0% found this document useful (0 votes)
46 views1 page

Tender - 240515 - JTI Marocco - 0.1.2 JTI - Second Floor

Uploaded by

Najim
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
46 views1 page

Tender - 240515 - JTI Marocco - 0.1.2 JTI - Second Floor

Uploaded by

Najim
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

LEGEND

Building materials
A7 A6 A5 A4 A3 A2 A1' A1
brickwork existing terrain
B1 B1

insulation planned terrain

reinforced concrete plot boundary


B1' B1'

drywall set-back

glass fire wall


B2 B2

A7 A6 A5 A4 A3 A2 A1' A1

+4,20 FFL
finish floor level

+4,00 SFL
6.15 4.90 4.90 4.90 4.90 4.90 4.90 4.90 4.90 4.90 4.90 4.90 4.90 4.90 4.90 4.90 4.90 4.90 4.90 4.90 4.90 4.90 4.90 4.90 4.90 4.90 4.90 50 4.90 4.915 4.785 5.00 4.90 4.90
slab floor level

±0,00 FFL=SFL
134.695 slab = finish floor level
46.57 88.125

41 60 5.50 60 9.20 60 9.20 60 9.20 60 9.15 60 9.30 50 9.30 50 9.275 525 9.30 50 9.30 50 9.30 50 9.30 50 9.30 50 9.30 50 235

25 16 25 35.30 30 9.70 30 76.21 30 6.64 30 4.50 26 225

22.835 21.15 2.585 15.465 2.00 2.00 2.00 2.00 2.00 16.00 2.00 2.00 2.00 2.00 2.00 14.00 2.00 2.00 2.00 2.00 2.00 12.66

A B C D E F

41

24 41
PH 50

1
1 1

60

2.355
4.95

4.40

7.00
G H I J K L M N OP R S T

2 2.09
2

50
WC / Shower M
NGF: 39.85m²
U: 56.96m
2.08
Lockers M
NGF: 98.24m²
U: 42.94m
Ventilation blind Ventilation blind Ventilation blind Ventilation blind Ventilation blind Ventilation blind Ventilation blind Ventilation blind Ventilation blind

sm

41

41
PH 50 PH 50 PH 50 PH 50 BA (H 20) PH 50 PH 50 PH 50 PH 50 PH 50
2.00

ok
Staircase

50
NGF: 39.04m²

e
U: 27.45m

ex
2' 2'

50
ha
us
t

3.065
2.07 2.06
Vestibule Lockers neutral
NGF: 8.07m² NGF: 31.00m²
7.50

7.00
U: 11.36m U: 27.56m

2.13

20.11

30
Lokers Extension

16.95
NGF: 322.29m²
U: 74.85m
2.01

PH 50
Corridor
NGF: 29.24m²
2.05 U: 27.07m
Corridor 2.23
NGF: 40.77m² Staircase
U: 42.36m NGF: 22.58m²
U: 20.08m

sm

3.40
ok
e
ex
3 3
50

ha
us
t
2.10
2.22
AHU
NGF: 1137.81m²
fresh air grille

12.00

12.50
30
Vestibule W 2.03 U: 260.81m
NGF: 7.63m² Elevator
top level wall:

U: 11.05m NGF: 5.77m²


U: 9.65m

sm

sm

sm

sm

sm

sm

sm
ok

ok

ok

ok

ok

ok

ok
e

e
2.12 fresh air grille

ex

ex

ex

ex

ex

ex

ex
WC / Showers W

ha

ha

ha

ha

ha

ha

ha
NGF: 29.00m²
56.91

U: 44.50m

us

us

us

us

us

us

us
t

t
2.11
7.50

7.00

Lockers W
NGF: 124.12m² 2.02
2.04 Storage
U: 50.93m Schaft
NGF: 4.89m² NGF: 28.69m²
U: 26.49m
U: 8.85m

6.285
fresh air grille
D' G' J' M'
PBA (40x110) PBA (40x110) PBA (40x110) PBA (40x110) PBA (40x110) PBA (40x110) PBA (40x110) PBA (40x110) PBA (40x110)
PPR (40x93) PPR (40x93) PPR (40x93) PPR (40x93) PPR (40x93)

4 4
50

50
15

15
57

57
50

5 5

fresh air grille


±0.00 FFL=SFL
2.015
4.40

Shaft
NGF: 10.90m²
U: 13.80m
5.20

D E G H J N R S

7.79
30

13.51

2.14
Corridor
9.96

NGF: 17.06m²
6 U: 24.52m 6
L

sm
5.96

ok
5.19

e
ex 6' 6'
ha
us
t
sm
ok
e

2.17
Staircase
ex

NGF: 14.27m²
ha

U: 16.72m
us

7 7
50

t
30

fresh air grille

Level neighbour:

7.79
Ventilation blind
2.00

PH 50
5.19

54.15
1.995

8 8
Ventilation blind
2.005

PH 50
5.165

7.75
9 9
8.00
25.38

47.30

47.30
5.165

sm 9' 9'
ok
e
ex
ha
us 2.18
AHU / Compressors /Vacuum
t NGF: 683.71m²
U: 127.53m

10 10
Ventilation blind

PH 45
2.00

PH 50

7.75
5.165

2.00
36.34

Ventilation blind
2.00

PH 50

11 11
2.00
5.19

Ventilation blind
2.00

PH 50

7.79
12 12
50

2.00

attention! enough space for the fire gate


between wall and steel structure
Ventilation blind

sm
2.00

ok
PH 50

e
5.19

ex 12' 12'
ha
us
t
2.00

13 13
10.46

Ventilation blind
2.00

PH 50

D'' E'' F'' G'' H'' I'' J'' K'' L'' M''

7.79
fresh air grille
5.20

14 14
1.14

1.14
50

50

50

50
15 15
The Fire Engineering Report from the local
architect / engineer must be observed !
A
5.20

7.79
sm

sm

sm

sm
17.00

oke

oke

oke

oke
2.19
10.46

10.46

exh
exh

exh

exh
Corridor
NGF: 24.58m²

16 16

All measures and levels are to be checked on site !


U: 25.62m

aus
aus

aus

aus

t
t

t
Any gueries to be clarified with the architect !
152.485
5.19

16' 16'

140.07
305

17 17
50

Discrepancies in the construction are to be informed of the construction


fresh air grille

7.79
sm

sm

sm

sm

sm
management immediately.
oke

oke

oke

oke
D' F G' I J' K M M'

ke
exh

exh

exh
exh

exh
5.19

aus

aus

aus
a

aus
ust
All given door and balustrade heights refer to ready floor and are a shell
Ventilation blind

t
2.00

PH 50

mass.
9.855

18 18
2.00

Ventilation blind
2.00

PH 50
5.165

7.75
sm

sm

sm

sm
sm

sm

sm

oke

oke

oke

oke
oke

oke

oke

exh

exh
exh

exh
exh

exh

exh

19 19
50

aus

aus
aus

aus
aus

aus

aus

t
t

t
t

t
5.00

sm
ok
e
ex
5.165

19' 19'
ha
us
t local
Ventilation blind

civil
2.00

PH 50
top level big wall:

engineer: TME Tanger Med Engineering


9.835

20 20
2.00

7.75
sm

sm

sm

sm

sm

sm

sm

sm

sm

sm
Port Tanger Med, TMPC, secteur 4, Oued Rmel, Province Fahs Anjra
64.66

oke

oke

oke

oke

oke

oke

oke

oke
ke

ke
exh

exh

exh

exh

exh

exh

exh

exh
exh

exh
5.165

Ventilation blind

Tél: (+212) 539 379 072 - Email: [email protected]


aus

aus

aus

aus

aus

aus

aus

aus
aus

aus
2.00

PH 50

t
t

t
2.00

21 21
50

Ventilation blind
2.00

sm
PH 50

ok
e
ex
5.165

h au
st
Salah-eddine SADDOUGUI
2.00

local

7.75
sm

sm

sm

sm

sm

sm

sm

sm

sm

sm
o

oke
o

oke

o
N°Autorisation: 2626 - BO n°5376
ke

ke

ke

ke

ke

ke
ke

ke
exh

exh
e

e
exh
exh
xha

xha

xha

xha

xha

xha
responsible
9.835

22 22

aus

aus
aus
aus

N°1, rue Ibnalhaytam, 90 020 Tanger


Ventilation blind

u
st

st

st

st

st

st
t

t
t
t
2.00

PH 50

architect: Tél : (+212) 08 08 50 68 35


Email: [email protected]

78.05

78.05
5.165

22' 22'
5.00

23 23
50

7.75
sm

sm
sm

sm

sm

sm

sm

sm

sm

sm
oke

oke
sm
oke

oke

oke

oke

oke

oke

oke

oke
65.72

ok
Ventilation blind

e
exh

exh
exh

exh

exh

exh

exh
exh

exh

exh
2.00

ex
PH 50
5.165

ha
aus

a
aus

aus

aus

aus

aus
a

a
ust
ust

ust

ust
us
t
t
t

t
1.00

2.20
AHU
NGF: 1099.71m²
U: 210.82m
Ventilation blind
9.835

24 24
2.00

PH 50
1.00
5.165

Ventilation blind
2.00

PH 50

JTI Logo
on Wall

7.75
7 21 35 50 63

Flagpoles

25 25
50

parking area future parking area

1 8 22 36 51
4.00

A7 A6 A5 A4 A3 A2 A1' A1

B1 B1

sm ly
ok B1'
Ro
of on Gatehouse
205 m2
B1'

e
ex
5.165

25' 25'
B2 B2

ha A7 A6 A5 A4 A3 A2 A1' A1

us
t
Ventilation blind

10 steps
16x25
A B C D E F

64 78
2.00

PH 50

1 1

G H I J K L M N O P R S T

2 2

F.F.L. = ± 0.00 =

54,85
smoke exhaust
2' 2'
9.835

26 26 3 finish level 3 smoke exhaust

top level wall:


smoke exhaust fresh air grille smoke exhaust smoke exhaust smoke exhaust smoke exhaust smoke exhaust smoke exhaust fresh air grille
fresh air grille

56.91
D' G' J' M'
2.00

4 4
5 5

7.75
D E G H J N R S
sm

sm

sm

sm

sm

sm

sm

sm

sm

sm
6 6
L
oke

oke

oke

oke

oke
oke

oke

oke

oke
smoke exhaust 6' 6'
ke

smoke exhaust

7 7

fresh air grille


Level neighbour:
exh

exh

exh
exh

exh

exh

exh

exh
exh

exh

54.15
Ventilation blind

8 8
5.165

aus

aus

aus
aus

aus

aus

aus

aus
aus

aus

10 steps
16x25
2.00

PH 50

Waste center
9 9
t

t
t

t
t

walkway
9' 9'

smoke exhaust
Production Future
Building
10 10

Extension
19.285 m2 4.640 m2
11 11

12 12
2.00

12' 12'

smoke exhaust

13 13

27 27
50

D'' E'' F'' G'' H'' I'' J'' K'' L'' M''

14 14

15 15

smoke exhaust smoke exhaust smoke exhaust smoke exhaust


16 16
Ventilation blind

16' 16'

17 17
top level small wall:
2.00

fresh air grille


sm
PH 50

61.83 D' smoke exhaust F smoke exhaust


G' smoke exhaust
I smoke exhaust
J' K
smoke exhaust
M M' smoke exhaust

ok 18 18

e
ex
5.165

smoke exhaust smoke exhaust smoke exhaust smoke exhaust smoke exhaust smoke exhaust

h
19 19

au Level neighbour: smoke exhaust


19' 19'

st 59.07

top level big wall:


1.00

20 20

64.66
smoke exhaust smoke exhaust smoke exhaust smoke exhaust smoke exhaust smoke exhaust smoke exhaust smoke exhaust smoke exhaust smoke exhaust

21 21

7.75
sm

sm

sm

sm

sm

sm

sm

sm

sm

sm
smoke exhaust

smoke exhaust smoke exhaust smoke exhaust smoke exhaust smoke exhaust smoke exhaust smoke exhaust smoke exhaust smoke exhaust smoke exhaust

22 22
o

o
Ventilation blind

ke

ke

ke

ke

ke

ke

ke
ke

ke

ke

22' 22'
2.00

PH 50

23 23
e

e
exh

exh

exh

smoke exhaust smoke exhaust smoke exhaust smoke exhaust smoke exhaust smoke exhaust smoke exhaust smoke exhaust smoke exhaust smoke exhaust
xha

xha

xha

xha

xha

xha

xha
smoke exhaust
9.835

28 28 24 24
aus

aus

aus

top level small wall:


u

u
61.83
st

st

st

st

st

st

st
t

25 25

smoke exhaust
25' 25'
1.00

26 26

smoke exhaust smoke exhaust smoke exhaust smoke exhaust smoke exhaust smoke exhaust smoke exhaust smoke exhaust smoke exhaust smoke exhaust

27 27

smoke exhaust

smoke exhaust smoke exhaust smoke exhaust smoke exhaust smoke exhaust smoke exhaust smoke exhaust smoke exhaust smoke exhaust smoke exhaust

28 28
Ventilation blind

28' 28'
2.00
5.165

28' 28'
PH 50

29 29

fresh air grille


smoke exhaust

Rain water evacuation according MEP plan


30 30
smoke exhaust

5 Steps
17x 27
17 x 27
7 Steps

5
10 steps

5
16x25

17 5x 27
6 Steps
31 31
-1.20
Loading area

A C D'' E'' F'' G'' H'' I'' J'' K'' L'' M'' 31' O 31'

32 32

P T

29 29
-0.85 = 54.00
50

Waste water treatment center


115m2
fresh air grille

Sprinkler Center
150m2
Loading and parken

sm

7.75
ok
e
ex
ha
us
t
5.165

30

12.67

sm

30 30
9.985

ok

1516

31
e

2.21
3.40

Staircase
ex

NGF: 21.23m² fall protection fall protection


U: 19.29m
ha
us
t

5 Steps
18 x 27
30
5.315

175 x 27
7 Steps

5.515

7.75
2.985

17 5 x 27
6 Steps

31 31
50

15 26
41

-1.20
Loading area

A C D'' E'' F'' G'' H'' I'' J'' K'' L'' M'' 31' O 31'

15 26 50 15.685 118.10
www.pasucha-klepzig.com

7.75
41 2.30 30 6.245 30 6.435 30 71.27 30 46.53 1615

134.695
Pasucha Klepzig Architekten GmbH - R merstra e 100a - D-54293 Trier
fon +49 (0) 651-97514-0 fax +49 (0) 651-97514-30 mail [email protected]

15.95 11.77 11.77 11.77 11.77 11.77 11.77 94 11.51 11.51 11.51 11.51 50

32 32

Tender
P T

Client JTI Maroc


Office N°308 & 313, Flour 3, Ibn BAtouta Mall
Avenue Youssef Ben Tachfine, Tangier

Project New Factory Marocco


Tetuan Industrial Park
Marocco

Content: 2nd floor

legally binding signature of client legally binding signature of architect


2nd. floor plandata: scale date proj. nr. sign. layout size layout nr.
1:250 2024-05-15 001 KT 881 x 1135 0.1.2

You might also like