All Performas of Lab
All Performas of Lab
Additional Works B2
CONTRACTOR: CONSULTANT:
ACES:
CONTRACTOR: CONSULTANT:
ACES
Strength Strength
Load in Area
Cylinder # Testing Date: Age/Days (Psi) (Psi)
(KN) cm2
Actual Correction
Contractor: Consultant:
CONTRACTOR: CONSULTANT:
182.4 28.27
Area Of Cylinder: Sq cm Sq Inch
Remarks :
CONSTRUCTION OF CIVIL INFRASTRUCTURE WORKS INCLUDING ROAD WORKS, MAIN TRUNK
SWEWR PACKGE-II
DEFENCE HOUSING AUTHORITY MULTAN
CONTRACTOR: CONSULTANT:
Tested By:
Material Engineer: Senior Lab Technician: Material Engineer:
RESIDENTIAL CITY DHA MULTAN SECTOR-D
Additional Works B2
CONTRACTOR: CONSULTANT:
ACES
Size (In) Size(mm) Wt Ret (g) Cum Ret(g) Cum Ret % Passing % Specification %
4" 100
3" 75
2" 50.08
1" 25
¾" 19
½" 12.5
⅜" 9.5
#4 4.75
#8 2.36
# 10 2.00 0 0.0 100.0
# 16 1.18
# 30 600 um
# 40 425 um 6 0.9 99.1
# 50 300 um
# 80 180 um
# 100 150 um
# 200 0.075 um 613.0 93.3 6.7
PAN
Station
Compaction Equivalent
Relative Density (%) 96.1
Status: PASS
Remarks
CONTRACTOR: CONSULTANT:
MOISTURE CONTENT
1 CAN NO. No
2 Wt. OF CAN GM MC
3 Wt.OF CAN +WET SOIL GM
4 Wt.OF CAN +DRY GM By
5
6
Wt.OF WATER
Wt.OF DRY SOIL
GM
GM
Speedy
7 WATER CONTENT % 12.6
FIELD DENSITY
1 Wt. OF WET SOIL +CONT GM 5327
2 Wt. OF CONT GM 20
3 Wt. OF WET SOIL FROM HOLE GM 5307
4 Wt. OF SAND+CONE BEFORE TEST GM 8420
5 Wt. OF SAND+CONE AFTER TEST GM 3080
6 Wt. OF SAND To FILL HOLE +CONE GM 5340
7 Wt. OF SAND TO FILL CONE GM 1570
8 Wt. OF SAND TO FILL HOLE GM 3770
9 UNIT Wt. OF SAND GM/CC 1.390
10 GROSS VOL. OF HOLE CC 2712
11 Percentage Retained 3/4'' From Hole % -
12 Vol.Retain 3/4'' From Hole GM/CC -
13 Percentage Passing 3/4'' From Hole % -
14 WET UNIT Wt. OF SOIL GM/CC 1.957
15 DRY UNIT Wt. OF SOIL GM/CC 1.738
16 MAX. DRY DENSITY GM/CC 1.933
17 OPT. M.C % 12.4
18 Adjusted Proctor GM/CC -
19 ACHIVED COMPACTION % 89.9
20 REQUIRED COMPACTION % 93.0
21 REMARKS FAIL
CONRACTOR CONSULTANT
MOISTURE CONTENT
1 CAN NO. No B
2 Wt. OF CAN GM 45.2
3 Wt.OF CAN +WET SOIL GM 196.3
4 Wt.OF CAN +DRY GM 192.2
5 Wt.OF WATER GM 4.1
6 Wt.OF DRY SOIL GM 147.0
7 WATER CONTENT % 2.8
FIELD DENSITY
1 Wt. OF WET SOIL +CONT GM 11427
2 Wt. OF CONT GM 20
3 Wt. OF WET SOIL FROM HOLE GM 11407
4 Wt. OF SAND+CONE BEFORE TEST GM 12460
5 Wt. OF SAND+CONE AFTER TEST GM 2270
6 Wt. OF SAND To FILL HOLE +CONE GM 10190
7 Wt. OF SAND TO FILL CONE GM 3237
8 Wt. OF SAND TO FILL HOLE GM 6953
9 UNIT Wt. OF SAND GM/CC 1.416
10 GROSS VOL. OF HOLE CC 4910
11 Vol.Retain 3/4'' From Hole % 2281
12 Percentage Retained 3/4'' From Hole GM/CC 20
13 Percentage Passing 3/4'' From Hole % 80
14 WET UNIT Wt. OF SOIL GM/CC 2.323
15 DRY UNIT Wt. OF SOIL GM/CC 2.260
16 MAX. DRY DENSITY GM/CC 2.265
17 OPT. M.C % 5.6
18 Adjusted Proctor GM/CC 2.342
19 ACHIVED COMPACTION % 96.5
20 REQUIRED COMPACTION % 100
21 REMARKS FAIL
CONRACTOR CONSULTANT
4" 100
3" 75
2" 50.08
1" 25
¾" 19
½" 12.5
⅜" 9.5
#4 4.75
#8 2.36
# 10 2.00 4 0.5 99.5
# 16 1.18
# 30 600 um
# 40 425 um 13 1.8 98.2
# 50 300 um
# 80 180 um
# 100 150 um
# 200 0.075 um 190.7 25.5 74.5
PAN
Remarks
CONTRACTOR CONSULTANT
S.L.T
L.T M.E M.E
Infrastructure Development works of PC-01 Sector-N & PC-04 Sector-I
(Package-02) Infrastructure Development works of SRA Gate Road work MB-05
Pakistan Square to SRA Gate & PC-02 (From Pakistan Square to MB-01)
(Package-01) DHA Multan
CLIENT: CONTRACTOR:
CONSULTANT:
ACES
DHA
Soils Classification /Atterburg Limits
Adaptation of AASHTO T 89 - 90 - 80 (Method-A)
25.0
Water Content %
20.0
15.0
15 20 25 30 35
No. of Blows
Determintion No : 2 3 4 5
Wt of wet soil + Mould : g 8406 8719 8959 8904
Wt of wet soil : g 4156 4469 4709 4654
Wet density : gm/cc 1.949 2.096 2.209 2.183
Dry density : gm/cc 1.805 . 1.902 1.965 1.913
Moisture content : % A C F C
Average Plastic Limit: 48.50 50.60 50.20 51.60
Wt of wet soil +Cntainer : g 273.1 285.0 281.7 278.3
Wt of dry soil +Cntainer : g 256.5 263.3 256.2 250.3
Wt of water : g 16.6 21.7 25.5 28.0
Wt of dry soil : g 208.0 212.7 206.0 198.7
Moisture content : % 8.0 10.2 12.4 14.1
2.000
1.950
Dry Density
1.900
1.850
1.800
1.750
7.0 8.0 9.0 10.0 11.0 12.0 13.0 14.0 15.0
Moisture contant
Blows/Lift
Kg / Cm2
0 0 0 0 0
0.5 0.64 3.0 0.4 8.0 1.1 15.0 2.0
1 1.27 10.0 1.3 16.0 2.1 25.0 3.3
1.5 1.91 18.0 2.4 28.0 3.7 36.0 4.8
2.0 2.54 70.35 28.0 3.7 70.3 5.3 38.0 5.0 70.3 7.1 48.0 6.3 70.3
2.5 3.18 38.0 5.0 46.0 6.1 58.0 7.7
3.0 3.81 50.0 6.6 58.0 7.7 71.0 9.4
3.5 4.45 60.0 7.9 71.0 9.4 80.0 10.6
4.0 5.08 105.53 72.0 9.5 105.5 9.0 80.0 10.6 105.5 10.0 88.0 11.6 105.5
5.0 6.35 88.0 11.6 94.0 12.4 101.0 13.3
6.0 7.62
7.0 8.89
Swell Reading 109 25.6303
15
Blows Per Mold 10 30 65
Final Height mm 0.00 0.00 0.00
Unit Load (Stress) kg / cm2
CONTRACTOR:
24/10/2022
Density Determination
65
2134
9792
5296
4496
2.107
11.80
1.884
2.556
3
65
Tested
CBR
%
9.0
11.0
15
Unit Load (Stress) kg / cm2
12
0
0 1.27 2.54 3.81 5.08 6.35
Penetration mm
CONSULTANT:
16.0
14.0
Soaked CBR %
12.0
10.0
8.0
6.0
Passing 60 mm (%) -
PL (%) - -
T-90
PI Non Plasstic Max 6
Contractor: CONSULTANT:
CONTRACTOR: CONSULTANT:
ACES
SIEVE ANALYSIS AASHTO -T 27
Date: Sub Base Class B 9/5/2022
MB-05 Stock Pile
4" 100
3" 75
¾" 19
½" 12.5
#8 2.36
# 16 1.18
# 30 600 um
# 50 300 um
# 80 180 um
# 100 150 um
PAN
Remarks
Contractor: CONSULTANT:
CONSULTANT:
ACES
ALYSIS AASHTO -T 27
9/5/2022
MB-05 Stock Pile
1022
Specification %
(class B)
100
55 ~ 85
40 ~ 70
30 ~ 60
20 ~ 50
10 ~ 30
5 ~ 15
CONSULTANT:
No of Blows Nos
Container No Nos
tic
Wt. of Can Gms
as
Wt. Wet Soil+Can Gms
Pl
Wt. Dry Soil+Can Gms
Water Content %
15
Water Content %
10
5 10 15 20 25 30 35 40 45 50
No. of Blows
Determintion No : 1 2 3 4
Wt of wet soil + Mould : g 8529 8845 9104 9008
Wt of wet soil : g 4499 4815 5074 4978
Wet density : gm/cc 2.110 2.258 2.380 2.335
Dry density : gm/cc 2.045 2.159 2.241 2.180
Moisture content : % D K C M
Wt of container : g 55.3 51.0 56.0 54.0
Wt of wet soil +Cntainer : g 263.2 274.0 291.8 288.5
Wt of dry soil +Cntainer : g 256.8 264.2 278.0 273.0
Wt of water : g 6.4 9.8 13.8 15.5
Wt of dry soil : g 201.5 213.2 222.0 219.0
Moisture content : % 3.2 4.6 6.2 7.1
2.250
2.200
Dry Density
2.150
2.100
2.050
2.000
3.0 4.0 5.0 6.0 7.0
Moisture contant
CONTRACTOR: CONSULTANT:
ACES
10/5/2022
2132
7.0
ial Engineer:
Infrastructure Development works of PC-01 Sector-N & PC-04 Sector-I (Package-02)
Infrastructure Development works of SRA Gate Road work MB-05 Pakistan Square to SRA Gate
& PC-02 (From Pakistan Square to MB-01)(Package-01) DHA Multan
CONSULTANT:
CONTRACTOR:
ACES
California Bearing Ratio
Adaptation of ASTM D 1883 - AASHTO T-193
Description: SUB BASE Request No:
Blows/Lift
Kg / Cm2
100.0
90.0
Soaked CBR %
80.0
70.0
60.0
50.0
2.000 2.050 2.100 2.150 2.200 2.250 2.300 2.350 2.400
SAND EQUIVALENT
AASHTO T - 176
Determination 1 2
CONTRACTOR: CONSULTANT:
D EQUIVALENT
SHTO T - 176
9/5/2022
11/5/2022
27.3
Minimum 25%
CONSULTANT:
H Absorption % ((B-A)/A))*100
CONTRACTOR: CONSULTANT:
9/5/2022
12/5/2022
2.652
2.680
2.728
1.049
Average
CONSULTANT:
SIEVE SIZE A B C D
PASSING RETAINED
1-½" 1" 1250 - - -
1" 3/4" 1250 - - -
3/4" 1/2" 1250 2500 - -
1/2" 3/8" 1250 2500 - -
3/8" 1/4" - - 2500 -
1/4" #4 - - 2500 -
#4 #8 - - - 5000
TOTAL : 5000 ± 10 5000 ± 10 5000 ± 10 5000 ±
A CLASS A
C SPHERES 12
Remarks 50 % Maximum
CONTRACTOR: CONSULTANT:
OMC 6.2
Sr No RTD ( %) Adjusted M.D.D S.No RTD(%) Adjusted M.D.D Sr No RTD ( %) Adjusted M.D.D
###
39 0+300 48.7 48.6 49.0 48.8 865.0 617.6 979.6 362.0 2.389 2.453 97.4
0+240-0+340
40 0+250 48.5 48.3 49.1 48.6 871.0 517.1 882.0 364.9 2.387 2.453 97.3
41 0+200 55.0 55.4 55.2 55.2 1006.0 596.8 1017.0 420.2 2.394 2.453 97.6
0+140-0+240
42 0+150 59.9 60.4 60.1 60.1 1058.0 628.3 1069.3 441.0 2.399 2.453 97.8 97
43 0+100 55.0 55.4 55.2 55.2 1006.0 596.8 1017.0 420.2 2.394 2.453 97.6
0+040-0+140
44 0+050 59.9 60.4 60.1 60.1 1058.0 628.3 1069.3 441.0 2.399 2.453 97.8
45 0+000-0+040 0+020 51.5 51.3 50.4 51.1 997.5 587.0 1005.4 418.4 2.384 2.453 97.2
Contractor: Consultant:
Test Number 1 2
Remarks:
Contractor: Consultant:
Wt.of Filter befor Test 20.2 1/2'' 364.2 16.0 84.0 75.1-89.1 75-90
Wt.of Filter after Test 22.2 3/8'' 587.3 25.8 74.2 65.7-79.7 60-80
Wt.of Aggregte after Test 2274.4 #4 1115.5 49.0 51.0 46.3-54.3 40-60
6 0 4 '' ''
90
90
80
80
70
70
Percente%%
PassingPercente
60
60
Passing
50
50
40
40
30
30
20
20
10
10
0
0 25.4
0.01
0.01
0.075
0.075 0.1
0.1
0.150
0.150
0.30
0.30
0.42
0.42
0.60
0.60 1
1
1.18
1.18
2.00 2.38
2.00 2.38
4.75
4.75 10
9.5 12.5
10 12.5
9.5
19.
19. 25.4 38.5
38.5
50
50
63.5 75
63.5 75 100
100
Grain00 Size55 mm
0
0
0
0
Contractor: Consultant:
DESCRIPTION 1
A Temprature of Water 25
Remarks:
Contractor: Consultant:
Specimen No. 1 2 3 4 5 6 7 8 9
Wt. of Dry Specimen in Air 1243.6 1242.2 1252.6 1252.1 1250.9 1245.0 1248.0 1244.1 1249.5
Wt. of SSD Specimen 1259.0 1256.0 1265.0 1266 1264.8 1259.0 1261.0 1259.3 1266.1
COMPACTED SPECIMEN
Wt. of Specimen in Water 751.0 749.0 755.0 757.0 753.8 750.0 751.0 751.3 756.1
Volume Cubic Centimeter 508.0 507.0 510.0 509.0 511.0 509.0 510.0 508.0 510.0
Bulk Sp. Gravity (Gmb) 2.448 2.450 2.456 2.460 2.448 2.446 2.447 2.449 2.450
Max. Sp. Gravity of Mix (GMM) 2.593 Bulk Sp. Gravity of Agg (Gsb) 2.732
4.15 95.85
CONTENT
Air Voids (Gmm-Gmb/Gmm)*100 5.5 483 To 495 - 1.09 523 To 535 - 0.96
VOIDS
Measured 94 97 95 85 90 86 77 80 83
STABILITY
Volume Correction 1.04 1.04 1.00 1.00 1.00 1.00 1.00 1.04 1.00
Adjusted Stability 1214 1253 1180 1056 1118 1068 956 1033 1031
Contractor: Consultant:
Wt.of Filter befor Test 21.0 3/4'' 106.6 4.6 95.4 90-100 90 - 100
Wt.of Filter after Test 23.5 3/8'' 660.5 28.5 71.5 65-79 56 - 80
#200 #100 #50 #40 #3 #1 #1 #8 #4 #3/8'' 1/2'' 3/4'' 1'' 1/1/2 2'' 2/1/2 3'' 4''
100 0 6 0 ''
90
80
70
Passing Percente %
60
50
40
30
20
10
0 0.075 0.150 0.30 0.42 0.60 1.18 2.00 2.38 4.75 9.5 12.5 19. 25.4 38.5 50 63.5 75
0.01 0.1 Grain
0 Size
5 mm
0 1 10 0 100
Contractor: Consultant:
CONTRACTOR: CONSULTANT:
ACES
MAXIMUM SPECIFIC GRAVITY OF PAVING MIXTURE
AASHTO T-209
Description: Asphalt Binder Course Date: 27/11/2020
DESCRIPTION 1
A Temprature of Water 25
Remarks:
Contractor: Consultant:
CONTRACTOR: CONSULTANT:
ACES
HOT MIX DESIGN BY MARSHALL METHOD
AASHTO T-245/74 & ASTM T-559/72 & MS-2
Description: Asphalt Binder Course Date: 29/11/2020
Specimen No. 1 2 3 4 5 6 7 8 9
Wt. of Dry Specimen in Air 1235.2 1243.5 1247.5 1258.8 1257.0 1236.0 1254.1 1245.6 1259.4
Wt. of SSD Specimen 1248.5 1256.3 1261.2 1272.7 1269.8 1250.4 1267.0 1258.5 1271.0
COMPACTED SPECIMEN
Wt. of Specimen in Water 743.3 747.3 749.7 759.1 757.8 745.9 757.0 750.5 758.2
Volume Cubic Centimeter 505.2 509.0 511.5 513.6 512.0 504.5 510.0 508.0 512.8
Bulk Sp. Gravity (Gmb) 2.445 2.443 2.439 2.451 2.455 2.450 2.459 2.452 2.456
Max. Sp. Gravity of Mix (GMM) 2.584 Bulk Sp. Gravity of Agg (Gsb) 2.744
CONTENT
By Wt. of Mix % (Pb) 4.05 % of Agg by Total Wt. of Mix (Ps) 95.95
ASPHALT
Air Voids (Gmm-Gmb/Gmm)*100 5.2 483 To 495 - 1.09 523 To 535 - 0.96
VOIDS
Measured 72 77 79 68 66 63 62 69 61
STABILITY
Volume Correction 1.04 1.00 1.00 1.00 1.00 1.04 1.00 1.04 1.00
Adjusted Stability 1358 1397 1433 1233 1197 1188 1124 1302 1106
Flow
10.8 11.6 12.0 Loss of Stability % 15.6
Average Flow (mm) 11.5
Contractor: Consultant:
3
COMBINED GRADATION
S. No Size % 3" 2.1/2" 2" 1.1/2" 1" 3/4" 1/2" 3/8" #4 #8 #16 #30 #50 #100 #200
COMBINED GRADATION
S. No Size % 2" 1.1/2" 1" 3/4" 1/2" 3/8" #4 #8 #16 #30 #50 #100 #200
Remarks:
Contractor: Consultant:
75 3''
63 2.1/2"
50.0 2"
37.5 1 1/2''
2.36 No. 8
2.00 No. 10
1.18 No. 16
0.60 No. 30
0.425 No. 40
0.3 No. 50
0.18 No. 80
75 3''
63 2.1/2"
50.0 2"
37.5 1 1/2''
25.0 1"
2.36 No. 8
2.00 No. 10
1.18 No. 16
0.60 No. 30
0.425 No. 40
0.3 No. 50
0.18 No. 80
Source: Lab No 11
Lawerence pur
Wt. of Oven Dry Sample: Gms 909
Wt. of Washed Sample: Gms
Cum. Cum. Cum. Specification
Sieve Size Wt.Retained Retained Passing (ASTM-C 33)
Remarks
mm (alt.) (Grms) (%) (%) (%)
75 3''
63 2.1/2"
50.0 2"
37.5 1 1/2''
25.0 1"
2.00 No. 10
0.425 No. 40
0.18 No. 80
Remarks:
CONTRACTOR:
CONSULTANT:
Tested By:
Material Engineer: Senior Lab Technician: Material Engineer:
Infrastructure Development works of PC-01 Sector-N & PC-04 Sector-I (Package-02) Infrastructure
Development works of SRA Gate Road work MB-05 Pakistan Square to SRA Gate & PC-02 (From
Pakistan Square to MB-01)(Package-01)
CLIENT: CONSULTANT: CONTRACTOR:
DHA ACES
3" 2.1/2"
2.1/2" 2"
2" 1.1/2"
1/4" #4 2500±10
#4 #8 5000±10
No of Spheres (Balls) 12 11 8 6
A Designation B
B Revolution 500
40%
F Specification
Maximum
Contractor: Consultant:
Test No. 1 2 3
Specification % 75 Min
Remarks:
CONTRACTOR: CONSULTANT: