0% found this document useful (0 votes)
19 views1 page

+2 MM +3 MM: Sumbawa LNG Terminal & Regas Facility

1

Uploaded by

hudiono cahyono
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
19 views1 page

+2 MM +3 MM: Sumbawa LNG Terminal & Regas Facility

1

Uploaded by

hudiono cahyono
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

0° 0°

330° 30° 330° 30°

300° +3 60° 300° 60°


MM
+2
MM
270° 500.0000

90° 270° 90°

240° 120° 240° 120° PURCHASER DECAL


ISSUE PURPOSE :
RESULT CODE :
NEXT STATUS :
RESUBMISSION DATE :
RESPONSIBLE DEPT./PERSON :

210° 150° 210° 150° REVIEW DATE

MEDCO SUMBAWA GAS, PT


:

180° 180°
SUMBAWA LNG TERMINAL AND
REGASIFICATION PROJECT

A. APPROVED
Approved without exception

B. APPROVED WITH COMMENTS


May proceed to next stage resubmit corrected document for final approval

C. REVIEW / COMMENTED
Resubmit corrected document for approval

D. REJECTED AND TO BE RESUBMITTED

E-301 A2 E-301 A2 Presubmit new Document with some revision status

E. RETAINED FOR INFORMATION

ADJUST FAN RING KELUAR PADA SUDUT ADJUST ALL FAN BLADE
Note : Approval or comments does not relieve the Contractor of any
obligations covered under contract

Date :

300° DENGAN JARAK +3 MM KELUAR +2 MM DENGAN ACUAN SUDUT 300° Signature


NEXT STATUS :
: Name :

PREPD CHKD. APVD CHKD. APVD APVD


REV ISSUE DATE PURPOSE VENDOR/ SUBCONT CTR CPY

REVISIONS

PROJECT :

SUMBAWA LNG TERMINAL & REGAS FACILITY


COMPANY :

CONTRACTORS :

VENDOR :

TITLE :
FAN TIP CLEARANCE RECOMENDATION
FAN RING E-301_A2
BOG COMPRESSOR AFTER COOLER (E-301 A/B/C)

PURCHASE ORDER NO : CLASS :


0-0831-0-P-2153-101-A
DRW'N CHK'D APP'D SCALE
DATE DATE DATE NTS

COMPANY No.
B
SIZE

DWG No.
B