P-Mr-009-Kyn-Bud-Lc-4c-Sub-004 (Sheet 1 of 3) - R0-Deck Slab
P-Mr-009-Kyn-Bud-Lc-4c-Sub-004 (Sheet 1 of 3) - R0-Deck Slab
BH-5
DN LL
UP LL
NORTH
P5 P6 P5 P6 NORTH
CL OF EXPANSION JOINT CL OF EXPANSION JOINT
E
E
E
K1
E
DN MAIN LIN
UP MAIN LIN
CL OF EXPANSION JOINT
K2
CL OF EXPANSION JOINT
DN MAIN LIN
UP MAIN LIN
58/29
EXPANSION JOINT TO EXPANSION JOINT CENTER TO CENTER = 37280
FUTURE TRAC
FUTURE TRAC
C
L OF BEARING CL OF BEARING
CL OF BEARING CL OF BEARING
58/30
640 640 640 640
H5
300
H1 H4
1400
RCC RAILING KERB CRASH BARRIER H3
1
H7 H7
3
7 7
FOOTPATH
500 1500
G1
3000
25
00
P6 P8
00
25
P2 P5
2500
ELASTOMERIC ELASTOMERIC 2500 2500
SEAL (SE-400) SEAL (SE-400)
G1 P7
OVERALL WIDTH OF DECK
58/28
58/27
P3 P4
CLEAR CARRIAGEWAY 9500
2500
2 2 3 3
12300
G1
2500
G1
KEY PLAN
4 4 (SCALE :- 1:600)
2500
DRAINAGE SPOUT 00
25
3000
25
0
6 6
0
G1
NOTES :-
900
1
H6
3
H6 H2 3. ALL REINFORCEMENT SHALL BE HYSD AND SHALL CONFIRM TO
IS:1786:2008 Fe 500D
H5 4. NUMBER OF BARS, STIRRUPS ETC. SHALL NOT BE COUNTED FROM
PLAN OF DECK SLAB THIS DRAWING. ONLY GIVEN SPACING AND/ OR SPECIFIED NUMBER
(SCALE 1:150) OF BARS/ LINKS SHALL BE PROVIDED.
REINFORCEMENT PLAN OF DECK SLAB 5. ALL REINFORCEMENT BARS SHALL BE CLEAN AND FREE FROM DIRT
(SCALE 1:150) AND MILL SCALE RUST ETC. AND SHALL BE BEND COLD TO SHAPE AS
PER DIMENSIONS INDICATED AND SHALL BE PLACED AS EXACTLY
SHOWN.
6. LAPS SHALL GENERALLY BE AVOIDED, IF REQUIRED LAP SHALL BE
OVERALL WIDTH OF DECK SLAB 12300 STAGGERED & NOT MORE THAN 50% OF BAR SHALL BE LAPPED AT
ANY LOCATION.
7. GRADE OF CONCRETE :-
500 500 CLEAR CARRIAGEWAY 8500 500 500 1500 300
FOOTPATH i) DECK SLAB = M40
DETAIL 'A' ii) CRASH BARRIER, KERB AND APPROACH SLAB= M40.
iii) PCC = M15.
H3 8. CLEAR COVER TO REINFORCEMENT FOR DECK SLAB - 25
RAILING
240MM THK DECK SLAB
CRASH BARRIER
1630
1250
5 DETAIL 'B' 3000
CL OF C/W LEGEND 5
75MM THK WEARING COAT 3000
C
L OF C/W L OF PIER/PIERCAP
C CL - CENTER LINE
SLOPE 2.5 % SLOPE 2.5 %
H1 DETAIL - C
80
RCC DECK SLAB H5 + H1 H5 + H1 EXP. JT - EXPANSION JOINT
TYP - TYPICAL
200
240
TOP REINFORCEMENT
BOTTOM REINFORCEMENT
H1 DECK SLAB
H6 + H3 H1
COAT
RAILING
2 2
980
450 H13 P5
300
250
300 SCHEDULE OF REINFORCEMENT BOQ OF STRUCTURE
200 CL OF EXP JT. CL OF BEARING
40 BAR SPACING/ SR.NO ITEM NO. QUANTITY
H1 SHAPE REMARKS
H12 MARK DIA
1630
NOS.
1 M40 CONCRETE REQUIRED (m3) 170.36
5 NOS SENIOR PROJECT AEN DY. CPM -VI CPM - IV
H9 2500 H1 12 200 C/C TOP BAR
2 PCC (m3) 8.61 ENGINEER
200
430
H3 + H6
H3 10 250 C/C DISTRIBUTION AT TOP 4 51 MM DECKING SHEET (m2) 458.54
DECK SLAB
H8
H10
895
BE SUPPORTED
400
200
1
DECK SLAB
SECTION 4-4 1
DECK SLAB
DETAIL OF RAILING KERB (SCALE 1:20) H10 16 120 C/C STIRRUPS TITLE CONCRETE DIMENSIONS AND REINFORCEMENT DETAILS
(SCALE 1:10) OF DECK SLAB AND CRASH BARRIER ( P5 & P6) LC-4C FOR
H11 12 22 NOS. HORIZONTAL BAR PROPOSED ROB AT CH. 58.300 KM BETWEEN KYN-BUD
DETAIL - A DETAIL - B DRAWN BY DMG DESIGNED BY IQRA KHAN
RAILING
DETAIL OF CRASH BARRIER DETAIL OF CRASH BARRIER H12 12 4 NOS. HORIZONTAL BAR APPROVED BY VIVEK P.
KERB
CHECKED BY MIK
(SCALE 1:20)
(SCALE 1:20) STIRRUPS SCALE AS SHOWN DATE 06-04-2021
H13 16 120 C/C 300
DRG. NO P/MR/009/KYN-BUD/LC-4C/SUB/004 (SHEET 1 OF 3) REV. R0
MRVC DRG. NO.
A B C D E F G H J A1