08 Testing
08 Testing
1. Overview
• Project Name: Mobile Signal Finder
• Purpose: To validate the functionalities and performance of the Mobile Signal
Finder application, ensuring it meets specified requirements for usability,
accuracy, and reliability.
• Prepared by: [Your Name]
• Reviewed by: [Reviewer’s Name]
• Date: [Date]
2. Scope
• Features to be Tested:
o Signal search and retrieval based on location
o Signal report submission by users
o User interface elements (forms, buttons, tables)
o Error handling and validation
o Database interactions (saving and retrieving signal reports)
• Out of Scope:
o Third-party service reliability (e.g., external map APIs)
o Non-functional requirements like compliance with specific regulatory
standards
3. Objectives
• To ensure the application accurately displays mobile signal reports based on
user input.
• To verify that signal report submissions work as expected and data is stored
correctly.
• To confirm that error handling and validation are effective.
• To check the usability and accessibility of the interface.
4. Test Approach
• Testing Levels:
o Unit Testing: Conducted by developers to verify the functionality of
individual code units.
o Integration Testing: Verify interactions between components, such as
frontend-backend communication.
o System Testing: Full end-to-end testing of the application’s features.
o Acceptance Testing: Testing to ensure the application meets business and
functional requirements.
• Testing Types:
o Functional Testing: Validate each feature against the specifications.
o Usability Testing: Check interface usability and consistency.
o Performance Testing: Ensure application response time is acceptable
under load.
o Security Testing: Assess vulnerability to ensure data protection and
prevent unauthorized access.
5. Test Environment
• Hardware:
o Servers with PHP and MySQL setup
o Devices: Desktop, tablet, mobile devices
• Software:
o Browsers: Chrome, Firefox, Safari, Edge
o Tools: Database management (e.g., phpMyAdmin), optional test
automation tools (e.g., Selenium)
• Network: Stable internet to simulate different user conditions
6. Test Cases
Test Description Expected Result Status
Case ID
TC001 Verify that entering a Location-based search returns Pending
location returns accurate relevant signal provider and strength
signal reports. data.
TC002 Validate form fields for Form submission only succeeds if Pending
report submission. all required fields (location, provider,
strength) are filled correctly.
TC003 Check error message for "No results found" message is Pending
unsupported locations in shown when location search yields
search. no results.
TC004 Validate data validation Values outside the range (1-5) are Pending
for signal strength (values rejected with an error message.
1–5).
TC005 Verify report storage with Each new report entry has an Pending
correct timestamps in the accurate timestamp in the
database. database.
TC006 Test simultaneous Application handles concurrent Pending
searches for application search requests without errors or
stability under load. slowdowns.
TC007 Ensure homepage Most recent reports appear first in Pending
displays recent reports in descending order by date.
the correct order.
TC008 Verify user redirection to User is redirected to a confirmation Pending
home after submitting a page or homepage after submission.
report.
TC009 Confirm cross-browser Application functions consistently Pending
compatibility. across Chrome, Firefox, Safari, and
Edge.
TC010 Validate SQL injection All input fields are secure from SQL Pending
protection on all input injection vulnerabilities.
fields.
7. Test Data Requirements
• Sample Locations: Data for popular cities (e.g., "New York," "London") to validate
the search function.
• Provider Names: Sample provider names for report submission.
• Invalid Data: Data to test field validation, such as non-numeric input for signal
strength.
8. Test Schedule
Milestone Estimated Completion Date Responsibility
Unit Testing [Start Date] Development Team
Integration Testing [Start Date + 1 week] QA Team
System Testing [Start Date + 2 weeks] QA Team
Acceptance Testing [Start Date + 3 weeks] Project Lead
Final Test Review [Start Date + 4 weeks] QA Lead
11. Approval
• Test Plan Approval by QA Lead: [Name, Date]
• Project Lead Approval: [Name, Date]