 = 102 Nos
Middle binder length : 0.20 + 30.25 + 0.20 = 30.65 m
Middle binder lapping : 0.60× 16 × 2 = 19.20 m
Middle binder spaci ng : 8 + 8 = 16 Nos
Page-
Project Engineer Project Engineer Project NCO Project JCO PO
contractor 20 ECB 20 ECB 20 ECB 20 ECB
FABRICARES LIMITED
Building construction & textile manufacturer
Index no : C – 1046, Tell : +88028932440, +880248955266
Email : [email protected]

DETAILS MEASUREMENT OF P.C GIRDER REINFORCEMENT


Project :Construction of 97.326 m (2 × 30.488 m + 1 × 33.54 m) longP.C Girder Bridge
(Mahalia Bridge)at 5th km (Ch= 4 km + 923.50m N-105)
of Keranihat-Bandarban road (N-108)
SL TS Pay
Description Unit Measurement Quantity
No Item No
Middle Span (34.25 m) Girder Middle Span (34.25 m) Girder
Straight binder bar: Straight binder bar:
Bottom strai ght ba r length :34.15 m 12 mm Φ Bottom s traight bar = 34.15 × 6 × 1 × 0.89 = 182.361
Bottom strai ght ba r lapping length : 0.6 × 6 × 3 = 10.8 m 12 mm Φ Bottom s traight bar lapping = 10.8 × 1 × 1 × 0.89 = 9.612
Bottom strai ght ba r spacing : 6 Nos
10 mm Φ Top s traight ba r = 34.15 × 23 × 1 × 0.62 = 486.979
Top s traight ba r length :34.15 m 10 mm Φ Top s traight ba r lapping = 34.50 × 1 × 1 × 0.62 = 21.390
Top s traight ba r lapping : 0.5 × 23 × 3 = 34.50 m 10 mm Φ Bottom Side s traight ba r = 34.15 × 2 × 1 × 0.62 = 42.346
Top s traight ba r spa cing = 23 Nos 10 mm Φ Side s traight ba r lapping = 3 × 1 × 1 × 0.62 = 1.860
Bottom Side s traight ba r length :34.15 m
Si de s traight ba r lappi ng : 0.5 × 2 × 3 = 3.00 m 12 mm ΦDiaphra gm main ba r = 2.024×7 × 2 × 3 × 0.89 = 75.657
30 5/2/02 Si de s traight ba r spa cing : 2 Nos 12 mm ΦDiaphra gm verti cal ba r = 1.60×2 × 2×3×0.89 = 17.088
Ton
Diaphragm main ba r length: 0.50 + 0.45 + 0.124 + 0.45 + 0.50 = 2.024 m
Diaphragm ba r spa cing:( 1.275/0.225) + 1 = 7 Nos 20 mm Φ Spi ral ba r = 11.784 × 2 × 4 × 2.47 = 232.852
Diaphragm verti cal ba r length: 1.60 m 10 mm Φ Mesh-1 ba r = 25.16 × 2 × 2 × 0.62 = 62.397
10 mm Φ Mesh-2 ba r = 8.00 × 2 × 1 × 4 × 0.62 = 39.680
Spi ral ba r : 11 × 3.1416 (0.350 + 0.02) + 8 × 0.02 = 11.784 m 16 mm Φ Anchor ba r = 2.90 × 2 × 2 × 1 × 1.58 = 18.328
Mesh type M-1 : 12.58 × 2 = 25.16 M 12 mm Φ Profile support ba r = 0.35 × 35 × 4 × 1 × 0.89 = 43.610
Mesh type M-2 : 4.00 × 2 = 8.00 M 10 mm Φ Roof support ba r = 0.25 × 69 × 2 × 1 × 0.62 = 21.390
2.511
Anchor ba r: 0.60 + 1.7 + 0.60 = 2.90 m Total kg = 1255.550
For two Gi rder = 1255.550 × 2 = 2511.100
Total (ton) = 2511.100/1000 = 2.511

Project Engineer Project Engineer Project NCO 20 ECB PO


contractor 20 ECB 20 ECB Project JCO 20 ECB Page-
FABRICARES LIMITED
Building construction & textile manufacturer
Index no : C – 1046, Tell : +88028932440, +880248955266
Email : [email protected]

DETAILS MEASUREMENTOF CLASS-30 CASTING


Project :Construction of 97.326 m (2 × 30.488 m + 1 × 33.54 m) longP.C Girder Bridge
(Mahalia Bridge)at 5th km (Ch= 4 km + 923.50m N-105)
of Keranihat-Bandarban road (N-108)

TS Pay Item
SL No Description Unit Measurement Quantity
No
st
1 Span:
Parapet wall : 31.198 × 0.40 × 0.30 × 2 = 7.488
Concrete class 30 (Deck slab, side wall, wheel guard,
27 5/01/03k Cum : 31.198 × 0.585 × 0.30 × 2 = 10.950 26.511
curb etc). (Batching plant)
Wheel guard : 31.198×{(0.275 + 0.25)/2} × 0.25 × 2 = 4.095
Footpath: 31.198 × 0.85 × 0.075 × 2 = 3.978
Total = 26.511

Project Engineer Project Engineer Project NCO Project JCO PO


Contractor 20 ECB 20 ECB 20 ECB 20 ECB Page-
FABRICARES LIMITED
Building construction & textile manufacturer
Index no : C – 1046, Tell : +88028932440, +880248955266
Email : [email protected]

DETAILS MEASUREMENTOF M S PIPE RAILING


Project :Construction of 97.326 m (2 × 30.488 m + 1 × 33.54 m) longP.C Girder Bridge
(Mahalia Bridge)at 5th km (Ch= 4 km + 923.50m N-105)
of Keranihat-Bandarban road (N-108)

SL TS Pay
Description Unit Measurement Quantity
No Item No
st
1 Span:
43 SP-09 M S Pipe Railing m M S Pipe Railing: 31.198 × 2 × 1 = 62.396 87.076
: 6.170 × 2 × 2 = 24.680
Total = 87.076

Project Engineer Project Engineer Project NCO Project JCO PO


Contractor 20 ECB 20 ECB 20 ECB 20 ECB

Page-
FABRICARES LIMITED
Building construction & textile manufacturer
Index no : C – 1046, Tell : +88028932440, +880248955266
Email : [email protected]

DETAILS MEASUREMENTOF CROSS GIRDER CASTING


Project :Construction of 97.326 m (2 × 30.488 m + 1 × 33.54 m) longP.C Girder Bridge
(Mahalia Bridge)at 5th km (Ch= 4 km + 923.50m N-105)
of Keranihat-Bandarban road (N-108)

SL TS Pay
Description Unit Measurement Quantity
No Item No
Cross gi rder: 1.20×1.275× 0.25 ×25 = 9.563
: 0.90×0.15× 0.25 ×25 = 0.844
29 05/01/03m Concrete class-40 (Cross girder)
Cum
Cha mfer : ½ × 0.15 × 0.15 × 0.90 × 2 × 25 = 0.506
10.913
Total = 10.913

Project Engineer Project Engineer Project NCO Project JCO PO


contractor 20 ECB 20 ECB 20 ECB 20 ECB

Page-
FABRICARES LIMITED
Building construction & textile manufacturer
Index no : C – 1046, Tell : +88028932440, +880248955266
Email : [email protected]

DETAILS MEASUREMENT OF P.C GIRDER REINFORCEMENT


Project :Construction of 97.326 m (2 × 30.488 m + 1 × 33.54 m) longP.C Girder Bridge
(Mahalia Bridge)at 5th km (Ch= 4 km + 923.50m N-105)
of Keranihat-Bandarban road (N-108)

SL TS Pay
Description Unit Measurement Quantity
No Item No
Cross girder: Cross girder:
Main ba r length :1.600 m 20 mm Φ Bottom ba r = 1.60 × 3 ×25× 2.47 = 296.40
Bi nder ba r : 0.10 + 0.174 + 1.575 + 0.174 + 1.575 + 0.1 = 3.698 m 20 mm Φ Bottom ba r lapping = 0.40 × 3 ×25 × 2 × 2.47 = 148.20
Bi nder ba r spa cing : (1.20/0.15) + 1 = 9 Nos 12 mm Φ main ba r = 1.60 × 12× 2 × 25 × 0.89 = 854.40
Cha mfer ba r CG-1 : 0.30 + 0.35 + 0.20 + 0.375 + 0.2 = 1.425 m 12 mm Φ main ba r lapping = 0.3 × 12 × 2 ×25× 2 × 0.89 = 320.40
30 5/2/02 Cha mfer ba r CG-1 : 0.30 + 0.60 + 0.175 = 1.075 m 12 mm Φ binder ba r = 3.698× 9 ×25 × 0.89 = 740.53
Cha mfer ba r CG-2 : 0.30 + 0.60 + 0.175 = 1.075 m Ton 12 mm Φ chamfer ba r CG-1 = 1.425×9×5× 2 × 0.89 = 114.14
12 mm Φ chamfer ba r CG-1 = 1.075×9×5× 2 × 0.89 = 86.11
12 mm Φ chamfer ba r CG-2 = 1.075×9×20× 2 × 0.89 = 344.43
Total (kg) = 2904.61
Total (ton) = 2904.61/1000 = 2.904 2.904

Project Engineer Project Engineer Project NCO Project JCO PO


contractor 20 ECB 20 ECB 20 ECB 20 ECB

Page-
FABRICARES LIMITED
Building construction & textile manufacturer
Index no : C – 1046, Tell : +88028932440, +880248955266
Email : [email protected]

DETAILS MEASUREMENTOF REINFORCEMENT


Project :Construction of 97.326 m (2 × 30.488 m + 1 × 33.54 m) longP.C Girder Bridge
(Mahalia Bridge)at 5th km (Ch= 4 km + 923.50m N-105)
of Keranihat-Bandarban road (N-108)
SL TS Pay
Description Unit Measurement Quantity
No Item No
st st
1 Span: 1 Span:
Parapet wall vertical bar: (0.75 + 1.035 + 0.15 + 1.035 + 0.35) = 3.326 M 12 mm Φ Main bar top & bottom = 10.35 × 35 ×2 × 2 × 0.89 = 1289.61
Parapet wall bracket bar: 0.20 + 0.45 + 0.20 = 0.85 m 12 mm Φ Main bar top & bottom lapping = 0.60 × 35 × 2 × 2 × 0.89 = 121.38
Parapet wall bracket binder bar Spacing: 3.00 Nos
Parapet wall vertical & bracket bar spacing: (31.098 / 0.15) + 1 = 209 Nos
16 mm Φ Parapet wall vertical bar = 3.326 × 209 × 1 × 2 × 1.58 = 2196.62
Parapet wall binder bar length: 0.15 + 31.098 + 0.15 = 31.398 m
Parapet wall binder bar spacing: (1.035 / 0.15) + 1 = 8 Nos 16 mm Φ Parapet wall bracket bar = 0.85 × 209 × 1 × 2 × 1.58 = 561.37
12 mm Φ Parapet wall bracket binder = 31.098 × 3 × 1 × 2 × 0.89 = 166.06
Wheel guard vertical bar length: 0.10 + 0.20 + 0.425 + 0.225 + 0.45 + 0.15 + 12 mm Φ Parapet wall binder bar = 31.098 × 8 × 2 × 2 × 0.89 = 885.67
0.10 = 1.65 m 12 mm Φ pa rapet wall b inder bar lapping = 0.60 × 8 × 2 × 2 × 0.89 = 17.09
Wheel guard vertical bar spacing: (31.098 / 0.15) + 1 = 209 Nos
30 5/2/02 Wheel guard binder bar: 0.15 + 31.098 + 0.15 = 31.398 m Ton 12 mm Φ Wheel guard vertical bar = 1.65 × 209 × 2 × 0.89 = 613.83
12 mm Φ Wheel guard binder bar= 31.098 × 6 × 2 × 0.89 = 332.13
Footpath main ba r: 0.80 m
12 mm Φ Wheel gua rd b inder bar lapping = 0.60 × 6 × 2 × 2 × 0.89 = 12.82
Footpath spa cing: (31.098 / 0.125) + 1 = 250 Nos
20 mm Φ Wheel guard binder bar= 31.098 × 2 × 2 × 2.47 = 307.25
Footpath binder: 31.098 m
20 mm Φ Wheel guard binder bar lapping = 1.00 × 2 × 2 × 2 × 0.89 = 7.12
Footpath binder spa cing: (0.80 / 0.125) + 1 = 8 Nos
10 mm Φ Footpa th main ba r = 0.80 × 250 × 1 × 2 × 0.62 = 248.00
10 mm Φ Footpa th binder= 31.098 × 8 × 1 × 2 × 0.62 = 308.49
Total (kg) = 7067.44
Total (ton) = 7067.44/1000 = 7.067 7.067

Project Engineer Project Engineer Project NCO Project JCO PO


Contractor 20 ECB 20 ECB 20 ECB 20 ECB

Page-
FABRICARES LIMITED
Building construction & textile manufacturer
Index no : C – 1046, Tell : +88028932440, +880248955266
Email : [email protected]

DETAILS MEASUREMENTOF REINFORCEMENT


Project :Construction of 97.326 m (2 × 30.488 m + 1 × 33.54 m) longP.C Girder Bridge
(Mahalia Bridge)at 5th km (Ch= 4 km + 923.50m N-105)
of Keranihat-Bandarban road (N-108)
SL TS Pay
Description Unit Measurement Quantity
No Item No
Back wall (Binder Bar) Back wall (Binder Bar)
Ba ck wall binder ba r length: 0.20 + 10.15 + 0.20 = 10.55 m 10 mm Φ ba ck wall binder ba r = 10.55 × 12 × 2 × 2 × 0.62 = 313.97
Ba ck wall binder ba r spacing: (2.197 / 0.20) + 1 = 12 nos 12 mm Φ chamfer ba r = 2.31 × 12 × 2 × 2 × 0.89 = 98.68
Cha mfer ba r length = 2.31 m
Cha mfer ba r spacing (2.197 / 0.20) + 1 = 12 nos Bandarban End Wing wall (Binder Bar)
16 mm Φ Wa ter face binder ba r = 6.987 × 12 × 2 × 1.58 = 264.95
Bandarban End Wing wall (Binder Bar) 20 mm Φ Ea rth fa ce binder ba r = 6.987 × 16 × 2 × 2.47 = 552.25
Wi ng wall binder bar length : 6.187 m - (Clea r cover 0.05 × 2) + 0.30 + 0.30 = 6.987
30 4/7/01 m Keranihat End Wing wall (Binder Bar)
Si de wall wa ter fa ce spa cing : (2.147 / 0.20) + 1 = 12 nos Ton 16 mm Φ Wa ter face binder ba r = 6.987 × 6 × 2 × 1.58 = 132.47
Si de wall ea rth fa ce spa cing : (2.147 / 0.15) + 1 = 16 nos 20 mm Φ Ea rth fa ce binder ba r = 6.987 × 8 × 2 × 2.47 = 276.13
Total (kg) = 1638.45
Keranihat End Wing wall (Binder Bar) Total (ton) = 1638.45/1000 = 1.638
Wi ng wall binder bar length : 6.187 m - (Clea r cover 0.05 × 2) + 0.30 + 0.30 = 6.987
m
Si de wall wa ter fa ce spa cing : (1.00 / 0.20) + 1 = 6 nos
Si de wall ea rth fa ce spa cing : (1.00 / 0.15) + 1 = 8 nos 1.638

Project Engineer Project Engineer Project NCO Project JCO PO


Contractor 20 ECB 20 ECB 20 ECB 20 ECB
20 ECB

Page-

You might also like