0% found this document useful (0 votes)
38 views2 pages

BCS501 Model Set 1 Paper

Uploaded by

rbk7105
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
38 views2 pages

BCS501 Model Set 1 Paper

Uploaded by

rbk7105
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

BCS501

Model Question Paper-1 with effect from 2022(CBCS Scheme)


USN

Fifth Semester B.E. Degree Examination


Software Engineering and Project Management

TIME: 03 Hours Max.Marks:100

Note:1. Answer any FIVE full questions, choosing at least ONE question from each MODULE.

*Bloom’s
Module-1 Taxonomy COs Marks
Level
Q.01 a Define process and explain generic process framework for software engineering. L1 CO1 10
b Explain the different attributes are encountered in the vast majority of WebApps.
L2 CO1 10
OR
Q.02 a Compare and contrast Waterfall model and spiral model L1 CO1 10
b Discuss the David Hooker’s seven principles of software engineering practice. L2 CO1 10

Module-2
Q.03 a With an example, describe the Class-Responsibility-Collaborator(CRC) modeling. L1 CO2 10
b Explain three types of QFD with examples. L2 CO2 10
OR
Q.04 a Explain scenario based model with example. L2 CO2 10
b How can you develop an effective use case? Develop a UML use case diagram for
L1 CO2 10
home security function.

Module-3
Q.05 a Elucidate the concepts of extreme programming(XP) with its functional diagram L2 CO3 10
b Elucidate SCRUM process with a neat diagram L1 CO3 10
OR
Q.06 a What is Agility? Explain Agility with the cost of change with Diagram. Explain
L1 CO3 10
the Principles of Agile Software Development
b Explain Safe Home Security functions for Flow Oriented Modeling and
L1 CO3 10
Behavioral Modeling.

Module-4
Q.07 a Explain the procedure of setting objectives for successful completion of software
L2 CO4 10
project.
b With example explain different categories of Software Projects. L2 CO4 10
OR
Q.08 a Elucidate the concepts in activity planning in software project management. L1 CO4 10
b Explain the Risk Evaluation with example.
L3 CO4 10

Module-5
Q.09 a Define software quality and explain place of software quality in project
L2 CO5 10
management.
b Explain capability process model and CMM key areas. L1 CO5 10

Page 01 of 02
BCS501
OR
Q.10 a Explain Quality Management Systems with Principles of BSENISO
L1 CO5 10
9001:2000
b List and Explain the Techniques to enhance Software Quality and Software
L3 CO5 10
Reliability.

Bloom’s Taxonomy Level: Indicate as L1, L2, L3, L4, etc. It is also desirable to indicate the COs and POs to be