SOPC PSM - Work Authorization Rev 04
SOPC PSM - Work Authorization Rev 04
Contracts
TITLE: REVISION: C2 Page 1 of 31
Work Authorization
Reference to (Continuous Service Agreement) signed by and between Suez Oil Processing Co.
(xxx) as First Party and EPROM as Second Party; this Work Authorization had been signed by and
between Parties representative to enter into force on its date and according to the following data,
terms and conditions.
CSA BY AND BETWEEN SOPC & EPROM
CSA /TSA DATED : XX/XX/2021
W.A SERIAL No.: WA-CLIENT-…..-2021
W.A DATE: DD/MM/YYYY
W.A TOTAL AMOUNT :
Work Authorization Content includes but is not limited to the following;
1. INTRODUCTION
2. SCOPE OF WORK
3. EPROM RESPONSIBILITIES
4. SOPC RESPONSIBILITIES
5. WORK LOCATION
6. PROJECT DURATION
7. PRICING AND TERMS OF PAYMENT
8. ATTACHEMENTS ☐
Rates apply as one of the following check ( ) for right box;
Daily Rate: ☐ Lump sum : Unit Rate: ☐
TERMS AND CONDITIONS OF THE W.A:
1. All terms and conditions of the (CSA) are applicable and in force between the parties.
2. In case of conflict between the provisions of this Work Authorization and the original Agreement,
the provisions of the Work Authorization shall prevail.
CLIENT PROJECT MANAGER EPROM PROJECT MANAGER
NAME: NAME:
SIGNATURE: SIGNATURE:
DATE: DATE:
CLIENT CONTRACTS MANAGER EPROM CONTRACTS MANAGER
NAME: NAME:
SIGNATURE: SIGNATURE:
DATE: DATE:
CHAIRMEN APPROVALS
ON BEHALF OF CLIENT ON BEHALF OF EPROM
NAME: NAME:
SIGNATURE: SIGNATURE:
DATE: DATE:
Initiate Dept.:
Prepared by: Contracts Department
Initial signatures:
DEPARTMENT: CODE: Procedure code:
Material &Contracts F.C.CO.008 CP.C.CO.005
Contracts
TITLE: REVISION: C2 Page 2 of 31
Work Authorization
1- INTRODUCTION
This work authorization is drafted in connection to the governing CSA, where EPROM
provides the qualified experts and necessary technical support for SOPC, SOPC intends to
apply a process safety & asset integrity management system (PSAIM).
The approach presented here is to develop an appropriate process safety management (PSM)
system based on the CCPS Risk-Based model (20 element).
An RBPS management system incorporates four main accident prevention pillars
(foundational blocks) – as shown in fig. below:
Initiate Dept.:
Prepared by: Contracts Department
Initial signatures:
DEPARTMENT: CODE: Procedure code:
Material &Contracts F.C.CO.008 CP.C.CO.005
Contracts
TITLE: REVISION: C2 Page 3 of 31
Work Authorization
2- APPROACH
Risk Based Process Safety is the latest approach published by CCPS, the RBPS recognizes
that all hazards and risks in all facilities are not equal; A risk-based approach reduces the
potential for assigning an undue amount of resources to managing lower-risk activities,
thereby focusing the available resources for tasks that address higher-risk activities.
Initiate Dept.:
Prepared by: Contracts Department
Initial signatures:
DEPARTMENT: CODE: Procedure code:
Material &Contracts F.C.CO.008 CP.C.CO.005
Contracts
TITLE: REVISION: C2 Page 4 of 31
Work Authorization
Initiate Dept.:
Prepared by: Contracts Department
Initial signatures:
DEPARTMENT: CODE: Procedure code:
Material &Contracts F.C.CO.008 CP.C.CO.005
Contracts
TITLE: REVISION: C2 Page 5 of 31
Work Authorization
Executing work activities to ensure that equipment is fabricated and installed in accordance
with specifications, and that it remains fit for service over its entire life cycle.
Managing contractors, and evaluating work performed by contractors, to ensure that the
associated risks are acceptable; ensuring that contractors are not exposed to unrecognized
hazards or undertake activities that present unknown or intolerable risk.
Providing training and conducting related activities to ensure reliable human performance at
all levels of the organization.
Recognizing and managing changes.
Ensuring that units, and the people who operate them, are properly prepared for start-ups.
Maintaining a very high level of human performance, particularly among operators,
maintenance personnel, and others whose actions directly affect process safety.
Preparing for and managing emergencies.
Initiate Dept.:
Prepared by: Contracts Department
Initial signatures:
DEPARTMENT: CODE: Procedure code:
Material &Contracts F.C.CO.008 CP.C.CO.005
Contracts
TITLE: REVISION: C2 Page 6 of 31
Work Authorization
Auditing RBPS management systems as well as the performance of work activities that
make up the management system.
Holding periodic management reviews to determine if the management systems are
working as intended and if the work activities are helping the facility effectively manage risk.
3- SCOPE OF WORK
SOPC assigned EPROM to establish the PSM to the SOPC units inside refinery battery limits as
shown in below-
1- Asphalt unit (U-33)
2- CDU-1
3- CDU-2
4- CDU-3
5- VDU
6- U-20 (Reformer complex)
7- U-21 (Reformer complex)
8- U-22 (Reformer complex)
9- Utilities Units
10- Hydrogen plant
11- Tank farm, pump houses, loading & Unloading Platform
12- Offshore SOPC platform (Process safety studies only)
Initiate Dept.:
Prepared by: Contracts Department
Initial signatures:
DEPARTMENT: CODE: Procedure code:
Material &Contracts F.C.CO.008 CP.C.CO.005
Contracts
TITLE: REVISION: C2 Page 7 of 31
Work Authorization
Phase 3:
1- Conduct the required PSM/AIM studies and Revalidating the outdated studies
2- PSM/AIM studies for asphalt unit to be done if needed .
3- Review & audit on the system output as per CCPS RBPS .
Initiate Dept.:
Prepared by: Contracts Department
Initial signatures:
DEPARTMENT: CODE: Procedure code:
Material &Contracts F.C.CO.008 CP.C.CO.005
Contracts
TITLE: REVISION: C2 Page 8 of 31
Work Authorization
Initiate Dept.:
Prepared by: Contracts Department
Initial signatures:
DEPARTMENT: CODE: Procedure code:
Material &Contracts F.C.CO.008 CP.C.CO.005
Contracts
TITLE: REVISION: C2 Page 9 of 31
Work Authorization
Establish a system to properly protect documents and records, including those that are
archived electronically.
- Ensure that the procedures describe the expected system response, how to
determine if a step or task has been done properly, and possible consequences
associated with errors or omissions.
- Supplement procedures with checklists.
Contracts
TITLE: REVISION: C2 Page 10 of 31
Work Authorization
- Validate procedures and verify that the responsible person understands their rule.
Providing Interlink related procedures.
The guidance shall also include:
- Developing the Responsibility and Accountability matrix for reviewing and
updating all Operating
- Review and update all detailed process description, ensure that it is in place and
the key operational areas are identified.
Initiate Dept.:
Prepared by: Contracts Department
Initial signatures:
DEPARTMENT: CODE: Procedure code:
Material &Contracts F.C.CO.008 CP.C.CO.005
Contracts
TITLE: REVISION: C2 Page 11 of 31
Work Authorization
- Define the criteria for evaluating the performance of contractors and suppliers.
- Establish a monitoring and follow-up system during the execution of the works.
Setting the procedure of communication to contractors and suppliers of work
requirements and services.
Developing contractor site orientation plan.
Element 12: Training and Performance Assurance
Setting training Matrix and Identify training needs for all SOPC Staff through a
systematic process.
Conduct a job/task analysis; determine minimum requirements (or essential elements)
for job candidates.
Establishing systematic and effective training and development programs to ensure
that each person is qualified to understand, accept, and assume the responsibilities of
process safety identified for their role.
Officially review & evaluate training and development programs to assess their
effectiveness and identify opportunities for improvement.
Setting up a system for obtaining training programs eligible for promotion and
preparing a testing and evaluation system for job vacancies, in accordance with the
requirements of the General Petroleum Corporation.
Setting up an evaluation system for companies and contracting parties to provide
training services, including evaluation of scientific materials and the competence and
experience of the lecturer / training audit and assessments and periodic review of all
programs.
Identify & address cause of poor performance and implement corrective.
Initiate Dept.:
Prepared by: Contracts Department
Initial signatures:
DEPARTMENT: CODE: Procedure code:
Material &Contracts F.C.CO.008 CP.C.CO.005
Contracts
TITLE: REVISION: C2 Page 12 of 31
Work Authorization
Initiate Dept.:
Prepared by: Contracts Department
Initial signatures:
DEPARTMENT: CODE: Procedure code:
Material &Contracts F.C.CO.008 CP.C.CO.005
Contracts
TITLE: REVISION: C2 Page 13 of 31
Work Authorization
Initiate Dept.:
Prepared by: Contracts Department
Initial signatures:
DEPARTMENT: CODE: Procedure code:
Material &Contracts F.C.CO.008 CP.C.CO.005
Contracts
TITLE: REVISION: C2 Page 14 of 31
Work Authorization
- Engage management to follow up and close out actions derived from management
reviews.
Initiate Dept.:
Prepared by: Contracts Department
Initial signatures:
DEPARTMENT: CODE: Procedure code:
Material &Contracts F.C.CO.008 CP.C.CO.005
Contracts
TITLE: REVISION: C2 Page 15 of 31
Work Authorization
Initiate Dept.:
Prepared by: Contracts Department
Initial signatures:
DEPARTMENT: CODE: Procedure code:
Material &Contracts F.C.CO.008 CP.C.CO.005
Contracts
TITLE: REVISION: C2 Page 16 of 31
Work Authorization
Initiate Dept.:
Prepared by: Contracts Department
Initial signatures:
DEPARTMENT: CODE: Procedure code:
Material &Contracts F.C.CO.008 CP.C.CO.005
Contracts
TITLE: REVISION: C2 Page 17 of 31
Work Authorization
Initiate Dept.:
Prepared by: Contracts Department
Initial signatures:
DEPARTMENT: CODE: Procedure code:
Material &Contracts F.C.CO.008 CP.C.CO.005
Contracts
TITLE: REVISION: C2 Page 18 of 31
Work Authorization
Initiate Dept.:
Prepared by: Contracts Department
Initial signatures:
DEPARTMENT: CODE: Procedure code:
Material &Contracts F.C.CO.008 CP.C.CO.005
Contracts
TITLE: REVISION: C2 Page 19 of 31
Work Authorization
Initiate Dept.:
Prepared by: Contracts Department
Initial signatures:
DEPARTMENT: CODE: Procedure code:
Material &Contracts F.C.CO.008 CP.C.CO.005
Contracts
TITLE: REVISION: C2 Page 20 of 31
Work Authorization
Initiate Dept.:
Prepared by: Contracts Department
Initial signatures:
DEPARTMENT: CODE: Procedure code:
Material &Contracts F.C.CO.008 CP.C.CO.005
Contracts
TITLE: REVISION: C2 Page 21 of 31
Work Authorization
Note
SOPC shall identify the System Owners & focal persons at the kick off meeting.
System Owners: Company representative with the power to roll out the system through the
company.
Focal persons: The selected personals from every discipline who will participate during the
system development & will be empowered to implement all its pillars.
During the kick off meeting, SOPC focal persons will be divided into teams; each will be
involved in specified technical study (Process safety studies, RBI, FMECA).
Initiate Dept.:
Prepared by: Contracts Department
Initial signatures:
DEPARTMENT: CODE: Procedure code:
Material &Contracts F.C.CO.008 CP.C.CO.005
Contracts
TITLE: REVISION: C2 Page 22 of 31
Work Authorization
Initiate Dept.:
Prepared by: Contracts Department
Initial signatures:
DEPARTMENT: CODE: Procedure code:
Material &Contracts F.C.CO.008 CP.C.CO.005
Contracts
TITLE: REVISION: C2 Page 23 of 31
Work Authorization
Overall purpose of the study is adopting a risk-based approach for establishing maintenance
and inspection strategy for the identified equipment as per scope of work.
Our Method statement is study by answering following questions:
What are the functions and associated desired standards of performance of the asset in its
present operating context (functions)?
In what ways can it fail to fulfil its functions (functional failures)?
What causes each functional failure (failure modes)?
What happens when each failure occurs (failure effects)?
In what way does each failure matter (failure consequences)?
What should be done to predict or prevent each failure (proactive tasks and task intervals)?
What should be done if a suitable proactive task cannot be found (default actions)?
Assessment will follow Risk Priority Numbering based Criticality approach. A risk is the chance
of something happening as a result of hazard or threat which will impact on business activity
or planned
event. Risk arises out of uncertainty. It is measured in terms of the likelihood of it happening
and the consequences if it does happen.
The methodology for this is FMECA. FMECA is a process used to identify and document the
functions,
functional failures, failure modes and failure effects of an item. It is used to determine the
significance of functional failures in terms of Safety, Environment, Operations, and Economics.
FMECA analyses would include some effort to prioritize issues in order to determine the
sequence and time-frame for the corrective actions that will be performed. The methods used
to set this priority is Risk Priority Numbers.
A risk is the chance of something happening as a result of hazard or threat which will impact
on business activity or planned event. Risk arises out of uncertainty. It is measured in terms of
the likelihood of it happening and the consequences if it does happen.
RCM Deliverables
Initiate Dept.:
Prepared by: Contracts Department
Initial signatures:
DEPARTMENT: CODE: Procedure code:
Material &Contracts F.C.CO.008 CP.C.CO.005
Contracts
TITLE: REVISION: C2 Page 24 of 31
Work Authorization
Deliverables upon completion of the study is the study worksheet for the rotating equipment
for SOPC units (previously determined above) identify the function, functional failure, effect,
Si, classification, failure mode, occurrence, control, control type, DI, RPNI, action.
7- Inputs Requirements
The following are required per each unit – to be provided from SOPC (If available) prior to the
studies.
- General plot plan of each unit.
- Process Schematic for each unit either in DCS screenshot form or any other useful form
- Operating manual for individual unit – in consolidated single document in pdf form
- PFD (all set) –in pdf form
- P&ID (all set) –in pdf form
- Material balance –pdf and native EXCEL form
- Energy balance –in pdf and native EXCEL form
- MSD (Material selection diagram) –in pdf form
- Equipment redundancy / service level
- Equipment Data Sheet – Process and Mechanical
- Equipment Drawings – General arrangement and Detailed drawing – in pdf form
- Mechanical line list – in pdf and native EXCEL form
- Piping class/ line class/ piping specification document – in pdf consolidated form
- Insulation line list
- Inputs in Excel form including the information about PRV including following information:
Type of PRV (Conventional / Balanced Bellow / Pilot Operated / with Rupture disk).
PRV discharge location (Atmosphere / Flare / Closed)
Operating, Design and Release set pressure
MOC of Valve trim and spring exposed to process fluid
Fluid service severity that might jeopardize valve disk free movement (Mild, Moderate,
Severe)
Initiate Dept.:
Prepared by: Contracts Department
Initial signatures:
DEPARTMENT: CODE: Procedure code:
Material &Contracts F.C.CO.008 CP.C.CO.005
Contracts
TITLE: REVISION: C2 Page 25 of 31
Work Authorization
Overpressure case of the protected equipment / piping circuit for which PRV is
designed.
- A consolidated report listing the last intrusively inspected dates in past for respective
equipment
- Major Inspection Reports for last three (3) occasions for respective static equipment
- Major Maintenance / repair report for last three (3) occasions for respective rotating
equipment
- Other relevant information pertaining to maintenance history
- Track records related to plant upset
- Additional information related to the specific chemical composition of the handled fluid
services
- Service start date, most conservative operating case for the unit
- Previous RCAs related to the equipment. (If any)
- CMMS historical data and maintenance plans
- Rotating equipment manuals.
- Condition monitoring reports where applicable
- Inspection history
- Preventive maintenance, condition monitoring, inspection and operator inspection &
monitoring program
- Current basis of determination of Severity, Occurrence and Detection classification / rating
(number)
- Company maintenance and inspection philosophy / strategy / program.
In addition, SOPC should clarify the following (If available) as these inputs will form the basic
basis of RBI study and are required to be entered in the software setting prior to starting RBI
assessment.
Company’s risk matrix including the info, on 1) POF & Damage Factor Ranges, 2) COF
categories & its ranges and 3) Risk Categories with Matrix cell settings
Initiate Dept.:
Prepared by: Contracts Department
Initial signatures:
DEPARTMENT: CODE: Procedure code:
Material &Contracts F.C.CO.008 CP.C.CO.005
Contracts
TITLE: REVISION: C2 Page 26 of 31
Work Authorization
Typical Outage days for different failure modes (small hole, medium hole, large hole and
rupture) for different equipment types and piping circuit sizes (maximum NB)
Production down time cost @ day for individual unit, impact on unit production by
unavailability of respective individual equipment and piping circuit
Total equipment cost for individual unit
Population Density for individual unit and Injury cost @ fatality
Maximum Acceptable Risk Target in form of Damage Factor, Affected Area, Total Cost,
PLL
Maximum and Minimum cap of Inspection Interval generally adopted by company.
Service start date, Current evaluation date and Future evaluation date for RBI assessment
Important Note
EPROM assumes availability of all above mentioned required data. Incase of any unavailable
data, EPROM will conduct the study - if possible- in conservative manner based on
engineering assumption. All the assumption will be submitted in questionnaire form & SOPC to
fill & approve it in time to proceed in the study.
8- Asset count
The asset count to undergo the RBI & RCM studies are as follow-
SN Unit Asset count
346 Fixed equipment
1 Process units 172 pumps + 15 compressors
14700 piping tag
550 PSV
160 Fixed equipment
2 Utilities & tank farms 320 pumps + 6 compressors + 1 turbine
6000 piping tag
250 PSV
Any addition or submission will have an impact on the project time frame & cost.
Initiate Dept.:
Prepared by: Contracts Department
Initial signatures:
DEPARTMENT: CODE: Procedure code:
Material &Contracts F.C.CO.008 CP.C.CO.005
Contracts
TITLE: REVISION: C2 Page 27 of 31
Work Authorization
Any additional asset over the above-mentioned table will be considered as extra cost. The
cost will be clarified in a “cost time & resources” documentation prior any work, SOPC
approval on the CTR is mandatory to proceed.
9- Training
9.1 In addition to the awareness & shadowing with SOPC focal persons, we offer capacity
building training program as follow-
1- Top & senior managers (2 waves, 15 trainees per wave) for 2 days.
2- Engineers (7 waves, 15 trainees per wave) for 5 days.
3- Technicians (134 waves, 15 trainees per wave) for 1 day.
9.2 Apply a safe operation course training for 250 operating personnel (10 waves, 25 trainees
per wave) for 5 days.
9.3 Provide training on the delivered RBI software for SOPC RBI team for 2 weeks.
Note:
Training shall be carried out at SOPC. SOPC to provide the proper training rooms.
The training evidence (attendance sheet, evaluated test) will be provided.
11-Deliverables
1- GAP Analysis report.
Initiate Dept.:
Prepared by: Contracts Department
Initial signatures:
DEPARTMENT: CODE: Procedure code:
Material &Contracts F.C.CO.008 CP.C.CO.005
Contracts
TITLE: REVISION: C2 Page 28 of 31
Work Authorization
2- A PSM system as per CCPS cover the 20 elements as mentioned in details above &
included the following-
Incentive & Disciplinary program.
Action tracking system.
Non-routine work lists.
Audit program & related documents.
PSM competency & training assurance program.
SCE register.
PSM lesson learn plan (beacon).
PSV Maintenance procedure.
KPIs follow-up procedure.
PSM manual.
Fitness for duty program.
3- Deliver RBI software as mentioned in clause 5.0
4- A training program as mentioned in details in clause 9.0
5- Deliver an engineering library as mentioned in details in clause 10.0
6- Reporting:
EPROM will provide a progress report for all activities (monthly) to SOPC.
Communication Matrix to be provided. “Indicating intervals & approval method “
12-WORK LOCATION
- SOPC
- EPROM Headquarters (Alexandria).
Responsibility for site configuration is as below
Item SOPC EPROM
10 Laptops R
TCF for EPROM team R
Suitable empty area for TCF R
Utilities for the TCF & offices (water,
R
sewer, electricity, telephone line, internet)
4 Offices for achieving (1) R
Offices furniture R
(1) : SOPC to provide 4 offices (2 for archiving & 2 for the working team) each room shall
be able to accommodate 5 engineers.
Initiate Dept.:
Prepared by: Contracts Department
Initial signatures:
DEPARTMENT: CODE: Procedure code:
Material &Contracts F.C.CO.008 CP.C.CO.005
Contracts
TITLE: REVISION: C2 Page 29 of 31
Work Authorization
13- ORGANIZATION
EPROM Project team will comprise of highly qualified engineers covering a vast range of specialties as
shown in the following table:
1 Project Manager 1 9
2 Focal point 2 8
3 Process safety engineer 4 8
4 Functional safety engineer 2 8
5 Operation engineer 2 8
6 Process engineer 2 8
7 Asset integrity leader 1 8
8 RBI engineer 1 8
9 Reliability RCM engineer 1 8
10 Rotating engineer 2 8
11 Instrumentation engineer 3 8
12 Electrical engineer 2 8
13 Static & piping engineer 2 8
14 Corrosion engineer 1 8
15 Inspection engineer 3 8
16 DCC 1 8
17 Planner 1 8
18 Helper 4 3
Initiate Dept.:
Prepared by: Contracts Department
Initial signatures:
DEPARTMENT: CODE: Procedure code:
Material &Contracts F.C.CO.008 CP.C.CO.005
Contracts
TITLE: REVISION: C2 Page 30 of 31
Work Authorization
The preliminary project schedule is 41 months as presented in Gantt chart as per attachment #1.
The presented schedule is based on the asset count shown in clause 8.0 & in consistence with the
responsibility matrix shown in clause 4.2. Any additional asset or scope will have an impact on the
estimated project duration.
The estimated project may subject to modification after mutual approval between EPROM & SOPC.
Contracts
TITLE: REVISION: C2 Page 31 of 31
Work Authorization
Payment terms
Initiate Dept.:
Prepared by: Contracts Department
Initial signatures: