OHS-PR-02-03-F07 (A)
JOB/TASK TYPE: Testing & Pre-Commissioning of 132 kV Mobile Substation DATE: 16.12.24
JOB SAFETY PROCEDURE N0: COMPILED BY: DATE: 16.12.24
Name Designation Signature Name Designation Signature
HIRA
ATEEQ KHAN Electrical Engineer
TEAM
Reviewed by: Date: 16.12.24 Signature: Approved by: Mohammed Al-Suwaileh (PM) Date: 16.12.24 Signature:
P.P.E.
Helmet, Safety Goggles, Safety Shoes, ☐Coverall, ☐ Respiratory Musk, ☐ Ear Protection, ☐ Full body Harness, ☐ Hand Protection, ☐ Arc Flash Protection, ☐ Others To be
REQUIRED FOR
Specify: _____CAT-2 Uniform_____________________, ☐ Others To be Specify: __________________________
TASK:
JOB SAFE PROCEDURE ANALYSIS
LIST ALL STEPS IN HAZARDS DANGER / RISK
STEP PREVENTATIVE CONTROLS REQUIRED TO
PERFORMING THIS TASK IN EACH STEP, WHAT COULD CAUSE INJURY,
(INJURIES, DAMAGE, ILLNESS, ACTION TAKEN
No. LOSS, DAMAGE INTERRUPTION, OR
POLLUTION, ETC)
MINIMIZE / ELIMINATE HAZARD
(IN SEQUENCE) POLLUTION?
statement, and other Ensure that all required supporting documents shall be
forms necessary to fulfill available as per PTW requirements.
the request. All the required related documents as identified to be
attached in PTW shall be reviewed and evaluated by
issuer and receiver to ensure that all hazard and risk is
identified and complete.
1.3 Verifying the site Open areas, protruding sharp Lack of Supervision The workplace shall be pre-checked, free from any Action Taken
condition as per objects, falling objects, limited Unidentified Hazards obstruction, and in safe, good working conditions Action Not Taken
requirements mentioned illuminations, and other hazards leading to an Accident. before a combined verification visit. Reasons:
in the application of may cause accidents during the Lack of productivity All Issuer and receiver must be aware of the hazard
Permit to Work by both verification visit. present in the area and must be familiar with the
the Permit Receiver and Unfamiliarity with access to the ingress and egress of the project site.
Permit Issuer. areas.
1.4 Issuance of approved Untrained personnel. Lack of Supervision Permit Issuer and Receiver must be qualified, trained, Action Taken
Permit to Work from Incomplete information on Permit Unidentified Hazards and competent. Action Not Taken
Permit Issuer to Permit to work. leading to an Accident. Permit Issuer shall ensure that the site was visited to Reasons:
Receiver. Lack of productivity ensure that workplace hazards and risks are
adequately identified, and mitigating measures shall be
established.
Permit Issuer and Receiver shall ensure that all the
information required in the permit to work is reviewed,
completed, and signed.
1.5 Verifying the approved Inadequate coordination and area Lack of Supervision Permit to Work shall be displayed at the worksite Action Taken
Permit to Work by the control protocol. Unidentified Hazards Permit Receiver shall not leave the area for the whole Action Not Taken
assigned SEC Consultant. Unauthorized work to be leading to an Accident. duration of permit to work. Reasons:
performed within a defined Lack of productivity Work shall not proceed without the presence of
location and boundary. approved PTW and the Permit Receiver overseeing the
activity.
Permit Receiver shall account all workers under his
Permit to Work before the start of work.
Ergonomic hazard (poor body Incorrect manual handling Access must always be clear and free from any
positioning, repetitive movement, causes Back injuries, Strains obstruction.
excessive force). and sprains, Hand and foot Ensure to plan correct manual lifting procedures and
Expose to High ambient injuries, Musculoskeletal body positioning before the actual lift.
temperature. disorders, Slip, trip and fall Only 20 kg allowed lifting by an individual.
Contact with sharp edges or injuries and Hernias. Use a buddy system if the load exceeds.
objects. Muscular injuries (Back Use hand protection (cotton gloves minimum) during
Exposure to dust through pain, strain, fractures) the handling of materials.
inhalation. Illness and injuries due to Keep hands away from pinch/crash points.
Insufficient Illumination in the bad ergonomics Ensure safe and clear pathways before lifting.
warehouse. Heat Stress (stroke, cramps, Provide material handling equipment for the transport
skin rashes etc.) of heavy and large materials/equipment.
Exhaustion Conduct manual handling training for the workers.
Cuts/laceration/pinch/cras Avoid repetitive movements throughout the work.
h points resulting injuries. Provision of approved PPE and ensure that all workers
Excessive dust irritates to attended proper usage & care of PPE.
the eyes, skin and Provision of rest shelter for outside workers.
respiratory tract. Provide sufficient drinking water and scheduled breaks.
Poor illumination can cause Ensure that all workers are provided with required
headache and eyestrain, mandatory PPEs such as Hard Hat, CAT-2 Uniform,
neck, back, and shoulder Safety Shoes, Hand Gloves, Safety Harness, etc.
strain, falling, tripping, Good lighting is provided to all workspaces, and this is
slipping dropping materials maintained regularly. Fluorescent tubes are checked &
or tools and depression replaced as required.
2.3 Checking equipment Expose to High ambient Heat Stress (stroke, cramps, Provision of rest shelter for outside workers. Action Taken
functionality, safety, and temperature. skin rashes etc.) Provide sufficient drinking water and scheduled breaks. Action Not Taken
good working condition. Poor Access / Egress at the Exhaustion Designate a spotter to control the traffic movement in Reasons:
workplace. Injury due to Slip, Trip and the workplace.
Incorrect manual handling/ lifting fall on the same level. Any obstructions shall be moved and kept materials
of material. Incorrect manual handling away from any access. Keep work area free from loose
Ergonomic hazard (poor body causes Back injuries, Strains tools and materials.
positioning, repetitive movement, and sprains, Hand and foot Ensure to plan correct manual lifting procedures and
excessive force). injuries, Musculoskeletal body positioning before the actual lift.
OHS Forms Procedure Reference Revision Number Revision Date
Page |4 JOB SAFE PROCEDURE OHS-PR-09-03-F07 (A) 0 MAY 2021
JOB SAFE PROCEDURE
OHS-PR-02-03-F07 (A)
Exposure to excessive noise. disorders, Slip, trip and fall Only 20 kg allowed lifting by an individual.
injuries and Hernias. Use a buddy system if the load exceeds.
Muscular injuries (Back Use hand protection (cotton gloves minimum) during
pain, strain, fractures) the handling of materials.
Illness and injuries due to Keep hands away from pinch/crash points.
bad ergonomics Ensure safe and clear pathways before lifting.
Hearing impairment, Provide material handling equipment for the transport
temporary or permanent of heavy and large materials/equipment.
hearing loss. Conduct manual handling training for the workers.
Avoid repetitive movements throughout the work.
Ensure that all workers are provided with required
mandatory PPEs such as Hard Hat, CAT-2 Uniform,
Safety Shoes, Hand Gloves, Safety Harness, etc.
Earplugs or earmuff shall be worn properly to
effectively reduce the noise to a permissible level
3. Housekeeping (clearing the work area)
3.1 Before housekeeping, Inadequate PPE use Inappropriate/Not wearing Special personal protective equipment must be Action Taken
wearing personal PPE increases the risk of observed like coverall clothing, rubber gloves, Action Not Taken
protective equipment injury of burns, cuts, respiratory equipment, clear goggles, etc. Reasons:
such as safety gloves and punctures, electrocution,
masks must be fulfilled slips etc.
by the personnel
involved.
3.2 Removal of tools, Improper handling and storage of Injury due to Slip, Trip and Tools and other materials should be properly stacked Action Taken
equipment, and other materials fall on the same level and arranged. Action Not Taken
excesses/ unused Scattered tools, excess materials, Materials should be stored only in the designated area Reasons:
materials manually. etc. and in the shaded area.
Labeling of storage box (good items, scrap/damage
items, by capacity, etc.)
Damage tools and equipment must be returned to the
warehouse/store for repair or replace immediately.
Facilitate training for manual handling.
4.2 Verifying the site Poor housekeeping. Significant property and Permit Receiver shall ensure that housekeeping is done Action Taken
condition as per Undisposed waste materials. appurtenances damage before, during, and after the work. Action Not Taken
requirements mentioned Unaccounted workers. Governmental violation All waste materials generated from work shall be Reasons:
in the closing of Permit Unsecured electrical equipment Environmental complaint properly disposed of and shall not be left unattended
to Work by both the /energized equipment. Loss of production at the worksite.
Permit Issuer and Permit Poor storage of chemical, Accident resulting serious Electrical equipment shall be properly secured;
Receiver. flammable and combustible injury or death to worker. distribution board closed and padlocked.
materials, etc. Significant cost due to All materials used at the site, such as chemicals,
Unattended unsafe condition. damages. flammable and combustible materials, shall be stored
Unfamiliarity with access to the at the designated storage at the end of each day.
areas and the present Mobile equipment shall properly park on a designated
construction hazard. equipment laydown.
Ensure that all workers are accounted for, and there
was no incident/accident occurred, which is not
reported.
All Issuer and receiver must be aware of the hazard
present in the area and must be familiar with the
ingress and egress of the project site.
4.3 Signing/clearing of the Inadequate communication. Accident resulting serious Work permit issuer and receiver must be qualified, Action Taken
Permit to Work by the Untrained personnel. injury or death to worker trained, and competent. Action Not Taken
Permit Issuer upon Proper communication should be observed. Reasons:
verification of site
condition and
satisfactorily comply
with the requirements
mentioned.
4.4 Keeping and recording of Inadequate communication. Accident resulting serious Work permit issuer and receiver must be qualified, Action Taken
the completed and Untrained personnel. injury or death to worker trained, and competent. Action Not Taken
signed Permit to Work Proper communication should be observed. Reasons:
by ensuring that the
permit to work register is
duly accomplished.