0% found this document useful (0 votes)
8 views4 pages

CE9051 - Term Project - E20

Uploaded by

dollarsavinglk80
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
8 views4 pages

CE9051 - Term Project - E20

Uploaded by

dollarsavinglk80
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

HIGHWAY ENGINEERING (CE9051) – TERM PROJECT

1. PROJECT TASK: Design a suitable pavement for the road stretch assigned to your group using

ORN31.

2. The project assessment includes two components

a. Design report

b. Oral presentation

DESIGN REPORT

1. Submit a design report (one per group).

The design report should include the following

A. Cover page

B. Table of contents

C. Introduction

D. Preliminary investigation

E. Data collection

a. Traffic load

b. Material properties

F. Design calculations

a. Traffic

b. Subgrade

c. Pavement structure

G. Construction method

H. Drawings

I. Bill of Quantities

J. References (if any)

K. Appendix (if any)

Clearly state all the assumptions and justifications for your decisions.

1
ORAL PRESENTATION

1. You’re expected to present the details of your design with the aid of any presentation tool.

2. Duration of the presentation (per group)

Oral presentation 10 min

Question and Answer 05 min

Total 15 min

3. The assessment scheme for the final presentation will be as follows

SN Assessment criteria %

01 Project introduction 10

02 Determination of design variables and parameters 30

03 Design of components 30

04 Drawings 10

05 Question and answer 20

4. The schedule of presentations will be announced in due course.

THE EXPECTED WORKLOAD

Hours
Content
L T L/F A

Term Project 01 09 21

L/F – Lab/Fieldwork; A – Assignment (Independent working hours)

You may carry out the lab/field tests with prior permission.

2
Road segments allocation for groups
Group 01

Group 04
Group 03

Group 02
Serial No. Reg. No. Name Group details
1 2020/E/032 DILAXSAN S.
2 2020/E/037 DISSANAYAKA S.S.L.
3 2020/E/038 DISSANAYAKA M.D.M.S.M.B. Group 01
4 2020/E/042 FARSAN M.F.M.
5 2020/E/049 GUNASEKARAN V.
6 2020/E/055 ILZAM UL HAQ M.I.M.
7 2020/E/056 INPARAJAH L.
8 2020/E/062 JENIS M.M. Group 02
9 2020/E/093 MARASINGHE M.P.S.N.
10 2020/E/094 MATHURSHIKA P.
11 2020/E/103 NANDAGGOPAN S.
12 2020/E/133 RESHINTHAN V.
13 2020/E/134 RIFLAN M.M.M. Group 03
14 2020/E/151 SUJANTHAN E.
15 2020/E/153 TENNAKOON H.E.
16 2020/E/162 TITUS T.
17 2020/E/163 UDAYANGA B.G.T.
18 2020/E/191 MADUSHAN S.A.I.
Group 04
19 2020/E/211 KITHUSAN M.
20 2020/E/214 MATHANARAJ R.
21 2019/E/148 THILAKARATHNE K.D.D.M.