0% found this document useful (0 votes)
36 views1 page

Tauseef

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
36 views1 page

Tauseef

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

__________________________________________________________________________________

Contact: 0334 8706009 / 091 3066 327


Email: [email protected]
Address: GTC,
OfficeShop 7-10,
Stamp: Palace Shopping
__________________
plaza, Karkhanu Market, Peshawar, KP, Pakistan

Quotation 6 KW
Installation of 6KW hybrid Solar Home Powering System with PV=7020W

Ref No: GTC/133/18/12/2024/PP Client: Tauseef Date: 18th December, 2024

S.
Item Description Unit Price Quantity Total
No
Photo Voltaic (PV) Jinko 585-watt each (12 panels) bi-facial Solar
31 7020 217620
1 Panel N-type

Solar Inverter Solis 6KW IP65 with LCD 280000 1 280000


2

Batteries BYD Li Fe Po 5000AH 48V (LV 5.0) 325000 1 325000


3

Frame/ Mounting L2 14 Guage structure 5000 6 30000


4

Installation Turnkey system installation 25000 1 25000


5

Transportation Equipment/ Items/ People (Not Included) 5000 1 5000


6

Breaker Box, Bolts, Nuts, Insulation, taping,


Accessories 25000 1 25000
7 Lugs,earthing rod, ducting etc.

AC/DC copper wire, Breakers, MC4 connectors,


System Wiring 70000 1 70000
8 Volt protectors, etc.

Service Charge Service 0 0 0


9

Miscellaneous, change overs, electrician work,


Extra Work 0 0 0
10 safety etc.

Net metering Not included 0 0 0


11

Received Amount = Nill /- Grand


1049620/-
Remaining Amount =/- Total
• Warranty for batteries and inverter is as per the manufacturers official warranty.
• PV panels are warranted to provide its rated efficiency for 30 years as per manufacturer data sheet.
• Initial payment of 80% out of the total value of the project will be charged. 20% will be received after the
completion of system/ project.