HALFAYA OIL FIELD
SURFACE FACILITY PROJECT
PETROCHINA
HALFAYA
MINUTES OF
MEETING
Phase : IV
Doc. No. : HFY4-WS-MOC-PCH-M-0071 Meeting Date : 18th November 2024
Location : GRS Meeting Room Meeting Time : 09:00am – 12:00am
Chaired by : Sadiq N. yaseen Prepared By : Li Zhiyong
Subject : 24” Gas line from GPP to GRS intelligent pigging Meeting
ATTENDANES
PETROCHINA-HALFAYA MISSAN OIL COMPANY
Name Position Name Position
Li Zhiyong GPP TL F&C Sadiq N. yaseen Eng. Inspection. Mgr
Bassam Sid Ahmed PMC focal point Ali Hussen GRS section head
Zhang Weili HBP Project Manager Ali Khalid MOC
Radhy jbari
Ali Jassim
Rusul atheer
Jaafar chassib
Ali Badr
Ali M Saaed
PetroChina Halfaya HBP Missan Oil Company
[MOC]
________________________ ________________________
_______________________
Name: Name: Name:
Designation: Designation: Designation:
Template No: HFY-PMT-DC-TMP-0005 Revision 1 Page
Issue Date: 10/02/15
HALFAYA OIL FIELD
SURFACE FACILITY PROJECT
PETROCHINA
HALFAYA
Date: 18th November 2024 Date: 18th November 2024 Date: 18th November
2024
The minutes are hereby duly recorded as follows:
ITEM ACTION
DESCRIPTION DATE
NO. BY
MOC, GRS, PCH and HBP organized the joint workshop to discuss INFO
1
the intelligent regarding dry gas pipeline from GPP to GRS.
With reference to HFY-DL-03824-F&C-2024-Nov dated 14 th
2 November 2024, the subjected intelligent will be conducted on 9 th INFO
December 2024.
HBP presented the draft method Rev. B of intelligent pigging,
3 INFO
MOC/GRS will study this method and will feedback on 25th Nov.
MOC/GRS will provide the related GRS production data on 25 th
4 INFO
Nov.
MOC/GRS is requested to connect the temporary pipeline from
5 GRS pig receiver to dry pit and keep fire in dry pit through MOC/GRS
cylinder.
The work scope is as follows:
PCH/GPP will maintain the pressure of GPP export dry gas
pipeline as support of the subjected pigging;
6 INFO
HBP will be in charge of the pigging launch and receive;
MOC/GRS will be responsible for the condensation receiving and
treatment.
HBP clarified that:
7 Metal Loss Tools type is High-resolution axial field MFL tools; INFO
Geometry tools type is caliper tools.
HBP will present the way of subjected pigging procedure including
8 INFO
GPP operation condition during pigging.
HBP request MOC to provide support for the security clearance
9 INFO
application once the pigging operation team mobilized to site.
MOC requested that all pigging procedure/activities shall follow
10 INFO
NACE SP0102 and ASME B 31.8S.
Next joint meeting will be organized on 25 th November 2024. HBP
11
is requested to present technical details for the subjected pigging.