CE9051 - Term Project - E20
CE9051 - Term Project - E20
1. PROJECT TASK: Design a suitable pavement for the road stretch assigned to your group using
ORN31.
a. Design report
b. Oral presentation
DESIGN REPORT
A. Cover page
B. Table of contents
C. Introduction
D. Preliminary investigation
E. Data collection
a. Traffic load
b. Material properties
F. Design calculations
a. Traffic
b. Subgrade
c. Pavement structure
G. Construction method
H. Drawings
I. Bill of Quantities
Clearly state all the assumptions and justifications for your decisions.
1
ORAL PRESENTATION
1. You’re expected to present the details of your design with the aid of any presentation tool.
Total 15 min
SN Assessment criteria %
01 Project introduction 10
03 Design of components 30
04 Drawings 10
Hours
Content
L T L/F A
Term Project 01 09 21
You may carry out the lab/field tests with prior permission.
2
Road segments allocation for groups
Group 01
Group 04
Group 03
Group 02
Serial No. Reg. No. Name Group details
1 2020/E/032 DILAXSAN S.
2 2020/E/037 DISSANAYAKA S.S.L.
3 2020/E/038 DISSANAYAKA M.D.M.S.M.B. Group 01
4 2020/E/042 FARSAN M.F.M.
5 2020/E/049 GUNASEKARAN V.
6 2020/E/055 ILZAM UL HAQ M.I.M.
7 2020/E/056 INPARAJAH L.
8 2020/E/062 JENIS M.M. Group 02
9 2020/E/093 MARASINGHE M.P.S.N.
10 2020/E/094 MATHURSHIKA P.
11 2020/E/103 NANDAGGOPAN S.
12 2020/E/133 RESHINTHAN V.
13 2020/E/134 RIFLAN M.M.M. Group 03
14 2020/E/151 SUJANTHAN E.
15 2020/E/153 TENNAKOON H.E.
16 2020/E/162 TITUS T.
17 2020/E/163 UDAYANGA B.G.T.
18 2020/E/191 MADUSHAN S.A.I.
Group 04
19 2020/E/211 KITHUSAN M.
20 2020/E/214 MATHANARAJ R.
21 2019/E/148 THILAKARATHNE K.D.D.M.