Moric Energy Atc Proposal

Uploaded by

De Great
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
147 views4 pages

Moric Energy Atc Proposal

Uploaded by

De Great
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

Moric Energy 161c Rauf Taylor Close, Off Idejo

Global Limited Street, Victoria-Island, Lagos.

30th December, 2023

The Managing Director/CEO,


Impact Refinery and Petrochemical Limited
Km 6 Ubogo Road, Umukwata,
Delta state, Nigeria

Sir,

ENGINEERING DESIGN FOR ACQUISITION OF AUTHORITY TO CONSTRUCT (ATC)


Kindly refer to our discussion with respect to the development of an Engineering Design package of
your proposed refinery project with a view to securing an Approval to Construct (ATC) from the
Nigerian Midstream and Downstream and Petroleum Regulatory Authority (NMDPRA).
Moric Energy Global Limited is pleased to inform you of our commitment to develop the Design for
grant of ATC for a total sum of Two hundred and fifty million Naira (NGN 250,000,000) with payments
following the order:
(i) NGN 175,000,000 (70% of fee) - Upon Agreement signing billed for; the purchase of ASPEN
Hysys Software to be used; signaling the commencement of Design Work.
(ii) NGN 50,000,000 (20% of fee) - On completion and submission of the Engineering Design.
(iii) NGN 25,000,000 (10% of fee) – For Design Review and HAZOP workshop with NMDPRA

Our Solutions team/consultants are sophisticated and can provide the Design within two (2) months
of your order and from the date of making initial down payment as defined in “Appendix A”.
Please be assured of our quality services that will be provided within the highest standards.
Kindly note that the agreed sum of Two hundred and fifty million Naira (NGN 250,000,000) shall be
paid as stipulated to:
MORIC GLOBAL ENERGY LIMITED
Providus Bank - 0033253403
Thank you.

West, Sotonye Richard


Managing Director.
[30th December 2023]

Appendix A
Services

1.0 Services
Contractor’s services shall consist solely of the preparation, development and delivery of
a Engineering Design Definition Study including preparation of Basis of Design document,
Location evaluation, emissions estimate, process configuration definition, preliminary
equipment list and sizing, site plan, non-detailed (2-D) plant dimensional model, and cost
estimate Study for the Refinery, as set forth below.

I. Prepare Basis of Design Document


a. Identify crude oil feedstock
b. Provide feedstock assay
c. Throughput (BPD)
d. Products required
e. Product specifications

II. Evaluate Location


a. Identify logistics required for handling feedstock and products
b. Identify site environmental conditions
i. Geographical location
ii. Site elevation
iii. Minimum and maximum ambient temperature
iv. Average ambient temperature
v. Maximum wet bulb temperature
vi. Minimum relative humidity
vii. Maximum relative humidity
viii. Prevailing wind direction
ix. Maximum wind velocity
x. Average annual rainfall
xi. Maximum 24-hour rainfall
xii. Soil bearing capacity
xiii. Seismic zone
xiv. Regulatory emission requirements

Page 2
[30th December 2023]

III. Estimate Emissions

IV. Define Process Configuration and schedule


a. Computer simulations for modeling processes
b. Energy and material balances
c. Estimated product yields
d. Process Flow Diagrams (PFD)
e. Piping & Instrumentation Diagrams
f. Plot plans
g. Electrical Single Line Diagram
h. Equipment list
i. Line list
j. Instrument list
k. Equipment data and specification sheets
l. Hydraulic calculations
m. Project schedule

V. Prepare Preliminary Equipment List/Sizing


a. Process equipment skids
b. Utilities
i. Oily water treatment
ii. Cooling water system
iii. Steam system
iv. Fire protection system
v. Fuel system
vi. Power supply and distribution
vii. Potable water treatment
viii. Nitrogen system
ix. Septic system

c. Other OSBL equipment


i. Crude oil receiving facilities
ii. Product loading facilities
iii. Buildings

Page 3
[30th December 2023]

iv. Flare
v. Roads
vi. Security fencing
vii. LPG bottling plant
d. Tank farm

VI. Prepare Site Plan


a. Standards used
i. API
ii. NFPA
iii. Industrial Risk Insurers
iv. ASME

VII. Prepare Non-Detailed (2-D) Model


VIII. Prepare Cost Estimate

Page 4