All Performas of Lab

Jkakananano sjososo jOKak. KKkaka joa. Kakakka s kakk kakNallaknba akkm jakakb sjkananmm kakkana kalaosobde kakskskanksos kaksksksmms kakakksmsneia. AkkaM kakak a.lama a. Alks. Akkakkaka s kalskksmaka kakkaks alls kkkan. Kkkan makka kakk kalaoo lalpoan akkkakakaoa kkaknav jjajisvs makkakakka. Amakka...a Jaikakmbkkqk k ajka. Ooiaba kkkkk lOabmS eJka jiJjajz aa. Jkakananano sjososo jOKak. KKkaka joa. Kakakka s kakk kakNallaknba akkm jakakb sjkananmm kakkana kalaosobde kakskskanksos kaksksksmms
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
82 views60 pages

All Performas of Lab

Jkakananano sjososo jOKak. KKkaka joa. Kakakka s kakk kakNallaknba akkm jakakb sjkananmm kakkana kalaosobde kakskskanksos kaksksksmms kakakksmsneia. AkkaM kakak a.lama a. Alks. Akkakkaka s kalskksmaka kakkaks alls kkkan. Kkkan makka kakk kalaoo lalpoan akkkakakaoa kkaknav jjajisvs makkakakka. Amakka...a Jaikakmbkkqk k ajka. Ooiaba kkkkk lOabmS eJka jiJjajz aa. Jkakananano sjososo jOKak. KKkaka joa. Kakakka s kakk kakNallaknba akkm jakakb sjkananmm kakkana kalaosobde kakskskanksos kaksksksmms
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 60

INFRASTRUCTERE DEVELOPMENT AUTHORITY DHA MULTAN (SECTOR-D)

Additional Works B2

CONTRACTOR: CONSULTANT:
ACES:

CONCRETE COMPRESSIVE STRENGTH


(AASHTO T-22)
Location: MB-02 L/S SVC
Description: Tuff Paver
B2T Foot Path
Sampling Date :
Testing Date: 28/5/2021
27/5/2021
Load in Load in Area Strength Strength
Number Colour
(KN) (Kgs) cm2 (kg/sq cm) (Psi)
1 Red 755 76988 196.02 393 5586

2 Red 826 84228 196.02 430 6111

3 Red 902 91978 196.02 469 6674

4 Red 810 82597 196.02 421 5993

5 Red 725 73929 196.02 377 5364

6 Red 755 76988 196.02 393 5586

7 Red 824 84024 196.02 429 6097

8 Red 888 90550 196.02 462 6570

9 Red 875 89225 196.02 455 6474

10 Red 901 91876 196.02 469 6666

11 Red 762 77702 196.02 396 5638

12 Red 747 76172 196.02 389 5527

13 Red 749 76376 196.02 390 5542

14 Red 902 91978 196.02 469 6674

15 Red 884 90142 196.02 460 6541

16 Red 925 94323 196.02 481 6844

Avg. Strength 6118 PSI

Req. Strength (As Per NHA 602) 3000 PSI


Contractor: Consultant

SLT: Material Engineer: Material Inspector:


INFRASTRUCTERE DEVELOPMENT AUTHORITY DHA MULTAN (SECTOR-D)
Additional Works B2

CONTRACTOR: CONSULTANT:
ACES

CONCRETE COMPRESSIVE STRENGTH


(AASHTO T-22)
Location: MB-02 L/S S/Road
Description: Kerb Stone

Core Drilled : 01/6/2021 Testing Date : 2/6/2021

Correction factor as per ASTM C- 42 Drilled Core =0.96

Strength Strength
Load in Area
Cylinder # Testing Date: Age/Days (Psi) (Psi)
(KN) cm2
Actual Correction

1 2/6/2021 - 178 75.30 3427.7 3291

2 2/6/2021 - 180 74.80 3489.4 3350

3 2/6/2021 - 177 75.10 3417.5 3281

Avg. Strength 3307 Psi


As per ASTM C- 42 Drilled Core
Req. Strength ( 3000 psi ) as per NHA 601.2

Contractor: Consultant:

LT: Material Engineer: Material Inspector:


CONSTRUCTION OF CIVIL INFRASTRUCTURE WORKS INCLUDING ROAD WORKS, MAIN TRUNK
SWEWR PACKGE-II
DEFENCE HOUSING AUTHORITY MULTAN

CONTRACTOR: CONSULTANT:

CONCRETE COMPRESSIVE STRENGTH


(AASHTO T-22)
Description: Casting Date: 22/6/2020

Location: MH-52A,52&53 Request No: MTS-640

Concrete Class: 3000PSI Lab No: 96-A

182.4 28.27
Area Of Cylinder: Sq cm Sq Inch

Load in Load in Strength Strength


Cylinder # Testing Date: Age/Days
(KN) (Kgs) (kg/sq cm) (Psi)

1 29/6/2020 7 300 30591 168 2385

2 29/6/2020 7 310 31611 173 2464

3 29/6/2020 7 320 32631 179 2544

Achieved Avg. Strength for 07 Days: 2464 Psi

Load in Load in Strength Strength


Cylinder # Testing Date: Age/Days
(KN) (Kgs) (kg/sq cm) (Psi)

4 20/7/2020 28 410 41808 229 3259

5 20/7/2020 28 400 40788 224 3180

6 20/7/2020 28 413 42094 231 3282

Achieved Avg. Strength for 28 Days: 3240 Psi

Req. Strength for 28 Days: 3000 Psi

Remarks :
CONSTRUCTION OF CIVIL INFRASTRUCTURE WORKS INCLUDING ROAD WORKS, MAIN TRUNK
SWEWR PACKGE-II
DEFENCE HOUSING AUTHORITY MULTAN

CONTRACTOR: CONSULTANT:

CONCRETE COMPRESSIVE STRENGTH


(AASHTO T-22)
Contractor:
Consultant:

Tested By:
Material Engineer: Senior Lab Technician: Material Engineer:
RESIDENTIAL CITY DHA MULTAN SECTOR-D
Additional Works B2
CONTRACTOR: CONSULTANT:
ACES

Request No SW-20504 Date : 30/3/2021


Location: OHWT Wt of dry sample+can:

Sand Bedding of OHWT Plate Form


Description: Wt of can:

Sampled By Wt of dry sample (gms): 657

Size (In) Size(mm) Wt Ret (g) Cum Ret(g) Cum Ret % Passing % Specification %

4" 100
3" 75
2" 50.08
1" 25
¾" 19
½" 12.5
⅜" 9.5
#4 4.75
#8 2.36
# 10 2.00 0 0.0 100.0
# 16 1.18
# 30 600 um
# 40 425 um 6 0.9 99.1
# 50 300 um
# 80 180 um
# 100 150 um
# 200 0.075 um 613.0 93.3 6.7

PAN

TOTAL DRY SAMPLE BEFORE TEST:

DRY SAMPLE AFTER WASH :

Remarks A-3 Sand


CONTRACTOR CONSULTANT
L.T M.E Material Inspector:
CIVIL INFRASTRUCTURE WORKS & DEVELOPMENT OF SECTOR "D"
DEFENCE HOUSING AUTHORITY MULTAN
CONTRACTOR: CONSULTANT:
ACES

Date: 14/10/2020 Request No: SW-16061

Location: MB-02,R/S R.D:

Description: Sand Bedding of Trench of MH-(36-37) Lab No: 3761A

RELATIVE DENSITY TEST


Test No: 1
SECTION - A

Station

Distance to centre line

Depth of hole (cm)


15.0

Wt. of Wet soil (gm) 4839

Wt. of sand + cone Before Test


(gm) 8600

Wt. of sand+cone after Test


(gm) 3157

Wt. of Sand to fill Hole + cone


(gm) 5443

Wt. of sand to fill Cone (gm) 1600

Wt. of sand to fill Hole (gm) 3843

Unit Wt. of sand (gm/cc) 1.390

Volume of Hole (cc) 2765


SECTION - B

Wet Density (gm/cc) 1.750

Moisture Content (%) 15.6

Dry Density (gm/cc) 1.514

Maximum Density (gm/cc) 1.603

Minimum Density (gm/cc) 1.300

Relative Density (R.D) (%) 74.8

Compaction Equivalent
Relative Density (%) 96.1

Compaction Required (%) 95.0

Status: PASS

Relative Density = (MaxD(F.D-MinD)/ (F.D(MaxD-MinD)*100

Remarks
CONTRACTOR: CONSULTANT:

Material Engineer: Material Engineer:


Tested By: Senior Lab
Technician:
RESIDENTIAL CITY DHA MULTAN
SEC-D
CONTRACTOR CONSULTANT
ProMag
Date: 2/5/2020 Request NO: EW-2948A
LOCATION : STVC-10 RD: 0+120-0+182.77
Description: Embankment 2nd Layer B-Zone Lab No:

FIELD DENSITY TEST


1 TEST NO. 1
2 Sta and Ref To Centerline
3 Sta To Sta Represented
4 Depth Hole Layer /cm 15.2

MOISTURE CONTENT
1 CAN NO. No
2 Wt. OF CAN GM MC
3 Wt.OF CAN +WET SOIL GM
4 Wt.OF CAN +DRY GM By
5
6
Wt.OF WATER
Wt.OF DRY SOIL
GM
GM
Speedy
7 WATER CONTENT % 12.6
FIELD DENSITY
1 Wt. OF WET SOIL +CONT GM 5327
2 Wt. OF CONT GM 20
3 Wt. OF WET SOIL FROM HOLE GM 5307
4 Wt. OF SAND+CONE BEFORE TEST GM 8420
5 Wt. OF SAND+CONE AFTER TEST GM 3080
6 Wt. OF SAND To FILL HOLE +CONE GM 5340
7 Wt. OF SAND TO FILL CONE GM 1570
8 Wt. OF SAND TO FILL HOLE GM 3770
9 UNIT Wt. OF SAND GM/CC 1.390
10 GROSS VOL. OF HOLE CC 2712
11 Percentage Retained 3/4'' From Hole % -
12 Vol.Retain 3/4'' From Hole GM/CC -
13 Percentage Passing 3/4'' From Hole % -
14 WET UNIT Wt. OF SOIL GM/CC 1.957
15 DRY UNIT Wt. OF SOIL GM/CC 1.738
16 MAX. DRY DENSITY GM/CC 1.933
17 OPT. M.C % 12.4
18 Adjusted Proctor GM/CC -
19 ACHIVED COMPACTION % 89.9
20 REQUIRED COMPACTION % 93.0
21 REMARKS FAIL
CONRACTOR CONSULTANT

Lab Tech. ME: Lab Tech. ME:


Lab Tech. ME: Lab Tech. ME:
Infrastructure Development works of PC-01 Sector-N & PC-04 Sector-I (Package-02)
Infrastructure Development works of SRA Gate Road work MB-05 Pakistan Square to
SRA Gate & PC-02 (From Pakistan Square to MB-01)(Package-01) DHA Multan

Date: 19/7/2022 Request NO:


LOCATION : PC-01 R/S 1+504 RD:
Description: Aggregate Base Course Lab No:
FIELD DENSITY TEST
1 TEST NO. 1
2 Sta and Ref To Centerline
3 Sta To Sta Represented
4 Depth Hole Layer /cm 15

MOISTURE CONTENT
1 CAN NO. No B
2 Wt. OF CAN GM 45.2
3 Wt.OF CAN +WET SOIL GM 196.3
4 Wt.OF CAN +DRY GM 192.2
5 Wt.OF WATER GM 4.1
6 Wt.OF DRY SOIL GM 147.0
7 WATER CONTENT % 2.8
FIELD DENSITY
1 Wt. OF WET SOIL +CONT GM 11427
2 Wt. OF CONT GM 20
3 Wt. OF WET SOIL FROM HOLE GM 11407
4 Wt. OF SAND+CONE BEFORE TEST GM 12460
5 Wt. OF SAND+CONE AFTER TEST GM 2270
6 Wt. OF SAND To FILL HOLE +CONE GM 10190
7 Wt. OF SAND TO FILL CONE GM 3237
8 Wt. OF SAND TO FILL HOLE GM 6953
9 UNIT Wt. OF SAND GM/CC 1.416
10 GROSS VOL. OF HOLE CC 4910
11 Vol.Retain 3/4'' From Hole % 2281
12 Percentage Retained 3/4'' From Hole GM/CC 20
13 Percentage Passing 3/4'' From Hole % 80
14 WET UNIT Wt. OF SOIL GM/CC 2.323
15 DRY UNIT Wt. OF SOIL GM/CC 2.260
16 MAX. DRY DENSITY GM/CC 2.265
17 OPT. M.C % 5.6
18 Adjusted Proctor GM/CC 2.342
19 ACHIVED COMPACTION % 96.5
20 REQUIRED COMPACTION % 100
21 REMARKS FAIL
CONRACTOR CONSULTANT

Lab Tech. ME: Lab Tech. ME:


Infrastructure Development works of PC-01 Sector-N & PC-04
Sector-I (Package-02) Infrastructure Development works of SRA
Gate Road work MB-05 Pakistan Square to SRA Gate & PC-02 (From
Pakistan Square to MB-01)(Package-01) DHA Multan
CLIENT: CONTRACTOR:
CONSULTANT:
ACES
DHA
SIEVE ANALYSIS AASHTO -T 27
Location: PC-02 B/S 1+540-1+640 Sampling Date: 18/9/2022
Description: Subgrade Top Testing Date: 18/9/2022
Sub Contractor United Fiber Wt of dry sample (gms): 748
Size (In) Size(mm) Wt Ret (g) Cum Ret(g) Cum Ret % Passing % Specification %

4" 100
3" 75
2" 50.08
1" 25
¾" 19
½" 12.5
⅜" 9.5
#4 4.75
#8 2.36
# 10 2.00 4 0.5 99.5
# 16 1.18
# 30 600 um
# 40 425 um 13 1.8 98.2
# 50 300 um
# 80 180 um
# 100 150 um
# 200 0.075 um 190.7 25.5 74.5
PAN

TOTAL DRY SAMPLE BEFORE TEST:

DRY SAMPLE AFTER WASH :

Remarks

CONTRACTOR CONSULTANT
S.L.T
L.T M.E M.E
Infrastructure Development works of PC-01 Sector-N & PC-04 Sector-I
(Package-02) Infrastructure Development works of SRA Gate Road work MB-05
Pakistan Square to SRA Gate & PC-02 (From Pakistan Square to MB-01)
(Package-01) DHA Multan
CLIENT: CONTRACTOR:
CONSULTANT:
ACES
DHA
Soils Classification /Atterburg Limits
Adaptation of AASHTO T 89 - 90 - 80 (Method-A)

Description: Subgrade Top Request No:

Location: PC-02 B/S 1+540-1+640 Sampling Date: 18/10/2022

Sub Contractor United Fiber Testing Date: 19/10/2022

Type of Test LIQUID LIMIT TEST


PLASTIC LIMIT TEST
No of Blows Nos 21 25 30

Container No Nos D A-1 B 1 2

Wt. of Can Gms 45.8 46.2 47.0 50.4 52.6

Wt. Wet Soil+Can Gms 112.7 110.3 105.6 65.8 66.4

Wt. Dry Soil+Can Gms 99.4 98.2 95.7 63.6 64.4

Wt. of Water Gms 13.3 12.1 9.9 2.2 2.0

Wt. of Dry Soil Gms 53.6 52.0 48.7 13.2 11.8

Water Content % 24.8 23.2 20.3 16.9 17.2

Average Plastic Limit: 17.0

25.0
Water Content %

20.0

15.0
15 20 25 30 35
No. of Blows

Liquid Limit (L.L) 22.80 Plastic Limit (P.L) 17.0


P.I =
Plasticity Index (P.I) L.L - P.L 5.8 Classification Group A-4
CONTRACTOR: CONSULTANT:

Tested By: Senior Lab Technician:


Material Engineer: Material Engineer:
Infrastructure Development works of PC-01 Sector-N & PC-04 Sector-I (Package-02)
Infrastructure Development works of SRA Gate Road work MB-05 Pakistan Square to SRA Gate
& PC-02 (From Pakistan Square to MB-01)(Package-01) DHA Multan
CONSULTANT: CONTRACTOR:
CLIENT: ACES
DHA

Moisture-Density Relationship of Soils


AASHTO T-180 (Method-B)
Location: PC-02 B/S 1+540-1+640 Samping Date: 18/10/2022

Description Subgrade Top Testing Date: 19/10/2022

Method : T - 180 Mould Wt : gms 4250 Mould Vol : cc 2132

Determintion No : 2 3 4 5
Wt of wet soil + Mould : g 8406 8719 8959 8904
Wt of wet soil : g 4156 4469 4709 4654
Wet density : gm/cc 1.949 2.096 2.209 2.183
Dry density : gm/cc 1.805 . 1.902 1.965 1.913
Moisture content : % A C F C
Average Plastic Limit: 48.50 50.60 50.20 51.60
Wt of wet soil +Cntainer : g 273.1 285.0 281.7 278.3
Wt of dry soil +Cntainer : g 256.5 263.3 256.2 250.3
Wt of water : g 16.6 21.7 25.5 28.0
Wt of dry soil : g 208.0 212.7 206.0 198.7
Moisture content : % 8.0 10.2 12.4 14.1

2.000

1.950
Dry Density

1.900

1.850

1.800

1.750
7.0 8.0 9.0 10.0 11.0 12.0 13.0 14.0 15.0
Moisture contant

Maximum Dry Density gms/cc 1.965


Moisture Content % 12.4
CONTRACTOR CONSULTANT

S.L.T M.E S.L.T M.E


Infrastructure Development works of PC-01 Sector-N & PC-04 Sector-I (Package-02)
Infrastructure Development works of SRA Gate Road work MB-05 Pakistan Square to
SRA Gate & PC-02 (From Pakistan Square to MB-01)(Package-01) DHA Multan

CLIENT: CONSULTANT: CONTRACTOR:


DHA ACES

California Bearing Ratio


Adaptation of ASTM D 1883 - AASHTO T-193
Description: Subgrade Top Date Of Moulded: 20/10/2022

Location: PC-02 B/S 1+540-1+640 Date Of Testing: 24/10/2022


Moisture Content Density Determination
Blows Per Mold 10 30 65 Blows Per Mold 10 30
Can No. D E A-1 Mold Volume cm3 2134 2079
A Wt of Wet Soil + Can gm 281.5 287.6 280.0 Wt Sample + Mold gm 9741 9861
B Wt of Dry Soil + Can gm 256.9 262.4 255.7 Wt of Mold gm 5578 5628
C Wt of Can gm 48.2 50.4 49.7 Wt of Sample gm 4163 4233
D Wt of Water gm 24.63 25.23 24.31 Wet Density gm/cc 1.951 2.036
E Wt of Dry Soil gm 208.7 212.00 206.0 Moisture Content % 11.80 11.90
F Moisture Content % 11.80 11.90 11.80 Dry Density gm/cc 1.745 1.820
Area of Plunger 19.35 Ring Factor 2.556
Test No. 1 2 3
10 30 65
Standard Load

Blows/Lift
Kg / Cm2

Molded Tested Molded Tested Molded Tested


Penetration
Dial Unit Dial Unit Dial Unit
Reading Load
Standard Load CBR Reading Load
Standard
Load
CBR Reading Load
Standard
Load
Kg / Cm2
Per Min. mm Kg / Cm2 Kg / Cm2
Kg Kg / Cm2 % Kg Kg / Cm2 % Kg Kg / Cm2

0 0 0 0 0
0.5 0.64 3.0 0.4 8.0 1.1 15.0 2.0
1 1.27 10.0 1.3 16.0 2.1 25.0 3.3
1.5 1.91 18.0 2.4 28.0 3.7 36.0 4.8
2.0 2.54 70.35 28.0 3.7 70.3 5.3 38.0 5.0 70.3 7.1 48.0 6.3 70.3
2.5 3.18 38.0 5.0 46.0 6.1 58.0 7.7
3.0 3.81 50.0 6.6 58.0 7.7 71.0 9.4
3.5 4.45 60.0 7.9 71.0 9.4 80.0 10.6
4.0 5.08 105.53 72.0 9.5 105.5 9.0 80.0 10.6 105.5 10.0 88.0 11.6 105.5
5.0 6.35 88.0 11.6 94.0 12.4 101.0 13.3
6.0 7.62
7.0 8.89
Swell Reading 109 25.6303
15
Blows Per Mold 10 30 65
Final Height mm 0.00 0.00 0.00
Unit Load (Stress) kg / cm2

Initial Height mm 0.00 0.00 0.00 12


Difference mm 0.15 0.12 0.08
Sample Length mm 116.43 116.43 116.43 9

Percent Swell % 0.13 0.10 0.07


6
PROCTOR MAX DRY DENSITY 1.965 g/cm3
MODIFIED OMC 12.4 %
3
Blows Per Lift No. 10 30 65
Dry Density gm/cc 1.745 1.820 1.884
Soaked C.B.R. % 9.0 10.0 11.0 0
0 1.27 2.54 3.81 5.08 6.35
C.B.R At 90% of Max Dry Density 1.769 g/cm 3

C.B.R At 93% of Max Dry Density 1.827 g/cm3


Penetration mm
C.B.R At 95% of Max Dry Density 1.867 g/cm3
CONSULTANT:
CONTRACTOR:

S.L.T: Material Engineer: S.L.T: Material Engineer:


s of PC-01 Sector-N & PC-04 Sector-I (Package-02)
of SRA Gate Road work MB-05 Pakistan Square to
an Square to MB-01)(Package-01) DHA Multan

CONTRACTOR:

ornia Bearing Ratio


ASTM D 1883 - AASHTO T-193
20/10/2022

24/10/2022
Density Determination
65
2134
9792
5296
4496
2.107
11.80
1.884
2.556
3
65
Tested

CBR
%

9.0

11.0

15
Unit Load (Stress) kg / cm2

12

0
0 1.27 2.54 3.81 5.08 6.35

Penetration mm
CONSULTANT:

S.L.T: Material Engineer:


Infrastructure Development works of PC-01 Sector-N & PC-04 Sector-I (Package-
02) Infrastructure Development works of SRA Gate Road work MB-05 Pakistan
Square to SRA Gate & PC-02 (From Pakistan Square to MB-01)(Package-01) DHA
Multan
CLIENT: CONSULTANT: CONTRACTOR:
DHA ACES

California Bearing Ratio


Adaptation of ASTM D 1883 - AASHTO T-193
Description: Subgrade Top Date Of Moulded: 20/10/2022

Location: PC-02 B/S 1+540-1+640 Date Of Testing: 24/10/2022

16.0

14.0
Soaked CBR %

12.0

10.0

8.0

6.0

Dry Density g/cc


4.0
1.700 1.750 1.800 1.850 1.900

MAX DRY DENSITY 1.942 gm/cc


PROCTOR MODIFIED
OPTIMUM MOISTURE CONTENT 12.5 %
BLOWS PER LAYER 10 30 65 No.
DRY DENSITY AS MOLDED 1.745 1.820 1.884 gm/cc
SOAKED C.B.R. 9.0 10.0 11.0 %
90% 93% 95%
C.B.R At Max. Dry Density
1.748 1.806 1.845
C.B.R % 9.10 9.80 10.40
CONSULTANT:
CONTRACTOR:

S.L.T: Material Engineer:


S.L.T: Material Engineer:
Infrastructure Development works of PC-01 Sector-N & PC-04 Sector-I
(Package-02) Infrastructure Development works of SRA Gate Road work
MB-05 Pakistan Square to SRA Gate & PC-02 (From Pakistan Square to MB-
01)(Package-01) DHA Multan
Contractor: Consultant:
ACES

SUMMARY OF QUALITY TESTS OF SUB BASE (Class B)


Location: MB-05 Stock Pile Sub Contractor: 3H Fist

Source Sakhi Sarwar Date: 16/5/2022

TEST METHOD Description Results Specification (Class B)

Passing 60 mm (%) -

Passing 50 mm (%) 100 100

Passing 25.0 mm (%) 84 55 - 85

Passing 9.5 mm (%) 49.3 40 - 70


AASHTO T-27
Passing 4.75 mm (%) 40.9 30 - 60

Passing 2.0 mm (%) 31.2 20 - 50

Passing 0.425 mm (%) 23.8 10-30

Passing 0.075 mm (%) 8.7 5-15

T-89 LL (%) - Max 25

PL (%) - -
T-90
PI Non Plasstic Max 6

MDD g/cc 2.241 Not Specified


T-180
OMC (%) 6.2 Not Specified

T-193 CBR 79.8 Min 50%

Specific gravity 2.652 Not Specified


T-85
Absorption (%) 1.049 Not Specified

T - 176 SAND EQUIVALENT (%) 27.3 Min 25%

T-96 L.A. Abrasion (%) 36.0 Max 50%

Contractor: CONSULTANT:

Tested By: Material Engineer: SLT: Material Engineer:


Infrastructure Development works of PC-01 Sector-N & PC-04 Sector-I (Package-02)
Infrastructure Development works of SRA Gate Road work MB-05 Pakistan Square to SR
Gate & PC-02 (From Pakistan Square to MB-01)(Package-01) DHA Multan

CONTRACTOR: CONSULTANT:

ACES
SIEVE ANALYSIS AASHTO -T 27
Date: Sub Base Class B 9/5/2022
MB-05 Stock Pile

Wt of dry sample (gms): 9265 Before Washing (gms): 1022


Specification %
Size (In) Size(mm) Wt Ret (g) Cum Ret(g) Cum Ret % passing % (class B)

4" 100

3" 75

2" 50.08 0 0.0 100.0 100

1" 25 1482 16.0 84.0 55 ~ 85

¾" 19

½" 12.5

⅜" 9.5 4697 50.7 49.3 40 ~ 70

#4 4.75 5476 59.1 40.9 30 ~ 60

#8 2.36

# 10 2.00 242 23.7 76.3 31.2 20 ~ 50

# 16 1.18

# 30 600 um

# 40 425 um 427 41.8 58.2 23.8 10 ~ 30

# 50 300 um

# 80 180 um

# 100 150 um

# 200 0.075 um 805 78.7 21.3 8.7 5 ~ 15

PAN

Remarks

Contractor: CONSULTANT:

Tested By: Material Engineer: SLT: Material Engineer:


PC-01 Sector-N & PC-04 Sector-I (Package-02)
RA Gate Road work MB-05 Pakistan Square to SRA
quare to MB-01)(Package-01) DHA Multan

CONSULTANT:

ACES
ALYSIS AASHTO -T 27
9/5/2022
MB-05 Stock Pile

1022
Specification %
(class B)

100

55 ~ 85

40 ~ 70

30 ~ 60

20 ~ 50

10 ~ 30

5 ~ 15

CONSULTANT:

SLT: Material Engineer:


Infrastructure Development works of PC-01 Sector-N & PC-04 Sector-I
(Package-02) Infrastructure Development works of SRA Gate Road work MB-05
Pakistan Square to SRA Gate & PC-02 (From Pakistan Square to MB-01)
(Package-01) DHA Multan
CONTRACTOR: CONSULTANT:
ACES
Soils Classification /Atterburg Limits
Adaptation of AASHTO T 89 - 90 - 80)
Description: Sub Base Request No:

Location: MB-05 Stock Pile Sampling Date: 9/5/2022

Source: Sakhi Sarwar Testing Date: 10/5/2022


Type of Test LIQUID LIMIT TEST PLASTIC LIMIT TEST

No of Blows Nos

Container No Nos

tic
Wt. of Can Gms

as
Wt. Wet Soil+Can Gms

Pl
Wt. Dry Soil+Can Gms

Wt. of Water Gms


n
No
Wt. of Dry Soil Gms

Water Content %

Average Plastic Limit:

15
Water Content %

10

5 10 15 20 25 30 35 40 45 50
No. of Blows

Liquid Limit (L.L) - Plastic Limit (P.L) Can'nt be determined


P.I =
Plasticity Index (P.I) L.L - P.L - Classification Group
CONTRACTOR: CONSULTANT:

Tested By: Material Engineer: SLT: Material Engineer:


Infrastructure Development works of PC-01 Sector-N & PC-04 Sector-I (Package-02) Infrastructure
Development works of SRA Gate Road work MB-05 Pakistan Square to SRA Gate & PC-02 (From
Pakistan Square to MB-01)(Package-01) DHA Multan
CONTRACTOR: CONSULTANT:
ACES

Date: Moistuure - density relationship of soils


MB-05 Stock Pile
Sub Base

Method : T - 180 Mould Wt : gms 4030 Mould Vol : cc 2132

Determintion No : 1 2 3 4
Wt of wet soil + Mould : g 8529 8845 9104 9008
Wt of wet soil : g 4499 4815 5074 4978
Wet density : gm/cc 2.110 2.258 2.380 2.335
Dry density : gm/cc 2.045 2.159 2.241 2.180
Moisture content : % D K C M
Wt of container : g 55.3 51.0 56.0 54.0
Wt of wet soil +Cntainer : g 263.2 274.0 291.8 288.5
Wt of dry soil +Cntainer : g 256.8 264.2 278.0 273.0
Wt of water : g 6.4 9.8 13.8 15.5
Wt of dry soil : g 201.5 213.2 222.0 219.0
Moisture content : % 3.2 4.6 6.2 7.1

2.250

2.200
Dry Density

2.150

2.100

2.050

2.000
3.0 4.0 5.0 6.0 7.0

Moisture contant

Maximum Dry Density gms/cc 2.241

Moisture Content % 6.2

CONTRACTOR: CONSULTANT:

Lab Tech: Material Engineer: SLT: Material Engineer:


Infrastructure
PC-02 (From

ACES

10/5/2022

2132

7.0

ial Engineer:
Infrastructure Development works of PC-01 Sector-N & PC-04 Sector-I (Package-02)
Infrastructure Development works of SRA Gate Road work MB-05 Pakistan Square to SRA Gate
& PC-02 (From Pakistan Square to MB-01)(Package-01) DHA Multan

CONSULTANT:
CONTRACTOR:
ACES
California Bearing Ratio
Adaptation of ASTM D 1883 - AASHTO T-193
Description: SUB BASE Request No:

Location: MB-05 Stock Pile Date Of Moulded: 11/5/2022

Source: Sakhi Sarwar Date Of Testing: 15/5/2022


Moisture Content Density Determination
Blows Per Mold 10 30 65 Blows Per Mold 10 30 65
Can No. D B N Mold Volume cm3 2179 2180 2180
A Wt of Wet Soil + Can gm 265.4 257.3 271.7 Wt Sample + Mold gm 10219 10532 10334
B Wt of Dry Soil + Can gm 249.5 242.0 255.8 Wt of Mold gm 5410 5550 5120
C Wt of Can gm 40.00 40.00 45.00 Wt of Sample gm 4809 4982 5214
D Wt of Water gm 15.90 15.34 15.92 Wet Density gm/cc 2.207 2.285 2.392
E Wt of Dry Soil gm 209.5 202.0 210.8 Moisture Content % 6.10 6.20 6.20
F Moisture Content % 6.10 6.20 6.20 Dry Density gm/cc 2.080 2.152 2.252
Area of Plunger 19.35 Ring Factor 2.556
Test No. 1 2 3
10 30 65
Standard Load

Blows/Lift
Kg / Cm2

Molded Tested Molded Tested Molded Tested


Penetration
Dial Unit Corrected Dial Unit Corrected Dial Unit Corrected
Reading Load Load
CBR Reading Load Load
CBR Reading Load Load
CBR
Per Min. mm
Kg Kg / Cm2 Kg / Cm2 % Kg Kg / Cm2 Kg / Cm2 % Kg Kg / Cm2 Kg / Cm2 %
0 0 0 0 0
0.5 0.64 39.0 5.2 64.0 8.5 122.0 16.1
1 1.27 101.0 13.3 152.0 20.1 235.0 31.0
1.5 1.91 166.0 21.9 246.0 32.5 329.0 43.5
2.0 2.54 70.35 245.0 32.4 46.0 321.0 42.4 60.3 421.0 55.6 79.0
2.5 3.18 325.0 42.9 395.0 52.2 505.0 66.7
3.0 3.81 369.0 48.7 449.0 59.3 565.0 74.6
3.5 4.45 438.0 57.9 521.0 68.8 618.0 81.6
4.0 5.08 105.53 515.0 68.0 64.5 593.0 78.3 74.2 681.0 90.0 85.2
5.0 6.35 593.0 78.3 658.0 86.9 739.0 97.6
6.0 7.62
7.0 8.89
Swell Reading 109 25.6303
Blows Per Mold 10 30 65
Final Height mm 0.00 0.00 0.00
Unit Load (Stress) kg / cm2

Initial Height mm 0.00 0.00 0.00


100
Difference mm 0.00 0.00 0.00
Sample Length mm 116.3 116.3 116.3

Percent Swell % 0.00 0.00 0.00


50
PROCTOR MAX DRY DENSITY 2.241 g/cm3
MODIFIED OMC 6.2 %
Blows Per Lift No. 10 30 65 0
Dry Density gm/cc 2.080 2.152 2.252 0 1.27 2.54 3.81 5.08 6.35 7.62 8.89
Soaked C.B.R. % 64.5 74.2 85.2
C.B.R At 98% of Max Dry Density 2.196 % Penetration mm
CONTRACTOR: CONSULTANT:

Lab Tech: Material Engineer: SLT: Material Engineer:


Infrastructure Development works of PC-01 Sector-N & PC-04 Sector-I
(Package-02) Infrastructure Development works of SRA Gate Road work MB-05
Pakistan Square to SRA Gate & PC-02 (From Pakistan Square to MB-01)
(Package-01) DHA Multan
CONTRACTOR: CONSULTANT:
ACES
California Bearing Ratio
Adaptation of ASTM D 1883 - AASHTO T-193
Description: SUB BASE Request No:
Location: MB-05 Stock Pile Date of Moulded: 11/5/2022

Source: Sakhi Sarwar Date of Testing: 16/5/2022

100.0

90.0
Soaked CBR %

80.0

70.0

60.0

50.0
2.000 2.050 2.100 2.150 2.200 2.250 2.300 2.350 2.400

Dry Density g/cc

MAX DRY DENSITY 2.241 gm/cc


PROCTOR MODIFIED
OPTIMUM MOISTURE CONTENT 6.2 %

BLOWS PER LAYER 10 30 65 No.


DRY DENSITY AS MOLDED 2.080 2.152 2.252 gm/cc
SOAKED C.B.R. 64.5 74.2 85.2 %
C.B.R At 98% of Max Dry Density 2.196 gm/cc 79.8 %
CONTRACTOR: CONSULTANT:

Tested By: Material Engineer: SLT: Material Engineer:


Infrastructure Development works of PC-01 Sector-N & PC-04 Sector-I (Package-02)
Infrastructure Development works of SRA Gate Road work MB-05 Pakistan Square to
SRA Gate & PC-02 (From Pakistan Square to MB-01)(Package-01) DHA Multan
CONTRACTOR: CONSULTANT:
ACES

SAND EQUIVALENT

AASHTO T - 176

Description: Sub Base Date Of Sample 9/5/2022

Location: MB-05 Stock Pile Date Of Testing: 11/5/2022

Source Sakhi Sarwar

Determination 1 2

Clay Reading inach A 10.8 11.2

Sand Reading inach B 3.1 2.9

Sand Equivalent % C 28.7 25.9

Average Result % 27.3

Remarks: Minimum 25%

CONTRACTOR: CONSULTANT:

Tested By: Material Engineer: SLT: Material Engineer:


PC-01 Sector-N & PC-04 Sector-I (Package-02)
SRA Gate Road work MB-05 Pakistan Square to
n Square to MB-01)(Package-01) DHA Multan
CONSULTANT:
ACES

D EQUIVALENT

SHTO T - 176

9/5/2022

11/5/2022

27.3

Minimum 25%

CONSULTANT:

SLT: Material Engineer:


Infrastructure Development works of PC-01 Sector-N & PC-04 Sector-I (Package-
02) Infrastructure Development works of SRA Gate Road work MB-05 Pakistan
Square to SRA Gate & PC-02 (From Pakistan Square to MB-01)(Package-01) DHA
Multan
CONTRACTOR: CONSULTANT:
ACES

SPECIFIC GRAVITY AND ABSORPTION OF Sub Base


Location: MB-05 Stock Pile Request No:
Material Description: Sub Base Date Of Sample 9/5/2022
Source Sakhi Sarwar Date Of Testing 12/5/2022

SPECIFIC GRAVITY & ABSORPTION OF COARSE AGGREGATE (T - 85)


ITEM DESCRIPTION 1 2 3

A Wt. of Oven Dry Sample gms 2299.0 2370

B Wt. of Saturated Surface Dry Sample in Air gms 2323 2395

C Wt.Saturated Surface Dry Sample in Water gms 1455.9 1501.8

D Bulk Specific Gravity (Oven Dry) A/(B-C) 2.651 2.653

E Bulk Specific Gravity (S.S.D) B/(B-C) 2.679 2.681

F Apparent Specific Gravity A/(A-C) 2.727 2.730

G Absorption % ((B-A)/A))*100 1.044 1.055

SPECIFIC GRAVITY & ABSORPTION OF FINE AGGREGATE (T - 84)


ITEM DESCRIPTION 1 2 3

A Wt. of Oven Dry Sample gms

B Wt. of Saturated Surface Dry Sample in Air gms

C Wt.Bottle + Water + Sample gms

D Wt.Bottle + Water gms

E Bulk Specific Gravity (Oven Dry) A/(B+D)-C

F Bulk Specific Gravity (S.S.D) B/(B+D)-C

G Apparent Specific Gravity A/(A+D)-C

H Absorption % ((B-A)/A))*100

CONTRACTOR: CONSULTANT:

Tested By: Material Engineer: SLT: Material Engineer:


rks of PC-01 Sector-N & PC-04 Sector-I (Package-
t works of SRA Gate Road work MB-05 Pakistan
rom Pakistan Square to MB-01)(Package-01) DHA
Multan
CONSULTANT:
ACES

TY AND ABSORPTION OF Sub Base

9/5/2022
12/5/2022

ORPTION OF COARSE AGGREGATE (T - 85)

2.652

2.680

2.728

1.049

BSORPTION OF FINE AGGREGATE (T - 84)

Average

CONSULTANT:

SLT: Material Engineer:


Infrastructure Development works of PC-01 Sector-N & PC-04 Sector-I (Package-02)
Infrastructure Development works of SRA Gate Road work MB-05 Pakistan Square
to SRA Gate & PC-02 (From Pakistan Square to MB-01)(Package-01) DHA Multan
CONTRACTOR: CONSULTANT:
ACES

LOS ANGELES ABRASION


(AASHTO T-96)
Location MB-05 Stock Pile Date Of Testing 13/4/2022

Description: Sub Base Source: Sakhi Sarwar

SIEVE SIZE A B C D
PASSING RETAINED
1-½" 1" 1250 - - -
1" 3/4" 1250 - - -
3/4" 1/2" 1250 2500 - -
1/2" 3/8" 1250 2500 - -
3/8" 1/4" - - 2500 -
1/4" #4 - - 2500 -
#4 #8 - - - 5000
TOTAL : 5000 ± 10 5000 ± 10 5000 ± 10 5000 ±

A CLASS A

B REVOLUTION (30 TO 33 R.P.M) 500

C SPHERES 12

D TOTAL WEIGHT OF SAMPLE 5001

E RETAINED NO. 12 SIEVE 3202

F ABRASION {(D-E)/D x 100} % 36.0

Remarks 50 % Maximum
CONTRACTOR: CONSULTANT:

Tested By: Material Engineer: SLT: Material Engineer:


Infrastructure Development works of PC-01 Sector-N & PC-04 Sector-I (Package-
02) Infrastructure Development works of SRA Gate Road work MB-05 Pakistan
Square to SRA Gate & PC-02 (From Pakistan Square to MB-01)(Package-01) DHA
Multan
CONTRACTOR CONSULTANT
ACES

MB-05 Stock Pile


Sub Base
M.D.D 2.241 Specific Gravity: 2.652

OMC 6.2
Sr No RTD ( %) Adjusted M.D.D S.No RTD(%) Adjusted M.D.D Sr No RTD ( %) Adjusted M.D.D

1 10.0 2.276 15 17.0 2.302 29 24.0 2.328

2 10.5 2.278 16 17.5 2.304 30 24.5 2.330

3 11.0 2.280 17 18.0 2.305 31 25.0 2.331

4 11.5 2.282 18 18.5 2.307 32 25.5 2.333

5 12.0 2.283 19 19.0 2.309 33 26.0 2.335

6 12.5 2.285 20 19.5 2.311 34 26.5 2.337

7 13.0 2.287 21 20.0 2.313 35 27.0 2.339

8 13.5 2.289 22 20.5 2.315 36 27.5 2.341

9 14.0 2.291 23 21.0 2.316 37 28.0 2.343

10 14.5 2.293 24 21.5 2.318 38 28.5 2.345

11 15.0 2.294 25 22.0 2.320 39 29.0 2.347

12 15.5 2.296 26 22.5 2.322 40 29.5 2.348

13 16.0 2.298 27 23.0 2.324 41 30.0 2.350

14 16.5 2.300 28 23.5 2.326 42 31.0 2.354


Agro Pipe Factory
Pipe Testing Report

Req. No LEW-135 3-Edge Bearing Date 23-12-2021

Contractor: RMC Description: Street No: 20/24 & 22/26

To PKG-02 PC-01 , DHA MULTAN From NLC DHA Multan


Required Available F
T
1
Sr No Dia Of 5
Date Of
Sr. No Pipe No From- Pipe in Report /
Testing Dead Ultimate Dead Ultimate 1
Upto inchs
Load (Ton) Load (Ton) Load (Ton) Load (Ton) 2
=
1
.
2
5

1 64 1-85 18 23-12-2021 6.89 10.33 7.01 11.23 OK

###

Sign Of Contractor,s SLT Sign Of Consultant,s SLT


Infrastructure Development works of PC-01 Sector-N & PC-04 Sector-I (Package-02) Infrastructure
Development works of SRA Gate Road work MB-05 Pakistan Square to SRA Gate & PC-02 (From Pakistan
Square to MB-01)(Package-01) DHA Multan
CONTRACTOR: CONSULTANT:
ACES

Description: Asphaltic Binder Course Request No: EW-1937

Location: MB-05 Slip Road Sampling Date: 21/11/2022

RD: 0+000-0+740 Testing Date: 23/11/2022

CORE TEST RESULTS (THICKNESS & DENSITY)


Average
Wt. in Wt. in Wt. in Reference Percentage
Core Measured Measured Volume Density Specification
Sr. No Chainage Air dry Water S.S.D Average Compaction
Location Thickness(mm) Thickness (cm³) (gm/cm³) (%)
(gms) (gms) (gms) Gmb (%)
(mm)

39 0+300 48.7 48.6 49.0 48.8 865.0 617.6 979.6 362.0 2.389 2.453 97.4
0+240-0+340
40 0+250 48.5 48.3 49.1 48.6 871.0 517.1 882.0 364.9 2.387 2.453 97.3

41 0+200 55.0 55.4 55.2 55.2 1006.0 596.8 1017.0 420.2 2.394 2.453 97.6
0+140-0+240
42 0+150 59.9 60.4 60.1 60.1 1058.0 628.3 1069.3 441.0 2.399 2.453 97.8 97

43 0+100 55.0 55.4 55.2 55.2 1006.0 596.8 1017.0 420.2 2.394 2.453 97.6
0+040-0+140
44 0+050 59.9 60.4 60.1 60.1 1058.0 628.3 1069.3 441.0 2.399 2.453 97.8

45 0+000-0+040 0+020 51.5 51.3 50.4 51.1 997.5 587.0 1005.4 418.4 2.384 2.453 97.2

Contractor: Consultant:

SLT: Material Engineer: SLT: Material Engineer:


Infrastructure Development works of PC-01 Sector-N & PC-04 Sector-I (Package-02)
Infrastructure Development works of SRA Gate Road work MB-05 Pakistan Square to SRA
Gate & PC-02 (From Pakistan Square to MB-01)(Package-01) DHA Multan
CONTRACTOR: CONSULTANT:
ACES

RATE OF APPLICATION OF BITUMINOUS PRIME COAT (Emulsified)


Road: MB-05 PS-MR B/S CW Request No: EW-1751-2

Location R/D: 1+040-1+232 Diversion Testing Date: 23/10/2022

Description: Spray rate of prime coat Lab No: 38

Test Number 1 2

Weight of Tray + Sample (gm) 629.0 631.2

Weight of Tray (gm) 533.0 534.0

Weight of Sample (gm) 96.0 97.2

Area of Tray ( m²) 0.097 0.097

Spray Rate (Kg/m²) 0.99 1.00

Specific gravity 1.012 1.012

Corrected Spray Rate (Lit/m²) 0.98 0.99

Average Spray Rate (Lit/m²) 0.98

Required Spray Rate (Lit/m²) 0.65-1.75

Remarks:
Contractor: Consultant:

Tested By: Material Engineer: Senior Lab Technician: Material Engineer:


GOLF CUMMUNITY RING ROAD, DHA MULTAN
CONTRACTOR: CONSULTANT:
ACES

BITUMINOUS EXTRACTION TEST (AASHTO T- 164)


Description: Asphalt Wearing Course Request Number: EW-2140

Location: GCP-30/33 Testing Date: 3/6/2021

R.D: 0+000-0+085 Bitumen Grade: 60/70

Opt AC: 4.1%


Grain Size Analysis of Aggregates

Extraction Test Wt.


Sieve Retained Passing Sep
Retained J.M.F
Size % % Class-B
(gm)

Wt. of Mix. 2375.0 3/4'' Nil Nil 100 100 100

Wt.of Filter befor Test 20.2 1/2'' 364.2 16.0 84.0 75.1-89.1 75-90

Wt.of Filter after Test 22.2 3/8'' 587.3 25.8 74.2 65.7-79.7 60-80

Wt.of Aggregte after Test 2274.4 #4 1115.5 49.0 51.0 46.3-54.3 40-60

Total Wt.of Aggregte 2276.4 #8 1559.4 68.5 31.5 25.4-33.4 20-40

Wt. of Bitumen 98.6 #50 2044.2 89.8 10.2 4.8-12.8 5-15

Bitumen % 4.15 #200 2144.4 94.2 5.8 4.7-6.7 3-8


#200 #100 #50 #40 #30 #1 #1 #8 # #3/8 1/2'' 3/4'' 1'' 1/1/2 2'' 2/1/2 3'' 4''
2'' 2/1/2
100
100
#200 #100 #50 #40 #30 #1
6
#1
0
#8 #
4
#3/8
''
1/2'' 3/4'' 1'' 1/1/2
''
3'' 4''

6 0 4 '' ''

90
90

80
80

70
70
Percente%%
PassingPercente

60
60
Passing

50
50

40
40

30
30

20
20

10
10

0
0 25.4
0.01
0.01
0.075
0.075 0.1
0.1
0.150
0.150
0.30
0.30
0.42
0.42
0.60
0.60 1
1
1.18
1.18
2.00 2.38
2.00 2.38
4.75
4.75 10
9.5 12.5
10 12.5
9.5
19.
19. 25.4 38.5
38.5
50
50
63.5 75
63.5 75 100
100
Grain00 Size55 mm
0
0
0
0
Contractor: Consultant:

Tested By: Material Engineer: Senior Lab Technician: Material Engineer:


GOLF CUMMUNITY RING ROAD, DHA MULTAN
CONTRACTOR: CONSULTANT:
ACES
MAXIMUM SPECIFIC GRAVITY OF PAVING MIXTURE
AASHTO T-209
Description:
Asphalt Wearing Course Date: 3/6/2021

Location: GCP-30/33 Source: Sargodha

R.D: 0+000-0+085 Bitumen Grade: 60/70

Bitumen %: Opt AC 4.1 Request No: EW-2140

DESCRIPTION 1

A Temprature of Water 25

B Weight of Dessicator + Water 12134.9

C Weight of Sample 2557

D Wt. of Dessicator + Sample + Water 13705.6

E Wt. of Replaced Water (B+C)-D 986.0

F Max. Sp. Gravity of Material (C/E) 2.593

Remarks:

Contractor: Consultant:

Tested By: Material Engineer: Senior Lab Technician: Material Engineer:


GOLF CUMMUNITY RING ROAD, DHA MULTAN
CONTRACTOR: CONSULTANT:
ACES
HOT MIX DESIGN BY MARSHALL METHOD
AASHTO T-245/74 & ASTM T-559/72 & MS-2
Asphalt Wearing Course
Description: Date: 5/6/2021

Location: GCP-30/33 Request No: EW-2140

R.D: 0+000-0+085 OPT AC: 4.1%


Source: Sargodha

Specimen No. 1 2 3 4 5 6 7 8 9

Wt. of Dry Specimen in Air 1243.6 1242.2 1252.6 1252.1 1250.9 1245.0 1248.0 1244.1 1249.5

Wt. of SSD Specimen 1259.0 1256.0 1265.0 1266 1264.8 1259.0 1261.0 1259.3 1266.1
COMPACTED SPECIMEN

Wt. of Specimen in Water 751.0 749.0 755.0 757.0 753.8 750.0 751.0 751.3 756.1

Volume Cubic Centimeter 508.0 507.0 510.0 509.0 511.0 509.0 510.0 508.0 510.0

Bulk Sp. Gravity (Gmb) 2.448 2.450 2.456 2.460 2.448 2.446 2.447 2.449 2.450

Average Gmb 2.450

Adjusted Gmb Sp. Gravity Of Bitumen (Gb) 1.031

Max. Sp. Gravity of Mix (GMM) 2.593 Bulk Sp. Gravity of Agg (Gsb) 2.732

4.15 95.85
CONTENT

By Wt. of Mix % (Pb) % of Agg by Total Wt. of Mix (Ps)


ASPHALT

Pba = 100[(Gse-Gsb)/(Gse*Gsb)]Gb 0.59 Effective Sp. Gravity of Agg (Gse) 2.775

Pbe = Pb-(Pba/100)Ps 3.59 STABILITY CORRECTION RATIOS

Air Voids (Gmm-Gmb/Gmm)*100 5.5 483 To 495 - 1.09 523 To 535 - 0.96
VOIDS

VMA (100-Gmb*Ps/Gsb) 14.0 496 To 508 - 1.04 536 To 546 - 0.93

VFA (Vma-Va/Vma)*100 60.8 509 To 522 - 1.00 547 To 559 - 0.89

STABILITY AFTER 20 MINUTES 30 MINUTES 24 HOURS

Measured 94 97 95 85 90 86 77 80 83
STABILITY

Ring Factor 12.421

Volume Correction 1.04 1.04 1.00 1.00 1.00 1.00 1.00 1.04 1.00

Adjusted Stability 1214 1253 1180 1056 1118 1068 956 1033 1031

Average Stability (Kg) 1216 1081 1007

Flow 10.1 10.5 11.2


FLOW

Loss of Stability % 17.2


Average Flow (mm) 10.6

Contractor: Consultant:

Tested By: Material Engineer: Senior Lab Technician: Material Engineer:


GOLF CUMMUNITY RING ROAD, DHA MULTAN
CONTRACTOR: CONSULTANT:
ACEC

BITUMINOUS EXTRACTION TEST (AASHTO T- 164)


Description: Asphaltic Binder Course Testing Date: 27/11/2020

Location : Ring Road Bitumen Grade: 60-70

RD : 1+420-1+690 Requset no: EW-910


Grain Size Analysis of Aggregates

Extraction Test Wt.


Sieve Passing
Retainet Retained % J.M.F Sep
Size %
(gm)

Wt. of Mix. 2415.5 1'' Nil Nil 100 100 100

Wt.of Filter befor Test 21.0 3/4'' 106.6 4.6 95.4 90-100 90 - 100

Wt.of Filter after Test 23.5 3/8'' 660.5 28.5 71.5 65-79 56 - 80

Wt.of Aggregte after Test 2315.2 #4 1246.9 53.8 46.2 40-48 35 - 65

Total Wt.of Aggregte 2317.7 #8 1689.6 72.9 27.1 22-30 23 - 49

Wt. of Bitumen 97.8 #50 2123.0 91.6 8.4 4-12 5 - 19

Bitumen % 4.05 #200 2248.1 97.0 3.0 2.9-4.9 2-8

#200 #100 #50 #40 #3 #1 #1 #8 #4 #3/8'' 1/2'' 3/4'' 1'' 1/1/2 2'' 2/1/2 3'' 4''

100 0 6 0 ''

90

80

70
Passing Percente %

60

50

40

30

20

10

0 0.075 0.150 0.30 0.42 0.60 1.18 2.00 2.38 4.75 9.5 12.5 19. 25.4 38.5 50 63.5 75
0.01 0.1 Grain
0 Size
5 mm
0 1 10 0 100
Contractor: Consultant:

Tested By: Material Engineer: Senior Lab Technician: Material Engineer:


CONSTRUCTION OF RING ROAD
DEFENCE HOUSING AUTHORITY MULTAN

CONTRACTOR: CONSULTANT:
ACES
MAXIMUM SPECIFIC GRAVITY OF PAVING MIXTURE
AASHTO T-209
Description: Asphalt Binder Course Date: 27/11/2020

Location: Ring Road Source: Sargodha

Bitumen %: Opt AC 4.0 Bitumen Grade: 60 - 70

RD : 1+420-1+690 Requset no: EW-910

DESCRIPTION 1

A Temprature of Water 25

B Weight of Dessicator + Water 12134.9

C Weight of Sample 2513.7

D Wt. of Dessicator + Sample + Water 13675.8

E Wt. of Replaced Water (B+C-D) 972.8

F Max. Sp. Gravity of Material (C/E) 2.584

Remarks:

Contractor: Consultant:

Lab Technician: Material Engineer: Senior Lab Technician: Material Engineer:


CONSTRUCTION OF RING ROAD
DEFENCE HOUSING AUTHORITY MULTAN

CONTRACTOR: CONSULTANT:
ACES
HOT MIX DESIGN BY MARSHALL METHOD
AASHTO T-245/74 & ASTM T-559/72 & MS-2
Description: Asphalt Binder Course Date: 29/11/2020

Location: Ring Road 1+420-1+690 Request No: EW-910

Source: Sargodha Bitumen Grade: 60/70

Specimen No. 1 2 3 4 5 6 7 8 9

Wt. of Dry Specimen in Air 1235.2 1243.5 1247.5 1258.8 1257.0 1236.0 1254.1 1245.6 1259.4

Wt. of SSD Specimen 1248.5 1256.3 1261.2 1272.7 1269.8 1250.4 1267.0 1258.5 1271.0
COMPACTED SPECIMEN

Wt. of Specimen in Water 743.3 747.3 749.7 759.1 757.8 745.9 757.0 750.5 758.2

Volume Cubic Centimeter 505.2 509.0 511.5 513.6 512.0 504.5 510.0 508.0 512.8

Bulk Sp. Gravity (Gmb) 2.445 2.443 2.439 2.451 2.455 2.450 2.459 2.452 2.456

Average Gmb 2.450

Adjusted Gmb Sp. Gravity Of Bitumen (Gb) 1.031

Max. Sp. Gravity of Mix (GMM) 2.584 Bulk Sp. Gravity of Agg (Gsb) 2.744
CONTENT

By Wt. of Mix % (Pb) 4.05 % of Agg by Total Wt. of Mix (Ps) 95.95
ASPHALT

Pba = 100[(Gse-Gsb)/(Gse*Gsb)]Gb 0.366 Effective Sp. Gravity of Agg (Gse) 2.771

Pbe = Pb-(Pba/100)Ps 3.70 STABILITY CORRECTION RATIOS

Air Voids (Gmm-Gmb/Gmm)*100 5.2 483 To 495 - 1.09 523 To 535 - 0.96
VOIDS

VMA (100-Gmb*Ps/Gsb) 14.3 496 To 508 - 1.04 536 To 546 - 0.93

VFA (Vma-Va/Vma)*100 63.8 509 To 522 - 1.00 547 To 559 - 0.89

STABILITY AFTER 20 MINUTES 30 MINUTES 24 HOURS

Measured 72 77 79 68 66 63 62 69 61
STABILITY

Ring Factor 18.137

Volume Correction 1.04 1.00 1.00 1.00 1.00 1.04 1.00 1.04 1.00

Adjusted Stability 1358 1397 1433 1233 1197 1188 1124 1302 1106

Average Stability (Kg) 1396 1206 1177

2.7 2.9 3.0


FLOW

Flow
10.8 11.6 12.0 Loss of Stability % 15.6
Average Flow (mm) 11.5

Contractor: Consultant:

Tested By: Material Engineer: Senior Lab Technician: Material Engineer:


Infrastructure Development works of PC-01 Sector-N & PC-04 Sector-I (Package-02) Infrastructure Development works of
SRA Gate Road work MB-05 Pakistan Square to SRA Gate & PC-02 (From Pakistan Square to MB-01)(Package-01)
CONTRACTOR Consultant:
ACES
Date: 15/7/2022 Lab No. Lab-11
Descripton: Coarse Aggregate 20mm Down (1500PSI) Location: NLC Stock Pile Plant
BLENDING OF AGGREGATES
SIEVE ANALYSIS
Sr Sieve Size 3" 2.1/2" 2" 1.1/2" 1" 3/4" 1/2" 3/8" #4 #8 #16 #30 #50 #100 #200
1 20mm to 12mm 100 99.2 11.3 3.1 1.8

2 12mm to 05mm 100 100 89.6 59.2 0.8

3
COMBINED GRADATION
S. No Size % 3" 2.1/2" 2" 1.1/2" 1" 3/4" 1/2" 3/8" #4 #8 #16 #30 #50 #100 #200

1 65 64.5 7.3 2.0

2 35 35.0 31.4 20.7 0.3

100 99.5 38.7 22.7 0.3


SPECIFICATION

Mid Point 95.0 - 37.5 5.0

Contract Limits 90-100 - 20-55 0-10


Contractor:
Consultant:

Senior Lab Technician:


Material Engineer: Senior Lab Technician: Material Engineer:
Infrastructure Development works of PC-01 Sector-N & PC-04 Sector-I (Package-02) Infrastructure
Development works of SRA Gate Road work MB-05 Pakistan Square to SRA Gate & PC-02 (From
Pakistan Square to MB-01)(Package-01)
CLIENT: CONSULTANT: CONTRACTOR
DHA
Date: 15/7/2022 Lab No: Lab-11
Descripton: Coarse Aggregate 20mm Down 3000 Psi Location: NLC Stock Pile Plant
BLENDING OF AGGREGATES
SIEVE ANALYSIS
Sr Sieve Size 2" 1.1/2" 1" 3/4" 1/2" 3/8" #4 #8 #16 #30 #50 #100 #200

1 20-12 mm 100 99.2 11.3 3.1 1.8

2 12-5 mm 100 100 89.6 59.2 0.8

COMBINED GRADATION
S. No Size % 2" 1.1/2" 1" 3/4" 1/2" 3/8" #4 #8 #16 #30 #50 #100 #200

1 40 40 39.7 4.5 1.2 0.7

2 60 60 60.0 53.8 35.5 0.5


SPECIFICATION

100 100 99.7 58.3 36.8 1.2

Mid Point - 97.5 - 40.0 5.0

Contract Limits - 95-100 - 25-55 0-10

Remarks:

Contractor: Consultant:

Tested By: Material Engineer: Senior Lab Technician: Material Engineer:


Infrastructure Development works of PC-01 Sector-N & PC-04 Sector-I (Package-02) Infrastructure
Development works of SRA Gate Road work MB-05 Pakistan Square to SRA Gate & PC-02 (From
Pakistan Square to MB-01)(Package-01)
CLIENT:
CONSULTANT: CONTRACTOR:
ACES
DHA
Sieve Analysis
Grain Size Analysis AASHTO-T-27
Coarse Aggregate (20mm Down)
Description: Sampling Date: 15/7/2022

Location: NLC Stock Pile Plant Testing Date: 15/7/2022

Source: Sargodha Lab No: 11


Wt. of Original Sample: Gms 8325
Wt. Cum. Cum. Cum.
Sieve Size Retained Wt.Retained Retained Passing
Specification
Remarks
mm (alt.) Grms Grms % % %

75 3''

63 2.1/2"

50.0 2"

37.5 1 1/2''

25.0 1" Nil Nil 100.0

19.0 3/4 " 67 0.8 99.2

12.5 1/2 " 7384 88.7 11.3

9.5 3/8 " 8067 96.9 3.1

4.75 No. 4 8175 98.2 1.8

2.36 No. 8

2.00 No. 10

1.18 No. 16

0.60 No. 30

0.425 No. 40

0.3 No. 50

0.18 No. 80

0.15 No. 100

0.075 No. 200


CONTRACTOR: CONSULTANT:

Tested By: Senior Lab Technician:


Material Engineer: Material Engineer:
Infrastructure Development works of PC-01 Sector-N & PC-04 Sector-I (Package-02)
Infrastructure Development works of SRA Gate Road work MB-05 Pakistan Square to SRA
Gate & PC-02 (From Pakistan Square to MB-01)(Package-01)
CLIENT:
CONSULTANT: CONTRACTOR:
ACES
DHA
Sieve Analysis
Grain Size Analysis AASHTO-T-27
Coarse Aggregate (12mm Down)
Description: Sampling Date: 15/7/2022

Location: NLC Stock Pile Plant Testing Date: 15/7/2022

Source: Sargodha Lab No: 11


Wt. of Original Sample: Gms 6495
Wt. Cum. Cum. Cum.
Sieve Size Retained Wt.Retained Retained Passing
Specification
Remarks
mm (alt.) Grms Grms % % %

75 3''

63 2.1/2"

50.0 2"

37.5 1 1/2''

25.0 1"

19.0 3/4 " NIL NIL 100.0

12.5 1/2 " 675 10.4 89.6

9.5 3/8 " 2650 40.8 59.2

4.75 No. 4 6443 99.2 0.8

2.36 No. 8

2.00 No. 10

1.18 No. 16

0.60 No. 30

0.425 No. 40

0.3 No. 50

0.18 No. 80

0.15 No. 100

0.075 No. 200


CONTRACTOR: CONSULTANT:

Tested By: Senior Lab Technician:


Material Engineer: Material Engineer:
Infrastructure Development works of PC-01 Sector-N & PC-04 Sector-I (Package-02) Infrastructure
Development works of SRA Gate Road work MB-05 Pakistan Square to SRA Gate & PC-02 (From
Pakistan Square to MB-01)(Package-01)
CONTRACTOR:
CLIENT:
CONSULTANT:
ACES
DHA
Sieve Analysis
Grain Size Analysis ASTM C-136 AASHTO-T-27
Description: Fine Aggregate (Sand) Sampling Date: 15/7/2022
Location: NLC Stock Pile Plant Testing Date: 15/7/2022

Source: Lab No 11
Lawerence pur
Wt. of Oven Dry Sample: Gms 909
Wt. of Washed Sample: Gms
Cum. Cum. Cum. Specification
Sieve Size Wt.Retained Retained Passing (ASTM-C 33)
Remarks
mm (alt.) (Grms) (%) (%) (%)

75 3''

63 2.1/2"

50.0 2"

37.5 1 1/2''

25.0 1"

19.0 3/4 "

12.5 1/2 "

9.5 3/8 " NIL - 100.0 100

4.75 No. 4 12.7 1.4 98.6 95-100

2.36 No. 8 97.3 10.7 89.3 80-100

2.00 No. 10

1.18 No. 16 275.0 16.7 83.3 50-85

0.60 No. 30 379.1 41.7 58.3 25-60

0.425 No. 40

0.3 No. 50 708.1 77.9 22.1 5-30

0.18 No. 80

0.15 No. 100 860.8 94.7 5.3 0-10

0.075 No. 200 900.8 99.1 0.9 0-3

Fineness Modulus = 2.431 2.3-3.1

Remarks:
CONTRACTOR:
CONSULTANT:

Tested By:
Material Engineer: Senior Lab Technician: Material Engineer:
Infrastructure Development works of PC-01 Sector-N & PC-04 Sector-I (Package-02) Infrastructure
Development works of SRA Gate Road work MB-05 Pakistan Square to SRA Gate & PC-02 (From
Pakistan Square to MB-01)(Package-01)
CLIENT: CONSULTANT: CONTRACTOR:

DHA ACES

Coarse Aggregate (20mm Down)


Description: Sampling Date: 15/7/2022

Location: NLC Stock Pile Plant Testing Date: 15/7/2022

Source: Sargodha Lab No: 11

LOS ANGELES / ABRASION TEST


AASHTO T - 96
Passing Retained A B C D

3" 2.1/2"

2.1/2" 2"

2" 1.1/2"

1.1/2" 1" 1250±25

1" 3/4" 1250±25

3/4" 1/2" 1250±10 2500±10

1/2" 3/8" 1250±10 2500±10

3/8" 1/4" 2500±10

1/4" #4 2500±10

#4 #8 5000±10

Total 5000±10 5000±10 5000±10 5000±10

No of Spheres (Balls) 12 11 8 6

A Designation B

B Revolution 500

C Total Wt. of Sample 5002

D Retained on #12 Sieve 4136

E Los Angeles / Abrasion % (C-D/C)*100 17.3

40%
F Specification
Maximum
Contractor: Consultant:

Tested By: Material Engineer: Senior Lab Technician: ME:


Infrastructure Development works of PC-01 Sector-N & PC-04 Sector-I (Package-02)
Infrastructure Development works of SRA Gate Road work MB-05 Pakistan Square to SRA
Gate & PC-02 (From Pakistan Square to MB-01)(Package-01)
CONTRACTOR:
CLIENT: CONSULTANT:
DHA ACES

DETERMINATION OF SAND EQUIVALENT


(ASTM D- 2419, AASHTO T - 176)
Description: Fine Aggregate Date of sampling: 15/7/2022

Location: NLC Stock Pile Plant Date of Testing: 15/7/2022

Source: Lawerencepur Lab No: 11

Test No. 1 2 3

Clay Reading (Inch) A 7.5 7.3 7.2

Sand Reading (Inch) B 6.3 6.4 6.0

Sand Equivalent (B/A)*100 84.0 87.7 83.3

Average Sand Equivalent: % 85.0

Specification % 75 Min

Remarks:
CONTRACTOR: CONSULTANT:

Tested By: Material Senior Lab Technician: Material Engineer:


Engineer: