0% found this document useful (0 votes)
25 views

Crc Team Building Program 2023

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
25 views

Crc Team Building Program 2023

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 7

FOR RESERVATIONS, PLEASE CONTACT:

MONICA ELLA F. TIGAS


OFFICE NO. 632 1010 loc. 435
MOBILE NO. 0917-868-3551(GLOBE)
E-mail: [email protected]

CALIRAYA RESORT CLUB, INC.


SPORTS AND RECREATION DEPARTMENT TEAMBUILDING
PROGRAM

RATIONALE
In line with the commitment of providing guest with utmost delight and to continuously entice the interest of
would be patrons in lieu of the exciting recreational offerings and services, Caliraya Resort Club has
institutionalized its inhouse teambuilding with facilitator.

TEAMBUILDING PROGRAM
These Teambuilding activities are mainly focused in building a high performing team using simple activities with
relevant and significant learning values towards the attainment of objectives and goals. These high energy and
exciting teambuilding programs uses carefully sequenced group initiatives to develop understanding and build the
effectiveness of the group while still having fun!

OBJECTIVES
The overall objective is to achieve high performance. Our aim primarily is to motivate and inspire groups/entities
to strive in the attainment of this objective by means of embracing the mindset of having a Super team rather
than having superstars. With the use of ideal group activities and exercises, we could develop teams to become
cohesive units of individuals that can effectively work together to achieve goals.

Other purposes includes:


• Improve communication
• To develop good working relationship with team members and giving them experience of working with different
team members
• To establish a positive team culture, the beliefs, values and norms of behavior
• To motivate team members
• To establish the role of the leader in building a TEAM
• Helping members to learn more about themselves and peers (strength and weaknesses)
• Improving team productivity

PROGRAMS
Since programs are custom designed, groups can request small or large group activities as they prefer. All
activities are low impact and designed for all ability levels. Safety measures are paramount in all the programs.
Preferred activities may vary based on our assessment of the client’s need.
Designed activities differ from bonding exercises, group dynamics games, team recreation and sports games.

***** OPTION TIME FOR TEAMBUILDING *****


AM: 08:00 – 10:00AM & 10:00 – 12:00NN
PM: 01:00 – 03:00PM & 03:00 – 05:00PM
*rates are subject to change without prior notice
TEAMBUILDING PROGRAM SELECTION
(minimum of 20 pax)
PROGRAM 1: SELECTION OF 4 TEAM BUILDING GAMES PROGRAM 2: Cost: P 180.00/pax
Cost: P 120.00/pax
SQUID GAMES
- Air Lock Game 1: Red Light, Green Light
- All Aboard Game 2:The Graham Tricks
- Blind Polygon Game 3: Step Yes, Step No
- Canoe Relay Game 4: The Marble Game
- Earth Ball Challenge Game 5: Tug of War
- Electric Fence PROGRAM 3: Cost: P 220.00/pax
- Helium Stick
- Magic Carpet OPTION 1: AMAZING RACE
- Mine Field - Puzzle Game
- Obstacle Course - Wall Climbing or Rapelling
- Sack Wheel Race - Swimming Pool (object search)
- Slide Pinoy Relay - Canoe Race
- Slip & Slide (Mud Slide) - Obstacle Course
- Spider’s Web - Slip N Slide
- Traffic Jam
- Unity Walk OPTION 2: SELECTION OF 8 GAMES
- Human Overhand Knot
- Blind Drawing PROGRAM 4: Cost: P 280.00/pax
- Leaky Pipe
- Tower of Hanoi OPTION 1: AMAZING RACE plus 4 GAMES
- Building Blocks
OPTION 2: SELECTION OF 10 GAMES
PROGRAM SELECTION

Program 1 P 120.00/pax – Selection of Four (4) Team Building Activities

It may take 1 to 2 hours depending on the capability of the group and number of participating team.
This program is ideal for a group of 20 to 40 participants. The group can choose from a list of teambuilding
activities (see below) depending on the objectives or learning values they would like to highlight.

Program 2 P 180.00/pax – The Caliraya Squid Games


These newest selections are inspired by the hit Netflix Series but make sure that it will be more fun (no
killings), more on group efforts, strategies, team works and everyone may play up to the finale round.

Program 3 P 220.00/pax

Option 1: Selection of Caliraya Race Course


It may take 1 to 2 hours depending on the capability of the group and number of participating team.
This program is ideal for groups which can form a minimum of 2 to 4 teams (min. of 10 pax/team). Group can
choose from the list of course depending on their objectives and demographics.

Adventure Race aka Amazing Race

Groups must race around the resort and complete task with special marker (Detour,
RoadBlock). This exercise will test each member’s skills individually and how they distribute the task to
each member of the team.

Option 2: Selection of Eight (8) Team Building Activities

This program is ideal for a group with 60 to 80 participants who would prefer to have a whole day
activity. Usually, this program is divided into two (2) segments wherein half of the program will be done in the
morning and the other half in the afternoon. This program is more physically challenging because of the number
of activities.

Program 3 P280.00/pax

It may take 2 to 4 hours depending on the capability of the group and number of participants.

Option 1: Amazing Race plus selection of 4 games

This program is ideal for a group of 20 to 40 participants who prefer to have a whole day activities. It
can be divided into two segments wherein four (4) games will be conducted in the morning and the race in the
afternoon. This program is suitable for groups who want to have more bonding with each other.

Option 3: Selection of Ten (10) Team Building Activities

This program is ideal for a group with 80-100 participants who would prefer to have a whole day activity.
Usually, this program is divided into two (2) segments wherein half of the program will be done in the morning
and the other half in the afternoon. This program is more physically challenging because of the number of
activities.
Team Building Activities Selections for 4 games, 8 games or 10 games

Team Building Activities Selections

Air Lock
A teambuilding activity that emphasizes communication, careful steady movement,
and team coordination. All members of the team will be linked by being tied to one
another, ankle to ankle and must pass through a hula hoop.

All Aboard
This event challenges the group to get everyone on top of a platform for a negotiated
period of time (normally a long 5 seconds). Yes, each member must have both feet
off the ground. This challenge is a good warm-up initiative to get the team
communicating and working together.

Blind Polygon
The team must form a square, star or other geometric shape with a piece of rope (if
they can find it) while blindfolded. Once they find the length of rope, real
communication and cooperation will be required to work synergistically to form the
shape.

Canoe relay
Teams will ride a canoe and paddle going to a certain point then back.

Earth ball Challenge


Teams will compete against each other. They will be playing a game similar to a
volleyball game except that they will be using an 8 foot ball. Alternate service is
applied regardless who wins the serve. Teamwork, communication, participation and
cooperation are needed.
Electric Fence
The object is for the entire team to get over the "electric fence" (the string or rope)
without getting "electrocuted" (touching the rope). No going under either! Only one
team member can go over at a time, but can be helped by team-mates. Other team
members can help any way they want, but once a person is over the fence, they must
stay over the fence and may not come back around to help anyone. So the last person
each time must somehow get over the fence without help from the other side. This
game requires lots of teamwork and cooperation.

Helium Stick
Deceptively simple but powerful exercise for learning how to work together and
communicate. The challenge is to lower the Helium Stick (rod) to the ground with
every member’s index finger in contact with the rod.

Magic Carpet
This activity involves communication and teamwork. The team is on a magic carpet
ride and must turn the carpet over without touching the ground surrounding the
magic carpet.

Mine Field
This engaging activity involves communication and trust. Members direct their
blindfolded team mate through a mine field of objects.

Obstacle Course
Teams must go through an obstacle course one by one.

Sack Wheel Race


Teams will get into a giant sack looking like a tank wheel. And the wheels have a race.

Slide Pinoy Relay


One by one, members must slide down the Slide Pinoy, dismounting safely and run
back to give the seat for the next member to ride. First team to finish wins.
Slip and Slide
Each member of the team will be given a plastic cup to be filled with water at the start
of the slide. Only one person at a time is allowed to slide and transfer the water from
their plastic cup to the empty container.

Spider’s Web
A 'web' is placed between two poles with varying sized spaces. The objective is to
move the entire team through the web, without touching the cord and using each
opening only once. One of the most popular and exciting events, it helps a team
effectively determine roles.

Traffic Jam
You just got to do it to understand. The team is broken down into two sides. Each
group faces toward the middle. They must switch sides without passing anyone facing
the same direction.

Unity walk
The component is constructed of two boards with numerous ropes attached to each
board. The group uses the two boards to cross a specified distance, without touching
the ground.

Human Overhand Knot


For the group to tie an overhand knot in the middle section of rope without anyone
releasing their ropes.

Blind Drawing
In this activity, the team has to instruct their “artist” to draw an item. They have to
describe their chosen item without revealing what it is and they are not able to see
what the “artist” is drawing. At the end of the activity, the team whose drawing is
closest to the actual item wins.
Leaky Pipe
Team’s race against the clock to try and retrieve a ping pong ball placed at the bottom
of a leaky pipe. To do this they are provided with a bucket of water and several cups.
Teams are required to use good teamwork and problem solving skills to complete the
challenge.

Tower of Hanoi
The team is presented with the challenge of organising a stack of tyres in a set order
but on a different post. There are a total of three posts and five tyres, moving just one
tyre at a time, transfer the tyres from the post they are currently on to another set
post. The group cannot put a larger tyre on a smaller tyre and they stack of tyres must
look the same as they do to begin with.

Building Blocks
Several blocks will be given to a team and needs to copy a replica which is far away
from their working station.

You might also like