100% found this document useful (3 votes)
5K views

Method Statement Sub Base & Road Base

This method statement describes the process for placing subbase and roadbase for a construction project. It outlines 3 key steps: 1) placing the lower subbase which involves shaping and compacting the subgrade, placing and compacting the subbase material in layers; 2) placing the upper subbase using a similar process; and 3) placing the road base and wet mix macadam by compacting it to the required thickness, shape, grade and tolerances as specified in the drawings. Quality control measures like moisture content checks and level checks using control pegs are also described.

Uploaded by

fyzalazry
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100% found this document useful (3 votes)
5K views

Method Statement Sub Base & Road Base

This method statement describes the process for placing subbase and roadbase for a construction project. It outlines 3 key steps: 1) placing the lower subbase which involves shaping and compacting the subgrade, placing and compacting the subbase material in layers; 2) placing the upper subbase using a similar process; and 3) placing the road base and wet mix macadam by compacting it to the required thickness, shape, grade and tolerances as specified in the drawings. Quality control measures like moisture content checks and level checks using control pegs are also described.

Uploaded by

fyzalazry
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

METHOD STATEMENT SUB-BASE AND ROAD-BASE 1.

0 OBJECTIVE The purpose of this method statement is to describe the activities and methods, which will be used to carry out the placing of subbase and roadbase 2.0 CONSTRUCTION METHOD The sequence of the work to be carried out shall be as follows:2.1 Placing of Lower Subbase 2.2 Placing of Upper Subbase 2.3 Placing of Road Base and Wet Mix Macadam 2.1 Placing of Subbase 2.1.1 Prior to placing any Lower Subbase material, the underlaying subgrade shall be shaped and compacted in accordance to the specifications. 2.1.2 The material shall be placed over the full width of the formation to the required thickness as shown in the drawings in one layer or more, each layer not exceeding 200mm compacted thickness. 2.1.3 Each layer of Lower Subbase shall be process as necessary to bring its moisture content to a uniform level throughout the material suitable for compaction. 2.1.4 The Lower Subbase shall be compacted using suitable compactione quipment approved by the Engineer to not less than 95% of the maximum dry density determined in the B.S. 1377 Compaction Test(4.5 km rammer method). 2.1.5 The top of Lower Subbase shall have the required thickness, shape, superelevation, levels and grades as required in the drawings and shall be within the tolerances as specified in the specifications. 2.1.6 In the course of the construction, the level shall be checked using control/dipping pegs, set out at regular interval along both sides of the pavement.