Date:21-April-24
Doc. NO: 0130
Location/ ARD
Contractor:ARD
Observations
NO Observation comment Corrective action Facility Evidence Pic of Correction
ARD company ARD company The problem was ARD ADM
1 lack proper should urgently resolved and
address the lack personal protective
PPE, putting
of proper PPE equipment was
their safety at among its provided to workers
risk. This workers to according to safety
neglect violates prioritize their standards.
safety safety and
standards and comply with
safety standards.
jeopardizes
employee well-
being.
Date:21-April-24
Doc. NO: 0130
Location/ ARD
Contractor:ARD
Observations
NO Observation comment Corrective Facility Evidence Pic of Correction
action
The makeshift ARD company Work on the ARD
2 construction of should cease makeshift table ADM
the table saw by using the has been stopped
combining a makeshift and removed
hand saw and table saw from the site
attaching it immediately permanently.
beneath the and invest in
table is proper, safety-
dangerously compliant
inadequate, equipment to
failing to meet ensure the
accepted safety well-being of
standards. its workers.
Date:21-April-24
Doc. NO: 0130
Location/ ARD
Contractor:ARD
Observations
NO Observation comment Corrective Facility Evidence Pic of
action Correction
Exposed rebar Address the exposed ARD ADM
3 rebar edges on the
edges on the concrete column. Proper
concrete column safety measures, such as
poses a covering or securing the
rebar, should be
significant safety implemented to prevent
hazard, risking potential injuries
injury to anyone
passing by.
Date:21-April-24
Doc. NO: 0130
Location/ ARD
Contractor:ARD
Observations
NO Observation comment Corrective action Facility Evidence Pic of Correction
ARD's lack of an ARD must urgently The HSE department ARD
4 appoint an HSE has been provided in
HSE Manager or the company to ensure
department Manager and
the health and safety
establish an HSE of employees and
violates CPP department to provide a safe working
regulations, ensure compliance environment.
endangering with CPP regulations
worker safety and prioritize
and prompting worker safety. All
the necessary work activities
halt of all work should remain
suspended until
activities. these measures are
in place to mitigate
risks effectively.
Date:21-April-24
Doc. NO: 0130
Location/ ARD
Contractor:ARD
Observations
NO Observation comment Corrective action Facility Evidence Pic of Correction
ARD's ARD must Housekeeping was ARD
5 prioritize done and the nails
formwork were removed.
operation at immediate
housekeeping
the jobsite is measures to
directly remove
impeded by scattered nails
scattered nails from the
on the ground, jobsite,
posing a severe mitigating the
safety risk to sharp hazard to
workers during
workers. formwork
operations.
Date:21-April-24
Doc. NO: 0130
Location/ ARD
Contractor:ARD
Observations
NO Observation comment Corrective action Facility Evidence Pic of
Correction
ARD should immediately ARD
6 establish a designated
ARD lacks a chemical area at the
jobsite to ensure proper
designated handling and storage of
chemical rea chemical materials.
Additionally, implement
comprehensive protocols
for the safe storage,
handling, and disposal of
chemicals to mitigate
risks to worker health
and safety.
Date:21-April-24
Doc. NO: 0130
Location/ ARD
Contractor:ARD
Observations
NO Observation comment Corrective Facility Evidence Pic of Correction
action
The cables and ARD should swiftly It has been ARD
7 inspect and repair repaired and
sockets of the connected
electrical system at exposed steel cables
properly.
and damaged wires to
ARD have not been prevent accidents.
adequately checked, Regular maintenance
with visible steel checks and thorough
cables lacking covers employee training on
and damaged wires electrical safety are
exposed. This crucial. Enforce strict
oversight poses a Lockout/Tagout
(LOTO) procedures to
severe safety hazard, safeguard workers
risking electrical during maintenance.
accidents and
potential injuries to
workers.
NO Observation comment Corrective Facility Evidence Pic of Correction
Date:21-April-24
Doc. NO: 0130
Location/ ARD
Contractor:ARD
Observations
action
Without proper The ARD
8 maintenance, no generator
The generator exhibits
was stopped
multiple safety hazards, Permit to Work (PTW)
and
including diesel leakage, should be approved surrounded
exposed wires, absence for the generator. ARD by red tape,
of a fire extinguisher, must urgently address waiting for
barricades, and diesel leaks, exposed the crane to
remove it
grounding measures. This wires, and other
from the
lack of safety protocols hazards. Install fire
place.
poses significant risks to extinguishers,
personnel and property, barricades, and
increasing the likelihood grounding measures,
of fire hazards, ensuring compliance
electrocution, and with safety standards.
environmental damage. Regular inspections
and training are
essential to mitigate
risks.
Date:21-April-24
Doc. NO: 0130
Location/ ARD
Contractor:ARD
Observations
Remark:
❖ All the above mentioned observations should get their corrective actions within 72 hours.
Reported by:(HSSE Department)
Ahmed Habeeb Yasir