GCC Trenton TX Preliminary Site Road Phase 1 Plans - 10.7.24
GCC Trenton TX Preliminary Site Road Phase 1 Plans - 10.7.24
CR 4450
NORTH
Hw
y
69
TN
RE
M
ai
nl
in
e
OF TE
TE X
A A
T
S
Hw
y
12
1
PRELIMINARY
X
n, T
R
PR
nto
Tre
EE
LI
C E NS ED
N
E I
F
SS G
IO NA L EN
CAD Filename: CDI Project No. Drawn By: Checked By: Scale: Date: Sheet No: of No:
GCC - Trenton, TX 609 Main Ave S
ESTIMATE OF QUANTITIES
BID ITEM
DESCRIPTION UNIT QUANTITIES
NUMBER
OF TE
TE X
A A
T
S
PRELIMINARY
R
PR
EE
LI
C E NS ED
N
E I
F
SS G
IO NA L EN
CAD Filename: CDI Project No. Drawn By: Checked By: Scale: Date: Sheet No: of No:
GCC - Trenton, TX 609 Main Ave S
UTILITIES
Utilities indicated on the plans are diagrammatic and shown for the Contractor's convenience TRAFFIC CONTROL
and information. Existing utility locations shown on drawings are approximate. There is no
guarantee that the utilities shown include all such utilities or that the locations indicated are The Contractor completing the grading shall be responsible for all traffic control throughout
exact. Utilities within the limits of the proposed construction are to be adjusted by the Owner the project. Any other contractors working on the project will be responsible for notifying the
unless otherwise indicated on these plans. The Contractor shall contact Texas 811 at 811 (in grading contractor of traffic control concerns. Traffic control shall be properly maintained at
Texas) or 1-800-344-8377 (Out-Of-State) a minimum of 48 hours prior to any underground all locations where work will impede or impair the typical flow of traffic. Temporary signage
work to determine utility locations. shall be maintained as shown in the latest edition of the Manual on Uniform Traffic Control
Devices (MUTCD), unless otherwise noted in these plans. The Contractor is responsible for
The Contractor shall cooperate with and coordinate their efforts to work with the utility providing the public with proper notification in accordance with local requirements and for
companies and their contractors. Each bidder shall be responsible prior to bid letting, for completing any required permits to work within the right-of-way.
determining the effects of utility work on the project work scope and schedule, and shall
account for all such effects in his bid. No consideration will be given to the Contractor after CLEARING
the bid letting on account of utility work done by others.
Clearing shall generally consist of removing and disposing of all trees, shrubs and
WATER SOURCE miscellaneous vegetation within the project limits. All stumps and roots must be removed to a
The Contractor shall not withdraw water with equipment previously used outside the State of depth of 2-feet (minimum) below finished grade. Any downfall or debris from the trees must
Texas without prior approval from the Texas Environmental Office. Thoroughly wash all be removed from the site. Onsite burning or burial of trees is not permitted without written
construction equipment before entering Texas to reduce the risk of invasive species approval from the landowner. Trees may not be burned or buried in the right-of-way.
introduction into the project vicinity.
Scarify & Recompact (1' minimum)
The Contractor shall obtain the necessary permits from the regulatory agencies such as the
Texas Commission on Environmental Quality, Department of Environment and Natural As shown in the typical section(s), the earthen subgrade shall be scarified, moisture
Resources (DENR) and the United States Army Corps of Engineers (COE) prior to executing conditioned, and recompacted to a depth of 1-ft (minimum) below the finished earthen
water extraction activities. subgrade surface. The scarified material or other suitable material, as directed by the
Engineer, shall be moisture conditioned to the specified range (-3% to +3% of optimum
STORM WATER PERMITTING moisture content), and compacted to a minimum density of 95% of maximum dry density.
Construction activities constitute more than 1 acre of earth disturbance. The final surface shall be proof rolled with a loaded tandem truck with a minimum 10-ton
load, as stated in the Grading Operations. All proof rolling will be performed in the presence
Construction activities constitute more than 1 acre of earth disturbance. The Contractor is of the Owner's Representative. Soft or yielding areas will be repaired at the Contractors
required to secure proper Stormwater Permitting. expense prior to any placement of woven geotextile fabric and/or sand subbase.
A major component of the storm water construction permits is development and RCP Storm Sewer
implementation of a Storm Water Pollution Prevention Plan (SWPPP), which is a joint effort
Reinforced concrete pipe (RCP) shall be bell and spigot, and conform to AASHTO M 170 OF TE
and responsibility of Sherman Township and the Contractor. Erosion control measures and TE X
best management practices will be implemented in accordance with the SWPPP. The requirements. The pipe sections shall be adjoined such that the ends are fully entered, and A A
the inner surfaces are reasonably flush and even. RCP shall be constructed in accordance T
SWPPP is a dynamic document and is to be available on-site at all times.
S
with Item 464 of the TXDOT specifications, except as modified herein. RCP shall be Class III
EROSION CONTROL & STORMWATER POLLUTION PREVENTION PLAN (SWPPP) minimum.
An initial Erosion Control Plan and Stormwater Pollution Prevention Plan have been included Pipe damaged during the production, delivery or handling shall be immediately rejected and
in the plans. This plan shall be implemented by the Contractor at the direction of the Owner.
The Contractor shall use Best Management Practices (BMPs), such as silt fence, surface
replaced at the Contractor's expense. PRELIMINARY
roughening, temporary seeding, etc, to provide erosion protection within the project area. Watertight joints are required for all reinforced concrete pipes and manhole drop inlets. RCP
R
PR
Changes to the plan shown device locations will be necessary as the project progresses to shall have flexible watertight gaskets and conform to the requirements of ASTM C1619. All
EE
ensure that adequate protection is being provided at appropriate points to prevent silt from new storm sewer on this project requires Class III reinforced concrete pipe. Payment will be LI
C E NS ED
O
made at the Contract Unit Bid Prices for the various bid items and shall be full compensation
N
entering the storm sewer system and downstream areas. E I
F
for all labor, equipment, materials (including bedding material) and other incidentals required SS G
to complete the work. IO NA L EN
Unit bid items have been provided for the items included in the initial Erosion Control Plan.
CAD Filename: CDI Project No. Drawn By: Checked By: Scale: Date: Sheet No: of No:
GCC - Trenton, TX 609 Main Ave S
All topsoil within the project limits shall be stripped and stockpiled onsite at a location chosen by TESTING
the Contractor and approved by the Engineer and protected in accordance with best
management practices for erosion control. This may include placing High Flow Silt Fence All Quality Control Testing will be provided by the Owner. The Contractor will cooperate.
around the perimeter of the stockpile and/or temporary seeding with an annual species such as
oats or wheat. GRAVEL SURFACING
Gravel Surfacing shall be placed to the dimensions and thickness indicated on the Typical
Excavation and construction of embankments shall be performed in accordance with Section 97 Sections. Gravel Surfacing shall be placed over prepared and approved subgrade as indicated.
of the Standard Specifications. Compaction requirements shall be governed by the Specified
Density Method. All embankments shall be compacted to 97% of maximum dry density with a
moisture content +2% to -3% percent of optimum. Excess moisture in the embankment Gravel Surfacing shall be processed by either road mix or plant mix methods.
material shall be removed by drying operations.
Materials processed by road mix methods shall be windrowed and equalized to the satisfaction
After completing subgrade shaping and compaction, and prior to placement of geogrid fabric of the Engineer prior to placement. The material in the windrow will be limited to the quantity
and gravel surfacing, the Contractor shall contact the Engineer to complete a proof roll of the necessary to construct a maximum 3” compacted layer. Granular material which is dumped on
prepared subgrade. The Contractor shall provide a tandem truck loaded with at least 10 tons of the prepared surface shall be windrowed prior to incorporating additives.
material. Following the proof roll, the Contractor will be required to rework any unstable
subgrade as determined by the Engineer and then proof roll again to prove that the subgrade is
ready for aggregate base course. This process will be repeated as many times as the Engineer Materials processed by plant mix methods shall be fed uniformly into the mixer at a
requires. Base materials shall not be placed until the Engineer is satisfied that the subgrade is predetermined rate. The plant shall be equipped with positive proportioning devices and shall
stable. thoroughly mix the materials. When the material is laid by a spreader, it shall have been
previously processed by a central plant.
SHRINKAGE FACTOR: Embankment -40%
Graveling Surfacing shall be placed in lifts not exceeding 3 inches. Each layer shall be
compacted to the specified density before the next lift is placed and shall be rolled until a
*Place uniform, stable surface is obtained. Gravel Surfacing shall be compacted to a minimum of 95
Exc. *Undercut Waste percent of the maximum dry density as determined by ASTM D698.
Topsoil
16,726 4,425 4,502 8,920 The final rolling of the top surface of the granular materials shall embed as many loose stones
as possible. The finished surface shall be smooth, free from waves, and be within ±0.5% of the
typical section cross slope when measured with a straight edge, stringline, or other suitable
equipment.
TOTAL - TABLE OF UNCLASSIFIED EXCAVATION Gravel Surfacing shall conform with TXDOT Class 5 Aggregate specifications & gradations.
Topsoil Stripping 13,422 CuYd Granular material of which 30% of the particles retained on the No. 4 (4.75 mm) sieve shall
Excavation 16,726 CuYd contain one or more fractured faces.
Undercut 4,425 CuYd
*Unclassified Excavation 34,573 CuYd The fraction passing the No. 200 (75 μm) sieve shall not be greater than 2/3 of the fraction
passing the No. 40 (425 μm) sieve. In no case shall the upper limit specified for the No. 200
*Undercut = 4,425 CuYd (75 μm) sieve be exceeded. OF TE
*Placing Topsoil = 4,502 CuYd TE X
A A
T
All Gravel Surfacing delivered to the job must be accompanied by a printed weight ticket from a
S
* The quantities for these items are in the Estimate of Quantities under their respective bid certified scale in accordance with DOT Requirements.
items. The estimated existing topsoil depth was 6".
** Waste material will be placed as directed by the Owner and Engineer, waste material shall
not be placed in any wetlands or in the road right-of-way.
PRELIMINARY
UNDERCUT
R
PR
EE
As shown in the typical section(s), the earthen subgrade shall be undercut 1.0' below the
LI
C E NS ED
O
finished earthen subgrade surface. The earthen subgrade shall then be scarified and
N
E I
F
recompacted for a depth of 6" below the undercut. The undercut material or other suitable SS G
material, as directed by the Engineer, shall then be replaced and compacted to 97% of IO NA L EN
maximum dry density, +2% to -3% percent of optimum moisture content. Payment for Undercut
will be plans quantity unless additional undercut is ordered by the Engineer.
PLACING TOPSOIL
Topsoil shall be spread evenly and uniformly over the designated areas to a depth of 6”
(minimum). If topsoil is not available in sufficient quantities to cover the designated areas to the
plan depth, the Contractor shall spread the available topsoil as required by the Engineer.
CAD Filename: CDI Project No. Drawn By: Checked By: Scale: Date: Sheet No: of No:
GCC - Trenton, TX 609 Main Ave S
PERMANENT SEEDING
The areas to be seeded comprise all newly graded areas within the project limits except for top
of aggregate base course or subballast.
All seed broadcast must be raked or dragged in (incorporated) within the top ¼” to ½” of topsoil
when possible. This requirement may be waived by the Engineer during construction when
raking or dragging is deemed not feasible by conventional methods.
Seeding shall conform to Item 164 of the TxDOT Standard Specifications. Seed must meet the
requirements of the Texas Seed Law. Seed Mix will be provided following Geotechnical Survey
completion.
Following permanent seeding, a mulch consisting of grass hay or straw shall be blown on at
the rate of 2.5 tons per acre and punched in on slopes 3:1 and flatter and on 2:1 slopes
where equipment can be operated without rutting the slope due to slippage.
OF TE
Bales with noxious weed contamination will be rejected and the Contractor will be required to TE X
remove the contaminated bales from the project. A A
T
S
PRELIMINARY
R
PR
EE
LI
C E NS ED
N
E I
F
SS G
IO NA L EN
CAD Filename: CDI Project No. Drawn By: Checked By: Scale: Date: Sheet No: of No:
GCC - Trenton, TX 609 Main Ave S
CAD Filename: CDI Project No. Drawn By: Checked By: Scale: Date: Sheet No: of No:
GCC - Trenton, TX 609 Main Ave S
40
Phase 1 Site Road Plans
SWPPP 2024-037 ERB JJC No Scale 7/5/2024
Brookings, SD
605-696-3200 6
Spill Control Practices v Construction Changes v CONTACT INFORMATION
In addition to the previous housekeeping and management practices, the following practices When changes are made to the construction project that will require alterations in the temporary Contractor Information:
will be followed for spill prevention and cleanup if needed. erosion controls of the site, the Storm Water Pollution Prevention Plan (SWPPP) will be Prime Contractor Name:
For all hazardous materials stored on site, the manufacturer's recommended methods for amended to provide appropriate protection to disturbed areas, all storm water structures, and Contractor Contact Name:
spill clean up will be clearly posted. Site personnel will be made aware of the procedures adjacent waters. The Owner or Owner's Representative will modify the SWPPP plan and Address:
and the locations of the information and cleanup supplies. drawings to reflect the needed changes. Copies of forms and the SWPPP will be retained in a City: State: Zip:
Appropriate cleanup materials and equipment will be maintained by the contractor in the designated place for review over the course of the project. Office Phone:
materials storage area on-site. As appropriate, equipment and materials may include items Cell Phone: Fax:
such as brooms, dust pans, mops, rags, gloves, goggles, kitty litter, sand, sawdust, and v CERTIFICATIONS
plastic and metal trash containers specifically for clean up purposes. Certification of Compliance with Federal, State, and Local Regulations Owner
All spills will be cleaned immediately after discovery and the materials disposed of properly. The Storm Water Pollution Prevention Plan (SWPPP) for this project reflects the requirements of Name: GCC
The spill area will be kept well ventilated and personnel will wear appropriate protective all local municipal jurisdictions for storm water management and sediment and erosion control Address:
clothing to prevent injury from contact with a hazardous substance. as established by ordinance, as well as other state and federal requirements for sediment and City: State: Zip:
After a spill a report will be prepared describing the spill, what caused it, and the cleanup erosion control plans, permits, notices or documentation as appropriate. Office Phone:
measures taken. The spill prevention plan will be adjusted to include measures to prevent Cell Phone:
this type of spill from reoccurring, as well as clean up instructions in the event of Owner - GCC
reoccurrences. I certify under penalty of law that this document and all attachments were prepared under my Project Engineer
The contractor's site superintendent, responsible for day-to-day operations, will be the spill direction or supervision in accordance with a system designed to assure that qualified personnel Name: Civil Design Inc (Jeff Cooley)
prevention and cleanup coordinator. The contractor is responsible for ensuring that the site properly gather and evaluate the information submitted. Based on my inquiry of the person or Business Address: 609 Main Ave South
superintendent has had appropriate training for hazardous materials handling, spill persons who manage the system, or those persons directly responsible for gathering the City: Brookings State: SD Zip: 57006
management, and cleanup. information, the information submitted is, to the best of my knowledge and belief, true, accurate, Office Phone: (605) 696-3200
Spill Response and complete. I am aware that there are significant penalties for submitting false information, Cell Phone: (605) 695-5377 Fax: (605) 696-3220
The primary objective in responding to a spill is to quickly contain the material(s) and prevent including the possibility of fine and imprisonment for knowing violations.
or minimize migration into storm water runoff and conveyance systems. If the release has TCEQ Contact Spill Reporting
impacted on-site storm water, it is critical to contain the released materials on-site and prevent Business Hours Monday-Friday 1-800-832-832-8224
their release into receiving waters. If a spill of pollutants threatens storm water or surface
water at the site, the spill response procedures outlined below must be implemented in a ____________________________________________________ National Response Center Hotline
timely manner to prevent the release of pollutants. Authorized Signature (800) 424-8802
The contractor's site superintendent will be notified immediately when a spill or the threat of
a spill is observed. The superintendent will assess the situation and determine the Prime Contractor
appropriate response. This section is to be executed by the General Contractor after the award of the contract. This
If spills represent an imminent threat of escaping erosion and sediment controls and section may be executed any time there is a change in the Prime Contractor of the project.
entering receiving waters, personnel will be directed to respond immediately to contain the
release and notify the superintendent after the situation has been stabilized. I certify under penalty of law that this document and all attachments will be revised or maintained
Spill kits containing appropriate materials and equipment for spill response and cleanup will under my direction or supervision in accordance with a system designed to assure that qualified
be maintained by the contractor at the site. personnel properly gather and evaluate the information submitted. Based on my inquiry of the
If oil sheen is observed on surface water (e.g. settling ponds, detention ponds, swales), person or persons who manage the system, or those persons directly responsible for gathering
action will be taken immediately to remove the material causing the sheen. The contractor the information, the information submitted is, to the best of my knowledge and belief, true,
will use appropriate materials to contain and absorb the spill. The source of the oil sheen accurate, and complete. I am aware that there are significant penalties for submitting false
will also be identified and removed or repaired as necessary to prevent further releases. information, including the possibility of fine and imprisonment for knowing violations.
If a spill occurs the superintendent or the superintendent's designee will be responsible for
completing the spill reporting form and for reporting the spill to TCEQ.
Personnel with primary responsibility for spill response and clean up will receive training by
the contractor's site superintendent or designee. The training must include identifying the ____________________________________________________
location of the spill kits and other spill response equipment and the use of spill response Authorized Signature
materials.
Spill response equipment will be inspected and maintained as necessary to replace any
materials used in spill response activities.
v Spill Notification
In the event of a spill, the contractor's site superintendent will make the appropriate
notification(s), consistent with the following procedures:
A release or spill of a regulated substance (includes petroleum and petroleum products) must
be reported to Texas Commission on Environmental Quality immediately if any one of the
following conditions exists:
The discharge threatens or is in a position to threaten the waters of the state (surface water
or ground water).
The discharge causes an immediate danger to human health or safety.
The discharge exceeds 25 gallons.
The discharge causes a sheen on surface water.
Reporting the release to Department of Health does not meet any obligation for reporting to other
state, local, or federal agencies. Therefore, the responsible person must also contact local
authorities to determine the local reporting requirements for releases. Department of Health
recommends that spills also be reported to the National Response Center at (800) 424-8802.
CAD Filename: CDI Project No. Drawn By: Checked By: Scale: Date: Sheet No: of No:
GCC - Trenton, TX 609 Main Ave S
40
Phase 1 Site Road Plans
SWPPP 2024-037 ERB JJC No Scale 7/5/2024
Brookings, SD
605-696-3200 7
Typical Section
CL CL
South Shoulder Proposed CR 4450 Existing CR4450 North Shoulder
30'
OHE
ROW
2% Slope 2% Slope 12" Base Course
s Var
rie ies
Va
OHE
Existing Ground
Existing Ground
30' Minimum
CL
Proposed Site Road
(Phase 1)
Varies Varies
es
Vari Var
ies
CAD Filename: CDI Project No. Drawn By: Checked By: Scale: Date: Sheet No: of No:
GCC - Trenton, TX 609 Main Ave S
N
US
HW
Y
69
Existing 24" RCP Culvert
OH
X
X Existing 18" CMP Culvert
X
X
X (To Be Removed)
Control Point X
X
X
N: 7215178.2 X X
X
E: 2624266.7 X
X
Elev.: 771.3 X
X X
X
X
X
X
X 50
X
CR 44
Control Point
N: 7214980.3
E: 2623924.3
Elev.: 758.1 Property Line
OF TE
TE X
A A
T
S
PRELIMINARY
R
PR
EE
LI
C E NS ED
O
E I
F
SS G Wetland - .09 Ac
IO NA L EN
Wetland - 1.06 Ac
Wetland - .40 Ac
In
d
ia
n
Cr
ee
H
NORT
k
Scale: 1"=200'
CAD Filename: CDI Project No. Drawn By: Checked By: Scale: Date: Sheet No: of No:
GCC - Trenton, TX 609 Main Ave S
TNER
Phase 1 Milepost
Site RoadRoad
Site 687.9
Plans
Plans
Preliminary Design 2024-037 ERB JJC 1" = 200' 10/7/2024 Brookings, SD
605-696-3200 9 40
Erosion Control
Sta. Rt/Lt
2+00 Lt
4+00 Lt
6+00 Lt
11+00 Rt/Lt
14+00 Rt/Lt
17+00 Rt/Lt
00
20+00 Lt
0+
Install 20' Silt Fence
22+00 Lt
25+00 Lt
Erosion Control Log
Flow Arrow 29+00 Rt/Lt OH
32+00 Rt/Lt
5+00
X
X
X
X
35+00 Rt/Lt X
X
X
X
X
X
X X
X
X
35+00
X
X
X
10+00
X
X
X
X
X
H
NORT
15+00
Scale: 1"=200'
RC
P 20+
00
30+00
S
P
25+
00
PRELIMINARY
RC
R
PR
P
CM
EE
P
LI
C E NS ED
N
E I
F
SS G
IO NA L EN
CAD Filename: CDI Project No. Drawn By: Checked By: Scale: Date: Sheet No: of No:
GCC - Trenton, TX 609 Main Ave S
TNER
Phase 1 Milepost
Site RoadRoad
Site 687.9
Plans
Plans
Preliminary Design 2024-037 ERB JJC 1" = 200' 10/7/2024 Brookings, SD
605-696-3200 10 40
CAD Filename: CDI Project No. Drawn By: Checked By: Scale: Date: Sheet No: of No:
GCC - Trenton, TX 609 Main Ave S
45
TNER Milepost 686.86 to 687.63
Erosion Control Details 2024-037 ERB JJC No Scale 7/1/2024
Brookings, SD
605-696-3200 13
CAD Filename: CDI Project No. Drawn By: Checked By: Scale: Date: Sheet No: of No:
GCC - Trenton, TX 609 Main Ave S
45
TNER Milepost 686.86 to 687.63
Erosion Control Details 2024-037 ERB JJC No Scale 7/1/2024
Brookings, SD
605-696-3200 14
CAD Filename: CDI Project No. Drawn By: Checked By: Scale: Date: Sheet No: of No:
GCC - Trenton, TX 609 Main Ave S
45
TNER Milepost 686.86 to 687.63
Erosion Control Details 2024-037 ERB JJC No Scale 7/1/2024
Brookings, SD
605-696-3200 15
CAD Filename: CDI Project No. Drawn By: Checked By: Scale: Date: Sheet No: of No:
GCC - Trenton, TX 609 Main Ave S
45
TNER Milepost 686.86 to 687.63
Erosion Control Details 2024-037 ERB JJC No Scale 7/1/2024
Brookings, SD
605-696-3200 16
Proposed Site
N
US
HW
Widen Existing CR4450 Y
69
OH
X
X
X X
X 55' - 18" CMP Replacement
X
X
X
X X
X X
X
X
X X
X
X
X
X 50
X
X
CR 44
Property Line
OF TE
TE X RC
P
A A Phase 1 Loadout
T
S
RC
P
PRELIMINARY
R
PR
EE
LI RC
P
C E NS ED
CM
O
E I
F
P
SS G
IO NA L EN
Storm Sewer
In
di
H
NORT
an
Cr
ee
k
Scale: 1"=200'
CAD Filename: CDI Project No. Drawn By: Checked By: Scale: Date: Sheet No: of No:
GCC - Trenton, TX 609 Main Ave S
TNER
Phase 1 Milepost
Site RoadRoad
Site 687.9
Plans
Plans
Preliminary Design 2024-037 ERB JJC 1" = 200' 10/7/2024 Brookings, SD
605-696-3200 15 40
Phase 1 Site Road - Plan & Profile
Property Line
Sta. 0+31
Existing 24" RCP Culvert Crossing Note: All Grading between Sta. 0+00 to Sta. 6+70 shall be kept within the existing ROW
(See Storm Sewer Plan Pages)
P
OH OH OH
M
OH
C
5+00
C
M
P
CR 4450
P
M
C
30' Roadway Width X X X X
R.O.W.
OF TE
00
TE X
A A
0+ T
S
S
NORTH
PRELIMINARY R
PR
Scale: 1"=50'
EE
E I PVI STA:2+66.2
F
BVCS: 6+15.1
EVCE: 766.2
BVCS: 1+66.2
EVCS: 3+66.2
BVCE: 765.4
BVCE: 769.4
VPI STA = 0+00.0
ELEV = 766.1
770 770
1.25%
Lt: 1.75%
-0.42% Finish Grade
Lt: 1.00% VPI STA = 5+66.6
ELEV = 767.8 VPI STA = 6+93.5
Lt: 1.04%
ELEV = 770.0
VPI STA = 2+63.2
760 760
ELEV = 764.8
VPI STA = 1+03.8
ELEV = 763.1
750 750
FG: 766.1
EG: 766.9
EG: 765.3
EG: 764.6
EG: 765.2
EG: 766.4
EG: 767.4
EG: 768.6
EG: 770.3
FG: 769.2
FG: 765.7
FG: 765.3
FG: 765.6
FG: 766.7
FG: 767.9
FG: 770.4
0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00
CAD Filename: CDI Project No. Drawn By: Checked By: Scale: Date: Sheet No: of No:
GCC - Trenton, TX 609 Main Ave S
TNER
Phase 1 Milepost
Site RoadRoad
Site 687.9
Plans
Plans
Preliminary Design 2024-037 ERB JJC
H: 1" = 50'
V: 1" = 10'
10/7/2024 Brookings, SD
605-696-3200 16 40
Phase 1 Site Road - Plan & Profile
Property Line
35+00
Catchline
10+00
Overhead Electric
(To Be Relocated)
CR 4450
S
(No Relocation Necessary)
R
PR
EE
LI 25 12.5 0 25 50
C E NS ED
O
PVI STA:7+15.1 PVI STA:10+80.9
N
E I
F
PVI ELEV:770.6 PVI ELEV:775.8 SS G
K:1231.36 K:44.26 IO NA L EN
LVC:200.00 LVC:96.82
790 790
BVCE: 775.1
EVCS: 8+15.1
EVCE: 772.0
EVCE: 775.4
BVCS: 10+32.5
EVCS: 11+29.3
780 780
Finish Grade
-0.78%
1.41%
Lt: 0.55%
760 760
FG: 774.1
EG: 770.3
EG: 771.9
EG: 773.3
EG: 774.0
EG: 774.4
EG: 774.3
EG: 773.4
EG: 772.3
FG: 773.2
FG: 770.4
FG: 771.8
FG: 774.6
FG: 775.5
FG: 774.8
FG: 773.3
7+00 8+00 9+00 10+00 11+00 12+00 13+00 14+00
CAD Filename: CDI Project No. Drawn By: Checked By: Scale: Date: Sheet No: of No:
GCC - Trenton, TX 609 Main Ave S
TNER
Phase 1 Milepost
Site RoadRoad
Site 687.9
Plans
Plans
Preliminary Design 2024-037 ERB JJC
H: 1" = 50'
V: 1" = 10'
10/7/2024 Brookings, SD
605-696-3200 17 40
Phase 1 Site Road - Plan & Profile
P
RC
OF TE
TE X
A A
T
P
RC
S
NORTH
PRELIMINARY
RC
Tr
ac
k1
R
PR
Scale: 1"=50' P
EE
RC
LI
C E NS ED
N
E I
F
25 12.5 0 25 50 SS G
IO NA L EN Tr
ac
k2
Catchline
15+00
PVI STA:15+97.6
PVI ELEV:771.8
K:358.32
LVC:200.00
790 790
BVCS: 14+97.6
EVCS: 16+97.6
BVCE: 772.5
EVCE: 771.5
780 780
Finish Grade
Existing Ground
770 Lt: -0.90% 770
760 760
FG: 771.1
EG: 772.3
EG: 771.3
EG: 770.6
EG: 769.9
EG: 768.7
EG: 768.0
FG: 773.3
FG: 772.5
FG: 771.9
FG: 771.5
FG: 771.3
14+00 15+00 16+00 17+00 18+00 19+00
CAD Filename: CDI Project No. Drawn By: Checked By: Scale: Date: Sheet No: of No:
GCC - Trenton, TX 609 Main Ave S
TNER
Phase 1 Milepost
Site RoadRoad
Site 687.9
Plans
Plans
Preliminary Design 2024-037 ERB JJC
H: 1" = 50'
V: 1" = 10'
10/7/2024 Brookings, SD
605-696-3200 18 40
Phase 1 Site Road - Plan & Profile
OF TE
TE X Catchline
A
H
T A
NORT
S
S
PRELIMINARY Scale: 1"=50'
25 12.5 0 25 50
R
PR
EE
LI
C E NS ED
O
E I
F
SS G
IO NA L EN
Proposed Track 2 - TOR
@ Loadout = 770.4
25+00
20+00
RCP
RCP
RCP
RCP RCP
RCP RCP
RCP
RCP RCP RCP Track 2
RCP
RCP 20
See Storm Sewer Plan & Profile Sheet See Storm Sewer Plan & Profile Sheet
Sta. 19+58 - Culvert Crossing
Install 60' - 12" RCP Track 1
(See Storm Sewer Plan Pages)
35
PVI STA:24+49.6
PVI ELEV:769.9
K:956.40
LVC:500.00
780 780
BVCE: 770.4
BVCS: 21+99.6
-0.22% Finish Grade
770 770
Existing Ground
Lt: -0.12%
760 760
VPI STA = 19+57.4
ELEV = 765.2
750 750
EG: 770.1
FG: 771.1
EG: 768.0
EG: 768.4
EG: 768.3
EG: 768.2
EG: 769.0
EG: 769.4
EG: 768.5
FG: 770.9
FG: 770.7
FG: 770.4
FG: 770.3
FG: 770.2
FG: 770.3
FG: 770.4
19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00
CAD Filename: CDI Project No. Drawn By: Checked By: Scale: Date: Sheet No: of No:
GCC - Trenton, TX 609 Main Ave S
TNER
Phase 1 Milepost
Site RoadRoad
Site 687.9
Plans
Plans
Preliminary Design 2024-037 ERB JJC
H: 1" = 50'
V: 1" = 10'
10/7/2024 Brookings, SD
605-696-3200 19 40
Phase 1 Site Road - Plan & Profile
30
+0
0
Catchline
CM
P
CM
P
CM
P
NORT
H
CM
25+00 P
Scale: 1"=50'
RCP RCP
25 12.5 0 25 50 RCP
RCP RCP
RCP RCP
PVI STA:24+49.6 OF TE
PVI ELEV:769.9 TE X
A A
K:956.40 T
See Storm Sewer Plan & Profile Sheet
S
LVC:500.00
780 780
EVCS: 26+99.6
EVCE: 770.7
PRELIMINARY
R
PR
Existing Ground
EE
0.30% LI
C E NS ED
N
E I
F
770 Finish Grade 770 SS G
IO NA L EN
Lt: 1.12%
Rt: 1.20%
750 750
EG: 770.1
EG: 773.1
EG: 771.0
EG: 771.8
EG: 773.7
FG: 770.4
FG: 770.7
FG: 771.0
FG: 771.3
FG: 771.6
26+00 27+00 28+00 29+00 30+00
CAD Filename: CDI Project No. Drawn By: Checked By: Scale: Date: Sheet No: of No:
GCC - Trenton, TX 609 Main Ave S
TNER
Phase 1 Milepost
Site RoadRoad
Site 687.9
Plans
Plans
Preliminary Design 2024-037 ERB JJC
H: 1" = 50'
V: 1" = 10'
10/7/2024 Brookings, SD
605-696-3200 20 40
Phase 1 Site Road - Plan & Profile
X X
X
X
X
OH
X
X
X
30+00
X
35+00
X
X
CR 4450
X
20' Roadway Width
X
OH
X
X
X
Catchline
X
OF TE
X
TE X
A A
X
T
S
NORTH
X
X
OH
X
PRELIMINARY
X
Scale: 1"=50'
R
PR
EE
25 12.5 0 25 50 LI
C E NS ED
N
E I
F
SS G
IO NA L EN
780 780
760 760
750 750
EG: 773.1
FG: 773.1
EG: 773.7
EG: 774.0
EG: 773.8
EG: 773.6
EG: 772.8
FG: 771.6
FG: 772.2
FG: 771.9
FG: 772.5
FG: 772.8
30+00 31+00 32+00 33+00 34+00 35+00
CAD Filename: CDI Project No. Drawn By: Checked By: Scale: Date: Sheet No: of No:
GCC - Trenton, TX 609 Main Ave S
TNER
Phase 1 Milepost
Site RoadRoad
Site 687.9
Plans
Plans
Preliminary Design 2024-037 ERB JJC
H: 1" = 50'
V: 1" = 10'
10/7/2024 Brookings, SD
605-696-3200 21 40
Phase 1 Site Road - Storm Sewer
X
X
30
X
15
+0
0
X
X
X
H
NORT
Scale: 1"=100'
CM
P
50 25 0 50 100
OH
OF TE
TE X
A A CM
T P
S
25+00
20+00 12 13
10 11 RCP
9
PRELIMINARY 4 RCP
5 6
RCP RCP
7 8 RCP RCP
2 3 RCP
1 RCP Install 24" Precast Drop Inlet
R
PR
Install 24" Precast Drop Inlet Install Neenah Frame & Grate
LI Install Neenah Frame & Grate
C E NS ED
O
Install 24" Precast Drop Inlet Install Neenah Frame & Grate
N
780 780
TC Drop Inlet TC Drop Inlet TC Drop Inlet TC Drop Inlet TC Drop Inlet
Finish
TC DropGrade
Inlet STA:9+71.6
STA:0+98.6 STA:5+48.6 STA:7+48.4 STA:11+27.3
770 STA:3+48.6 ELEV:767.1 770
ELEV:767.0 ELEV:767.0 ELEV:767.0 ELEV:766.9
ELEV:766.6
EG: 771.1
FG: 767.1
EG: 768.7
EG: 767.8
EG: 767.6
EG: 768.0
EG: 768.0
EG: 768.0
EG: 768.2
EG: 768.9
EG: 769.6
EG: 770.4
EG: 770.7
EG: 768.5
FG: 767.0
FG: 767.4
FG: 767.0
FG: 767.0
FG: 767.3
FG: 767.2
FG: 767.3
FG: 767.5
FG: 767.9
FG: 767.2
FG: 767.3
FG: 763.7
1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00 13+00
CAD Filename: CDI Project No. Drawn By: Checked By: Scale: Date: Sheet No: of No:
GCC - Trenton, TX 609 Main Ave S
TNER
Phase 1 Milepost
Site RoadRoad
Site 687.9
Plans
Plans
Preliminary Design 2024-037 ERB JJC
H: 1" = 100'
V: 1" = 6'
10/7/2024 Brookings, SD
605-696-3200 22 40
Cross Sections - Co. Rd/Phase 1 Site Road
780
770
760
750
780
770
760
750
780
770
760
750
780
770
760
750
20
20
20
20
0+00.00
2+00.00
3+00.00
1+00.00
0
0
-20
-20
-20
-20
780
770
760
750
780
770
760
750
780
770
760
750
780
770
760
750
OF TE
TE X
A A
T
S
PRELIMINARY
R
PR
EE
LI
C E NS ED
N
E I
F
SS G
IO NA L EN
CAD Filename: CDI Project No. Drawn By: Checked By: Scale: Date: Sheet No: of No:
GCC - Trenton, TX H: 1" = 20'
609 Main Ave S
TNER
Phase 1 Milepost
Site RoadRoad
Site 687.9
Plans
Plans
Preliminary Design 2024-037 ERB JJC V: 1" = 10'
10/7/2024 Brookings, SD
605-696-3200 23 40
Cross Sections - Co. Rd/Phase 1 Site Road
780
770
760
750
780
770
760
750
780
770
760
750
780
770
760
750
20
20
20
20
4+00.00
6+00.00
5+00.00
7+00.00
0
0
-20
-20
-20
-20
780
770
760
750
780
770
760
750
780
770
760
750
780
770
760
750
OF TE
TE X
A A
T
S
PRELIMINARY
R
PR
EE
LI
C E NS ED
N
E I
F
SS G
IO NA L EN
CAD Filename: CDI Project No. Drawn By: Checked By: Scale: Date: Sheet No: of No:
GCC - Trenton, TX 609 Main Ave S
TNER
Phase 1 Milepost
Site RoadRoad
Site 687.9
Plans
Plans
Preliminary Design 2024-037 ERB JJC
H: 1" = 20'
V: 1" = 10'
10/7/2024 Brookings, SD
605-696-3200 24 40
Cross Sections - Co. Rd/Phase 1 Site Road
OF TE
TE X
A A
T
790
780
770
760
790
780
770
760
790
780
770
760
S
S
PRELIMINARY
R
PR
60
60
60
EE
LI
C E NS ED
O
N
E I
F
SS G
IO NA L EN
40
40
40
790
780
770
760
20
20
20
20
10+00.00
11+00.00
9+00.00
8+00.00
0
-20
-20
-20
-20
-40
-40
-40
-40
790
780
770
760
790
780
770
760
790
780
770
760
-60
790
780
770
760
CAD Filename: CDI Project No. Drawn By: Checked By: Scale: Date: Sheet No: of No:
GCC - Trenton, TX 609 Main Ave S
TNER
Phase 1 Milepost
Site RoadRoad
Site 687.9
Plans
Plans
Preliminary Design 2024-037 ERB JJC
H: 1" = 20'
V: 1" = 10'
10/7/2024 Brookings, SD
605-696-3200 25 40
Cross Sections - Co. Rd/Phase 1 Site Road
790
780
770
760
790
780
770
760
790
780
770
760
790
780
770
760
60
60
60
60
40
40
40
40
20
20
20
20
14+00.00
15+00.00
12+00.00
13+00.00
0
0
-20
-20
-20
-20
-40
-40
-40
-40
OF TE
TE X
A A
T
-60
-60
-60
-60
S
790
780
770
760
790
780
770
760
790
780
770
760
790
780
770
760
PRELIMINARY
R
PR
EE
LI
C E NS ED
N
E I
F
SS G
IO NA L EN
CAD Filename: CDI Project No. Drawn By: Checked By: Scale: Date: Sheet No: of No:
GCC - Trenton, TX 609 Main Ave S
TNER
Phase 1 Milepost
Site RoadRoad
Site 687.9
Plans
Plans
Preliminary Design 2024-037 ERB JJC
H: 1" = 20'
V: 1" = 10'
10/7/2024 Brookings, SD
605-696-3200 26 40
Cross Sections - Co. Rd/Phase 1 Site Road
790
780
770
760
160
OF TE
TE X
A A
T
140
PRELIMINARY
R
PR
120
EE
LI
C E NS ED
O
N
E I
F
SS G
IO NA L EN
790
780
770
760
790
780
770
760
100
100
100
790
780
770
760
80
80
80
60
60
60
60
40
40
40
40
20
20
20
20
20+00.00
16+00.00
17+00.00
18+00.00
19+00.00
0
0
-20
-20
-20
-20
-40
-40
-40
-40
-60
-60
-60
-60
790
780
770
760
790
780
770
760
790
780
770
760
790
780
770
760
CAD Filename: CDI Project No. Drawn By: Checked By: Scale: Date: Sheet No: of No:
GCC - Trenton, TX 609 Main Ave S
TNER
Phase 1 Milepost
Site RoadRoad
Site 687.9
Plans
Plans
Preliminary Design 2024-037 ERB JJC
H: 1" = 30'
V: 1" = 10'
10/7/2024 Brookings, SD
605-696-3200 27 40
790
780
770
760
Cross Sections - Co. Rd/Phase 1 Site Road
40
790
780
770
760
780
770
760
750
790
780
770
760
60
40
60
20
40
20
40
24+00.00
23+00.00
0
20
0
20
-20
21+00.00
22+00.00
-20
0
-40
-20
-40
-20
-60
-40
-60
-40
-80
-60
-80
-60
-100
790
780
770
760
-100
OF TE
TE X -80
A A
T
S
-120
PRELIMINARY
-120
-100
790E R
PR
780
770
760
LI
E
C E NS ED
O
E I
F
SS G
IO NA L EN
-140
780
770
760
750
790
780
770
760
CAD Filename: CDI Project No. Drawn By: Checked By: Scale: Date: Sheet No: of No:
GCC - Trenton, TX 609 Main Ave S
TNER
Phase 1 Milepost
Site RoadRoad
Site 687.9
Plans
Plans
Preliminary Design 2024-037 ERB JJC
H: 1" = 20'
V: 1" = 10'
10/7/2024 Brookings, SD
605-696-3200 28 40
Cross Sections - Co. Rd/Phase 1 Site Road
790
780
770
760
790
780
770
760
790
780
770
760
790
780
770
760
60
60
60
60
40
40
40
40
20
20
20
20
28+00.00
26+00.00
27+00.00
25+00.00
0
0
0
0
-20
-20
-20
-20
-40
-40
-40
-40
-60
-60
-60
-60
-80
-80
-80
-80
-100
-100
-100
-100
-120
-120
-120
-120
OF TE
TE X
A A
-140
-140
-140
T
-140
S
790
780
770
760
790
780
770
760
790
780
770
760
790
780
770
760
PRELIMINARY
R
PR
EE
LI
C E NS ED
N
E I
F
SS G
IO NA L EN
780
770
760
CAD Filename: CDI Project No. Drawn By: Checked By: Scale: Date: Sheet No: of No:
GCC - Trenton, TX 609 Main Ave S
TNER
Phase 1 Milepost
Site RoadRoad
Site 687.9
Plans
Plans
Preliminary Design 2024-037 ERB JJC
H: 1" = 30'
V: 1" = 10'
10/7/2024 Brookings, SD
605-696-3200 29 40
Cross Sections - Co. Rd/Phase 1 Site Road
790
780
770
760
120
790
780
770
760
790
780
770
760
790
780
770
760
100
100
100
100
80
80
80
80
60
60
60
60
40
40
40
40
20
20
20
31+00.00
32+00.00
30+00.00
20
0
0
29+00.00
-20
-20
-20
-20
-40
-40
-40
-40
-60
-60
-60
-60
790
780
770
760
790
780
770
760
-80
-80
OF TE
TE X
-100
A A
T
S
790
780
770
760
-100
PRELIMINARY
R
PR
-120
EE
LI
C E NS ED
O
790
780
770
760
N
E I
F
SS G
IO NA L EN
CAD Filename: CDI Project No. Drawn By: Checked By: Scale: Date: Sheet No: of No:
GCC - Trenton, TX 609 Main Ave S
TNER
Phase 1 Milepost
Site RoadRoad
Site 687.9
Plans
Plans
Preliminary Design 2024-037 ERB JJC
H: 1" = 30'
V: 1" = 10'
10/7/2024 Brookings, SD
605-696-3200 30 40
Cross Sections - Co. Rd/Phase 1 Site Road
790
780
770
760
790
780
770
760
790
780
770
760
80
80
80
60
60
60
40
40
40
20
20
20
34+00.00
33+00.00
35+00.00
0
0
0
-20
-20
-20
-40
-40
-40
OF TE
TE X
A A
T
-60
-60
-60
S
PRELIMINARY
790
780
770
760
790
780
770
760
790
780
770
760
R
PR
EE
LI
C E NS ED
N
E I
F
SS G
IO NA L EN
CAD Filename: CDI Project No. Drawn By: Checked By: Scale: Date: Sheet No: of No:
GCC - Trenton, TX 609 Main Ave S
TNER
Phase 1 Milepost
Site RoadRoad
Site 687.9
Plans
Plans
Preliminary Design 2024-037 ERB JJC
H: 1" = 20'
V: 1" = 10'
10/7/2024 Brookings, SD
605-696-3200 31 40
County Rd Culvert Extensions
Plan & Profile
O
H
Catch Line
O
H
O
H
O
Sta. 0+33 Existing S Inv: 761.8
H
New S Inv: 761.4
CMP
CMP CMP
CMP CMP
CMP
Catch Line
OF TE
TE X
A A
O
T
H
Existing 24" RCP
0+00
S
N Inv: 760.9
S Inv: 760.4
PRELIMINARY
R
PR
N
EE
O
LI
RT
C E NS ED
N
E I
F
H
SS G
IO NA L EN
Scale: 1"=20'
CAD Filename: CDI Project No. Drawn By: Checked By: Scale: Date: Sheet No: of No:
GCC - Trenton, TX 609 Main Ave S
TNER
Phase 1 Milepost
Site RoadRoad
Site 687.9
Plans
Plans
Preliminary Design 2024-037 ERB JJC
H: 1" = 20'
V: 1" = 10'
10/7/2024 Brookings, SD
605-696-3200 32 40
Plan View - Phase 1 Road - Storm Sewer
RCP
RCP
30+00
Track 1
Track 2
RCP
P
CM
20+00
4
P
CM
Sta. 28+26
RCP
P
CM
P
RC
P
CM
Catch Line Sta. 19+58
P
Catch Line CM
RCP
P
RC
P
CM
RCP
k2
60' - 12" RCP - 1 Flared End Sections
P
200' - 18" CMP - 2 Flared Ends
RC
ac
E Inv: 764.8 N Inv: 764.3
Tr
W Inv: 765.2 S Inv: 763.6
1
ck
RCP
a
TH
Tr
P
RC
R
NO
OF TE
TE X
RTH
A A
T
NO
S
Scale: 1"=40'
20 10 0 20 40
Scale: 1"=40' PRELIMINARY
R
PR
20 10 0 20 40
EE
790 790 LI
C E NS ED
N
E I
F
SS G
28+26.05 IO NA L EN
780 780 780 780
T/C Elev = 766.6
770 770 770 770
CAD Filename: CDI Project No. Drawn By: Checked By: Scale: Date: Sheet No: of No:
GCC - Trenton, TX 609 Main Ave S
TNER
Phase 1 Milepost
Site RoadRoad
Site 687.9
Plans
Plans
Preliminary Design 2024-037 ERB JJC
H: 1" = 40'
V: 1" = 40'
10/7/2024 Brookings, SD
605-696-3200 33 40
CAD Filename: CDI Project No. Drawn By: Checked By: Scale: Date: Sheet No: of No:
GCC - Trenton, TX 609 Main Ave S